Attachment 1 - Statement of Work (4 Nov 26).pdf PDF
Attachment 22 - UFGS 01 33 29 Sustainability Requirements and Reporting.pdf PDF
Attachment 28 - SCA WD 2015-4439 Rev 31 - Sumter.pdf PDF
Attachment 16 - Sample Project SOW Misc. Repair.pdf PDF
Attachment 27 - SCA WD 2015-4463 Rev 36 - Orangeburg.pdf PDF
Attachment 18 - Sample Project Price Worksheet.xlsx XLSX spreadsheet
Attachment 21 - JBLG Integrated Solid Waste Management Plan.pdf PDF
Solicitation Amendment - FA441827R00010001.pdf PDF
Attachment 24 - UFGS 01 57 19 Temporary Environmental Controls.pdf PDF
Attachment 25 - Tier I Carpet Vendors.pdf PDF
Attachment 29 - 27R0001 Questions and Answers.pdf PDF
Attachment 19 - Section L Offeror Instructions.pdf PDF
Attachment 26 - SCA WD 2015-4427 Rev 35 - Berkeley Charelston Dorchester.pdf PDF
Attachment 23 - UFGS 01 74 19 - Construction Waste Management and Disposal.pdf PDF
Solicitation Amendment FA441827R00010001 SF 30.pdf PDF
Attachment 13 - USAF Carpet Ordering Guide - 2023.pdf PDF
Attachment 10 - JB CHS Approved Paint Colors.pdf PDF
Attachment 9 - Contract Security Handbook.pdf PDF
Attachment 4 - SC20260022 Berkeley.pdf PDF
Attachment 8 - PPQ.pdf PDF
Attachment 3 - SC20260016 Orangeburg.pdf PDF
Attachment 14 - Sample Project SOW (Floorcovering).pdf PDF
Attachment 20 - Evaluation Factors (Section M).pdf PDF
Attachment 17 - Sample Project - AB B325 Floorplans.pdf PDF
Attachment 11 - Technical Exhibit for Base Signage.pdf PDF
Attachment 5 - SC20260023 Charleston.pdf PDF
Attachment 7 - SC20260030 Sumter.pdf PDF
Attachment 15 - Sample Project SOW (Protective Coating).pdf PDF
Attachment 6 - SC20260024 Dorchester.pdf PDF
Attachment 12 - UFC Protective Coatings and Paints.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE B: FEM IDIQ PRICE SCHEDULE
GENERAL NOTES
1Quanities are presented for bid evaluation purposes only.
2Include in Unit Cost Column E all direct and indirect costs and expenses required to complete the work in an acceptable manner.
3Estimated escalation rate for option years 1 through 4 and the six month extention in Column E at the bottom of the sheet for the corresponding years
4CLIN 0001 Base Period unit prices shall be the unit prices submitted as part of this Price Schedule. During contract performance for CLIN 1001-4001 Option Years 1-4, the Unit Cost for the Price Schedule for Each Line Item shall be calculated by multiplying the Unit Cost from the Previous Period by the proposed Line Item Escalation and rounding to the nearest cent. For the 6 month extension, unit costs shall be the same as Option Year 4 (Escalation Rate must = 0%).
CLINDescriptionQuantity(1)UnitUnit Price(2)Extended Price
0001PERFORM FLOOR COVERING INSTALLATION/INLCUDES MATERIAL PURCHASE & ANY NEEDED ADHESIVES
0001AACarpet selected via AF Contract (INCLUDING ADHESIVE)7000SY$ - 0
0001ABINSTALLATION OF ANY CARPET REGARDLESS OF SUPPLIER7000SY$ - 0
0001ACSheet Vinyl With Backing INSTALLED500SY$ - 0
0001ADVinyl Composition Tile NSTALLED1000SF$ - 0
0001AELuxury Vinyl Tile INSTALLED15000SF$ - 0
0001AFRubber Flooring 1'x1' up to 1Meter X 1Meter INSTALLED500SF$ - 0
0001AGFloating LVT with underlayment INSTALLED2000SF$ - 0
0001AHCeramic Tile 12x12 or 6x6 INSTALLED200SF$ - 0
0001AJCeramic Tile Bull Nose INSTALLED20LF$ - 0
0001AKCarpet Padding INSTALLED500SY$ - 0
0001ALEpoxy Poured Floor INSTALLED8000SF$ - 0
0001AMEpoxy Poured 4" OR 6" Wall Base INSTALLED5000LF$ - 0
CLINDescriptionUNIT
0002PERFORM INSTALL OF FLOOR ACCESSORIES/INCLUDES MATERIAL PURCHASE & ANY NEEDED ADHESIVES
0002AAWall Base (Rubber, Vinyl) 4" INSTALLED8000LF$ - 0
0002ABWall Base (Rubber, Vinyl) 6" INSTALLED5000LF$ - 0
0002ACWall Base (Painted quarter round) and Finish INSTALLED2100LF$ - 0
0002ADVinyl Transition INSTALLED500LF$ - 0
0002AEMetal Transition INSTALLED50LF$ - 0
0002AFFloating Floor Transition INSTALLED10LF$ - 0
0002AGDoor Threshold INSTALLED2EA$ - 0
0002AHRubber Stair Treads/and Risers INSTALLED500LF$ - 0
0002AJMetal Stair Treads59LF$ - 0
0002AKFloor Prep/Patch/Level/Sand COMPLETED TO MFG ACCEPTED LEVEL28000SF$ - 0
0002ALVinyl Stair Nosing100LF$ - 0
0002AMMetal Stair Nosing100LF$ - 0
CLINDescriptionUNIT
0003OTHER FLOOR REQUIREMENTS
0003AAModify/Cut Wood Doors10EA$ - 0
0003ABCarpet on Steps INSTALLED60LF$ - 0
0003ACCarpet as Base INSTALLED100LF$ - 0
0003ADAsbestos Test (one product sample)5EA$ - 0
0003AEAsbestos Test (additional sample)3EA$ - 0
0003AFAsbestos Removal up to 500 SF1EA$ - 0
0003AGAsbestos Removal 501-1000 SF1EA$ - 0
0003AHAsbestos Removal 1001 - 2000 SF1EA$ - 0
0003AJClearance Testing3EA$ - 0
CLINDescriptionUNIT
0004PERFORM FURNITURE MOVING
0004AALight Furniture6750EA$ - 0
0004ABHeavy Furniture300EA$ - 0
0004ACSystems Furniture70EA$ - 0
CLINDescriptionUNIT
0005REMOVE AND DISPOSE OF MATERIALS
0005AAGlue-Down Carpet4500SY$ - 0
0005ABStretched-In Carpet500SY$ - 0
0005ACGlue-down Resilient Floorcovering9000SF$ - 0
0005ADFloating Floorcovering2700SF$ - 0
0005AECeramic or Porcelain Floorcovering300SF$ - 0
0005AFWall Base any type up to 6"8000LF$ - 0
0005AGStair Treads/Riser100LF$ - 0
CLINUNIT
0006PERFORM APPLICATION OF PROTECTIVE COATINGS - INCLUDING MATERIALS OF INTERIOR & EXTERIOR
0006AAGYPSUM BOARD350000SF$ - 0
0006ABWOOD INTERIOR10000SF$ - 0
0006ACWOOD EXTERIOR20000SF$ - 0
0006ADMETAL INTERIOR40000SF$ - 0
0006AEMETAL EXTERIOR10000SF$ - 0
0006AFCONCRETE/MASONRY/PLASTER20000SF$ - 0
0006AGTRIM50000LF$ - 0
0006AHENGINEER GRADE REFLECTIVE BASE500SF$ - 0
0006AJALUMINUM SIGN BLANKS500SF$ - 0
0006AKPAINT POOL ADULT AND WADING AREA200SF$ - 0
0006ALFULL PRIME80000SF$ - 0
0006AMMUD AND TAPE30000SF$ - 0
0006ANWATER BLASTING200000SF$ - 0
0006APLEAD BASE PAINT REMOVAL1000SF$ - 0
0006AQREMOVE WALLPAPER20000SF$ - 0
0006ARSIGN POSTS110LF$ - 0
Escalation Rate (see note 3)
Base Period Total$ - 0
Option Year 1 Total0%$ - 0
Option Year 2 Total0%$ - 0
Option Year 3 Total0%$ - 0
Option Year 4 Total0%$ - 0
6 Month Option Total0%$ - 0