1E. SOW Attachment 5 - 1391 Template.docx

DOCX document 47 KB Posted

Attached to
100% Design, B501 Mission Planning Cell
Solicitation number
FA449725R0011
Issued by

About this file

The document is a DD Form 1391 Military Construction Project Data Template, detailing a comprehensive facility renovation and repair project for an Air Force installation. The template provides a structured framework for documenting project scope, cost estimates, and mission-critical requirements, with specific focus on repair and maintenance (R&M) work categories including electrical, mechanical, structural, and fire protection improvements. The project involves various work elements such as repairing collateral facility damage, replacing infrastructure components like roofs and HVAC systems, and potentially expanding facility footprints, with cost classifications ranging across different Engineering and Installation Cost (EEIC) codes.

Key project characteristics include a potential project cost between $500,000 and $1,000,000, targeting facility improvements to support mission requirements, with emphasis on operational efficiency and meeting current standards. The template requires detailed documentation of the project's necessity, including mission impacts, facility condition assessments, and potential consequences of not completing the work. The document also includes certification sections for civil engineering review, joint use considerations, and compliance with various technical and regulatory rules, such as seismic, anti-terrorism, fire protection, and sustainability guidelines.

View the file

Other files

File Type Posted
Amendment No. 3_Solicitation No. FA449725R00110003.pdf PDF
4. Solictation Questions and Answers Document_B501.pdf PDF
1H. SOW Attachment 8 - Dover AFB OPSEC Awareness Guide for Contractors.pdf PDF
1I. SOW Attachment 9 - Dover AFB AT Awareness for Contractors Trifold Apr 24.pdf PDF
1G. SOW Attachment 7 - B500 Renovation Layout.pdf PDF
1. SOW_B501_AE 100pct Design_15 May 2025.pdf PDF
1J. SOW Attachment 10 - Dover AFB AT Awareness Guide for Contractors (Apr 24).pdf PDF
Amendment No. 2_Solicitation No. FA449725R00110002.pdf PDF
Amendment No. 1_FA449725R0011 0001.pdf PDF
1B. SOW Attachment 2 - B501 Current Floor Plan.pdf PDF
1H. SOW Attachment 8 - DAFB AT Awareness for Contractors Trifold Apr 24.pdf PDF
1G. SOW Attachment 7 - Dover AFB OPSEC Awareness Guide for Contractors.pdf PDF
2. Bid Schedule_Bldg. 501 Mission Planning Cell.xlsx XLSX spreadsheet
1D. SOW Attachment 4 - B501 Generator Authorization Request.pdf PDF
1I. SOW Attachment 9 - DAFB AT Awareness Guide for Contractors (Apr 24).pdf PDF
1F. SOW Attachment 6 - A-E Requirements for Cost Estimates.pdf PDF
1. SOW_B501_AE 100pct Design_3 April 2025.pdf PDF
Solicitation - FA449725R0011.pdf PDF
3. WD 2015-4217, Rev No. 29, dated 23 Dec 2024.pdf PDF
1A. SOW Attachment 1 - MPC Construction Security Plan (CSP).pdf PDF
1C. SOW Attachment 3 - B501 Initial Concept Renovation Floor Plan.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. COMPONENT

MAJCOM

FY 20XX MILITARY CONSTRUCTION PROJECT DATA

2. DATE

Dated when routed for sig

3. INSTALLATION AND LOCATION

BASE, STATE or COUNTRY

4. PROJECT TITLE:

RPR/Renovate/CNS/Add/Consolidate/Demo, Fac name, Bldg # Include all work class--“Umbrella” for mult prjs—multi facs listed in block 11

5. PROGRAM ELEMENT

Sust ***78 (EEIC 521 or 524) R&M ***76 (EEIC 522 or 529 If multi list in block 11

6. CATEGORY CODE

Single use - Use “A Line” Multi use – Use “D Line” Verify using RPAD

7. PROJECT NUMBER

PROJECT NUMBER

8. PROJECT COST ($000)

EEIC 52X – $000K (Funded Cost) Include design cost if DB multi EEIC - ref block 11

9. COST ESTIMATE

ITEM

UOM
QTY
UNIT COST
COST ($000)

- (EEIC 52X) identifiable element of work

SM

- (52X) Electrical

SY
If a lump sum cost is used in this block, use a DD1391 to provide a detailed estimate

- (52X) Mechanical

EA

- (52X) Structural

SF

- (52X) Fire Protection

- (52X) AT Measures indoor

- (52X) AT Measures outdoor

- (529) Minor Construction limit is $1M

- (52X) break out individual facs for multi fac projects

- Contingency – if > 5% or $1M explain in block 11

OH&P (If not included in pricing)

SUBTOTAL

SUPERVISION, INSPECTION AND OVERHEAD (USACE CONUS 5.6% or OCONUS 7.5%, NAVFAC 4%-8%, in house 4%)

TOTAL FUNDED COST (ref AFI 65-601 V1 and AFI 32-1021)

DESIGN (6% limit)

- Engineering Services (surveys, investigations, etc. not part of 6%)

TOTAL UNFUNDED COST (ref AFI 65-601 V1 and AFI 32-1021)

- non-RPIE, furniture, GFE

SOURCE OF ESTIMATE:

10. DESCRIPTION OF PROPOSED WORK: (SUCCINT AND DESCRIPTIVE) Break out work by EEIC for clarity.

EEIC 522 work

- Repairing collateral facility damage caused by a leaking roof (cause by lack of sustainment)

- Repairing damage to a facility caused by a natural disaster

- Repairing a water line damaged by natural disaster

- Completely replacing a runway, taxiway or road that has not achieved its reasonably expected useful life but requires repair and replacement is best option

- Replacing existing lighting with more energy efficient system before the end of its useful life

- Installing fire suppression to meet updated code

EEIC 524 work

- Mill and overlay existing pavement

- Replacing a roof on a life cycle basis

- Completely replacing a runway or taxiway that achieved its expected life cycle

- Replacing HVAC systems, in kind or to current standards, that have reached the end of their useful life

EEIC 529

- Change in function within minor construction threshold

- Increasing facility footprint

- Installing fire suppression due to change in function

- Constructing a new road or expanding the footprint of an existing road within O&M funding limits

11. REQUIREMENT:

PROJECT: RESTATE PROJECT TITLE AND FAC NUMBER. SPELL OUT ACRONYMS

REQUIREMENT: WHY IS THE PROJECT REQUIRED TO SUPPORT THE MISSION. WHAT IS THE END STATE THAT THE PROJECT WILL HELP ATTAIN

CURRENT SITUATION: CRITICAL DETAILS SUPPORTING WHY PROJECT IS REQUIRED. MISSION IMPACTS, COSTS, WASTED TIME, EFFICIENCIES. FACILITY CONDITION

IMPACT IF NOT PROVIDED: IMPACT TO MISSION. E.G SORTIES LOST, FINES, RISK TO PERSONNEL, ETC

ADDITIONAL:

- INTENDED AGENT: USACE, NAVFAC, IN-HOUSE

- CONCURRENT OR COMPANION PROJECTS: (IF ANY)

- METHOD OF COMPLETION: Design-Build, Design-Bid-Build

- THRESHOLD DETERMINATION – BREAK OUT EEICS TO DETERMINE APPROVAL AUTHORITY

EEIC 522 - $K

EEIC 524 - $K

EEIC 529 - $K

** MUST INCLUDE ONE OF THE FOLLOWING STATEMENTS;

“THE TOAL FUNDED COST OF $X IS Y% OF THE ESTIMATED COST OF A MILITARY CONSTRUCTION PROJECT TO REPLACE THE FACILITY OF $Z”

“IN ACCORDANCE WITH AF/A4C GUIDANCE, THIS REPAIR PROJECT REPLACES LESS THAN 75% OF THE <TYPE OF NETWORK FACILITY> NETWORK FACILITY.”

BCE NAME AND CONTACT INFO:

A PRELIMINARY ANALYSIS OF REASONABLE OPTIONS FOR ACCOMPLISHING THIS PROJECT (STATUS QUO, LEASE/RENT, RELOCATE, AND UPGRADE) WAS DONE. THERE IS ONLY ONE OPTION THAT WILL MEET THE OPERATIONAL AND CURRENT MISSION REQUIREMENT. THIS PROJECT MEETS THE CRITERIA/SCOPE IN PART II OF MILITARY HANDBOOK 1190, "FACILITY PLANNING AND DESIGN GUIDE" AND AIR FORCE HANDBOOK 32-1084, "CIVIL ENGINEERING REQUIREMENTS."

I HAVE REVIEWED THIS DOCUMENTAND CERTIFY IT IS COMPLETE AND ACCURATE, AND IS COMPLIANT WITH APPROPRIATE STATUTE(S) AND INSTRUCTIONS. I HAVE VALIDATED THE PROJECT’S PRIMARY AND SUPPORTING COST AND WORK CLASSIFICATION. IT HAS BEEN FULLY COORDINATED WITH THE USER AND OTHER APPROPRIATE AGENCIES AND APPROVED BY THE INSTALLATION COMMANDER.

JOINT USE CERTIFICATION: THESE FACILITIES CAN BE USED BY OTHER COMPONENTS ON AN "AS AVAILABLE" BASIS; HOWEVER, THE SCOPE OF THIS PROJECT IS BASED ON AIR FORCE REQUIREMENTS.

I HEREBY APPROVE PROJECT WXYZ170000, PROJECT NAME.

FUNDED COST $000K

UNFUNDED COST $000K

PROJECT COST $0,000K

NAME

CIVIL ENGINEER

[ADDITIONAL COMPLIANCE METRICS TO BE AWARE OF]

· 30% AND 50% SEISMIC RULE

· 50% AT RULE

· 50% FIRE PROTECTION RULE

· 50% SUSTAINABILITY RULE

· 75% EA RULE

· 75% REPAIR VS REPLACEMENT RULE

· 125% RULE

[SUPPORTING DOCUMENTS]

· DD1391C – DETAILED ESTIMATE, SINGLE LINE DRAWING (SITE PLAN/ BLDG FLOOR PLAN SHOWING AREA WHERE WORK WILL OCCUR. SHOW PROPOSED ADDITIONS FOR 529 WORK)

· CERTIFICATE OF COMPLIANCE SIGNED BY WING COMMANER

· PRV CALCULATION

· DD1391 OF CONCURRENT OR COMPANION PROJECTS

· FOR AIRFIELD PROJS PROVIDE PCI REPORT

DD FORM 1391, JUL99 Previous editions are obsolete Page No 1