This is a Statement of Work (SOW) for a mechanical system replacement task under the Facility Enhancement & Maintenance IDIQ (FEM) contract vehicle.
The work involves the replacement of one hydronic Air Handling Unit (AHU-1, designated "Rookies") located in the attic of Building 325 at Joint Base Charleston, South Carolina (100 Hill Blvd.). The project is scheduled for November 2026. The contractor must provide all labor, materials, equipment, tools, transportation, and storage necessary to complete the work. The demolition phase requires removal of the existing AHU-1 including all associated hydronic piping back to isolation valves, control valves, dampers, actuators, and AHU controls. The new work phase specifies installation of a replacement AHU with the following performance specifications: 3,300 CFM supply capacity, 2,150 CFM outside air capacity, 230,400 BTUH cooling capacity, and 113,700 BTUH heating capacity. The new AHU must include a native BACnet controller integrated with the existing Building Management System, a Variable Frequency Drive (VFD) with direct drive fan assembly rated at maximum 60Hz, chilled water specifications of 45°F entering water temperature with 10°F temperature differential, hot water specifications of 140°F entering water temperature with 20°F temperature differential, and 460V/3-phase electrical service. The GPM valve requirement is 46.2.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Facility Enhancement & Maintenance IDIQ (FEM)
MAINTENANCE & REPAIRS
Building 325 – Air Base Commons
100 Hill Blvd., Joint Base Charleston, SC November 2026
GENERAL: The work to be performed is a mechanical system replacement of an Air Handler Unit. The contractor shall provide all labor, materials, equipment, tools, transportation, and storage for this mechanical system replacement work requested. (Section 3.2)
LOCATION: Building 325, 100 Hill Blvd., Joint Base Charleston, SC.
SCOPE OF WORK: The work includes replacement of one (1) hydronic Air Handling Units in the attic.
DEMO
1) Demo 1 ea. existing AHU-1 (Rookies)
a) Include all hydronic piping back to the isolation valves for the AHU.
b) Include control valves, dampers and actuators associated with the AHU.
c) Include AHU controls associated with each AHU.
NEW WORK
1) Provide and Install 1 new AHU with the following capacities:
• Include native BacNet controller and integrate with existing BMS system
• Include VFD with direct drive fan assembly, max 60hz for rated CFM
• Chilled Water: 45° EWT, 10° △T
• Hot Water: 140° EWT, 20° △T
• Electrical: 460V/3ø
-End-
AHU-1
Supply CFM 3300
OA CFM 2150
Cool Total
BTUH
230,400
GPM/Valve 46.2 Heat Total
BTUH
113,700