1G. SOW Attachment 7 - Dover AFB OPSEC Awareness Guide for Contractors.pdf

PDF 163 KB Posted

Attached to
100% Design, B501 Mission Planning Cell
Solicitation number
FA449725R0011
Issued by

About this file

The document is an Operations Security (OPSEC) Awareness Guide for contractors working at Dover Air Force Base, providing detailed security guidance across six critical areas: Personal Identifiable Information, Mission Capabilities, Force Readiness, Force Structure, Exercises and Plans, and Physical Infrastructure. The guide emphasizes strict information protection protocols, including using encryption for electronic communications, adhering to 100% shredding policies, limiting information access to authorized personnel with a "need to know" basis, and avoiding public discussions or postings of sensitive contract-related details. Key security measures include protecting personal information like Social Security numbers, restricting access to mission-sensitive data such as aircraft and logistics information, ensuring secure communication channels, and controlling transmission of technical details, diagrams, maps, and imagery only to specifically authorized individuals like Project Managers, Contracting Officers, and designated representatives.

View the file

Other files

File Type Posted
Amendment No. 3_Solicitation No. FA449725R00110003.pdf PDF
4. Solictation Questions and Answers Document_B501.pdf PDF
1H. SOW Attachment 8 - Dover AFB OPSEC Awareness Guide for Contractors.pdf PDF
1I. SOW Attachment 9 - Dover AFB AT Awareness for Contractors Trifold Apr 24.pdf PDF
1G. SOW Attachment 7 - B500 Renovation Layout.pdf PDF
1. SOW_B501_AE 100pct Design_15 May 2025.pdf PDF
1J. SOW Attachment 10 - Dover AFB AT Awareness Guide for Contractors (Apr 24).pdf PDF
Amendment No. 2_Solicitation No. FA449725R00110002.pdf PDF
Amendment No. 1_FA449725R0011 0001.pdf PDF
1B. SOW Attachment 2 - B501 Current Floor Plan.pdf PDF
1H. SOW Attachment 8 - DAFB AT Awareness for Contractors Trifold Apr 24.pdf PDF
2. Bid Schedule_Bldg. 501 Mission Planning Cell.xlsx XLSX spreadsheet
1D. SOW Attachment 4 - B501 Generator Authorization Request.pdf PDF
1I. SOW Attachment 9 - DAFB AT Awareness Guide for Contractors (Apr 24).pdf PDF
1F. SOW Attachment 6 - A-E Requirements for Cost Estimates.pdf PDF
1. SOW_B501_AE 100pct Design_3 April 2025.pdf PDF
1E. SOW Attachment 5 - 1391 Template.docx DOCX document
Solicitation - FA449725R0011.pdf PDF
3. WD 2015-4217, Rev No. 29, dated 23 Dec 2024.pdf PDF
1A. SOW Attachment 1 - MPC Construction Security Plan (CSP).pdf PDF
1C. SOW Attachment 3 - B501 Initial Concept Renovation Floor Plan.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dover AFB OPSEC Awareness Guide for Contractors

INFORMATION COUNTERMEASURES

Security Measures Report suspicious behavior immediately Personal Identifiable

Information (PII) (Privacy Act) Use personal info only when required, utilize Privacy Act coversheets, adhere to 100% shred policy, encrypt when emailing, password protect documents when encryption is not available. Do not display info in public areas and verify need to know. Personal Info includes, but is not limited to:

SSANs, home addresses, and family members.

Mission Capabilities Restrict access to sensitive information such as aircraft, personnel, logistics, and supplies. Protect resources, follow a strict shredding policy, ensure sensitive facts are secure, and limit access to status boards.

Force Readiness Ensure secure communication by using email encryption when discussing information such as role of personnel, equipment, and manning strength reports. Do so only in authorized settings with authorized personnel. Use secure communication channels, controlling access to information, and limiting access to those who need to know.

Force Structure Avoid posting information relating to force structure procedures or email correspondence in public areas, follow a strict shredding policy, encrypt emails, and password protect documents when encryption is not possible to ensure sensitive information remains secure.

Exercises and Plans Reveal only technical details of mission related materials to those that need to know such as Project Manager, Inspector, Contracting Officer Representative, Contracting Specialist, and Contracting Officer. Do not post on social media any information relating to the contract or any events or situations occurring in government's premises. Adhere to

100% shred policy.

Physical Infrastructure Only disclose information such as diagrams, detailed maps, or any type of imagery, among others, to authorized personnel. Transmit information over approved channels, avoid discussing in open environments, and limit access to those who need to know.

File details come from the government source that posted it. Updated .