1E. SOW Attachment 5 - 1391 Template.docx
DOCX document 47 KB Posted
- Attached to
- 100% Design, B501 Mission Planning Cell
- Solicitation number
- FA449725R0011
About this file
The document is a DD Form 1391 Military Construction Project Data Template, detailing a comprehensive facility renovation and repair project for an Air Force installation. The template provides a structured framework for documenting project scope, cost estimates, and mission-critical requirements, with specific focus on repair and maintenance (R&M) work categories including electrical, mechanical, structural, and fire protection improvements. The project involves various work elements such as repairing collateral facility damage, replacing infrastructure components like roofs and HVAC systems, and potentially expanding facility footprints, with cost classifications ranging across different Engineering and Installation Cost (EEIC) codes.
Key project characteristics include a potential project cost between $500,000 and $1,000,000, targeting facility improvements to support mission requirements, with emphasis on operational efficiency and meeting current standards. The template requires detailed documentation of the project's necessity, including mission impacts, facility condition assessments, and potential consequences of not completing the work. The document also includes certification sections for civil engineering review, joint use considerations, and compliance with various technical and regulatory rules, such as seismic, anti-terrorism, fire protection, and sustainability guidelines.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. COMPONENT
MAJCOM
FY 20XX MILITARY CONSTRUCTION PROJECT DATA
2. DATE
Dated when routed for sig
3. INSTALLATION AND LOCATION
BASE, STATE or COUNTRY
4. PROJECT TITLE:
RPR/Renovate/CNS/Add/Consolidate/Demo, Fac name, Bldg # Include all work class--“Umbrella” for mult prjs—multi facs listed in block 11
5. PROGRAM ELEMENT
Sust ***78 (EEIC 521 or 524) R&M ***76 (EEIC 522 or 529 If multi list in block 11
6. CATEGORY CODE
Single use - Use “A Line” Multi use – Use “D Line” Verify using RPAD
7. PROJECT NUMBER
PROJECT NUMBER
8. PROJECT COST ($000)
EEIC 52X – $000K (Funded Cost) Include design cost if DB multi EEIC - ref block 11
9. COST ESTIMATE
ITEM
| UOM |
| QTY |
| UNIT COST |
| COST ($000) |
- (EEIC 52X) identifiable element of work
SM
- (52X) Electrical
| SY |
| If a lump sum cost is used in this block, use a DD1391 to provide a detailed estimate |
- (52X) Mechanical
EA
- (52X) Structural
SF
- (52X) Fire Protection
- (52X) AT Measures indoor
- (52X) AT Measures outdoor
- (529) Minor Construction limit is $1M
- (52X) break out individual facs for multi fac projects
- Contingency – if > 5% or $1M explain in block 11
OH&P (If not included in pricing)
SUBTOTAL
SUPERVISION, INSPECTION AND OVERHEAD (USACE CONUS 5.6% or OCONUS 7.5%, NAVFAC 4%-8%, in house 4%)
TOTAL FUNDED COST (ref AFI 65-601 V1 and AFI 32-1021)
DESIGN (6% limit)
- Engineering Services (surveys, investigations, etc. not part of 6%)
TOTAL UNFUNDED COST (ref AFI 65-601 V1 and AFI 32-1021)
- non-RPIE, furniture, GFE
SOURCE OF ESTIMATE:
10. DESCRIPTION OF PROPOSED WORK: (SUCCINT AND DESCRIPTIVE) Break out work by EEIC for clarity.
EEIC 522 work
- Repairing collateral facility damage caused by a leaking roof (cause by lack of sustainment)
- Repairing damage to a facility caused by a natural disaster
- Repairing a water line damaged by natural disaster
- Completely replacing a runway, taxiway or road that has not achieved its reasonably expected useful life but requires repair and replacement is best option
- Replacing existing lighting with more energy efficient system before the end of its useful life
- Installing fire suppression to meet updated code
EEIC 524 work
- Mill and overlay existing pavement
- Replacing a roof on a life cycle basis
- Completely replacing a runway or taxiway that achieved its expected life cycle
- Replacing HVAC systems, in kind or to current standards, that have reached the end of their useful life
EEIC 529
- Change in function within minor construction threshold
- Increasing facility footprint
- Installing fire suppression due to change in function
- Constructing a new road or expanding the footprint of an existing road within O&M funding limits
11. REQUIREMENT:
PROJECT: RESTATE PROJECT TITLE AND FAC NUMBER. SPELL OUT ACRONYMS
REQUIREMENT: WHY IS THE PROJECT REQUIRED TO SUPPORT THE MISSION. WHAT IS THE END STATE THAT THE PROJECT WILL HELP ATTAIN
CURRENT SITUATION: CRITICAL DETAILS SUPPORTING WHY PROJECT IS REQUIRED. MISSION IMPACTS, COSTS, WASTED TIME, EFFICIENCIES. FACILITY CONDITION
IMPACT IF NOT PROVIDED: IMPACT TO MISSION. E.G SORTIES LOST, FINES, RISK TO PERSONNEL, ETC
ADDITIONAL:
- INTENDED AGENT: USACE, NAVFAC, IN-HOUSE
- CONCURRENT OR COMPANION PROJECTS: (IF ANY)
- METHOD OF COMPLETION: Design-Build, Design-Bid-Build
- THRESHOLD DETERMINATION – BREAK OUT EEICS TO DETERMINE APPROVAL AUTHORITY
EEIC 522 - $K
EEIC 524 - $K
EEIC 529 - $K
** MUST INCLUDE ONE OF THE FOLLOWING STATEMENTS;
“THE TOAL FUNDED COST OF $X IS Y% OF THE ESTIMATED COST OF A MILITARY CONSTRUCTION PROJECT TO REPLACE THE FACILITY OF $Z”
“IN ACCORDANCE WITH AF/A4C GUIDANCE, THIS REPAIR PROJECT REPLACES LESS THAN 75% OF THE <TYPE OF NETWORK FACILITY> NETWORK FACILITY.”
BCE NAME AND CONTACT INFO:
A PRELIMINARY ANALYSIS OF REASONABLE OPTIONS FOR ACCOMPLISHING THIS PROJECT (STATUS QUO, LEASE/RENT, RELOCATE, AND UPGRADE) WAS DONE. THERE IS ONLY ONE OPTION THAT WILL MEET THE OPERATIONAL AND CURRENT MISSION REQUIREMENT. THIS PROJECT MEETS THE CRITERIA/SCOPE IN PART II OF MILITARY HANDBOOK 1190, "FACILITY PLANNING AND DESIGN GUIDE" AND AIR FORCE HANDBOOK 32-1084, "CIVIL ENGINEERING REQUIREMENTS."
I HAVE REVIEWED THIS DOCUMENTAND CERTIFY IT IS COMPLETE AND ACCURATE, AND IS COMPLIANT WITH APPROPRIATE STATUTE(S) AND INSTRUCTIONS. I HAVE VALIDATED THE PROJECT’S PRIMARY AND SUPPORTING COST AND WORK CLASSIFICATION. IT HAS BEEN FULLY COORDINATED WITH THE USER AND OTHER APPROPRIATE AGENCIES AND APPROVED BY THE INSTALLATION COMMANDER.
JOINT USE CERTIFICATION: THESE FACILITIES CAN BE USED BY OTHER COMPONENTS ON AN "AS AVAILABLE" BASIS; HOWEVER, THE SCOPE OF THIS PROJECT IS BASED ON AIR FORCE REQUIREMENTS.
I HEREBY APPROVE PROJECT WXYZ170000, PROJECT NAME.
FUNDED COST $000K
UNFUNDED COST $000K
PROJECT COST $0,000K
NAME
CIVIL ENGINEER
[ADDITIONAL COMPLIANCE METRICS TO BE AWARE OF]
· 30% AND 50% SEISMIC RULE
· 50% AT RULE
· 50% FIRE PROTECTION RULE
· 50% SUSTAINABILITY RULE
· 75% EA RULE
· 75% REPAIR VS REPLACEMENT RULE
· 125% RULE
[SUPPORTING DOCUMENTS]
· DD1391C – DETAILED ESTIMATE, SINGLE LINE DRAWING (SITE PLAN/ BLDG FLOOR PLAN SHOWING AREA WHERE WORK WILL OCCUR. SHOW PROPOSED ADDITIONS FOR 529 WORK)
· CERTIFICATE OF COMPLIANCE SIGNED BY WING COMMANER
· PRV CALCULATION
· DD1391 OF CONCURRENT OR COMPANION PROJECTS
· FOR AIRFIELD PROJS PROVIDE PCI REPORT
DD FORM 1391, JUL99 Previous editions are obsolete Page No 1