1B. SOW Attachment 2 - B501 Current Floor Plan.pdf

PDF 198 KB Posted

Attached to
100% Design, B501 Mission Planning Cell
Solicitation number
FA449725R0011
Issued by

About this file

Based on the file description, this appears to be a Statement of Work (SOW) Attachment specifically related to a B501 Mission Planning Cell design project. The solicitation is a small business set-aside for architectural and engineering design services for a construction project, with a contract value between $500,000 and $1,000,000. Key details include a 330-calendar day performance period, Firm Fixed Price (FFP) contract type, and a NAICS code of 541310 with a size standard of $12,500,000.

Critical submission dates include a site visit on 21 April 2025 at 10:00 AM EST, with access request information due by 15 April 2025. Questions must be submitted by 1:00 PM EST on 23 April 2025, and offerors are required to submit one electronic copy no larger than 10MB by Noon EST on 30 April 2025. The solicitation is issued by the Department of the Air Force Air Mobility Command, with contract points of contact being Princess Rivera (Contract Admin) and Anna George (Contract Officer). Notably, funds are not currently available, and the government reserves the right to cancel the solicitation.

View the file

Other files

File Type Posted
Amendment No. 3_Solicitation No. FA449725R00110003.pdf PDF
4. Solictation Questions and Answers Document_B501.pdf PDF
1H. SOW Attachment 8 - Dover AFB OPSEC Awareness Guide for Contractors.pdf PDF
1I. SOW Attachment 9 - Dover AFB AT Awareness for Contractors Trifold Apr 24.pdf PDF
1G. SOW Attachment 7 - B500 Renovation Layout.pdf PDF
1. SOW_B501_AE 100pct Design_15 May 2025.pdf PDF
1J. SOW Attachment 10 - Dover AFB AT Awareness Guide for Contractors (Apr 24).pdf PDF
Amendment No. 2_Solicitation No. FA449725R00110002.pdf PDF
Amendment No. 1_FA449725R0011 0001.pdf PDF
1H. SOW Attachment 8 - DAFB AT Awareness for Contractors Trifold Apr 24.pdf PDF
1G. SOW Attachment 7 - Dover AFB OPSEC Awareness Guide for Contractors.pdf PDF
2. Bid Schedule_Bldg. 501 Mission Planning Cell.xlsx XLSX spreadsheet
1D. SOW Attachment 4 - B501 Generator Authorization Request.pdf PDF
1I. SOW Attachment 9 - DAFB AT Awareness Guide for Contractors (Apr 24).pdf PDF
1F. SOW Attachment 6 - A-E Requirements for Cost Estimates.pdf PDF
1. SOW_B501_AE 100pct Design_3 April 2025.pdf PDF
1E. SOW Attachment 5 - 1391 Template.docx DOCX document
Solicitation - FA449725R0011.pdf PDF
3. WD 2015-4217, Rev No. 29, dated 23 Dec 2024.pdf PDF
1A. SOW Attachment 1 - MPC Construction Security Plan (CSP).pdf PDF
1C. SOW Attachment 3 - B501 Initial Concept Renovation Floor Plan.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .