Attachment 22 - UFGS 01 33 29 Sustainability Requirements and Reporting.pdf

PDF 139 KB Posted

Attached to
Facility Enhancement and Maintenance IDIQ
Solicitation number
FA441827R0001
Issued by

View the file

Other files

File Type Posted
Attachment 1 - Statement of Work (4 Nov 26).pdf PDF
Attachment 28 - SCA WD 2015-4439 Rev 31 - Sumter.pdf PDF
Attachment 16 - Sample Project SOW Misc. Repair.pdf PDF
Attachment 27 - SCA WD 2015-4463 Rev 36 - Orangeburg.pdf PDF
Attachment 18 - Sample Project Price Worksheet.xlsx XLSX spreadsheet
Attachment 21 - JBLG Integrated Solid Waste Management Plan.pdf PDF
Solicitation Amendment - FA441827R00010001.pdf PDF
Attachment 2 - Price List - Schedule B.xlsx XLSX spreadsheet
Attachment 24 - UFGS 01 57 19 Temporary Environmental Controls.pdf PDF
Attachment 25 - Tier I Carpet Vendors.pdf PDF
Attachment 29 - 27R0001 Questions and Answers.pdf PDF
Attachment 19 - Section L Offeror Instructions.pdf PDF
Attachment 26 - SCA WD 2015-4427 Rev 35 - Berkeley Charelston Dorchester.pdf PDF
Attachment 23 - UFGS 01 74 19 - Construction Waste Management and Disposal.pdf PDF
Solicitation Amendment FA441827R00010001 SF 30.pdf PDF
Attachment 13 - USAF Carpet Ordering Guide - 2023.pdf PDF
Attachment 10 - JB CHS Approved Paint Colors.pdf PDF
Attachment 9 - Contract Security Handbook.pdf PDF
Attachment 4 - SC20260022 Berkeley.pdf PDF
Attachment 8 - PPQ.pdf PDF
Attachment 3 - SC20260016 Orangeburg.pdf PDF
Attachment 14 - Sample Project SOW (Floorcovering).pdf PDF
Attachment 20 - Evaluation Factors (Section M).pdf PDF
Attachment 17 - Sample Project - AB B325 Floorplans.pdf PDF
Attachment 11 - Technical Exhibit for Base Signage.pdf PDF
Attachment 5 - SC20260023 Charleston.pdf PDF
Attachment 7 - SC20260030 Sumter.pdf PDF
Attachment 15 - Sample Project SOW (Protective Coating).pdf PDF
Attachment 6 - SC20260024 Dorchester.pdf PDF
Attachment 12 - UFC Protective Coatings and Paints.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USACE / NAVFAC / AFCEC / NASA UFGS- 01 33 29 ( Febr uar y 2021)

Pr epar i ng Act i v i t y: NAVFAC Superseding UFGS- 01 33 29 ( Febr uar y 2017) UFGS- 01 33 29. 05 20 ( Mar ch 2019)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Apr i l 2022

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 33 29

SUSTAINABILITY REQUIREMENTS AND REPORTING

02/21

PART 1 GENERAL

1.1 REFERENCES

1.2 SUMMARY

1.3 SUBMITTALS

1.4 GUIDING PRINCIPLES VALIDATION (GPV)

1.4.1 Sustainability Action Plan

1.4.2 Calculations

1.5 SUSTAINABILITY SUBMITTALS

1.5.1 High Performance Sustainable Building (HPSB) Checklist

1.5.1.1 HPSB Checklist Submittals

1.5.2 "S" Submittals for Sustainability Documentation

1.5.3 Sustainability eNotebook

1.5.3.1 Sustainability eNotebook Format

1.5.3.2 Sustainability eNotebook Submittal Schedule

1.6 DOCUMENTATION REQUIREMENTS

1.6.1 Integrated Design Process

1.6.1.1 Design Submittal Documentation

1.6.2 Commissioning (Cx)

1.6.3 Optimize Energy Performance

1.6.3.1 Design Submittal Documentation

1.6.3.2 Construction Submittal Documentation

1.6.4 Energy Efficient Products

1.6.5 On-site Renewable Energy Generation

1.6.5.1 Design Submittal Documentation

1.6.6 Solar Domestic Hot Water (SDHW)

1.6.6.1 Design Submittal Documentation

1.6.7 Building-level Power Metering

1.6.7.1 Design Submittal Documentation

1.6.7.2 Construction Submittal Documentation

1.6.8 Indoor Water Use

1.6.9 Indoor Water Metering

1.6.9.1 Design Submittal Documentation

SECTION 01 33 29 Page 1

1.6.9.2 Construction Submittal Documentation

1.6.10 Outdoor Water Use

1.6.10.1 Design Submittal Documentation

1.6.10.2 Construction Submittal Documentation

1.6.11 Outdoor Water Meters

1.6.11.1 Design Submittal Documentation

1.6.11.2 Construction Submittal Documentation

1.6.12 Alternative Water

1.6.12.1 Design Submittal Documentation

1.6.13 Stormwater Management

1.6.14 Ventilation and Thermal Comfort

1.6.14.1 Design Submittal Documentation

1.6.15 Daylighting

1.6.15.1 Design Submittal Documentation

1.6.16 Moisture Control

1.6.16.1 Design Submittal Documentation

1.6.16.2 Construction Submittal Documentation

1.6.17 Reduce Volatile Organic Compounds (VOC) (Low-Emitting

Materials)

1.6.18 Indoor Air Quality During Construction

1.6.19 Recycled Content

1.6.19.1 Construction Submittal Documentation

1.6.20 Bio-Based Products

1.6.21 Waste Material Management (Recycling – Design)

1.6.22 Waste Material Management (Recycling – Construction)

1.6.23 Address Climate Change Risk

1.6.24 Additional Sustainability Requirements

1.6.24.1 Third Party Certification (TPC) Documentation

1.6.24.1.1 TPC Registration Required

1.6.24.1.2 TPC Management and Certification

1.6.24.2 Third Party Certification (TPC) Documentation

1.6.24.2.1 TPC Registration

1.6.24.3 Third Party Certification (TPC) Documentation

1.6.24.3.1 TPC Registration Required

1.6.24.3.2 TPC Already Registered

1.6.24.3.3 TPC Management and Certification

1.6.25 Additional Sustainability Requirements

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 SUSTAINABILITY COORDINATION

3.2 THIRD PARTY CERTIFICATION CERTIFICATE, ASSESSMENT, OR VALIDATION

AND COMPLIANCE REPORT

3.3 TABLE 3-1 VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING

MATERIALS) REQUIREMENTS

-- End of Section Table of Contents --

SECTION 01 33 29 Page 2

USACE / NAVFAC / AFCEC / NASA UFGS- 01 33 29 ( Febr uar y 2021)

Pr epar i ng Act i v i t y: NAVFAC Superseding UFGS- 01 33 29 ( Febr uar y 2017) UFGS- 01 33 29. 05 20 ( Mar ch 2019)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Apr i l 2022

SECTION 01 33 29

SUSTAINABILITY REQUIREMENTS AND REPORTING

02/21

NOTE: Thi s gui de speci f i cat i on cover s t he r equi r ement s f or pr ovi di ng sust ai nabi l i t y document at i on f or Gui di ng Pr i nci pl es Val i dat i on ( GPV) and Thi r d Par t y Cer t i f i cat i on ( TPC) . GPV i s equi val ent t o meet i ng t he r equi r ement s of UFC

1- 200- 02 " HI GH PERFORMANCE AND SUSTAI NABLE BUI LDI NG

REQUI REMENTS. " Al l pr oj ect s must meet t he r equi r ement s of UFC 1- 200- 02.

Thi s gui de speci f i cat i on i ncl udes t ai l or i ng f or bot h DESI GN- BUI LD and DESI GN- BI D- BUI LD.

Thi s gui de speci f i cat i on i ncl udes t ai l or i ng f or ARMY. Desel ect t he ARMY t ai l or i ng opt i on f or Navy- execut ed pr oj ect s.

Use a pr oper l y edi t ed ver si on of t hi s gui de speci f i cat i on f or pr oj ect s t hat cont ai n one or mor e bui l di ngs t hat meet one of t he f ol l owi ng:

a) For Ar my and Navy, new bui l di ngs or st and- al one addi t i ons gr eat er t han or equal t o 10, 000 SF; f or Ai r For ce, al l new bui l di ngs or st and- al one additions.

b) Compr ehensi ve r epl acement i n an exi st i ng bui l di ng t hat i s gr eat er t han or equal t o 10, 000 SF, wi t h t ot al cost ( i ncl udes new wor k, r enovat i on, oper at i ons and mai nt enance, sust ai nment , r est or at i on, and moder ni zat i on associ at ed wi t h and exi st i ng bui l di ng r enovat i on) gr eat er t han $3M and 50- per cent or mor e Est i mat ed Repl acement Cost ( ERC) .

Use t he HPSB Checkl i st f or t he Ser vi ce who wi l l mai nt ai n t he bui l di ng asset i n t hei r Real Pr oper t y Recor d. Compl et e an HPSB Checkl i st f or each appl i cabl e bui l di ng i n t he pr oj ect , bef or e at t achi ng t o t hi s speci f i cat i on. Checkl i st ( s) must be

SECTION 01 33 29 Page 3 compl et el y f i l l ed out bef or e bei ng used i n a sol i c i t at i on. Check wi t h t he user Command f or addi t i onal r equi r ement s. Each Component ’ s HPSB Checkl i st may be f ound at :

https://www.wbdg.org/ffc/dod/tri-services-sustainability-program/tracking-reporting

( Wher e I nt er net addr ess appear s on mul t i pl e l i nes, copy f ul l addr ess i nt o I nt er net br owser . )

Adher e t o UFC 1-300-02 Uni f i ed Faci l i t i es Gui de Speci f i cat i ons ( UFGS) For mat St andar d when edi t i ng t hi s gui de speci f i cat i on or pr epar i ng new pr oj ect speci f i cat i on sect i ons. Edi t t hi s gui de speci f i cat i on f or pr oj ect speci f i c r equi r ement s by addi ng, del et i ng, or r evi s i ng t ext . For br acket ed i t ems, choose appl i cabl e i t em( s) or i nser t appr opr i at e i nf or mat i on.

Remove i nf or mat i on and r equi r ement s not r equi r ed i n r espect i ve pr oj ect , whet her or not br acket s ar e present.

Comment s, suggest i ons and r ecommended changes f or t hi s gui de speci f i cat i on ar e wel come and shoul d be submi t t ed as a Criteria Change Request (CCR) .

PART 1 GENERAL

1.1 REFERENCES

NOTE: Thi s par agr aph i s used t o l i s t t he publ i cat i ons c i t ed i n t he t ext of t he gui de speci f i cat i on. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y and l i s t ed i n t hi s par agr aph by or gani zat i on, desi gnat i on, dat e, and t i t l e.

Use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e when you add a Ref er ence I dent i f i er ( RI D) out si de of t he Sect i on' s Ref er ence Ar t i c l e t o aut omat i cal l y pl ace t he r ef er ence i n t he Ref er ence Ar t i c l e. Al so use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e t o updat e t he i ssue dat es.

Ref er ences not used i n t he t ext wi l l aut omat i cal l y be del et ed f r om t hi s sect i on of t he pr oj ect speci f i cat i on when you choose t o r econci l e r ef er ences i n t he publ i sh pr i nt pr ocess.

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

SECTION 01 33 29 Page 4

COUNCIL ON ENVIRONMENTAL QUALITY (CEQ) (WHITE HOUSE)

HPSB Guiding Principles (2016) Guiding Principles for Sustainable Federal Buildings and Determining Compliance with the Guiding Principles for Sustainable Federal Buildings

GREEN BUILDING INITIATIVE (GBI)

GBI DOD GP Compliance (2017) GBI Department of Defense Guiding Principles Compliance Program for New Construction

GBI Green Globes for NC (2017) Green Globes(tm) for New Construction Technical Reference Manual

GREEN BUSINESS CERTIFICATION INC. (GBCI)

GP Assessment (DOD) Guiding Principles Assessment for Department of Defense

INTERNATIONAL CODE COUNCIL (ICC)

ICC IgCC (2018) International Green Construction Code

SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION

(SMACNA)

ANSI/SMACNA 008 (2007) IAQ Guidelines for Occupied Buildings Under Construction, 2nd Edition

U.S. DEPARTMENT OF AGRICULTURE (USDA)

FSRIA 9002 Farm Security and Rural Investment Act Section 9002 (USDA BioPreferred Program)

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 1-200-02 (2020; with Change 1, 2020) High Performance and Sustainable Building Requirements

UFC 3-210-10 (2015; with Change 3, 2020) Low Impact Development

UFC 3-600-01 (2016; with Change 6, 2021) Fire Protection Engineering for Facilities

U.S. DEPARTMENT OF ENERGY (DOE)

Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED v4 BD+C LEED v4 Building Design and Construction

SECTION 01 33 29 Page 5

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

10 CFR 433.300 Subpart C - Green Building Certification for Federal Buildings

40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials

1.2 SUMMARY

This section includes requirements for Sustainability documentation and reporting submittals per the federally mandated High Performance and Sustainable Building (HPSB) or HPSB "Guiding Principles" (GP),[ and Third Party Certification (TPC) requirements,] in accordance with UFC 1-200-02 High Performance and Sustainable Building Requirements, and other identified requirements.

1.3 SUBMITTALS

NOTE: Revi ew Submi t t al Descr i pt i on ( SD) def i ni t i ons i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES and edi t t he f ol l owi ng l i s t , and cor r espondi ng submi t t al i t ems i n t he t ext , t o r ef l ect onl y t he submi t t al s r equi r ed f or t he pr oj ect . The Gui de Speci f i cat i on t echni cal edi t or s have cl assi f i ed t hose i t ems t hat r equi r e Gover nment appr oval , due t o t hei r compl exi t y or cr i t i cal i t y, wi t h a " G. " Gener al l y, ot her submi t t al i t ems can be r evi ewed by t he Cont r act or ' s Qual i t y Cont r ol Syst em. Onl y add a " G" t o an i t em i f t he submi t t al i s suf f i c i ent l y i mpor t ant or compl ex i n cont ext of t he pr oj ect .

For Ar my pr oj ect s, f i l l i n t he empt y br acket s f ol l owi ng t he " G" c l assi f i cat i on, wi t h a code of up t o t hr ee char act er s t o i ndi cat e t he appr ovi ng aut hor i t y. Codes f or Ar my pr oj ect s usi ng t he Resi dent Management Syst em ( RMS) ar e: " AE" f or Ar chi t ect - Engi neer ; " DO" f or Di st r i ct Of f i ce ( Engi neer i ng Di v i s i on or ot her or gani zat i on i n t he Di st r i ct Of f i ce) ; " AO" f or Ar ea Of f i ce; " RO" f or Resi dent Of f i ce; and " PO" f or Pr oj ect Of f i ce. Codes f ol l owi ng t he " G" t ypi cal l y ar e not used f or Navy, Ai r For ce, and NASA pr oj ect s.

The " S" c l assi f i cat i on i ndi cat es submi t t al s r equi r ed as pr oof of compl i ance f or sust ai nabi l i t y Gui di ng Pr i nci pl es Val i dat i on or Thi r d Par t y Cer t i f i cat i on and as descr i bed i n Sect i on 01 33 00 SUBMI TTAL

PROCEDURES.

NOTE: Sust ai nabi l i t y r equi r ement s have been i dent i f i ed i n many of t he t echni cal per f or mance sect i ons. I ncl ude addi t i onal sust ai nabi l i t y r equi r ement s t hr oughout t he t echni cal speci f i cat i on sect i ons accor di ng t o goal s of t hi s pr oj ect .

I dent i f y pr oduct s and ot her submi t t al s r equi r ed f or

SECTION 01 33 29 Page 6

Gui di ng Pr i nci pl e Val i dat i on ( GPV) and Thi r d Par t y Cer t i f i cat i on ( TPC) wher e appl i cabl e, wi t h an " S" next t o t he submi t t al i t em. Use t he f ol l owi ng f or mat t o add submi t t al i t ems i n t he t echni cal sect i ons t o compl y wi t h t he r equi r ement s of t hi s section:

<I TM><SUB>I nser t Submi t t al I t em</ SUB>;

<SUB>S</SUB></ITM>

Make cor r espondi ng edi t s i n t echni cal sect i ons' Par t 1, Par t 2 Pr oduct s or i n Par t 3 Execut i on t o di f f er ent i at e t hose pi eces of equi pment , pr oduct s, or act i v i t i es r el at ed t o GPV and TPC.

NOTE: Choose t he f ol l owi ng br acket ed par agr aph f or al l pr oj ect s except Navy- execut ed DESI GN- BUI LD.

Choose t he f i r st br acket ed i t em f or Navy, Ai r For ce, and NASA pr oj ect s, or choose t he second br acket ed i t em f or Ar my pr oj ect s.

[ Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are [for Contractor Quality Control approval.][for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.] Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

NOTE: For Ai r For ce onl y: For ever y Ai r For ce DESI GN- BUI LD pr oj ect , keep al l br acket ed SD- 01, SD- 05, and SD- 11 submi t t al s. For ever y Ai r For ce DESI GN- BI D- BUI LD pr oj ect , keep al l SD- 01 and SD- 11 submittals

Add ot her Checkl i st and Sust ai nabi l i t y eNot ebook submi t t al s t o mat ch t he number of desi gn submi ssi ons, based on t he pr oj ect scope, and add r equi r ement s par agr aphs i n Par t 1.

SD-01 Preconstruction Submittals

NOTE: For Navy pr oj ect s i n t he NAVFAC PAC Ar ea of Oper at i on onl y: r emove t he " G" desi gnat i on f r om al l SD- 01 Pr econst r uct i on Submi t t al s.

[ Preliminary High Performance and Sustainable Building Checklist ; G

] Sustainability Action Plan ; G[, [_____]]

[ Preliminary Sustainability eNotebook ; G[, [_____]]

SECTION 01 33 29 Page 7

] SD-05 Design Data

NOTE: The f ol l owi ng f our Submi t t al s ar e t ai l or ed f or DESI GN- BUI LD.

[ Interim Design High Performance and Sustainable Building Checklist ;

G[, [_____]]

][ Interim Design Sustainability eNotebook ; G[, [_____]]

][ Final Design High Performance and Sustainable Building Checklist ; G

][ Final Design Sustainability eNotebook ; G[, [_____]]

] SD-06 Test Reports

NOTE: For DESI GN- BI D- BUI LD pr oj ect s, del et e t he f ol l owi ng submi t t al i f i t i s not par t of t he cont r act or ' s scope.

[ Third Party Certification Design Compliance Report ; G[, [_____]]

] SD-11 Closeout Submittals

Final High Performance and Sustainable Building Checklist ; G[, Final Sustainability eNotebook ; G[, [_____]]

[ Amended Final Sustainability eNotebook ; G[, [_____]]

][ Amended Final High Performance and Sustainable Building Checklist ;

G[, [_____]]

NOTE: Choose br acket ed opt i on f or " Thi r d Par t y Cer t i f i cat i on Cer t i f i cat e, Assessment , or Val i dat i on and Compl i ance Repor t " f or TPC pr oj ect s t hat r equi r e t he Cont r act or t o obt ai n t he TPC cer t i f i cat i on.

[ Third Party Certification Certificate, Assessment, or Validation and Compliance Report ; G[, [_____]]

] 1.4 GUIDING PRINCIPLES VALIDATION (GPV)

NOTE: GUI DI NG PRI NCI PLES VALI DATI ON ( GPV) i s r equi r ed i n accor dance wi t h UFC 1- 200- 02 HI GH PERFORMANCE SUSTAI NABLE BUI LDI NG REQUI REMENTS and t he not es under t hi s speci f i cat i on' s t i t l e above.

Compl et e Pr el i mi nar y HPSB Checkl i st and i ncl ude at

SECTION 01 33 29 Page 8 t he end of t hi s speci f i cat i on. For pr oj ect s wi t h mul t i pl e bui l di ngs, at t ach HPSB Checkl i st f or each bui l di ng. See t he not es under t hi s speci f i cat i on' s t i t l e above.

Provide the following sustainability activities and documentation to verify achievement of HPSB Guiding Principles Validation (GPV):

a. Analysis of each Guiding Principle Requirement and how project complies. Include final government approved narrative(s) in the HPSB Checklist submittal. Multiple checklists indicate multiple buildings that require individual HPSB Checklist tracking.

NOTE: Choose f i r st br acket f or al l pr oj ect s except Navy- execut ed DESI GN- BUI LD. Choose second br acket f or Navy- execut ed DESI GN- BUI LD onl y.

b. No changes to the HPSB Checklist are allowed without approval from the Contracting Officer, in accordance with Section[ 01 33 00 SUBMITTAL REQUIREMENTS][ 01 33 00.05 20 CONSTRUCTION SUBMITTAL PROCEDURES and Section 01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES, paragraph DESIGN CHANGE AND VARIATION]. Immediately bring to the attention of the Contracting Officer any project changes that impact meeting the approved HPSB Guiding Principles Requirements for this project.

Demonstrate the change will not increase the life-cycle cost and maintains or improves the building performance.

c. Documentation of all work required to incorporate the applicable HPSB Guiding Principles requirements indicated on the HPSB Checklist and in this contract, including all "S" submittals.

d. Sustainability Action Plan.

NOTE: The f ol l owi ng par agr aph i s t ai l or ed f or

DESIGN-BUILD.

e. Design and construction related documentation for the project Sustainability eNotebook and keep updated with regularly-scheduled Construction Quality Control Meetings. Include design and construction related documentation containing the following components:

NOTE: The f ol l owi ng par agr aph i s t ai l or ed f or

DESIGN-BID-BUILD.

e. Construction related documentation for the project Sustainability eNotebook and keep updated with regularly-scheduled Construction Quality Control Meetings. Include construction related documentation containing the following components:

(1) HPSB Checklist(s)

(2) Sustainability Action Plan

SECTION 01 33 29 Page 9

(3) Documentation illustrating HPSB Guiding Principles Requirements compliance, including "S" submittals

1.4.1 Sustainability Action Plan

Include the following information in the Sustainability Action Plan:

a. Analysis of each HPSB Guiding Principles Requirement and how project will comply. Final government approved narrative(s) must be included in the HPSB Checklist submittal.

b. Name and contact information for: Contractor's Point of Contact (POC) ensuring sustainability goals are accomplished and documentation is assembled. For TPC that include on-site visit by third party representative, provide list of required attendees.

c. Indoor Air Quality plan.

1.4.2 Calculations

NOTE: The f ol l owi ng par agr aph i s t ai l or ed f or

DESIGN-BUILD.

Provide all design data, calculations, product data, labels and product certifications required in this specification to demonstrate compliance with the HPSB Guiding Principles Requirements.

NOTE: The f ol l owi ng par agr aph i s t ai l or ed f or

DESIGN-BID-BUILD.

Provide all calculations, product data, labels and product certifications required in this specification to demonstrate compliance with the HPSB Guiding Principles Requirements.

1.5 SUSTAINABILITY SUBMITTALS

Provide HPSB Checklist and other documentation in the Sustainability eNotebook to indicate compliance with the sustainability requirements of the project.

1.5.1 High Performance Sustainable Building (HPSB) Checklist

Provide construction documentation that provides proof of, and supports compliance with, the completed HPSB Checklist.

1.5.1.1 HPSB Checklist Submittals

Submit updated HPSB Checklist with each Sustainability eNotebook submittal. Include the final HPSB Checklist(s) with the interim DD1354 Real Property Record Submittal.

1.5.2 "S" Submittals for Sustainability Documentation

SECTION 01 33 29 Page 10

NOTE: I ncl ude t he br acket ed phr ases bel ow f or pr oj ect s r equi r ed t o obt ai n TPC.

"S" submittals are the sustainability documentation requirements cited in the various sections of this contract. Submit the GPV[ and TPC] sustainability documentation required in this section as "S" submittals in all affected UFGS Sections.

a. Highlight GPV[ and TPC] compliance data in "S" submittal.

b. Add "S" submittals to the Sustainability eNotebook only after submittal approval, and bookmark them as required in paragraph SUSTAINABILITY ENOTEBOOK below.

c. Ensure all approved "S" submittals are included in each Sustainability eNotebook submittal.

1.5.3 Sustainability eNotebook

NOTE: I ncl ude t he br acket ed TPC phr ases f or pr oj ect s r equi r ed t o obt ai n TPC.

The Sustainability eNotebook is an electronic organizational file that serves as a repository for all required sustainability submittals. To support documentation of compliance with an approved HPSB[ and TPC] checklist, provide and maintain a comprehensive and current Sustainability eNotebook. Include all required data in Sustainability eNotebook, to support full compliance with the HPSB Guiding Principles Requirements, including:

a. HPSB checklist

b. Sustainability Action Plan

c. Calculations

d. Labels

e. "S" submittals

[ f. Certifications, assessments, or validations and compliance report

][ g. TPC documentation required in paragraph THIRD PARTY CERTIFICATION

(TPC).

] 1.5.3.1 Sustainability eNotebook Format

Provide Sustainability eNotebook in the form of an Adobe PDF file;

bookmark each HPSB Guiding Principles Requirement[, TPC requirement,] and sub-bookmark at each document. Match format to HPSB Guiding Principles numbering system indicated herein. Maintain up-to-date information, such as spreadsheets, templates, with each current submittals.[ For TPC projects, provide a second Table of Contents using TPC numbering system, for maintaining documentation unique to TPC.]

Contracting Officer may deduct from the monthly progress payment

SECTION 01 33 29 Page 11 accordingly if Sustainability eNotebook information is not current and on track per project goals.

1.5.3.2 Sustainability eNotebook Submittal Schedule

Provide Sustainability eNotebook Submittals at the following milestones of the project:

NOTE: Choose submi t t al par agr aphs, based on scope of pr oj ect . I n each of t he f ol l owi ng par agr aphs, i ncl ude t he f i r st br acket ed phr ase f or pr oj ect s r equi r ed t o obt ai n TPC.

[ a. Preliminary Sustainability eNotebook

Submit preliminary Sustainability eNotebook with updated Preliminary High Performance and Sustainable Building Checklist [ and TPC checklist] at the first post award meeting in accordance with Section

01 30 00 ADMINISTRATIVE REQUIREMENTS.

NOTE: The f ol l owi ng t wo par agr aphs ar e t ai l or ed f or

DESIGN-BUILD.

Choose submi t t al par agr aphs, based on scope of pr oj ect . I n each of t he f ol l owi ng par agr aphs, i ncl ude t he f i r st br acket ed phr ase f or pr oj ect s r equi r ed t o obt ai n TPC. I ncl ude t he second br acket ed phr ase f or Navy- execut ed DESI GN- BUI LD onl y.

[ b. Interim Design Sustainability eNotebook

Submit updated Sustainability eNotebook with updated Interim Design High Performance and Sustainable Building Checklist [ with TPC Checklist] with the final design[, in accordance with Section 01 33

10.05 20 DESIGN SUBMITTAL PROCEDURES]. If issues relating to achieving the sustainability goals of the project are subsequently identified, identify reasons and mitigation from DOR, and resubmit to the Contracting Officer for approval.

][ c. Final Design Sustainability eNotebook

Submit updated Sustainability eNotebook with updated Final Design High Performance and Sustainable Building Checklist [ with TPC Checklist] with the final design[, in accordance with Section 01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES]. If issues relating to achieving the sustainability goals of the project are subsequently identified, identify reasons and mitigation from DOR, and resubmit to the Contracting Officer for approval.

NOTE: For pr oj ect s r equi r ed t o obt ai n TPC, i ncl ude t he br acket ed par agr aph when seeki ng appr oval of TPC desi gn r equi r ement s. Thi s i s t he pr ef er r ed met hod t o obt ai n TPC, and i t i s pr ef er r ed t hi s r epor t i s obt ai ned pr i or t o const r uct i on awar d. For

SECTION 01 33 29 Page 12

DESI GN- BI D- BUI LD pr oj ect s, del et e t hi s r epor t i f i t i s not par t of t he cont r act or ' s scope.

[ d. Third Party Certification Design Compliance Report

Obtain Third Party Certification Design Compliance Report after final design submittal is approved. Submittal must indicate 100 percent compliance with applicable design requirements. File approved submittal in the Sustainability eNotebook.

NOTE: I ncl ude t he br acket ed phr ases f or pr oj ect s r equi r ed t o obt ai n TPC.

e. Construction Quality Control Meetings.

Provide up-to-date GP[ and TPC] documentation in the Sustainability eNotebook[ and TPC Online tool] for each meeting.

NOTE: I ncl ude t he f i r st br acket ed phr ase f or pr oj ect s r equi r ed t o obt ai n TPC.

I ncl ude t he second br acket ed phr ase f or Navy- execut ed DESI GN- BUI LD onl y.

f. Final Sustainability eNotebook

Submit updated Sustainability eNotebook with updated Final High Performance and Sustainable Building Checklist [ with TPC Checklist][, in accordance with Section 01 33 00.05 20 CONSTRUCTION SUBMITTAL PROCEDURES] at Beneficial Occupancy Date (BOD). Final progress payment retainage may be held by Contracting Officer until Final Sustainability construction phase documentation is complete.

NOTE: I ncl ude t he f ol l owi ng par agr aph when an amended Sust ai nabi l i t y eNot ebook i s r equi r ed ( due t o post - const r uct i on act i v i t i es such as commi ssi oni ng) . I ncl ude t he f i r st br acket ed phr ase f or pr oj ect s r equi r ed t o obt ai n TPC.

[ g. Amended Final Sustainability eNotebook

Amend and resubmit the Amended Final Sustainability eNotebook with Amended Final High Performance and Sustainable Building Checklist [ and amended TPC Checklist], to include post-occupancy corrections, updates, and requirements. Final progress payment retainage may be held by Contracting Officer until amended final sustainability documentation is complete. Submit the Amended Final Sustainability eNotebook Submittal on DVDs to the Contracting Officer no later than 30 days after final GP[, TPC] determination.

SECTION 01 33 29 Page 13

] 1.6 DOCUMENTATION REQUIREMENTS

a. Incorporate each of the following HPSB Guiding Principles requirements into project and provide documentation that proves compliance with each listed requirement. Items below are organized by HPSB Guiding Principles . For life-cycle cost analysis requirements, one document with all analyses is acceptable, with Contracting Officer approval.

b. For each of the following paragraphs that require the use of products listed on Government-required websites, provide documentation of the process used to select products, or process used to determine why listed products do not meet project performance requirements.

NOTE: The f ol l owi ng subpar agr aphs pr ovi de Gui di ng Pr i nci pl e Requi r ement s.

Choose r equi r ement s t hat can be f ul l y achi eved, or par t i al l y achi eved t o t he gr eat est degr ee possi bl e.

For par t i al l y achi evabl e r equi r ement s, t r ack t hem as " yes" onl y wi t h one of t he f ol l owi ng j ust i f i cat i ons:

1. Li f e- cycl e cost - ef f ect i veness and ener gy model ;

2. Mi ssi on r est r i ct i on ( ex: 24/ 7 oper at i on) ;

3. Locat i on/ r egi onal r est r i ct i on ( ex: avai l abi l i t y of hi gh- ef f i c i ency equi pment ser vi ce) ;

4. Local e r est r i ct i on ( ex: pr oxi mi t y of exi st i ng bui l di ngs r est r i ct s dayl i ght i ng) .

Del et e r equi r ement s t hat ar e not appl i cabl e t o t he pr oj ect . Non- appl i cabi l i t y r equi r es one of t he f ol l owi ng j ust i f i cat i ons:

1. Li f e- cycl e cost - ef f ect i veness and ener gy model ;

2. Mi ssi on excl usi on ( ex: no dayl i ght i ng i n a t heat er or a SCI F) ;

3. Locat i on/ r egi onal excl usi on ( ex: no l ocal r ecycl i ng f aci l i t y) ; or

4. Local e excl usi on ( ex: t her e i s no st eam t o meter).

1.6.1 Integrated Design Process

NOTE: Thi s par agr aph i s t ai l or ed f or DESI GN- BUI LD.

For the submittal documentation below, demonstrate compliance with

UFC 1-200-02 .

1.6.1.1 Design Submittal Documentation

a. List the sustainability integrated design team, and a description of their roles in all stages of a project's planning and delivery:

(1) Include Contractor's Sustainability Coordinators; Architecture and Engineering disciplines involved on the project, and the DOR in

SECTION 01 33 29 Page 14 charge of the overall project and each discipline; Construction Subcontractors and the company representatives that align with each architectural and engineering discipline, Planning, Public Works, Environmental Specialist and other appropriate installation personnel.

(2) Describe their roles and responsibilities and plan-of-action for how each team member will be involved to achieve the project sustainability requirements, and how the Contractor will coordinate with Government personnel.

(3) Maintain an up-to-date list with descriptions throughout the project.

b. Provide narratives that:

(1) Indicate performance goals for siting, energy, water, materials, and indoor environmental quality along with other comprehensive design goals and ensures incorporation of these goals throughout the design and life cycle of the building.

(2) Demonstrate integration of the goals into design and construction.

(3) Demonstrate collaboration with other providers, such as Commissioning Authority[ and Third Party Certification].

1.6.2 Commissioning (Cx)

NOTE: Choose t he f i r st br acket ed phr ase f or Ai r For ce and Ar my pr oj ect s. Choose t he second br acket ed phr ase f or Navy pr oj ect s.

Develop and incorporate Commissioning requirements into the documents, in accordance with Section [ 01 91 00.15 10 TOTAL BUILDING COMMISSIONING][

01 91 00.15 20 TOTAL BUILDING COMMISSIONING].

1.6.3 Optimize Energy Performance

NOTE: Thi s par agr aph i s t ai l or ed f or DESI GN- BUI LD.

For the submittal documentation below, demonstrate compliance with

UFC 1-200-02 .

1.6.3.1 Design Submittal Documentation

NOTE: For det er mi ni ng ener gy consumpt i on r educt i on l evel s, compl y wi t h UFC 1- 200- 02 HI GH PERFORMANCE AND SUSTAI NABLE BUI LDI NG REQUI REMENTS, par agr aphs t i t l ed " Li f e- Cycl e Cost Anal ysi s, " " Ener gy Ef f i c i ency, " and " Ener gy Compl i ance Anal ysi s. "

a. Narrative that provides a summary of:

SECTION 01 33 29 Page 15

(1) The decision-making process leading to the selection of at least three energy-efficient solutions (for each system contributing to the energy footprint of the building) to be analyzed; and the selected design solution(s)

(2) The specific energy standard and version utilized; and the software used in the analysis

(3) The calculated energy consumption and energy use intensity (EUI in kBTU/sf/yr) of the baseline building and the proposed design alternatives

b. A minimum of the following energy modeling files and summaries for the baseline and proposed alternatives:

(1) Input, schedules and libraries; and output

(2) Calculated energy use by energy type

(3) Calculated energy use by building system

c. The life-cycle cost analysis input and output files for the baseline and the proposed alternatives

1.6.3.2 Construction Submittal Documentation

Provide revised energy modeling for actual system constructed.

1.6.4 Energy Efficient Products

Provide only energy-using products that are Energy Star rated or have Federal Energy Management Program (FEMP) recommended efficiency. Where Energy Star or FEMP recommendations have not been established, provide most efficient products that are life-cycle cost-effective. Provide only energy using products that meet FEMP requirements for low standby power consumption. Energy efficient products can be found at:

https://www.energy.gov/eere/femp/federal-energy-management-program and http://www.energystar.gov/ .

For construction submittal documentation, provide proof that product is labeled energy efficient and complies with the cited requirements.

1.6.5 On-site Renewable Energy Generation

NOTE: Thi s par agr aph i s t ai l or ed f or DESI GN- BUI LD.

For the submittal documentation below, demonstrate compliance with

UFC 1-200-02 .

1.6.5.1 Design Submittal Documentation

Provide life-cycle cost analysis (LCCA). When found to be LCCE, do one of the following options:

a. Provide design drawings and calculations that demonstrate total on-site renewable energy as an annual percentage of proposed building energy consumption in kBTU/year; and provide equipment ratings, and

SECTION 01 33 29 Page 16 calculations that demonstrate the generation capacity of the system in kBTU/year for thermal and kwh for electricity.

b. Provide documentation that renewable energy development at the Installation level is planned.

1.6.6 Solar Domestic Hot Water (SDHW)

NOTE: Thi s par agr aph i s t ai l or ed f or DESI GN- BUI LD.

For the submittal documentation below, demonstrate compliance with

UFC 1-200-02 .

1.6.6.1 Design Submittal Documentation

Provide life-cycle cost analysis (LCCA). When found to be LCCE, provide design drawings and calculations that demonstrate total on-site renewable energy as an annual percentage of proposed building energy consumption in kBTU/year; and provide equipment ratings, and calculations that demonstrate the generation capacity of the system in kBTU/year for thermal.

1.6.7 Building-level Power Metering

Provide building-level meters for electricity, natural gas, and steam where applicable.

1.6.7.1 Design Submittal Documentation

NOTE: The f ol l owi ng par agr aph i s t ai l or ed f or

DESIGN-BUILD.

Provide design drawings that highlight meter locations on the site.

1.6.7.2 Construction Submittal Documentation

Provide manufacturer's data validating compatibility with base-wide system and component advanced meter requirements.

1.6.8 Indoor Water Use

Provide Construction Documentation proof that fixtures are labeled EPA WaterSense, for products available with EPA WaterSense labeling; for all other fixtures, proof they comply with EPA WaterSense efficiency requirements.

1.6.9 Indoor Water Metering

Provide building-level meters for potable water use. Provide the requirements cited in the following paragraphs:

1.6.9.1 Design Submittal Documentation

NOTE: Thi s par agr aph i s t ai l or ed f or DESI GN- BUI LD.

SECTION 01 33 29 Page 17

Provide design drawings that highlight meter locations on the site.

1.6.9.2 Construction Submittal Documentation

Provide manufacturer's data validating compatibility with base-wide system and component advanced meter requirements.

1.6.10 Outdoor Water Use

Where new irrigation is required, provide only non-potable sources.

Provide the requirements cited in the following paragraphs:

1.6.10.1 Design Submittal Documentation

NOTE: Thi s par agr aph i s t ai l or ed f or DESI GN- BUI LD.

a. Provide design drawings and analysis that identify the non-potable water source used and demonstrate the non-potable water source is appropriate for landscape irrigation.

b. Provide life-cycle cost analysis (LCCA).

1.6.10.2 Construction Submittal Documentation

Provide manufacturer's data validating compatibility with base-wide system and component advanced meter requirements.

1.6.11 Outdoor Water Meters

Provide meters for outdoor systems that use potable water. Provide the requirements cited in the following paragraphs:

1.6.11.1 Design Submittal Documentation

NOTE: Thi s par agr aph i s t ai l or ed f or DESI GN- BUI LD.

a. Provide design drawings that highlight meter locations on the site.

b. Provide life-cycle cost analysis (LCCA).

1.6.11.2 Construction Submittal Documentation

Provide manufacturer's data validating compatibility with base-wide system and component advanced meter requirements.

1.6.12 Alternative Water

NOTE: Thi s par agr aph i s t ai l or ed f or DESI GN- BUI LD.

Use alternative sources of water to replace potable water usage, when life-cycle cost-effective and to the extent permitted by local laws and regulations.

SECTION 01 33 29 Page 18

1.6.12.1 Design Submittal Documentation

a. Provide design drawings and calculations that demonstrate the alternative water sources used, potable water savings as compared to non-alternative water sourcing, and projected annual potable water savings.

b. Provide life-cycle cost analysis (LCCA).

1.6.13 Stormwater Management

NOTE: Thi s par agr aph i s t ai l or ed f or DESI GN- BUI LD.

Develop and incorporate stormwater requirements into the documents.

Submit design and construction documentation required by UFC 3-210-10 and Service processes, as proof of this tracking requirement.

1.6.14 Ventilation and Thermal Comfort

NOTE: Thi s par agr aph i s t ai l or ed f or DESI GN- BUI LD.

For the submittal documentation below, demonstrate compliance with

UFC 1-200-02 .

1.6.14.1 Design Submittal Documentation

Provide design drawings and calculations that demonstrate HVAC systems and the building envelope have been designed to meet the requirements.

1.6.15 Daylighting

NOTE: Thi s par agr aph i s t ai l or ed f or DESI GN- BUI LD.

For the submittal documentation below, demonstrate compliance with

UFC 1-200-02 .

1.6.15.1 Design Submittal Documentation

a. Provide floor plans and elevations.

b. Provide design analysis delineating requirements, to include compliant reflective surface locations and shading devices (where applicable).

1.6.16 Moisture Control

Provide the following:

1.6.16.1 Design Submittal Documentation

NOTE: Thi s par agr aph i s t ai l or ed f or DESI GN- BUI LD.

SECTION 01 33 29 Page 19

Provide drawings of building envelope details and HVAC humidity controls.

1.6.16.2 Construction Submittal Documentation

Ensure construction materials are separated and protected in accordance with other sections in this contract document, with adequate humidity controls during construction. In accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA, includes plan for ongoing building moisture control.

NOTE: Choose t he f i r st br acket ed i t em f or Ai r For ce and Ar my pr oj ect s; choose t he second br acket ed i t em f or Navy pr oj ect s; choose t he t hi r d br acket ed i t em f or NASA pr oj ect s.

Coordinate with the moisture control requirements of Section [

01 45 00.00 10 ][ 01 45 00.00 20 ][ 01 45 00.00 40 ] QUALITY CONTROL.

1.6.17 Reduce Volatile Organic Compounds (VOC) (Low-Emitting Materials)

Meet the requirements of Table 3-1 at the end of this specification.

For Construction submittal documentation, provide certifications or labels that demonstrate compliance with cited requirements, based on the attached

TABLE 3-1.

1.6.18 Indoor Air Quality During Construction

Prior to construction, create indoor air quality plan. Develop and implement an IAQ construction management plan during construction and flush building air before occupancy.

NOTE: Choose t he f i r st br acket ed sent ence f or new const r uct i on or r enovat i on pr oj ect s i n bui l di ngs t hat ar e not occupi ed dur i ng const r uct i on.

Choose t he second br acket ed sent ence f or Navy- execut ed onl y.

Choose t he t hi r d br acket ed sent ence f or r enovat i on pr oj ect s i n bui l di ngs t hat r emai n occupi ed dur i ng construction.

[For new construction and for renovation of unoccupied existing buildings, meet the requirements of ICC IgCC 1001.3.1.5 (10.3.1.4) Indoor Air Quality (IAQ) Construction Management.] [Coordinate with moisture control requirements in Section 01 45 00.00 20 Quality Control.] [For renovation of occupied existing buildings, meet the requirements of ANSI/SMACNA 008 IAQ Guidelines for Occupied Buildings Under Construction.]

NOTE: Choose " bui l di ng" f or al l new const r uct i on pr oj ect s, and f or r enovat i on pr oj ect s t hat subst ant i al l y r epl ace t he bui l di ng f r om t he

SECTION 01 33 29 Page 20 f oundat i on up. Choose " ar ea" f or al l ot her r enovat i on pr oj ect s.

Provide documentation showing that after construction ends and prior to occupancy, HVAC filters were replaced and [building][area] air was flushed out in accordance with the cited standard.

1.6.19 Recycled Content

Comply with 40 CFR 247 . Refer to:

https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for assistance identifying products cited in 40 CFR 247 . Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation and must meet performance requirements.

1.6.19.1 Construction Submittal Documentation

a. Provide manufacturers' documents stating the recycled content by material, or written justification for claiming one of the exceptions allowed on the cited website.

b. Substitutions: Submit for Government approval for proposed alternative products or systems that provide equivalent performance and appearance and have greater contribution to project recycled content requirements. For all such proposed substitutions, submit with the Sustainability Action Plan accompanied by product data demonstrating equivalence.

c. In order to complete compliance with FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items, refer to submittal requirement for recycled/recovered material content in Section 01 78 00 CLOSEOUT SUBMITTALS.

1.6.20 Bio-Based Products

Provide products and materials composed of the highest percentage of bio-based materials (including rapidly renewable resources and certified sustainably harvested products), consistent with FSRIA 9002 USDA BioPreferred Program, to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user and when available at a reasonable cost. Use only supplies and materials of a type and quality that conform to applicable specifications and standards.

Comply with FSRIA 9002 USDA BioPreferred Program. Refer to www.biopreferred.gov for the product categories and BioPreferred Catalog.

Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation and must meet performance requirements.

Provide the following documentation:

a. USDA BioPreferred label for each product; for bio-based products used on project but not listed with BioPreferred program, provide bio-based content and percentage.

b. In order to complete compliance with FAR 52.223-1 Biobased Product Certification, refer to submittal requirement for biobased products in Section 01 78 00 CLOSEOUT SUBMITTALS, paragraphs CERTIFICATION OF EPA DESIGNATED ITEMS and CERTIFICATION OF USDA DESIGNATED ITEMS.

SECTION 01 33 29 Page 21

1.6.21 Waste Material Management (Recycling – Design)

NOTE: Thi s par agr aph i s t ai l or ed f or DESI GN- BUI LD.

For the submittal documentation below, demonstrate compliance with

UFC 1-200-02 .

For design submittal documentation, provide drawing showing an appropriately sized and placed dedicated storage area for recyclables.

1.6.22 Waste Material Management (Recycling – Construction)

NOTE: Ver i f y di v i s i on per cent age i n Sect i on 01 74 19

CONSTRUCTI ON WASTE MANAGEMENT AND DI SPOSAL.

Divert demolition and construction debris in accordance with Section

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.

[ 1.6.23 Address Climate Change Risk

NOTE: Thi s par agr aph i s t ai l or ed f or DESI GN- BUI LD.

Addr ess onl y gover nment - pr ovi ded, speci f i c scope di r ect i on r el at ed t o t he f ol l owi ng par agr aph. I f none has been pr ovi ded i n t he DD1391 or scope, del et e t hi s par agr aph, and document on HPSB Checkl i st and ot her r equi r ed t r acki ng l ocat i ons as " N/ A due t o l ocat i on/ r egi onal excl usi on" .

For design submittal documentation, provide narrative of decisions for design associated with scoped requirements.

] [ 1.6.24 Additional Sustainability Requirements

Provide the additional sustainability requirements cited in this paragraph.

NOTE: I n addi t i on t o GPV and Sust ai nabi l i t y eNot ebook, Thi r d Par t y Cer t i f i cat i on ( TPC) i s r equi r ed f or pr oj ect s t hat meet t he t hr eshol ds c i t ed i n Tabl e 1- 1 of UFC 1- 200- 02.

1. New bui l di ng or st and- al one addi t i on gr eat er t han or equal t o 10, 000 SF, wi t h const r uct i on cost gr eat er t han $3M.

2. Compr ehensi ve r epl acement i n an exi st i ng bui l di ng t hat i s gr eat er t han or equal t o 10, 000 SF, wi t h t ot al cost gr eat er t han $3M and 50- per cent or mor e ERC.

TPC i s t he gener i c t er m f or a t hi r d par t y pr oduct

SECTION 01 33 29 Page 22 t hat pr ovi des ei t her cer t i f i cat i on of t he t hi r d par t y vendor ' s pr opr i et ar y pr oduct r equi r ement s ( exampl es LEED, Gr een Gl obes) , or a val i dat i on pr ogr am by t he t hi r d par t y vendor t hat UFC 1- 200- 02 r equi r ement s have been met ( exampl es: Gui di ng Pr i nci pl es Assessment , Gui di ng Pr i nci pl es Compliance).

For each bui l di ng t hat meet s i t em 1 or i t em 2 above, choose one of t he f ol l owi ng par agr aphs t i t l ed " Thi r d Par t y Cer t i f i cat i on ( TPC) Document at i on" bel ow, based on how TPC i s execut ed, and del et e t he ot her s.

[ 1.6.24.1 Third Party Certification (TPC) Documentation

NOTE: Thi s par agr aph i s t ai l or ed f or DESI GN- BUI LD.

Third Party Certification certificate, assessment, or validation, and compliance report requirements are in addition to all requirements under header above GUIDING PRINCIPLES VALIDATION (GPV).

1.6.24.1.1 TPC Registration Required

NOTE: Choose t he r at i ng syst em bel ow t hat best assi st s wi t h Gui di ng Pr i nci pl es Val i dat i on and del et e t he ot her s. Ver i f y r at i ng syst ems appr oved f or use by Ser vi ce.

Obt ai n, f i l l out , and i ncl ude TPC checkl i st wi t h t hi s sect i on. For pr oj ect s wi t h mul t i pl e bui l di ngs, at t ach compl et ed TPC Checkl i st f or each bui l di ng t hat r equi r es TPC.

For cer t i f i cat i ons, assessment s, or val i dat i ons t hat i ncl ude a pl aque, i ncl ude t he br acket ed phr ase i n t he f i r st par agr aph.

For Ai r For ce ONLY: Choose one of t he f ol l owi ng met hods f or execut i ng TPC:

a. For Gui di ng Pr i nci pl es Assessment f or Depar t ment of Def ense ( by GBCI ) , choose " GP Assessment ( DOD) " , use onl y DOD ver si on, and ask f or i t when registering.

b. For Gr een Bui l di ng I ni t i at i ve ( GBI ) Depar t ment of Def ense Gui di ng Pr i nci pl es Compl i ance, or " GBI DOD GP Compl i ance" , use onl y DOD ver si on, and ask f or i t when r egi st er i ng.

For Ar my pr oj ect s ONLY: Choose onl y t he f ol l owi ng met hod f or execut i ng TPC:

a. For USGBC LEED v4, choose " LEED v4 BD+C" , and ent er " Si l ver " i n t he br acket . For use of al t er nat e

SECTION 01 33 29 Page 23 cer t i f i cat i on syst ems, a wai ver must be submi t t ed per t he cur r ent Ar my Sust ai nabl e Desi gn and Devel opment Pol i cy.

For Navy ONLY: Choose one of t he f ol l owi ng met hods f or execut i ng TPC:

a. For USGBC LEED v4, choose " LEED v4 BD+C" , and ent er t he t ar get l evel i n t he br acket .

b. For Gui di ng Pr i nci pl es Assessment f or Depar t ment of Def ense ( by GBCI ) , choose " GP Assessment ( DOD) " , use onl y DOD ver si on, and ask f or i t when registering.

c. For Gr een Bui l di ng I ni t i at i ve ( GBI ) Depar t ment of Def ense Gui di ng Pr i nci pl es Compl i ance, or " GBI DOD GP Compl i ance" , use onl y DOD ver si on, and ask f or i t when r egi st er i ng.

d. For " GBI Gr een Gl obes f or NC" , ent er t he t ar get l evel i n t he br acket .

e. For an al t er nat e cer t i f i cat i on syst em, use onl y t hose t hat compl y wi t h t he mi ni mum r equi r ement s of 10 CFR 433. 300 Subpar t C — Gr een Bui l di ng Cer t i f i cat i on f or Feder al Bui l di ngs, and i nser t t he name of t he compl i ant syst em i n t he empt y br acket .

Faci l i t i es Engi neer i ng Command ( FEC) Capi t al I mpr ovement s ( CI ) Cor e must aut hor i ze t he use of al t er nat i ve syst em.

Register and achieve Third Party Certification (TPC), by meeting all TPC and project requirements to achieve [ LEED v4 BD+C [_____]] [ GP Assessment (DOD) ] [ GBI DOD GP Compliance ] [ GBI Green Globes for NC [_____]] [[_____][_____]], or Government-approved equivalent TPC sustainability certification, assessment, or validation. An equivalent TPC organization must demonstrate equivalency for Government consideration and meet the requirements of 10 CFR 433.300 , prior to use on the project.

Third Party Certification is met when Government receives TPC organization certificate, assessment, or validation and compliance report[ and plaque].

Register project with TPC organization using the following format and content:

a. Project Title First Line: Building Owner (US Army, US Air Force, US Navy or US Marine Corps), Building Name (if known)

b. Project Title Second Line: MILCON P#, DD1391 Project Name

c. Project Address: UIC (Installation code), Category code, RPUID (Real Property Unique Identifier) Number

d. Project Owner Organization: US Army, US Air Force, US Navy or US Marine Corps

e. Primary Contact, Project Owner: Executing DOD Service's Project Manager or Design Manager

SECTION 01 33 29 Page 24

f. Building Owner Organization: US Army, US Air Force, US Navy or US Marine Corps

g. Building Owner Organization Project Number

NOTE: Choose f i r st br acket f or Ai r For ce pr oj ect s and del et e t he ot her s. Choose second br acket f or Ar my pr oj ect s and del et e t he ot her s. Choose t hi r d br acket f or Navy pr oj ect s and del et e t he ot her s.

h. Additional Contact, Building Owner: [ Base Civil Engineer][ Department of Public Works][ Public Works Officer] or Designee.

1.6.24.1.2 TPC Management and Certification

Execute the following TPC Certification, assessment, or validation requirements:

a. Refer to TPC Checklist at the end of this specification section.

(Multiple checklists indicate multiple buildings that require TPC.)

b. Immediately bring to the attention of the Contracting Officer any project changes that impact meeting the approved TPC Requirements for this project. Demonstrate the change will not increase the life-cycle cost and maintains or improves the building performance.

c. Complete all design and construction work to incorporate the applicable TPC Requirements.

d. Maintain the design and construction related information in the Sustainability eNotebook pertaining to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .