Attachment 15 - Sample Project SOW (Protective Coating).pdf

PDF 106 KB Posted

Attached to
Facility Enhancement and Maintenance IDIQ
Solicitation number
FA441827R0001
Issued by

View the file

Other files

File Type Posted
Attachment 1 - Statement of Work (4 Nov 26).pdf PDF
Attachment 22 - UFGS 01 33 29 Sustainability Requirements and Reporting.pdf PDF
Attachment 28 - SCA WD 2015-4439 Rev 31 - Sumter.pdf PDF
Attachment 16 - Sample Project SOW Misc. Repair.pdf PDF
Attachment 27 - SCA WD 2015-4463 Rev 36 - Orangeburg.pdf PDF
Attachment 18 - Sample Project Price Worksheet.xlsx XLSX spreadsheet
Attachment 21 - JBLG Integrated Solid Waste Management Plan.pdf PDF
Solicitation Amendment - FA441827R00010001.pdf PDF
Attachment 2 - Price List - Schedule B.xlsx XLSX spreadsheet
Attachment 24 - UFGS 01 57 19 Temporary Environmental Controls.pdf PDF
Attachment 25 - Tier I Carpet Vendors.pdf PDF
Attachment 29 - 27R0001 Questions and Answers.pdf PDF
Attachment 19 - Section L Offeror Instructions.pdf PDF
Attachment 26 - SCA WD 2015-4427 Rev 35 - Berkeley Charelston Dorchester.pdf PDF
Attachment 23 - UFGS 01 74 19 - Construction Waste Management and Disposal.pdf PDF
Solicitation Amendment FA441827R00010001 SF 30.pdf PDF
Attachment 13 - USAF Carpet Ordering Guide - 2023.pdf PDF
Attachment 10 - JB CHS Approved Paint Colors.pdf PDF
Attachment 9 - Contract Security Handbook.pdf PDF
Attachment 4 - SC20260022 Berkeley.pdf PDF
Attachment 8 - PPQ.pdf PDF
Attachment 3 - SC20260016 Orangeburg.pdf PDF
Attachment 14 - Sample Project SOW (Floorcovering).pdf PDF
Attachment 20 - Evaluation Factors (Section M).pdf PDF
Attachment 17 - Sample Project - AB B325 Floorplans.pdf PDF
Attachment 11 - Technical Exhibit for Base Signage.pdf PDF
Attachment 5 - SC20260023 Charleston.pdf PDF
Attachment 7 - SC20260030 Sumter.pdf PDF
Attachment 6 - SC20260024 Dorchester.pdf PDF
Attachment 12 - UFC Protective Coatings and Paints.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Facility Enhancement & Maintenance IDIQ (FEM)

PROTECTIVE COATING

Building 325 – Air Base Commons

100 Hill Blvd., Joint Base Lindsey Graham, SC June 2026

GENERAL: The work to be performed is water blasting of approximately 37,830 SF of identified areas. Identified areas include: the brick building, sidewalks, curbs, patio, utility boxes, gutters, downspouts, flashing/eaves, awnings, doors, bollards and light poles (excluding the roof). Preparing and painting of approximately 4,075 square feet of metal surfaces and 252 square feet of wood surfaces. The contractor shall provide all labor, materials, equipment, tools, transportation, and storage for protective coating materials to perform the work requested.

(Section 3.2)

LOCATION: Building 325, 100 Hill Blvd., Joint Base Lindsey Graham, SC.

SCOPE OF WORK: The work includes but is not limited to the following items:

1. Surface Preparation & Painting:

Contractor shall prep all surfaces identified to accept paint. Areas not requiring painting shall be protected by the contractor to ensure no damage occurs. (Section 3.2.1)

2. Protective Coating Application:

Contractor shall apply paint in accordance with paint product technical installation instructions and specifications. (Section 3.2.2 & 3.2.3) Paint colors will be identified by Facility Manager and COR and in accordance with Air Force Corporate Facility.

The following colors are approved for use per the Sherwin-Williams Paint Pallet:

Exterior Colors

Base Color: Sherwin Williams 6119 (Antique White) or equivalent.

Trim Color: Sherwin Williams 2007 (Nightscape) or equivalent.

Applicable Instructions:

Work areas may be occupied by the employees while work is being accomplished.

Caution must be taken to ensure all safe work practices are adhered to.

Caution shall be taken to prevent damage to the wall surfaces during removal process.

All work shall be in accordance with applicable federal, state, and local regulations, specifications, commercial practices, manufacture specifications, and industry standards. Low VOC materials shall be used, and work areas shall be well ventilated. Contractor shall keep a clean work area daily.

-End-