1D. SOW Attachment 4 - B501 Generator Authorization Request.pdf

PDF 2 MB Posted

Attached to
100% Design, B501 Mission Planning Cell
Solicitation number
FA449725R0011
Issued by

About this file

The document is a placeholder PDF page displaying technical loading instructions for Adobe Reader, with no actual contract document content visible. Based on the file metadata provided, this appears to be an attachment (Attachment 4) related to a B501 Generator Authorization Request for a Department of the Air Force Air Mobility Command solicitation.

The associated federal contract opportunity (Solicitation FA449725R0011) is for 100% Design of a Mission Planning Cell, set aside exclusively for small businesses. Key details include a $500,000-$1,000,000 project magnitude, 330-calendar day performance period, NAICS Code 541310, and a Firm Fixed Price contract type. Critical dates include a site visit on 21 April 2025, base access information due by 15 April 2025, questions due by 23 April 2025, and proposal submissions due by 30 April 2025 at Noon EST. Notably, funds are currently unavailable, and the government reserves the right to cancel the solicitation.

View the file

Other files

File Type Posted
Amendment No. 3_Solicitation No. FA449725R00110003.pdf PDF
4. Solictation Questions and Answers Document_B501.pdf PDF
1H. SOW Attachment 8 - Dover AFB OPSEC Awareness Guide for Contractors.pdf PDF
1I. SOW Attachment 9 - Dover AFB AT Awareness for Contractors Trifold Apr 24.pdf PDF
1G. SOW Attachment 7 - B500 Renovation Layout.pdf PDF
1. SOW_B501_AE 100pct Design_15 May 2025.pdf PDF
1J. SOW Attachment 10 - Dover AFB AT Awareness Guide for Contractors (Apr 24).pdf PDF
Amendment No. 2_Solicitation No. FA449725R00110002.pdf PDF
Amendment No. 1_FA449725R0011 0001.pdf PDF
1B. SOW Attachment 2 - B501 Current Floor Plan.pdf PDF
1H. SOW Attachment 8 - DAFB AT Awareness for Contractors Trifold Apr 24.pdf PDF
1G. SOW Attachment 7 - Dover AFB OPSEC Awareness Guide for Contractors.pdf PDF
2. Bid Schedule_Bldg. 501 Mission Planning Cell.xlsx XLSX spreadsheet
1I. SOW Attachment 9 - DAFB AT Awareness Guide for Contractors (Apr 24).pdf PDF
1F. SOW Attachment 6 - A-E Requirements for Cost Estimates.pdf PDF
1. SOW_B501_AE 100pct Design_3 April 2025.pdf PDF
1E. SOW Attachment 5 - 1391 Template.docx DOCX document
Solicitation - FA449725R0011.pdf PDF
3. WD 2015-4217, Rev No. 29, dated 23 Dec 2024.pdf PDF
1A. SOW Attachment 1 - MPC Construction Security Plan (CSP).pdf PDF
1C. SOW Attachment 3 - B501 Initial Concept Renovation Floor Plan.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

GENERATOR AUTHORIZATION AND DESIGN APPROVAL REQUEST

I. PROJECT INFORMATION - TO BE COMPLETED BY INSTALLATION OR DESIGN AGENT

7. PROJECT STATUS:

31. ATTACHMENTS: (ALL REQUIRED)

COPS FACILITIES MUST BE INDICATED ON DD 1391; REQUIRES AFCEC APPROVAL

PROPOSED GENSET RATINGS:

II. BASE CIVIL ENGINEER / DESIGNATED REPRESENTATIVE

IV. AFCEC GENERATOR AUTHORIZATION/CLASSIFICATION

(REVERSE)

AFCEC/CO ENDORSEMENT REQUIRED FOR DISAPPROVAL OF GENERATOR AUTHORIZATION

III. MAJCOM ENDORSEMENT

9.0.0.2.20120627.2.874785

CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 1
TextField1: Existing RPIE Generator Authorization
TextField1: Dover Air-force Base
TextField1: WT 13793272
TextField1: Base Operations
TextField1: 501
DropDownList3: AMC
TextField2: Impact of power lost on mission: Without a reliable emergency generator, all of the airfield management controls flight line operations, take off, landing, mission planning, intelligence processing and processing of survival kits would be compromised.

Emergency Classification: Other Permanently Installed AFI 32-1062 3.1.26. “Intelligence processing facilities providing mission-essential support to combat and contingency tactical missions [Other Permanently Installed]. (T-2)."

CheckBox3: 0
CheckBox3: 0
DropDownList1: RPIE
DropDownList1: RPIE
DropDownList2: OTHER PERMANENTLY INSTALLED
DropDownList2: OTHER PERMANENTLY INSTALLED
CheckBox5: 0
TextField3: Margaret Thompson
TextField3: Utility AMP
TextField3: margaret.thompson.6@us.af.mil
TextField3: 445-4881
CheckBox2: 0
CheckBox2: 0
CheckBox2: 0
CheckBox4: 1
CheckBox4: 0
TextField7: 208
TextField7: 80
TextField7: 100
TextField7: 0.80
TextField7: 51
TextField7: 600
TextField7: 600
TextField7: 2000
CheckBox9: 0
CheckBox10: 0
CheckBox10: 0
SignatureField2:
SignatureField3:
TextField4: 1. Based on design information provided and because of the base's geographic location, an 80kW RPIE generator is

approved for building 501, Base Operations facility, Dover AFB, DE.

2. Generator classification is "Other Permanently Installed." Installation must comply with NFPA 70, Article 701 and NFPA 110 Level 2 criteria.

3. Meets AFMAN 32-1062 and UFC 3-540-07 criteria.

4. Any change in design, prior to or during construction, that results in a change to the electrical load calculations will require a re-submittal.

5. Provide two copies of this signed authorization to the Power Production NCOIC upon receipt of this signed document.

CheckBox7: 0
CheckBox6: 0
TextField5: JOSHUA R. YERK, Lt Col, USAF

436 CES/CC

DOVER AFB, DOVER DE

TextField6: 19 Dec 23
TextField6: 445-6768
TextField8: 80