100% Design, B501 Mission Planning Cell
Solicitation number
FA449725R0011
Issued by

About this file

This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for a small business set-aside design contract. Amendment No. 0001 modifies the original solicitation FA449725R0011 for a 100% Design project for a B501 Mission Planning Cell, with a contract performance period of 330 calendar days and a project magnitude between $500,000 and $1,000,000.

Key changes include extending the proposal due date from 30 April 2025 to Noon on 30 May 2025, EST, incorporating a 2nd site visit date and time, and updating the questions and answer period. The contract will be Firm Fixed Price (FFP), with a site visit scheduled for 21 April 2025 at 10:00 AM EST. Offerors must submit one electronic copy no larger than 10MB via email by Noon EST on 30 April 2025, with points of contact being Princess Rivera (Contract Admin) and Anna George (Contract Officer), both from the Department of the Air Force Air Mobility Command.

View the file

Other files

File Type Posted
Amendment No. 3_Solicitation No. FA449725R00110003.pdf PDF
4. Solictation Questions and Answers Document_B501.pdf PDF
1H. SOW Attachment 8 - Dover AFB OPSEC Awareness Guide for Contractors.pdf PDF
1I. SOW Attachment 9 - Dover AFB AT Awareness for Contractors Trifold Apr 24.pdf PDF
1G. SOW Attachment 7 - B500 Renovation Layout.pdf PDF
1. SOW_B501_AE 100pct Design_15 May 2025.pdf PDF
1J. SOW Attachment 10 - Dover AFB AT Awareness Guide for Contractors (Apr 24).pdf PDF
Amendment No. 2_Solicitation No. FA449725R00110002.pdf PDF
1B. SOW Attachment 2 - B501 Current Floor Plan.pdf PDF
1H. SOW Attachment 8 - DAFB AT Awareness for Contractors Trifold Apr 24.pdf PDF
1G. SOW Attachment 7 - Dover AFB OPSEC Awareness Guide for Contractors.pdf PDF
2. Bid Schedule_Bldg. 501 Mission Planning Cell.xlsx XLSX spreadsheet
1D. SOW Attachment 4 - B501 Generator Authorization Request.pdf PDF
1I. SOW Attachment 9 - DAFB AT Awareness Guide for Contractors (Apr 24).pdf PDF
1F. SOW Attachment 6 - A-E Requirements for Cost Estimates.pdf PDF
1. SOW_B501_AE 100pct Design_3 April 2025.pdf PDF
1E. SOW Attachment 5 - 1391 Template.docx DOCX document
Solicitation - FA449725R0011.pdf PDF
3. WD 2015-4217, Rev No. 29, dated 23 Dec 2024.pdf PDF
1A. SOW Attachment 1 - MPC Construction Security Plan (CSP).pdf PDF
1C. SOW Attachment 3 - B501 Initial Concept Renovation Floor Plan.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .