Solicitation Amendment 01 - Attachment 1 - Addendum 01 - Repair Aircraft MX Facility B63 Revised Drawing Sheets.pdf

PDF 6 MB Posted

Attached to
Joint Base Charleston (JB CHS) Multiple Award Construction Contract (MACC)
Solicitation number
FA441822R0019
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment 01 - Attachment 6 - Berkeley County WD SC20210022.pdf PDF
Solicitation Amendment 01 - Attachment 3 - As Built Drawings B63.pdf PDF
Solicitation Amendment 01 - Attachment 5 - Solicitation Section B - Seed Project - 08 Nov 22.pdf PDF
Solicitation Amendment 01 - Attachment 9 - Orangeburg County WD SC20220016.pdf PDF
Solicitation Amendment 01 - Attachment 4 - Addendum 01 SOW - 08 Nov 22.pdf PDF
Solicitation Amendment 01 - Attachment 7 - Charleston County WD SC20220023.pdf PDF
Solicitation Amendment 01 - Attachment 10 - Wayne County WD NC20220041.pdf PDF
Solicitation Amendment 01 - Attachment 2 - As Built Drawings B61.pdf PDF
Solicitation Amendment 01 - Attachment 8 - Dorchester WD SC20220024.pdf PDF
JB CHS MACC - Questions and Answers - 09 Nov 22.pdf PDF
Update 1 - JB CHS MACC - Pre-Proposal Conference Slides.pdf PDF
Update 2 - JB CHS MACC - Sign-In Sheet for Attendees.pdf PDF
Amendment 1 - JB CHS MACC - Pre-Proposal Conference Slides.pptx PPTX presentation
Solicitation Attachment YT Seed Project Drawings -Updated.pdf PDF
Solicitation Attachment XX - TOPR - Seed Project - B63.pdf PDF
Solicitation Attachment XV - Past Performance Survey.pdf PDF
Solicitation Attachment YS Seed Project Specifications.pdf PDF
Solicitation Attachment XX - TOPR - Seed Project - B63.xlsx XLSX spreadsheet
Statement of Work - Attachment 9 - 01 33 00 - Attachment A - JB CHS Transmittal Form 4025.pdf PDF
Solicitation Attachment YU Seed Project Hydraulics.pdf PDF
Statement of Work - Attachment 7 - 01 32 00 - Attachment A - Schedule and Pay Request Calendar Example 2.xlsx XLSX spreadsheet
Solicitation Attachment XT - JB Charleston - Question and Answer Form.xlsx XLSX spreadsheet
Statement of Work - Attachment 16 - 01 45 00 - Quality Control.docx DOCX document
Statement of Work - Attachment 8 - 01 32 00 - Project Schedule.docx DOCX document
Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form 4288-R (Submittal Register).pdf PDF
Statement of Work - Attachment 17 - 01 78 00 - Closeout Requirements.docx DOCX document
Solicitation Attachment XU - Past Performance Customer Questionnaire.pdf PDF
Statement of Work - Attachment 13 - 01 33 00 - Submittal Procedures.docx DOCX document
Statement of Work - Attachment 14 - 01 35 26 - Attachment A - Accident Investigation Form (CIRS).pdf PDF
Statement of Work - Attachment 3 - 01 11 00 - Summary of Work.docx DOCX document
Statement of Work - Attachment 10 - 01 33 00 - Attachment B - JB CHS RFI Form.pdf PDF
Solicitation Attachment XY - On and Off-Ramp Procedures.pdf PDF
Statement of Work - Attachment 2 - Architectural Compatibility Plan.pdf PDF
Statement of Work - Attachment 4 - 01 14 00 - Work Restrictions.docx DOCX document
Solicitation - FA441822R0019.pdf PDF
Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form 4288-R (Submittal Register).xlsx XLSX spreadsheet
Statement of Work - Attachment 15 - 01 35 26 - Governmental Safety Requirements.docx DOCX document
Solicitation Attachment YV Seed Project Fire Pump Curves.pdf PDF
Statement of Work - Attachment 6 - 01 32 00 - Attachment A - Schedule and Pay Request Calendar Example 1.pdf PDF
Statement of Work - JB CHS MACC.pdf PDF
Solicitation Attachment XW - JB Charleston MACC Work Load Estimate.pdf PDF
Statement of Work - Attachment 1 - JB Charleston Statement of Work for Architect_Engineering (A_E) Services.pdf PDF
Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form 4289-R (RFI Register).xlsx XLSX spreadsheet
Solicitation Attachment YT Seed Project Drawings.pdf PDF
Solicitation Attachment XZ - Past Performance Project List.xlsx XLSX spreadsheet
Statement of Work - Attachment 5 - 01 30 00 - Administrative Requirements.docx DOCX document
Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form 4289-R (RFI Register).pdf PDF
Solicitation Section B - JB CHS MACC - Seed.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DE

SI

GN

ED

B Y:

CH

EC

KE

D

BY

DA

TE

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

RE

V

DE

SC

RI

PT

IO

N

PROJECT NUMBER:

DRAWING SIZE: ANSI D (22X34)

DE

PA

RT

ME

NT

O

F T

HE

A

IR

FO

RC

E

AI

R

MO

BI

LIT

Y

CO

MM

AN

D

CH

AR

LE

ST

ON

, S C

DR

AW

IN

G

RE

VI

SI

ON

S

DA

TE

PR

EP

B

Y

AP

PR

'D

DR

AW

N

BY

SU

PV

CH

E

NG

R:

RECORD DRAWING DATE:

G-001

D R

AW

IN

G

IN

D

EX

JO

IN

T B

AS

E

CH

AR

LE

ST

ON

D

RE

MY

Q

RE

MY

AP

RI

L 2

CERTIFIED FINAL DESIGN SUBMITTAL - FOR CONSTRUCTION

RE

PA

IR

A

IR

CR

AF

T M

AI

NT

EN

AN

CE

FA

CI

LIT

Y, B

.63

DKFX 1069825

G

UE

CK

ER

CLIN DESCRIPTIONS

BASE BID: BASE BID INCLUDES ALL THE REPAIR AND

CONSTRUCTION SCOPE REQUIRED IN THIS

PROJECT EXCEPT WORK UNDER OPTIONS.

OPTION 1: DEMOLITION AND REMOVAL OF

EXISTING BUILDING 61.

OPTION 2: REMOVE AND REPLACE EXISTING

TRANSLUCENT WALL PANELS FOR

BUILDING 63.

OPTION 3: STRIP ALL EXISTING INTERIOR PAINT

FROM ALL INTERIOR SURFACES, REMOVE

RUST, AND REPAINT INTERIOR OF HANGAR

BAY FOR BUILDING 63.

OPTION 4: REPLACE TWO ADDITIONAL CONCRETE

FLOOR SLAB PANELS IN HANGAR BAY

OPTION 5: REPLACE EXISTING HOT WATER HEATING

SYSTEM PIPING

DRAWING INDEX

SHEET NO. SHEET NAME

LIFE SAFETY

LS001 CODE SUMMARY

LS002 CODE SUMMARY

LS003 CODE COMPLIANCE SITE PLAN

LS101 LIFE SAFETY FLOOR PLAN - NORTH

LS102 LIFE SAFETY FLOOR PLAN - SOUTH

FIRE ALARM/ MASS NOTIFICATION

FD101 FIRE ALARM AND RELEASING SYSTEM DEMO PLAN

FA101 FIRE ALARM FLOOR PLAN - NORTH

FA102 FIRE ALARM FLOOR PLAN - SOUTH

FA501 DETAILS- FIRE ALARM

FA502 DETAILS- FIRE ALARM

FIRE PROTECTION

FD102 FIRE PROTECTION DEMO PLAN

FX101 FIRE PROTECTION FLOOR PLAN - NORTH

FX102 FIRE PROTECTION FLOOR PLAN - SOUTH

FX103 HANGAR BAY FLAME DETECTION SYSTEM FLOOR PLAN - NORTH

FX104 HANGAR BAY FLAME DETECTION SYSTEM FLOOR PLAN - SOUTH

FX501 FIRE PROTECTION DETAILS

FX502 RELEASING CONTROL UNIT DETAILS

PLUMBING

P-001 PLUMBING LEGEND & ABBREVIATIONS

PD101 PLUMBING DEMOLITION FIRST FLOOR PLANS

P-101 PLUMBING FIRST FLOOR PLAN

P-401 PLUMBING ENLARGED PLAN

P-402 PLUMBING ENLARGED PLAN

P-501 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES & DIAGRAMS

MECHANICAL

M-001 MECHANICAL LEGEND & ABBREVIATIONS

M-002 MECHANICAL GENERAL NOTES

MD101 MECHANICAL DEMOLITION FIRST FLOOR PLANS

M-101 MECHANICAL FIRST FLOOR PLAN

M-401 MECHANICAL ENLARGED PLANS

M-402 MECHANICAL ENLARGED PLANS

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-701 CONTROLS LEGEND

M-702 MECHANICAL CONTROLS

M-703 MECHANICAL CONTROLS

ELECTRICAL

E-001 ELECTRICAL LEGEND & ABBREVIATIONS

ED101 DEMOLITION FIRST FLOOR PLAN

ED102 DEMOLITION ROOF PLAN

EG101 ELECTRICAL LIGHTNING PROTECTION PLAN

EG501 LIGHTNING PROTECTION / GROUNDING DETAILS

EG502 LIGHTNING PROTECTION / GROUNDING DETAILS

EL101 ELECTRICAL LIGHTING FIRST FLOOR PLAN

EL601 ELECTRICAL LIGHTING SCHEDULES

EP101 ELECTRICAL POWER FIRST FLOOR PLAN

EP401 ELECTRICAL POWER ENLARGED PLANS

EP601 ELECTRICAL POWER ONE-LINE

EP602 ELECTRICAL POWER FEEDER SCHEDULE

EP603 ELECTRICAL SCHEDULES

EP604 ELECTRICAL POWER PANEL SCHEDULES

DRAWING INDEX

SHEET NO. SHEET NAME

GENERAL

G-000 COVER SHEET

G-001 DRAWING INDEX

G-002 VICINITY MAP, LOCATION MAP, AND CONSTRUCTION HAUL ROUTE

G-003 DEMOLITION - BUILDING 61 BID OPTION

CIVIL

C-001 ABBREVIATIONS AND LEGENDS

C-002 GENERAL CIVIL NOTES

GC001 CONSTRUCTION SAFETY NOTES

GC101 CONSTRUCTION SAFETY PLAN

CD101 EXISTING CONDITIONS AND DEMOLITION PLAN

CS101 SITE PLAN

CG101 GRADING AND EROSION CONTROL PLAN

CU101 UTILITY AND GRADING PLAN

C-501 CIVIL DETAILS

C-502 CIVIL DETAILS

C-503 CIVIL DETAILS

C-504 CIVIL DETAILS

STRUCTURAL

S-001 STRUCTURAL NOTES - SHEET 1

S-002 STRUCTURAL NOTES - SHEET 2

S-003 STRUCTURAL NOTES - SHEET 3

S-004 STRUCTURAL NOTES - SHEET 4

SD101 OVERALL GROUND FLOOR DEMOLITION PLAN

SD501 DEMOLITION DETAILS

S-101 OVERALL FOUNDATION PLAN

S-102 OVERALL ROOF FRAMING PLAN

S-401 FLOOR SLAB PLAN

S-501 TYPICAL CONCRETE DETAILS - SHEET 1

S-502 TYPICAL CONCRETE DETAILS - SHEET 2

S-510 TYPICAL MASONRY DETAILS

S-601 TYPICAL SCHEDULES

ARCHITECTURE

A-001 LEGENDS, ABBREVIATIONS, & GENERAL NOTES

AD101 DEMOLITION PLAN

AD102 DEMOLITION ROOF PLAN

AD201 DEMOLITION ELEVATIONS

AD202 DEMOLITION ELEVATIONS

AD401 ENLARGED DEMOLITION PLANS

AE101 FLOOR PLAN

AE102 ROOF PLAN

AE201 ELEVATIONS

AE202 ELEVATIONS

AE301 BUILDING SECTIONS

AE401 ENLARGED FLOOR PLANS

AE402 ENLARGED REFLECTED CEILING PLANS

AE501 DETAILS

AE502 DETAILS

AE503 DETAILS

AE504 DETAILS

AE601 DOOR SCHEDULE

AF001 FINISH MATERIAL LIST

AF101 FLOOR PATTERN FLOOR PLAN - OVERALL

AF102 FLOOR PATTERN PLANS - ENLARGED

AF601 ROOM FINISH SCHEDULE

AI101 ABA TYPICAL MOUNTING HEIGHTS

AI102 INTERIOR ELEVATIONS

INTERIORS

IG101 SIGNAGE FLOOR PLAN - OVERALL

IG102 ENLARGED SIGNAGE PLANS

IG501 SIGN TYPES

IG601 SIGNAGE SCHEDULE

CH

AN

GE

D

IN

A

CC

OR

DA

NC

E W

ITH

A

DD

EN

D U M

/04 /20

DW

R

* THE LIST OF ABBREVIATIONS AND THE LEGENDS

MAY CONTAIN ITEMS THAT ARE NOT SHOWN WITHIN

THE DRAWINGS AND DO NOT OCCUR IN THE PROJECT.

W W

AC ACRE OR ASBESTOS CEMENT

AGGR AGGREGATE

ALUM ALUMINUM

ASPH ASPHALT CEMENT

ASSY ASSEMBLY

B BACKWASH

BC BACK OF CURB

BCCMP BITUMINOUS COATED

CORRUGATED METAL PIPE

BE BOTTOM ELEVATION

BFP BACKFLOW PREVENTER

BITUM BITUMINOUS

BLDG BUILDING

BLV BALL VALVE

BM BENCHMARK

BV BUTTERFLY VALVE

BW BACK OF WALL

C CHORD

CATV CABLE TELEVISION

CATVo CABLE TELEVISION (OVERHEAD) CATVu CABLE TELEVISION

(UNDERGROUND)

CB CATCH BASIN

CC CENTER TO CENTER

CES CIVIL ENGINEERING SQUADRON

CF CUBIC FEET

C&G CURB & GUTTER

ChL CHORD LENGTH ChB CHEMICAL TREATMENT

CI CURB INLET

CISP CAST IRON SOIL PIPE

C CENTERLINE

CLR CLEAR

CMH COMMUNICATIONS MANHOLE

CMP CORRUGATED METAL PIPE

CO CLEANOUT

CMU CONCRETE MASONRY UNIT

COL COLUMN LINE

CONC CONCRETE

COND CONDENSATE

CONN CONNECTION

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CP CARPOOL PARKING SPACE

CV CHECK VALVE

CY CUBIC YARDS

D MAIN DRAIN

DA DRAINAGE AREA

DB DRAIN BASIN

DI DROP INLET

DIA DIAMETER

DIP DUCTILE IRON PIPE

DW DOMESTIC WATER

DWCPP DOUBLE-WALLED CORRUGATED

PLASTIC PIPE

DWCB DOUBLE-WING CATCH BASIN

DWG DRAWING

E EAST

Eo ELECTRICAL CABLE (OVERHEAD) Eu ELECTRICAL CABLE

(UNDERGROUND)

EF EACH FACE

EL ELEVATION

ELEV ELEVATION

EMH ELECTRICAL MANHOLE

EOP EDGE OF PAVEMENT

ESMT EASEMENT

EW EACH WAY

EX EXISTING

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

F FILTER RETURN

FES FLARED END SECTION

FEV FUEL EFFICIENT VEHICLE

FFE FINISHED FLOOR ELEVATION

FH FIRE HYDRANT

FIN FINISHED

FL FLOOR DRAIN

FM FORCE MAIN

FP FIRE PROTECTION

FS FLOW SWITCH

FT FEET or FOOT

FW FIRE WATER

GAL GALLON

GALV GALVANIZED

GE GUTTER ELEVATION

GLV GLOBE VALVE

GP GUARD POST

GPM GALLONS PER MINUTE

GS GALVANIZED STEEL

GV GATE VALVE

HC ACCESSIBLE PARKING

HDPE HIGH-DENSITY POLYETHYLENE

PIPE

HDWL HEADWALL

HG HYDROGEN GAS

HP HIGH POINT

HTW HIGH TEMPERATURE WATER

HW HARDWOOD TREE

HR HIGH TEMPERATURE, HIGH

PRESSURE WATER RETURN

HS HIGH TEMPERATURE, HIGH

PRESSURE WATER SUPPLY

ID INSIDE DIAMETER

IE INVERT ELEVATION

IP IRON PIN

IPF IRON PIN FOUND

IPS IRON PIN SET

JB JUNCTION BOX

L LENGTH

LF LINEAR FEET or LINEAR FOOT

LP LOW POINT

LA LANDSCAPE AREA

MAX MAXIMUM

MECH MECHANICAL

MH MANHOLE

MIN MINIMUM

MJ MECHANICAL JOINT

MON MONUMENT

MTR METER

M/U MAKE-UP

N NORTH

N/A NOT APPLICABLE

NaOCL SODIUM HYPOCHLORITE SOLUTION

NG NATURAL GAS

No NUMBER

NONRCP NON-REINFORCED CONCRETE PIPE

NTS NOT TO SCALE

OC ON CENTER

OCB OUTLET CONTROL BOX

OCEW ON CENTER EACH WAY

OD OUTSIDE DIAMETER

OHPL OVERHEAD POWER LINE

OT ORNAMENTAL PIPE

PC POINT OF CURVE

PD POSITIVE DISPLACEMENT

PE POLYETHYLENE

PF POINT OF FROG

1/2PF 1/2 POINT OF FROG

PFI POINT OF FROG INTERSECTION

PG PRESSURE GAUGE

PI POINT OF INTERSECTION

PIV POST INDICATOR VALVE

POV PRIVATELY OWNED VEHICLES

PL PROPERTY LINE

PS POINT OF SWITCH

PSF POUNDS PER SQUARE FOOT (or

FEET)

PSI POUNDS PER SQUARE INCH

PT POINT OF TANGENCY

PVC POINT OF VERTICAL CURVATURE or

POLYVINYLCHLORIDE PIPE

PVMT PAVEMENT

PVT POINT OF VERTICAL INTERSECTION

PW POTABLE WATER

R RADIUS

RCP REINFORCED CONCRETE PIPE

RED REDUCER

REINF REINFORCEMENT

ROW RIGHT OF WAY

RR RAILROAD (COMPANY)

RRT RAILROAD TRACK STRUCTURE

RW RAW WATER

R/W RIGHT OF WAY

S SOUTH or SLOPE SD STORM DRAIN or STORM SEWER

SHT SHEET

SS or Sx SANITARY SEWER

SSCO SANITARY SEWER CLEANOUT

SSE SANITARY SEWER EASEMENT

SSFM SANITARY SEWERAGE FORCE MAIN

SSMH SANITARY SEWER MANHOLE

ST STORM SEWER

STA STATION

STM STEAM

STMH STORM SEWER MANHOLE

SWCB SINGLE-WING CATCH BASIN

T TANGENT

To TELEPHONE (OVERHEAD) Tu TELEPHONE (UNDERGROUND)

TB THRUST BLOCK

TBM TEMPORARY BENCHMARK

TC TOP OF CURB ELEVATION

TD TRENCH DRAIN

TE TOP ELEVATION

TEL TELEPHONE CABLE

TFTG TOP OF FOOTING

TG TOP OF GRATE ELEVATION

TH THICK

THK THICKNESS

THREL THROAT ELEVATION

TP TOP OF PAVEMENT ELEVATION

TS TOP OF SLAB ELEVATION

TW TOP OF WALL ELEVATION

TYP TYPICAL

UC UNDERGROUND COMMUNICATIONS

UE UNDERGROUND ELECTRICAL

UNO UNLESS NOTED OTHERWISE ON

DRAWINGS

VC VERTICAL CURVE

VCP VITRIFIED CLAY PIPE

V/PG VACUUM PRESSURE GAUGE

VP VANPOOL

W WATER or WEST Wx EXISTING WATER LINE

W/ WITH

WD WIDE

WI WEIR INLET

WS WATER SURFACE

WWF WELDED WIRE FABRIC

L

EXISTING SANITARY SEWERSS

EXISTING STORM WATER SEWERST

EXISTING OVERHEAD ELECTRICOE

EXISTING UNDERGROUND ELECTRICUE

EXISTING UNDERGROUND COMMUNICATIONUC

EXISTING GAS LINEG

W EXISTING WATER MAIN

CONCRETE SIDEWALK

XX XX TEMPORARY SILT FENCE

POST INDICATOR VALVE

FIRE HYDRANT

MANHOLE

WATER VALVE

GAS METER

EXISTING CONDITIONS LEGENDABBREVIATIONS* DEMOLITION LEGENDSITE LEGEND

D

BOLLARD

ELECTRIC MANHOLE

COMM MANHOLE

GRADING & DRAINAGE LEGEND UTILITY LEGEND

JO

IN

T B

AS

E

CH

AR

LE

ST

ON

DE

SI

GN

ED

B Y:

CH

EC

KE

D

BY

A.

G

AD

HI

A C.

G

AJ

ER

A

AP

RI

L 2

DA

TE

G

CERTIFIED FINAL DESIGN SUBMITTAL – FOR CONSTRUCTION

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

RE

PA

IR

A

IR

CR

AF

T M

AI

NT

EN

AN

CE

FA

CI

LIT

Y B.

DKFX 1069825

RE

V

DE

SC

RI

PT

IO

N

PROJECT NUMBER:

DRAWING SIZE: ANSI D (22X34)

DE

PA

RT

ME

NT

O

F T

HE

A

IR

FO

RC

E

AI

R

MO

BI

LIT

Y

CO

MM

AN

D

CH

AR

LE

ST

ON

, S C

DR

AW

IN

G

RE

VI

SI

ON

S

DA

TE

PR

EP

B

Y

AP

PR

'D

DR

AW

N

BY

A.

G

AD

HI

A

SU

PV

CH

E

NG

R:

RECORD DRAWING DATE:

L.

TA

LIA

FE

RR

O

C -0

.d w g

AB

BR

EV

IA

TI

O

N S

AN

D

L

EG

EN

D

S

C-001

CLEAN OUT

ROOF DRAIN

LINEAR ITEM TO BE DEMOLISHED &

REMOVED

ASPHALT PAVEMENT & BASE TO BE

DEMOLISHED & REMOVED

SIDEWALK & BASE TO BE

DEMOLISHED & REMOVED

LIMITS OF BID OPTION

WATER LINE

SM EXISTING STEAM LINE

UD EXISTING UNDERGROUND ROOF DRAINAGE

DET EXISTING DETERGENT LINE

A EXISTING COMPRESSED AIR LINE

CW EXISTING COLD WATER LINE

HW EXISTING HOT WATER LINE

FW EXISTING HOT FIRE WATER LINE

CONCRETE PAVEMENT

BUILDING TO BE

DEMOLISHED & REMOVED

CONCRETE STOOP

CONCRETE PAVEMENT AND BASE

TO BE DEMOLISHED & REMOVED

LINEAR ITEM TO BE

ABANDONED IN PLACE

REDUCER

TAPPING SLEEVE AND VALVE

TEMPORARY CONSTRUCTION

ENTRANCE

1 1

CH

AN

GE

D

IN

A

CC

O

RD

AN

CE

W

IT

H

AD

DE

N

DU

M

/4

/2

C

LT

G

.d w g

C O

N

ST

R U

C

TI

O N

S

AF

ET

Y

N O

TE

S

GC001

JO

IN

T B

AS

E

CH

AR

LE

ST

ON

DE

SI

GN

ED

B Y:

CH

EC

KE

D

BY

A.

G

AD

HI

A C.

G

AJ

ER

A

AP

RI

L 2

DA

TE

G

CERTIFIED FINAL DESIGN SUBMITTAL – FOR CONSTRUCTION

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

RE

PA

IR

A

IR

CR

AF

T M

AI

NT

EN

AN

CE

FA

CI

LIT

Y B.

DKFX 1069825

RE

V

DE

SC

RI

PT

IO

N

PROJECT NUMBER:

DRAWING SIZE: ANSI D (22X34)

DE

PA

RT

ME

NT

O

F T

HE

A

IR

FO

RC

E

AI

R

MO

BI

LIT

Y

CO

MM

AN

D

CH

AR

LE

ST

ON

, S C

DR

AW

IN

G

RE

VI

SI

ON

S

DA

TE

PR

EP

B

Y

AP

PR

'D

DR

AW

N

BY

A.

G

AD

HI

A

SU

PV

CH

E

NG

R:

RECORD DRAWING DATE:

L.

TA

LIA

FE

RR

O

SCOPE OF WORK:

THE SCOPE OF THE PROJECT INVOLVES DEMOLITION OF BUILDING 61, BUILDING 61 UTILITIES, AND DEMOLITION AND REPLACEMENT OF

CONCRETE DRIVEWAY.

SAFETY

SAFETY

1. SAFETY PLAN (SPCD): CONTRACTOR SHALL SUBMIT A SAFETY PLAN COMPLIANCE DOCUMENT (SPCD) TO THE CONTRACTING OFFICER DESCRIBING HOW IT WILL COMPLY WITH THE REQUIREMENTS OF THE CONSTRUCTION OPERATIONAL SAFETY AND PHASING PLAN (COSPP OR CSPP) AND SUPPLYING DETAILS THAT COULD NOT BE DETERMINED BEFORE CONTRACT AWARD. NO WORK WILL BE

ALLOWED UNTIL THE SAFETY PLAN COMPLIANCE DOCUMENT IS APPROVED.

2. PROGRESS MEETINGS: THE CONTRACTOR SHALL CONDUCT WEEKLY PROGRESS MEETINGS WITH PRIMARY EMPLOYEES, SUB-CONTRACTORS DESIGNATED BASE ENGINEER, AND CONTRACTING OFFICER (OR CONTRACTING OFFICER REPRESENTATIVE (COR)).

3. EMERGENCY: IN THE EVENT OF AN EMERGENCY, THE CONTRACTOR SHALL MOVE EQUIPMENT AND PERSONNEL TO A SAFE DISTANCE FROM OPERATIONAL PAVEMENT AS DIRECTED BY AIRFIELD MANAGEMENT OR OTHER EMERGENCY RESPONDERS AND SHALL REMAIN

CLEAR UNTIL NOTIFIED THAT WORK MAY BE RESUMED.

4. VEHICLE MARKING: CONTRACTOR’S VEHICLES SHALL BE MARKED WITH FLASHING AMBER LIGHTS AND EQUIPMENT WITH 3’X3’ ORANGE AND WHITE CHECKERED FLAGS VISIBLE FROM THE AIR AND 360 DEGREES ABOUT THE VEHICLE AND EQUIPMENT. THE FLASHING LIGHT MUST HAVE PEAK INTENSITY WITHIN THE RANGE OF 40 TO 400 CANDELAS AND MUST FLASH AT 75± 15 FLASHES PER MINUTE.

5. PAVEMENT VACUUMING: THE CONTRACTOR SHALL MAINTAIN, BY CONTINUOUS VACUUMING, ALL PAVEMENTS IMPACTED BY CONTRACTOR OPERATIONS, INCLUDING BUT NOT LIMITED TO HAUL ROUTE PAVEMENTS, AND PAVEMENT ADJACENT TO THE AREA OF WORK. PAVEMENT SHALL BE KEPT FREE OF CONSTRUCTION MATERIALS, DIRT, ROCKS, AND OTHER DEBRIS AT ALL TIMES FOR THE LIFE OF THIS PROJECT BY VACUUMING OPERATIONS DURING ALL WORKING HOURS. AT THE CONSTRUCTION AND PRIOR TO FINAL ACCEPTANCE, THE CONTRACTOR SHALL CONDUCT A FINAL VACUUMING OF ALL PAVEMENTS UTILIZED/IMPACTED BY CONTRACTOR

OPERATIONS. STEEL WIRE BROOM VEHICLES ARE NOT PERMITTED.

6. WILDLIFE ATTRACTIONS: CONTRACTOR SHALL MAINTAIN WORK AREAS, LAYDOWN AREA, AND HAUL ROUTE TO BE FREE FROM WILDLIFE

ATTRACTANTS INCLUDING BUT NOT LIMITED TO TRASH, FOOD SCRAPS, AND PONDED WATER.

7. PAVEMENT PROTECTION: CONTRACTOR SHALL PROVIDE SPECIAL CARE WHERE CONTRACTOR’S TRAFFIC USES AND CROSSES AIRFIELD PAVEMENT. THE CONTRACTOR SHALL NOT CROSS ANY AIRFIELD PAVEMENT TO REMAIN WITH TRACKED EQUIPMENT WITHOUT A FORM OF PAVEMENT PROTECTION. PAVEMENT PROTECTION SHALL CONSIST OF A NON-SLIP MATERIAL SUCH AS NEOPRENE OR RUBBER

MATTING.

8. UNATTENDED VEHICLES: THE CONTRACTOR SHALL NOT LEAVE EQUIPMENT OR VEHICLES UNATTENDED ON THE AIRFIELD PAVEMENT.

9. ACTIVE AIRFIELD PAVEMENT: THE CONTRACTOR SHALL NOT PARK EQUIPMENT OR VEHICLES ON ACTIVE AIRFIELD PAVEMENT.

10. DUST CONTROL: THE CONTRACTOR SHALL PAY PARTICULAR ATTENTION TO DUST CONTROL. THE OPERATIONS OF THE RUNWAYS, TAXIWAYS AND ASSOCIATED NAVAIDS ARE SENSITIVE TO DUST. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL WITHIN THE LIMIT OF CONSTRUCTION AS WELL AS ALONG ANY HAUL ROUTES USED BY CONTRACTORS’ EQUIPMENT AND VEHICLES LOCATED ON THE AIRFIELD. THE GOVERNMENT RESERVES THE RIGHT TO STOP GRADING, HAULING, OR OTHER WORK AS NECESSARY TO BRING DUST

UNDER CONTROL.

11. FOREIGN OBJECT DEBRIS/DAMAGE (FOD): THE CONTRACTOR SHALL CONTROL FOD AT ALL TIMES. THE CONTRACTOR SHALL IMPLEMENT ALL NECESSARY PROTOCOLS TO CONTROL FOD DURING CONSTRUCTION, INCLUDING BUT NOT LIMITED TO, CONTROLLING VEHICLES TRACING OF SOIL AND ROCKS, CONTROLLING LOOSE DEBRIS FROM VEHICLES, CONTROL OF DEMOLITION AND CONSTRUCTION OF MATERIALS. IF IN THE OPTION OF THE CONTRACTING OFFICER, THE CONTRACTOR’S PROTOCOLS ARE INSUFFICIENT TO PREVENT THE SPREAD OF FOD, THE CONTRACTOR SHALL IMPROVE PROTOCOLS TO THE SATISFACTION OF THE CONTRACTING OFFICER AT NO

ADDITIONAL COST.

12. FLIGHT LINE DRIVERS TRAINING: CONTRACTOR’S PERSONNEL AND ALL SUBCONTRACTOR’S PERSONNEL THAT WILL BE OPERATING A VEHICLE OR EQUIPMENT ON THE AIRSIDE ARE REQUIRED TO ATTEND AND PASS FLIGHT LINE OPERATIONS TRAINING. FLIGHT LINE OPERATIONS TRAINING CONSISTS OF CLASSROOM INSTRUCTION AND TESTING (APPROXIMATELY 3 HOURS), COMPUTER-BASED TRAINING INSTRUCTION AND TESTING (APPROXIMATELY 30 MINUTES), AND FLIGHT LINE ORIENTATION (APPROXIMATELY 30 MINUTES).

THE ONLY EXCEPTION IS FOR HAULERS (TRUCK DRIVERS), WHO WILL BE ESCORTED ON AND OFF THE AIRFIELD BY SOMEONE WITH PROPER FLIGHT LINE CERTIFICATION. THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER FOR DETAILED

REQUIREMENTS.

13. CONTROLLED MOVEMENT AREA DRIVERS TRAINING: ALL CONTRACTOR AND SUBCONTRACTOR PERSONNEL CONDUCTING WORK IN CONTROLLED MOVEMENT AREAS ARE REQUIRED TO ATTEND AN APPROXIMATELY 1 HOUR MOVEMENT TRAINING AREA COURSE, HANDS-ON TRAINING AS NEEDED PROVIDED BY AIRFIELD MANAGEMENT, AND PASS A WRITTEN EXAM.

14. CALL-IN: CONTRACTOR SHALL CALL INTO AIRFIELD MANAGEMENT AND SECURITY FORCES EVERY MORNING AND EVENING AT

843-963-3024 OR 843-963-3026.

15. RADIOS AND ATC: THE CONTRACTOR SHALL PROVIDE THE NECESSARY BATTERY-POWERED TWO-WAY RADIO EQUIPPED WITH TOP MOUNDED ANTENNAS AND CAPABLE OF TUNING AIR NAVIGATION FREQUENCY BANDS. RADIOS MUST BE KEPT IN GOOD WORKING ORDER AT ALL TIMES WORK IS IN PROGRESS ON THE AIRFIELD WITHIN THE LANDING AREAS. THE CONTRACTOR SHALL HAVE AN OPERATOR (WHO SPEAKS FLUENT ENGLISH) AVAILABLE FOR RADIO CONTACT AT ALL TIMES. THE CONTRACTOR SHALL MAINTAIN A CONTRACT WITH THE AIR TRAFFIC CONTROL TOWER (FREQUENCY 121.9) AT ALL TIMES WHILE WORK IS BEING CONDUCTED WITHIN THE

LANDING AREAS.

16. ACTIVE TAXIWAY: THE SITE IS ADJACENT TO A TAXIWAY. THERE WILL BE ACTIVE AIRCRAFT ON THE TAXIWAY DURING CONSTRUCTION.

AIRFIELD SECURITY: THE CONTRACTOR SHALL INSTALL LOW PROFILE BARRICADE AND WATER FILLED JERSEY BARRIERS AT THE LOCATION SHOWN ON SHEET GC101 PRIOR TO BEGINNING ANY WORK. THE AIRFIELD SHALL REMAIN SECURE AT ALL TIMES AND NO CONTRACTOR

PERSONNEL SHALL ENTER THE AIRFIELD WITHOUT AN ESCORT FROM THE BASE.

17. PROTECTION OF NAVAIDS: BEFORE COMMENCING CONSTRUCTION ACTIVITY, PARKING VEHICLES, OR STORING CONSTRUCTION EQUIPMENT AND MATERIALS NEAR A NAVAID, THE CONTRACTOR SHALL COORDINATE WITH AIRFIELD MANAGEMENT AND BASE CES WHO WILL COORDINATE TO EVALUATE THE EFFECT OF CONSTRUCTION ACTIVITY, AND DETERMINE THE REQUIRED DISTANCES AND DIRECTION FROM THE NAVAID. CONTRACTOR PERSONNEL SHALL BE AWARE OF CRITICAL AREA LOCATIONS AND REMAIN CLEAR OF THE AREAS DURING LOW VISIBILITY. NO MATERIAL OR CONSTRUCTION WILL BE STOCKPILED OR STORED NEAR ANY NAVAIDS.

AIRSPACE IMAGINARY SURFACE LIMITATIONS / 7460’S/NOTAM’S

1. NOTAMS: BEFORE BEGINNING ANY CONSTRUCTION ACTIVITIES, THE CONTRACTOR MUST, THROUGH THE CONTRACTING OFFICER, GIVE NOTICE ISSUING THE NOTICE TO AIRMAN (NOTAM) OF THE PROPOSED LOCATION, TIME, AND DATE OF COMMENCEMENT OF CONSTRUCTION. ISSUANCE OF MULTIPLE NOTAMS DURING THE COURSE OF CONSTRUCTION MAY BE REQUIRED. UPON COMPLETION OF WORK AND RETURN OF ALL SUCH AREAS TO STANDARD OPERATING CONDITIONS, THE CONTRACTOR MUST, THROUGH THE CONTRACTING OFFICER, VERIFY THE CANCELLATION OF ALL NOTICES ISSUED VIA THE NOTAM SYSTEM. THE CONTRACTOR SHALL PROVIDE A MINIMUM OF 7 DAYS NOTICE TO ALLOW FOR EACH NOTAM TO BE FILED IN A TIMELY MANNER.

2. 7460-1: THE CONTRACTOR SHALL SUBMIT TO THE FAA, FOR APPROVAL, ALL NECESSARY 7460-1 FORMS A MINIMUM OF 45 DAYS PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL IDENTIFY ALL NECESSARY FORM 7460’S AS A NRA

(NON-RULE MAKING AIRPORT) NOTICE (I.E. CONSTRUCTION IS LOCATED ON AN AIRPORT).

3. 7460-2: THE CONTRACTOR SHALL SUBMIT TO THE FAA NECESSARY 7460-2 FORMS TO NOTIFY THE FAA THAT CONSTRUCTION WILL SOON COMMENCE. THE CONTRACTOR SHALL IDENTIFY ALL NECESSARY FORM 7460’S AS A NRA (NON-RULE MAKING AIRPORT) NOTICE (I.E.

CONSTRUCTION IS LOCATED AT AN AIRPORT).

4. AIRSPACE IMAGINARY SURFACES: PARTIAL AIRSPACE IMAGINARY SURFACES ARE PROVIDED FOR AIR FORCE STANDARDS HEREIN. ANY PERMANENT OR TEMPORARY PENETRATIONS TO AIRSPACE IMAGINARY SURFACES SHALL BE AUTHORIZED VIA A CONTRACTOR

PREPARED AND SUBMITTED 7460’S.

5. EQUIPMENT: THE CONTRACTOR SHALL STORE ANY EQUIPMENT INSIDE THE CONSTRUCTION-FREE ZONE LIMIT AT END OF EACH WORK SHIFT. ALL EQUIPMENT SHALL BE KEPT IN AN ORGANIZED MANNER TO THE SATISFACTION OF USAF AIRFIELD MANAGEMENT.

SECURITY

SECURITY CLEARANCE

1. FORM 74S: ALL CONTRACTOR AND SUBCONTRACTOR PERSONNEL SHALL FILL OUT SFS FORM 74 AND SUBMIT IT TO THE CONTRACTING OFFICER. IN GENERAL, TO OBTAIN SECURITY CLEARANCES, EACH PERSON SHALL SUBMIT AN APPLICATION TO THE CONTRACTING OFFICER FOR PROCESSING AND UNDERGO A BACKGROUND CHECK. THE SECURITY CLEARANCE PROCESS TYPICALLY REQUIRES

APPROXIMATELY A WEEK TO COMPLETE.

SECURITY:

1. SECURITY GUARDS: CONTRACTOR SHALL PROVIDE AND MAINTAIN SECURITY FROM A PROFESSIONAL (BONDED) SECURITY FIRM AT

CONTRACTOR ACCESS GATE FOR THE DURATION OF USE.

2. SECURITY GUARD TRAINING: ALL SECURITY PERSONNEL THAT WILL BE CONTROLLING CONTRACTOR ACCESS GATE ARE REQUIRED TO ATTEND A 2 HOUR SECURITY WORKSHOP. THE WORKSHOP WILL BE HELD AT JOINT BASE CHARLESTON (JBCHS).

3. ENTRY AUTHORIZATION LETTER (EAL): CONTRACTOR SHALL OBTAIN AN ENTRY AUTHORIZATION LETTER (EAL) LISTING ALL EMPLOYEES APPROVED TO WORK ON THE AIRFIELD. A COPY OF THE LETTER SHALL BE MAINTAINED BY SECURITY AT ALL CONTRACTOR ACCESS GATES. THE CONTRACTOR SHALL COORDINATE SECURITY PROTOCOLS WITH THE CONTRACTING OFFICER AND SECURITY FORCES.

4. GUARD RESPONSIBILITIES:

- GUARD SHALL NOT BE ARMED.

- GUARDS SHALL BE EQUIPPED WITH OPERATIONAL CELL PHONES.

- A SINGLE SECURITY GUARD SHALL BE STATIONED AT EACH CONTRACTOR ACCESS GATE BEING UTILIZED BY THE CONTRACTOR. THIS

INCLUDES EXISTING ACCESS CONTROL GATES AND ANY TEMPORARY CONSTRUCTION GATES.

- AT CONTRACTOR ACCESS GATES. GUARDS SHALL INSPECT ALL BADGES AND MAINTAIN A LOG OF ALL VEHICLES ENTERING AND

LEAVING THE AIRFIELD AND INSPECT ALL VEHICLES.

- ALL CONTRACTOR ACCESS GATES SHALL BE SECURED BY LOCK AT THE END OF EACH WORK SESSION.

- ALL CONTRACTOR ACCESS GATES SHALL BE KEPT CLOSED WHEN NOT IN USE AND OPENED ONLY FOR ENTERING AND EXITING

VEHICLES.

AIRFIELD ACCESS:

1. PREREQUISITES TO ACCESS: THE CONTRACTOR WILL NOT BE ALLOWED TO ACCESS TO THE AIRFIELD UNTIL:

- COMPLETION OF ALL NECESSARY SECURITY CLEARANCES, BADGES, ETC…

- COMPLETION OF ALL NECESSARY DRIVER TRAINING AND OTHER SECURITY SAFETY PROTOCOLS.

- APPROVAL OF ALL NECESSARY CONSTRUCTION SUBMITTALS

- APPROVAL OF THE CONTRACTOR’S SAFETY PLAN COMPLIANCE DOCUMENT (SPCD)

- APPROVAL OF THE CONTRACTOR’S QUALITY CONTROL PLAN

- COMPLETION OF OTHER NECESSARY APPROVALS

2. LOCATION: ACCESS TO THE AIRFIELD SHALL BE VIA EXISTING CONTRACTOR ACCESS GATES IN THE VICINITY OF WORK ONGOING AS

INDICATED ON THE PLANS.

3. HAZARD MARKING AND LIGHTING:

- PURPOSE - HAZARD MARKING AND LIGHTING PREVENTS PILOTS FROM ENTERING AREAS CLOSED TO AIRCRAFT, AND PREVENTS

CONSTRUCTION PERSONNEL FROM ENTERING AREAS OPEN TO AIRCRAFT.

- EQUIPMENT - CONTRACTOR SHALL MARK THE LIMITS OF CONSTRUCTION WITH FENCING AND JERSEY BARRIER AND FOD FENCE

BARRICADES AS INDICATED. CONTRACTOR SHALL PROVIDE A REPRESENTATIVE WHO WILL BE ON-CALL 24-HOURS A DAY TO PERFORM EMERGENCY MAINTENANCE OF ANY CONTRACTOR ERECTED SIGN, BARRICADE, OR WARNING LIGHTS DURING THE CONSTRUCTION

PERIOD.

- BARRICADES SHALL MEET THE DETAILS PROVIDED HEREIN. SEE PLANS FOR BARRICADE LOCATION.

- RED LIGHTS MUST BE SECURELY MOUNTED ON BARRICADE AND SPACED NO MORE THAN 10 FEET APART. LIGHTS MUST BE OPERATED

FROM SUNSET TO SUNRISE AND DURING PERIODS OF LOW VISIBILITY. THE LIGHTS MAY BE OPERATED BY PHOTOCELL; HOWEVER, THE CONTRACTOR MAY HAVE TO TURN THEM ON MANUALLY AT TIMES DURING LOW VISIBILITY DURING DAYTIME HOURS.

- THE CONTRACTOR SHALL COMPLY WITH THE FAA AND THE BASE WHEN ALIGNING CONSTRUCTION FLOODLIGHTS AS TO NOT INTERFERE WITH THE VISION OF AIRCRAFT PILOTS AND AIR TRAFFIC CONTROLLERS WHEN OPERATIONS ARE TAKING PLACE.

COORDINATION

LAYDOWN AREA:

1. LOCATION: THE CONTRACTOR’S LAYDOWN AREA SHALL BE LOCATED OUTSIDE THE SECURED AREA OF THE AIRFIELD AT A LOCATION WITHIN 1 MILE OF THE PROJECT SITE TO BE DETERMINED BY THE CONTRACTING OFFICER AT THE TIME OF AWARD.

2. UTILITIES: THE CONTRACTOR SHALL PERFORM ALL NECESSARY COORDINATION AND SHALL BEAR ALL COSTS NECESSARY TO ESTABLISH

ELECTRICAL, WATER, AND SEWER SERVICE TO THE LAYDOWN AREA.

3. WATER: THE CONTRACTOR MAY OBTAIN WATER VIA AN EXISTING FIRE HYDRANT LOCATED IN THE VICINITY OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL PROVIDE HYDRANT METERS AND BACKFLOW PREVENTION. WATER LINES SHALL BE SECURED AT ALL

TIMES AND REMOVED UPON COMPLETION.

4. PORTABLE TOILETS: PRIOR TO ANY CONSTRUCTION ACTIVITIES PROVIDE TEMPORARY SEWER AND SANITARY FACILITIES, AS DEFINED IN

THE SPECIFICATIONS, FOR ALL WORK AREAS AND ACCESS GATES.

5. ADDITIONAL FACILITIES: THE CONTRACTOR CAN USE EMPTY BUILDING 63 AS OFFICE SPACE AND NO ADDITIONAL FACILITY IS NEEDED

FOR THE GOVERNMENT.

6. SECURITY: THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MAINTAINING SECURITY AT THE LAYDOWN AREA.

7. APPEARANCE: THE CONTRACTOR SHALL MAINTAIN THE LAYDOWN AREA IN A GOOD STATE OF APPEARANCE.

8. FOD: THE CONTRACTOR SHALL MAINTAIN THE LAYDOWN AREA SUCH THAT IT DOES NOT GENERATE OR BECOME A SOURCE OF FOREIGN

OBJECT DEBRIS.

9. OFFSITE LAYDOWN AREA: THE AIRFIELD HAS LIMITED SPACE AVAILABLE FOR A CONTRACTOR’S LAYDOWN AREA. OBTAINING, MAINTAINING ANY REQUIRED OFF-SITE LAYDOWN AREA THAT THE CONTRACTOR SHALL NEED IS THE RESPONSIBILITY OF THE

CONTRACTOR.

10. LAND DISTURBANCE PERMIT: IF LOCATED OUTSIDE THE PERMIT AREA OF DISTURBANCE FOR THE PROJECT, THE CONTRACTOR SHALL OBTAIN A SEPARATE LAND DISTURBANCE/STORMWATER PERMIT FOR AN OFFSITE LAYDOWN AREA.

11. OTHER PERMITS: THE CONTRACTOR SHALL OBTAIN ALL PERMITS NECESSARY FOR THE ERECTION AND OPERATION OF PLANS/CRUSHER.

12. AIR SPACE LIMITATIONS/7460’S/NOTAMS: THE CONTRACTOR SHALL SUBMIT ALL NECESSARY FORM 7460’S TO FAA AND COORDINATE ALL NECESSARY NOTAMS WITH THE CONTRACTING OFFICER. APPROVAL OF 7460’S IS NOT GUARANTEED. REFER TO AIRSPACE

IMAGINARY SURFACE LIMITATION NOTES.

HAUL ROUTES:

1. LOCATION: CONTRACTOR SHALL UTILIZE HAUL ROUTES (PRIMARY) AS SHOWN ON SHEET G-002. THE CONTRACTOR SHALL BE ADVISED THAT, FOR BASE SECURITY, JBCHS MAY CLOSE VEHICLE GATE -3 (V-3) AT ANY TIME WITHOUT NOTICE. THE CONTRACTOR SHALL UTILIZE HAUL ROUTE # 2 AND VEHICLE GATE – 5 (V-5) TO GAIN ACCESS TO SPECIFIED WORK AREAS AT NO ADDITIONAL COST TO THE GOVERNMENT WHEN GATE V-3 IS CLOSED BY JBCHS. THE CONTRACTOR SHALL BE ADVISED THAT ALL TRAFFIC GOING THROUGH RIVERS

GATE WILL BE SCANNED BY SECURITY.

2. EXISTING ROADS: HAUL ROUTES UTILIZING EXISTING BASE ROADWAYS WILL REMAIN OPEN TO PATRON TRAFFIC AT ALL TIMES DURING CONSTRUCTION. THE CONTRACTOR SHALL EXERCISE ALL NECESSARY PROTOCOLS TO INSURE SAFETY TO THE GENERAL PUBLIC ON ALL

HAUL ROUTES.

3. DAMAGE: THE CONTRACTOR SHALL PREPARE A PHOTOGRAPHIC RECORD OF EXISTING ROADWAYS PRIOR TO CONSTRUCTION. DAMAGE TO EXISTING ROADWAYS, CAUSED BY CONSTRUCTION TRAFFIC, SHALL BE REPAIRED TO THE GOVERNMENT’S SATISFACTION AT NO

ADDITIONAL COST.

4. TRAFFIC CONTROL: IF DEEMED NECESSARY BY EITHER THE CONTRACTOR OR GOVERNMENT, THE CONTRACTOR SHALL, AT NO ADDITIONAL COST TO THE GOVERNMENT, PREPARE AND SUBMIT A TRAFFIC CONTROL PLAN IN KEEPING WITH THE LATEST MUTCD

MANUAL FOR APPROVAL.

5. FLAGMAN: PROVIDE AND MAINTAIN FLAGMEN TO DIRECT AND CONTROL CONSTRUCTION TRAFFIC WHERE ALL UTILIZED HAUL ROUTES ARE ON ACTIVE ROADWAYS OR ACTIVE AIRFIELD PAVEMENTS, CROSS ACTIVE ROADS OR ACTIVE AIRFIELD PAVEMENTS OR OTHERWISE IMPACT ACTIVE ROADWAYS OR ACTIVE AIRFIELD PAVEMENTS. COORDINATE FLAGMAN LOCATIONS WITH THE CONTRACTING OFFICER.

6. TEMPORARY HAUL ROUTES: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION AND MAINTAINING TEMPORARY HAUL ROUTES AS REQUIRES. THE CONTRACTOR SHALL RESTORE HAUL ROUTES TO EXISTING OR BETTER CONDITION AT COMPLETION OF THE

PROJECT.

7. LAND DISTURBANCE PERMIT: IF LOCATED OUTSIDE THE PERMIT AREA OF DISTURBANCE FOR THE PROJECT, THE CONTRACTOR SHALL OBTAIN A SEPARATE LAND DISTURBANCE/STORMWATER PERMIT FOR THE CONSTRUCTION OF HAUL ROUTES.

8. APPEARANCE: THE CONTRACTOR SHALL MAINTAIN THE HAUL ROUTES IN A GOOD STATE OF APPEARANCE.

9. FOD: THE CONTRACTOR SHALL MAINTAIN THE HAUL ROUTES SUCH THAT IT DOES NOT GENERATE OR BECOME A SOURCE OF FOREIGN

OBJECT DEBRIS.

CH

AN

GE

D

IN

A

CC

O

RD

AN

CE

W

IT

H

AD

DE

N

DU

M

/4

/2

© 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS

FIRE PUMP

HOUSE

BUILDING 64

CORROSION

CONTROL/WASHRACK

BUILDING 63

FFE = 40.00

STORAGE TANK

200,000 GAL.

BLDG. 61

TRANSFORMER

PAD

EX.

BLDG.

EX.

BLDG.

EX.

BLDG.

GM

10'

15'

10'

'10

G C

.d w g

C O

N

ST

R U

C

TI

O N

S

AF

ET

Y

PL

AN

GC101

JO

IN

T B

AS

E

CH

AR

LE

ST

ON

DE

SI

GN

ED

B Y:

CH

EC

KE

D

BY

A.

G

AD

HI

A C.

G

AJ

ER

A

AP

RI

L 2

DA

TE

G

CERTIFIED FINAL DESIGN SUBMITTAL – FOR CONSTRUCTION

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

RE

PA

IR

A

IR

CR

AF

T M

AI

NT

EN

AN

CE

FA

CI

LIT

Y B.

DKFX 1069825

RE

V

DE

SC

RI

PT

IO

N

PROJECT NUMBER:

DRAWING SIZE: ANSI D (22X34)

DE

PA

RT

ME

NT

O

F T

HE

A

IR

FO

RC

E

AI

R

MO

BI

LIT

Y

CO

MM

AN

D

CH

AR

LE

ST

ON

, S C

DR

AW

IN

G

RE

VI

SI

ON

S

DA

TE

PR

EP

B

Y

AP

PR

'D

DR

AW

N

BY

A.

G

AD

HI

A

SU

PV

CH

E

NG

R:

RECORD DRAWING DATE:

L.

TA

LIA

FE

RR

O

A1 CONSTRUCTION SAFETY PLAN

NORTH

SCALE: 1" = 30' 0 30' 60'

SHEET KEYNOTES

GENERAL SHEET NOTES

SHEET LEGEND

1. EXISTING INFORMATION SHOWN HEREON WAS OBTAINED

FROM INSTALLATION PROVIDED RECORD DRAWING AND

GEOGRAPHICAL INFORMATION SYSTEM (GIS) FILES. EXACT

LOCATION OF ALL INFORMATION MUST BE FIELD VERIFIED IN

ACCORDANCE WITH GENERAL CIVIL NOTES 4, 6, AND 10 ON

SHEET C-002.

2. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

3. REFER TO C-002 FOR GENERAL CIVIL NOTES.

1. LOW PROFILE BARRICADE - DETAIL C1/C-501

2. 32" HIGH WATER FILLED INTERLOCKING JERSEY STYLE

BARRIER

CONSTRUCTION FREE ZONE LIMIT

CONSTRUCTION

FREE ZONE LIMIT

CONSTRUCTION

FREE ZONE LIMIT

CONSTRUCTION

FREE ZONE LIMIT

WATER FILLED INTERLOCKING

JERSEY STYLE BARRIER

LOW PROFILE BARRICADE

CH

AN

GE

D

IN

A

CC

O

RD

AN

CE

W

IT

H

AD

DE

N

DU

M

/4

/2

SS

SM

IW

IW

SM

WW

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST ST ST ST ST ST ST ST ST ST ST ST ST ST

ST ST ST ST ST ST ST ST ST ST ST ST ST ST

ST ST ST ST ST ST ST

ST ST ST ST ST ST STSTST STST

ST

ST

ST

ST

U D

U D

U D

U D

U D

U D

U D

U D

U D

W

W

FD

PRD

SS SS SS SS SS SS SS SS

SS

SS

SS

ST

ST

ST

ST

ST

ST

ST

ST

G

G

UE

UE

UE

UE

UE

UE

UE UE UE UE UE

UE UE UE UE UE

U E

UE UE

U

E

G G G G G G G G G G G G

G

G

UE

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

UE UE UE UE UE

U C

UC UC

UC

UC

UC

UC

UC

UC

U C

U C

U C

U C

U C

U C

U C

U E

U E

U E

U C

U C

U C

UE

U E

FIRE PUMP

HOUSE

BUILDING 64

CORROSION

CONTROL/WASHRACK

BUILDING 63

FFE = 40.00

STORAGE TANK

200,000 GAL.

U C

U C

U C

U C

U C

UC

UC

UC

UC

UC

UC

U C

UC

UC

UC

UC

UC

UD UD UD UD UD UD UD

U D

U D

U D

U D

U D

U D

U D

U D

UD UD UD UD UD UD UD UD

G

G G

G

G

G

G

G

G G G G

G

W W W W W W W W W W

W W

W W

W

WW

W W

W W

W W

W W

W W

W W

W

W

W

W

W W W W W W W W W W

W W

W W

W W

W W

W W

W W

W W

W

W

W

W

WW

W

W

FW FW

FW

FW FW FW

PIV

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

IW IW

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM SM

SM

SM SM

UE

UE UE UE UE UE UE

UE

U E

U E

U E

U E

UE

TRANSFORMER

PAD

EX.

BLDG.

UD UD UD UD UD UD UD

EX.

BLDG.

EX.

BLDG.

GM

8-I

NCH D

IP

6-INCH DIP

8-

IN

C H

D

IP

8-

IN

C H

D

IP

6-INCH DIP

6" PVC

SANITARY

SEWER

8-

IN

C H

D

IP

XXXXXXXXXXXXXX

XX

XX

XXXXXXXXXXXX

XX

XX

XX

XX

XX

XX

WALL

C G

.d w g

G R

AD

IN

G A

N D

E R

O

SI

O N

C O

N

TR

O L

PL

AN

CG101

A1 GRADING AND EROSION CONTROL PLAN

NORTH

SCALE: 1" = 20' 0 20' 40'

SHEET KEYNOTES

GENERAL SHEET NOTES

1. MATCH EXISTING GRADE

2. TEMPORARY SILT FENCE - DETAIL B1/C-503

3. TEMPORARY CONSTRUCTION ENTRANCE - DETAIL A6/C-501

JO

IN

T B

AS

E

CH

AR

LE

ST

ON

DE

SI

GN

ED

B Y:

CH

EC

KE

D

BY

A.

G

AD

HI

A C.

G

AJ

ER

A

AP

RI

L 2

DA

TE

G

CERTIFIED FINAL DESIGN SUBMITTAL – FOR CONSTRUCTION

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

RE

PA

IR

A

IR

CR

AF

T M

AI

NT

EN

AN

CE

FA

CI

LIT

Y B.

DKFX 1069825

RE

V

DE

SC

RI

PT

IO

N

PROJECT NUMBER:

DRAWING SIZE: ANSI D (22X34)

DE

PA

RT

ME

NT

O

F T

HE

A

IR

FO

RC

E

AI

R

MO

BI

LIT

Y

CO

MM

AN

D

CH

AR

LE

ST

ON

, S C

DR

AW

IN

G

RE

VI

SI

ON

S

DA

TE

PR

EP

B

Y

AP

PR

'D

DR

AW

N

BY

A.

G

AD

HI

A

SU

PV

CH

E

NG

R:

RECORD DRAWING DATE:

L.

TA

LIA

FE

RR

O

1. EXISTING INFORMATION SHOWN HEREON WAS OBTAINED

FROM INSTALLATION PROVIDED RECORD DRAWING AND

GEOGRAPHICAL INFORMATION SYSTEM (GIS) FILES. EXACT

LOCATION OF ALL INFORMATION MUST BE FIELD VERIFIED IN

ACCORDANCE WITH GENERAL CIVIL NOTES 4, 6, AND 10 ON

SHEET C-002.

2. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

3. REFER TO C-002 FOR GENERAL CIVIL NOTES.

4. CONTRACTOR SHALL PERFORM A FIELD SURVEY PRIOR TO

CONSTRUCTION.

5. CONTRACTOR SHALL SEED AND FERTILIZE ALL DISTURBED

PERVIOUS AREA INCLUDING BUILDING 61 DEMOLISHED SITE

PER SPECIFICATION 32 92 19 SEEDING.

CH

AN

GE

D

IN

A

CC

O

RD

AN

CE

W

IT

H

AD

DE

N

DU

M

/4

/2

-5

.d w g

C

IV

IL

D

ET

AI

LS

C-501

JO

IN

T B

AS

E

CH

AR

LE

ST

ON

DE

SI

GN

ED

B Y:

CH

EC

KE

D

BY

A.

G

AD

HI

A C.

G

AJ

ER

A

AP

RI

L 2

DA

TE

G

CERTIFIED FINAL DESIGN SUBMITTAL – FOR CONSTRUCTION

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

RE

PA

IR

A

IR

CR

AF

T M

AI

NT

EN

AN

CE

FA

CI

LIT

Y B.

DKFX 1069825

RE

V

DE

SC

RI

PT

IO

N

PROJECT NUMBER:

DRAWING SIZE: ANSI D (22X34)

DE

PA

RT

ME

NT

O

F T

HE

A

IR

FO

RC

E

AI

R

MO

BI

LIT

Y

CO

MM

AN

D

CH

AR

LE

ST

ON

, S C

DR

AW

IN

G

RE

VI

SI

ON

S

DA

TE

PR

EP

B

Y

AP

PR

'D

DR

AW

N

BY

A.

G

AD

HI

A

SU

PV

CH

E

NG

R:

RECORD DRAWING DATE:

L.

TA

LIA

FE

RR

O

ABC-SEPARATION LAYER6"

7"

F1 REINFORCED PCC PAVEMENT

NO SCALE

PCC

24" COMPACTED SUBGRADE PER

SPECIFICATION 31 00 00

XXXX

6' MINIMUM (SEE SITE PLAN)

1/2" EXPANSION JOINT BETWEEN WALK AND PAVING OR

ADJACENT STRUCTURE AND AT ALL CONSTRUCTION JOINTS

4" THICK 4,000 PSI @ 28 DAYS FINISHED

GRADE

4" CRUSHED AGGREGRATE (ABC)

NOTES:

1.) ALL CONTROL JOINTS SHALL BE HAND TOOLED AND

NOT SAW-CUT

2.) MAXIMUM CROSS SLOPE IS 1

4 " PER 1-FT

F4 4" CONCRETE SIDEWALK

NO SCALE

C1 LOW PROFILE BARRICADE

NO SCALE

COMPACTED SUBGRADE

REINFORCEMENT -

RE CONCRETE REINFORCEMENT NOTES C-502

FLUORESCENT ORANGE AND

FLUORESCENT WHITE STRIPES

NOTES:

1. LOW PROFILE BARRICADES SHALL MEET FAA AC 150/5370-2F (OR CURRENT EDITION).

2. THE LOCATION OF THE BARRICADES AS SHOWN REPRESENTS THE MOST TYPICAL LOCATIONS. ACTUAL LOCATION OF THE

BARRICADES FOR WORK AREA SHALL BE COORDINATED WITH AIRFIELD MANAGER AND COR.

3. BARRICADES SHALL BE PLACED END TO END WITH NO GAPS ACROSS FULL WIDTH OF PAVEMENT CLOSED TO TRAFFIC INCLUDING

SHOULDERS.

4. FLASHING LIGHTS SHALL BE AT LEAST FIVE CANDELAS EFFECTIVE INTENSITY AND FLASH RATE AT A RATE OF 55 TO 160 FLASHES

PER MINUTE.

5. BARRICADES SHALL BE TEMPORARILY REMOVED AND REINSTALLED BY THE CONTRACTOR AS NEEDED TO MINIMIZE THE IMPACT OF

THIS PROJECT ON AIRPORT OPERATIONS.

6. CONTRACTOR SHALL MAINTAIN ALL LOW PROFILE BARRICADES FOR THE DURATION OF THE PROJECT.

6-INCH - 12-INCH WIDE

PAINTED STRIPES

WATER FILLED WEIGHTED BARRIER,

10" X 10" X 8' LONG, PAINTED TWO

SIDE AND TOP AS NOTES.

SOLAR POWERED (WITH BATTERY BACK-UP)

RED LIGHT MOUNTED ON BARRICADE, TWO

PER BARRICADE, OR APPROVED EQUAL 20-INCH X 20-INCH

FLUORESCENT ORANGE

FLAG. TWO PER BARRICADE.

(2) GALVANIZED STEEL SADDLE

CLIPS WITH FASTENERS

BARRICADES SHALL BE

FASTENED TOGETHER

TO FORM A CONTINUOUS

LINE FROM END TO END.

NOTES:

1. STABILIZED CONSTRUCTION ENTRANCES SHOULD BE USED AT ALL POINTS WHERE TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND

MOVING DIRECTLY ONTO A PUBLIC ROAD.

2. IF WASHING IS USED, PROVISIONS MUST BE MADE TO INTERCEPT THE WASH WATER AND TRAP THE SEDIMENT TO INTERCEPT THE WASH WATER AND TRAP THE SEDIMENT BEFORE IT IS CARRIED OFF SITE. WASHDOWN FACILITIES SHALL BE REQUIRED AS DIRECTED BY SCDOT AS NEEDED. WASHDOWN AREAS IN GENERAL MUST BE ESTABLISHED WITH CRUSHED GRAVEL AND DRAIN INTO A SEDIMENT TRAP OR SEDIMENT BASIN. CONSTRUCTION ENTRANCES SHOULD BE USED IN CONJUNCTION WITH THE STABILIZATION OF CONSTRUCTION ROADS TO REDUCE

THE AMOUNT OF MUD PICKED UP BY VEHICLES.

3. REMOVE ALL VEGETATION AND ANY OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA.

4. DIVERT ALL SURFACE RUNOFF AND DRAINAGE FROM STONES TO A SEDIMENT TRAP OR BASIN.

5. INSTALL A CLASS 2 NON-WOVEN GEOTEXTILE FABRIC THAT MEETS THE REQUIREMENTS OF SECTION 804 OF THE STANDARD SPECIFICATIONS

FOR HIGHWAY CONSTRUCTION, LATEST EDITION, PRIOR TO PLACING ANY STONE.

6. MINIMUM DIMENSIONS OF THE ENTRANCE SHALL BE 24-FT WIDE X 100-FT LONG, AND MAY BE MODIFIED AS NECESSARY TO ACCOMMODATE

SITE CONSTRAINTS.

7. INSPECT CONSTRUCTION ENTRANCES EVERY SEVEN (7) CALENDAR DAYS. CHECK FOR MUD AND SEDIMENT BUILDUP, AS WELL AS PAD INTEGRITY. MAINTENANCE IS REQUIRED MORE FREQUENTLY IN WET WEATHER CONDITIONS. RESHAPE THE STONE PAD AS NEEDED FOR

DRAINAGE AND RUNOFF CONTROL.

8. WASH OR REPLACE STONES AS NEEDED AND AS DIRECTED BY THE ENGINEER. THE STONE IN THE ENTRANCE SHOULD BE WASHED OR REPLACED WHENEVER THE ENTRANCE FAILS TO REDUCE MUD BEING CARRIED OFF SITE BY VEHICLES. FREQUENT WASHING WILL EXTEND

THE USEFUL LIFE OF STONE.

9. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD

ONLY BE USED WHEN THE WATER CAN BE DISCHARGED TO A SEDIMENT TRAP OR BASIN.

10. REPAIR ANY BROKEN PAVEMENT IMMEDIATELY.

11. USE AGGREGATE NO. 1, 2, 24, OR 3 AS CONSTRUCTION ENTRANCE MATERIAL.

12. PAY ITEM: 8156490 STABILIZED CONSTRUCTION ENTRANCE_____SY

A6 TEMPORARY CONSTRUCTION ENTRANCE

NO SCALE

CH

AN

GE

D

IN

A

CC

O

RD

AN

CE

W

IT

H

AD

DE

N

DU

M

/4

/2

1 1.9 2 11 11.1 123 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

J

K

L

CJCJCJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJCJCJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJCJCJ CJ CJ CJ CJ CJ CJ CJ CJ CJ

CJCJCJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJCJCJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ

CJ CJ CJ CJ CJ

CJ

CJ CJ

CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ

CJ CJ CJ

CJ CJ CJ CJ CJ

CJ CJ CJ

CJ CJ CJ

CJ CJ CJ CJ CJ

CJ CJ CJ

CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ

CJ CJ CJ

CJ CJ CJ CJ CJ

CJ CJ CJ

CJ CJ CJ CJ CJ CJ CJ

CJ CJ CJ

CJ CJ CJ

/8

/8 "1

/2

28' - 0" 6" 19' - 8" 20' - 4" 26' - 6" 24' - 10 1/2" 19' - 3" 24' - 10 1/2" 26' - 6" 20' - 4" 19' - 8" 6" 28' - 0"

CJ CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ

CJ CJ CJ CJ CJ

CJ CJ CJ CJ CJ

12' - 6" 12' - 6" 12' - 6" 12' - 6"

8.18.2 8.3

S-401

A1

A1

S-501

TYP.

A1

S-501

EXTENT OF

EXISTING STOOP

D E

S

IG

N E

D B

Y

C H

E C

K E

D B

Y

D A

T E

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

R E

V D

E S

C R

IP

T

IO

N

PROJECT NUMBER:

DRAWING SIZE: ANSI D (22X34)

D E

P A

R T

M E

N T

O F

T H

E A

IR

F

O R

C E

A

IR

M O

B

IL

IT

Y

C O

M M

A N

D C

H A

R L

E S

T O

N , S

C

D R

A W

IN

G

R E

V

IS

IO

N

S D

A T

E P

R E

P B

Y A

P P

R 'D

D R

A W

N B

Y

S U

P V

C

H E

N G

R

RECORD DRAWING DATE:

S-101

O V

E R

A L L F

O U

N D

A T

IO

N

P L A

N

JO

IN

T B

A S

E C

H A

R L

E S

T O

N

A . M

A G

IN

N

IS

J.

S P

E E

R S

A P

R

IL

CERTIFIED FINAL DESIGN SUBMITTAL - FOR CONSTRUCTION

R E

P A

IR

A

IR

C

R A

F T

M A

IN

T

E N

A N

C E

F A

C

IL

IT

Y

B .6

DKXF 1069825

J.

A

L D

A Z

C

H A

N G

E D

IN

A

C C

O R

D A

N C

E W

IT

H

A D

D E

N D

U M

/4

/2

1/16" = 1'-0"A1

OVERALL FOUNDATION PLAN

0 4' 8' 16' 32'

NORTH

1. EXISTING FINISHED FLOOR EL. = 100'-0".

2. "CJ" INDICATES EXISTING SLAB JOINT (VARIOUS TYPES).

1. SEE E1 / S-502 FOR TYPICAL ELECTRICAL ROOM SLAB

REPAIR DETAIL AT DEMOLISHED SLAB SURROUNDING

CORRODED CONDUIT.

2. NEW CONCRETE STOOP AT NEW EXTERIOR DOOR.

SEE ARCH. FOR PLAN DIMENSIONS.

3. SAW-CUT NEW DOOR IN CMU WALL. SEE DETAIL F1 /

S-510 FOR LINTEL DETAIL.

4. NEW EXTERIOR DOORWAY. SEE ARCH.

GENERAL SHEET NOTES

SHEET KEYNOTES

INDICATES EXTENTS OF NEW CONCRETE SLAB

PANELS REINF. WITH WELDED WIRE

REINFORCING.

LEGEND

A R

M

6 7 8

B

C

D

CJ

CJ CJ NCJ NCJ

CJ

CJ CJ CJ CJ

NCJ NCJ NCJ NCJ NCJ

CJ CJ CJ CJ CJ

CJ CJ NCJ NCJ NCJ

NCJ NCJ NCJ NCJ

12' - 6" 12' - 6" 12' - 6" 12' - 6"

D1

S-501

D1

S-501

F3

S-501

F3

S-501

1 1 1 1

F6

S-501

TYP. AT JOINTS

BETWEEN NEW

SLAB PANELS

D4

S-501

HANGER DOOR

PANELS

NCJ NCJ NCJ NCJ

NEW SLAB PANELS

NEW SLAB PANELS

D E

S

IG

N E

D B

Y

C H

E C

K E

D B

Y

D A

T E

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

R E

V D

E S

C R

IP

T

IO

N

PROJECT NUMBER:

DRAWING SIZE: ANSI D (22X34)

D E

P A

R T

M E

N T

O F

T H

E A

IR

F

O R

C E

A

IR

M O

B

IL

IT

Y

C O

M M

A N

D C

H A

R L

E S

T O

N , S

C

D R

A W

IN

G

R E

V

IS

IO

N

S D

A T

E P

R E

P B

Y A

P P

R 'D

D R

A W

N B

Y

S U

P V

C

H E

N G

R

RECORD DRAWING DATE:

S-401

F L O

O R

S L A

B P

L A

N

JO

IN

T B

A S

E C

H A

R L

E S

T O

N

A . M

A G

IN

N

IS

J.

S P

E E

R S

A P

R

IL

CERTIFIED FINAL DESIGN SUBMITTAL - FOR CONSTRUCTION

R E

P A

IR

A

IR

C

R A

F T

M A

IN

T

E N

A N

C E

F A

C

IL

IT

Y

B .6

DKXF 1069825

J.

A

L D

A Z

C

H A

N G

E D

IN

A

C C

O R

D A

N C

E W

IT

H

A D

D E

N D

U M

/4

/2

1/4" = 1'-0"A1

ENLARGED PARTIAL CONCRETE FLOOR PLAN

0 1' 2' 4' 8'

NORTH

1 ADD (6) 11" THICK CONCRETE SLAB PANELS TO

REPLACE DEMOLISHED SLABS (SEE SD-101).

REINFORCE WITH 6x6 W4.0xW4.0 W.W.R. AT 2 1/2"

BELOW TOP OF SLAB.

2. THE CONTRACTOR SHALL PRICE TWO ADDITIONAL 11"

THICK SLAB PANEL DEMOLITIONS AND REPLACEMENTS

AT LOCATIONS TO BE DETERMINED DURING

CONSTRUCTION BY THE CONTRACTING OFFICER.

SHEET KEYNOTES

1. EXISTING FINISHED FLOOR EL. = 100'-0".

2. "CJ" INDICATES EXISTING CONTROL OR CONSTRUCTION

JOINT.

3. "NCJ" INDICATES NEW CONTROL OR CONSTRUCTION

JOINT.

GENERAL SHEET NOTES

INDICATES EXISTING SLAB PANELS

LEGEND

A R

M

FINISHED FLOOR

100'-0"

T.O. HANGAR DOORS

165'-1"

A B C D E F H J K L

E3

AE301

TRANSLUCENT PANEL

SILL

114'-4"

RESTROOM

SHOWER

FIRE

RISER

ROOM

HANGAR

G

FINISHED FLOOR

100'-0"

T.O. HANGAR DOORS

165'-1"

1.9211.1 11 345678910 A3

AE301

TRANSLUCENT PANEL

SILL

114'-4"

HANGAR

2 9

DE

SI

GN

ED

B Y:

CH

EC

KE

D

BY

DA

TE

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

RE

V

DE

SC

RI

PT

IO

N

PROJECT NUMBER:

DRAWING SIZE: ANSI D (22X34)

DE

PA

RT

ME

NT

O

F T

HE

A

IR

FO

RC

E

AI

R

MO

BI

LIT

Y

CO

MM

AN

D

CH

AR

LE

ST

ON

, S C

DR

AW

IN

G

RE

VI

SI

ON

S

DA

TE

PR

EP

B

Y

AP

PR

'D

DR

AW

N

BY

SU

PV

CH

E

NG

R:

RECORD DRAWING DATE:

AE301

BU

IL

D

IN

G S

EC

TI

O N

S

JO

IN

T B

AS

E

CH

AR

LE

ST

ON

D

RE

MY

Q

RE

MY

AP

RI

L 2

CERTIFIED FINAL DESIGN SUBMITTAL - FOR CONSTRUCTION

RE

PA

IR

A

IR

CR

AF

T M

AI

NT

EN

AN

CE

FA

CI

LIT

Y, B

.63

DKFX 1069825

G

UE

CK

ER

1/16" = 1'-0"A3 BUILDING SECTION

1/16" = 1'-0"E3 BUILDING SECTION

0' 4' 8' 16' 32'

0' 4' 8' 16' 32'

SHEET KEYNOTES

1 PAINT EXISTING INSULATED METAL WALL PANELS

2 REPLACE AND REFLASH TRANSLUCENT PANEL SYSTEM

(BID OPTION) RE: DETAILS SHEETS

3 CLEAN EXISTING BRICK, TYP.

4 EXTERIOR PERSONNEL DOOR LEAVES TO BE

REPLACED. DOOR FRAMES TO BE PAINTED

5 INSULATED METAL DOOR AND FRAME

6 TPO ROOF SYSTEM OVER 1/2" HD POLYISO, ON 5"

RIGID INSULATION, ON METAL DECK

7 PREFINISHED METAL GUTTERS TO MATCH STANDING

SEAM METAL ROOF,

8 2" STANDING SEAM METAL ROOF ON SLIP SHEET ON

SELF ADHERING UNDERLAYMENT, ON 5" RIGID

INSULATION ON 3" METAL DECK

9 CLEAN EXISTING TRANSLUCENT PANEL SYSTEM (BASE

BID) REMOVE ALL RUST AND MILDEW. PAINT EXISTING

STEEL STRUCTURE

10 EXISTING PREFINISHED DOWNSPOUT TO REMAIN TIE

INTO NEW GUTTERS, REPAIR DAMAGE TO DOWNSPOUT

AND BRICK BASE AS REQUIRED.

11 HVAC EQUIPMENT, RE: MECHANICAL

GENERAL NOTES

1 (BID OPTION) IN THE ENTIRE HANGAR BAY, STRIP ALL

EXISTING INTERIOR PAINT, PREPARE ALL SURFACES

FOR NEW FINISHES INCLUDING BUT NOT LIMITED TO

WALLS, CEILINGS, STRUCTURE, PIPING, AND CONDUIT.

CH

AN

GE

D

IN

A

CC

OR

DA

NC

E W

ITH

A

DD

EN

D U M

/04 /20

DW

EXTERIOR FINISHES

CODE MFR/DESCRIPTION

MASONRY

MATCH EXISTING

INSULATED METAL:

KINGSPAN / KS SERIES, MICRO-RIB, COLOR: BONE WHITE

ROOF:

SSMR BERRIDGE / ZEE-LOCK PANEL, COLOR: DARK BRONZE

TPO CARLISLE SYSTEMS / TPO SINGLE-PLY, COLOR: WHITE

GUTTERS:

FACTORY FINISH, DARK BRONZE

DOWNSPOUTS:

FACTORY FINISH, COLOR TO MATCH METAL WALL PANEL

DOORS AND FRAMES:

DOORS FACTORY FINISH, DARK BRONZE

FRAMES FACTORY FINISH, DARK BRONZE

WINDOWS:

FRAMES FACTORY FINISH, DARK BRONZE

PAINT:

P-5 SHERWIN WILLIAMS / SW7554 STEAMED MILK

P-6 SAFETY YELLOW

EXTERIOR SIGNAGE:

MESSAGE REFLECTIVE WHITE

BACKGROUND AMS STANDARD 10055

INTERIOR FINISHES GENERAL SHEET NOTES

CODE MFR/DESCRIPTION

FLOORS:

T-TILE

T-1 DALTILE / PORTFOLIO, COLOR: PF06 IRON GREY, SIZE: 12 X 24,

INSTALLATION: BRICK JOINT, GRT-1

T-4 DALTILE / PORTFOLIO, COLOR: PF06 IRON GREY,

SIZE: 2 X 2 STRAIGHT JOINT, INSTALLATION: STRAIGHT, GRT-1

SC-SEALED CONCRETE

SC-1 SEALED CONCRETE

WALLS:

T-TILE

T-2 DALTILE / PORTFOLIO, COLOR: PF04 DOVE GREY, SIZE: 12 X 24,

INSTALLATION: BRICK JOINT, GRT-1

T-3 DALTILE / KEYSTONES, STYLE: HEXAGON, COLOR: GALAXY,

SIZE: 12 X 12, INSTALLATION: STRAIGHT, GRT-1

P-PAINT

P-1 SHERWIN WILLIAMS / SW6232 MISTY

P-2 SHERWIN WILLIAMS / SW7654 LATTICE

P-3 SHERWIN WILLIAMS / SW7006 EXTRA WHITE

P-4 SHERWIN WILLIAMS / SW6233 SAMOVAR SILVER

TB-TILE COVE BASE

TB-1 DALTILE / PORTFOLIO, COLOR: PF06 IRON GREY, SIZE: 6" X 12",

INSTALLATION: BRICK, GRT-1

RB-RESILIENT WALL BASE

RB-1 ROPPE / 700 SERIES WALL BASE, STYLE: STANDARD,

COLOR: 174 SMOKE

CEILINGS:

ACT-ACOUSTICAL CEILING TILE

ACT-1 ARMSTRONG / ULTIMA BEVELED 24"X24"

GYPSUM CEILING

PAINT MATCH P-3

GRT-GROUT

GRT-1 QUARTZLOCK / URETHANE GROUT, COLOR: 320 SILVER GRAY

DOORS:

METAL DOORS MATCH P-2

DOOR FRAMES:

METAL MATCH P-2

SSM-SOLID SURFACE MATERIAL

SSM-1 CORIAN / MINERAL

WINDOW SILLS:

NOT USED

A COLORS LISTED ARE FOR COLOR IDENTIFICATION PURPOSES ONLY. THIS

LISTING IS NOT INTENDED TO LIMIT SELECTION OF SAME QUALITY AND

SIMILAR COLORS, TEXTURES AND PATTERNS FROM OTHER

MANUFACTURERS.

B TILE GROUT JOINTS ARE TO BE 1/8" WIDE, TYPICAL.

C REFER TO THE INSTALLATION FACILITY STANDARDS FOR EXTERIOR

MATERIALS.

DE

SI

GN

ED

B Y:

CH

EC

KE

D

BY

DA

TE

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

RE

V

DE

SC

RI

PT

IO

N

PROJECT NUMBER:

DRAWING SIZE: ANSI D (22X34)

DE

PA

RT

ME

NT

O

F T

HE

A

IR

FO

RC

E

AI

R

MO

BI

LIT

Y

CO

MM

AN

D

CH

AR

LE

ST

ON

, S C

DR

AW

IN

G

RE

VI

SI

ON

S

DA

TE

PR

EP

B

Y

AP

PR

'D

DR

AW

N

BY

SU

PV

CH

E

NG

R:

RECORD DRAWING DATE:

AF001

FI

N

IS

H

M

AT

ER

IA

L

LI

ST

JO

IN

T B

AS

E

CH

AR

LE

ST

ON

D

RE

MY

Q

RE

MY

AP

RI

L 2

CERTIFIED FINAL DESIGN SUBMITTAL - FOR CONSTRUCTION

RE

PA

IR

A

IR

CR

AF

T M

AI

NT

EN

AN

CE

FA

CI

LIT

Y, B

.63

DKFX 1069825

C

JO

HN

SO

N

CH

AN

GE

D

IN

A

CC

OR

DA

NC

E W

ITH

A

DD

EN

D U M

/04 /20

DW

12 13

11 11

1'- 6"

3'-0"

2" 2" 2'-4"

2" 2"

9" 1 1

/2"

1'-0" 1'-

6"

1 1 /2"

9"

(2, 8 m m)

8'- 0"

TB-1

T-2

T-3

T-2

6"3'- 0"

1'-

0"TO

C

EIL

IN

G

DE

SI

GN

ED

B Y:

CH

EC

KE

D

BY

DA

TE

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

RE

V

DE

SC

RI

PT

IO

N

PROJECT NUMBER:

DRAWING SIZE: ANSI D (22X34)

DE

PA

RT

ME

NT

O

F T

HE

A

IR

FO

RC

E

AI

R

MO

BI

LIT

Y

CO

MM

AN

D

CH

AR

LE

ST

ON

, S C

DR

AW

IN

G

RE

VI

SI

ON

S

DA

TE

PR

EP

B

Y

AP

PR

'D

DR

AW

N

BY

SU

PV

CH

E

NG

R:

RECORD DRAWING DATE:

AI102

IN

TE

R

IO

R E

LE

VA

TI

O

N S

JO

IN

T B

AS

E

CH

AR

LE

ST

ON

D

RE

MY

Q

RE

MY

AP

RI

L 2

CERTIFIED FINAL DESIGN SUBMITTAL - FOR CONSTRUCTION

RE

PA

IR

A

IR

CR

AF

T M

AI

NT

EN

AN

CE

FA

CI

LIT

Y, B

.63

DKFX 1069825

C

JO

HN

SO

N

1/2" = 1'-0"E2 RESTROOM 103 - WEST ELEVATION

1/2" = 1'-0"E4 RESTROOM 103 - SOUTH ELEVATION

1/2" = 1'-0"E7 RESTROOM 103 - EAST ELEVATION

1/2" = 1'-0"E6 RESTROOM 103 - NORTH ELEVATION

0' 2' 4'6" 1' - 0"0' 2' 4'6" 1' - 0" 0' 2' 4'6" 1' - 0"

0' 2' 4'6" 1' - 0"

1/2" = 1'-0"A1

LOCKER ROOM 101 - EAST

ELEVATION

1/2" = 1'-0"A4

LOCKER ROOM 101 - WEST

ELEVATION

1/2" = 1'-0"A7

LOCKER ROOM 101 - NORTH

ELEVATION

1/2" = 1'-0"C7

LOCKER ROOM 101 - SOUTH

ELEVATION

SHEET KEYNOTES

TILE LEGEND

1 ALL DIMENSIONS ARE TO FACE OF BLOCK OR

FACE OF STUD, UNLESS NOTED OTHERWISE

2 ALL COMPONENTS (I.E. WATER CLOSET, GRAB BARS,

LAVATORY, SHOWER SEAT, LOCKERS, SOAP

DISPENSERS, TOILET AND PAPER TOWEL DISPENSERS,

ETC.) MUST BE PROVIDED BY CONTRACTOR.

0' 2' 4'6" 1' - 0" 0' 2' 4'6" 1' - 0" 0' 2' 4'6" 1' - 0"

0' 2' 4'6" 1' - 0"1/2" = 1'-0"C1 SHOWER 102 - EAST ELEVATION

1/2" = 1'-0"C2 SHOWER 102 - NORTH ELEVATION

1/2" = 1'-0"C6 SHOWER 102 - SOUTH ELEVATION

1/2" = 1'-0"C4 SHOWER 102 - WEST ELEVATION

GENERAL NOTES

1 RE: TILE LEGEND

2 CUSTOM STAINLESS STEEL SUPPORT BRACKET AS

DIMENSIONED

3 ABA FLOOR MOUNTED WATER CLOSET, RE: PLUMBING

4 36" GRAB BAR

5 42" GRAB BAR

6 WALL-MOUNTED LAVATORY, RE: PLUMBING

7 ABA SHOWER SEAT

8 SHOWER GRAB BARS

9 SHOWER HEAD AND CONTROLS

10 24" X 36" WALL-MOUNTED MIRROR

11 LOCKERS (CFCI)

12 SOAP DISPENSER

13 PAPER TOWEL DISPENSER

14 TOILET PAPER DISPENSER

15 SOLID SURFACE BENCH BOLTED TO BRACKETS

16 CURTAIN ROD

17 ROBE HOOK

0' 2' 4'6" 1' - 0"0' 2' 4'6" 1' - 0"0' 2' 4'6" 1' - 0"0' 2' 4'6" 1' - 0"

CH

AN

GE

D

IN

A

CC

OR

DA

NC

E W

ITH

A

DD

EN

D U M

/04 /20

DW

PLUMBING FIXTURE SCHEDULE

PLAN

MARK

TYPE DESCRIPTION

P-1 WATER CLOSET, WALL MOUNTED - ABA

WALL HUNG, 1.1 GPF, 1-1/2" INLET SPUD, VITREOUS CHINA, ELONGATED RIM, MANUALLY OPERATED, WHITE OPEN SEAT, MOUNT RIM 17" A.F.F.

P-2 LAVATORY, WALL-MOUNTED VITREOUS CHINA, FRONT OVERFLOW, WALL MOUNTING CARRIER AND TEMPLATE TO BE SUPPLIED, P-TRAP TO HAVE INTEGRAL CLEANOUT.

P-2 LAVATORY, FAUCET CAST BRASS CENTERSET CONSTRUCTION, CHROME PLATED, MANUALLY OPERATED, 0.5 GPM.

P-3 SHOWER BASIN - ABA 66" x 36" SOLID SURFACE SHOWER BASIN, ONE PIECE CONSTRUCTION, ROLL-IN TYPE.

P-3 SHOWER, FAUCET - ABA

36" SLIDE BAR WITH HAND SHOWER, 1.5 GPM, INTEGRAL VACUUM BREAKER, METAL HOSE, POLISHED CHROME FINISH, SINGLE LEVER CONTROL, PROVIDE

MIXING VALVE SET TO PROVIDE 120° F MAXIMUM.

P-4 WATER FOUNTAIN - ABA

STAINLESS STEEL, WALL MOUNTED, BI-LEVEL, HANDS FREE, 8 GPH WATER COOLER, BOTTLE FILLER, FILTER, AND VISUAL FILTER MONITOR.

WH WALL HYDRANT 3/4" SELF DRAINING, NON-FREEZING, INTEGRAL VACUUM BREAKER, CHROME PLATED BOX AND DOOR EXTERIOR FINISH.

REMARKS:

1. ALL PLUMBING FIXTURES WILL BE INSTALLED COMPLETE WITH ACCESIBLE VALVE OR STOPS. COORDINATE WITH ARCHITECTURAL DRAWINGS.

2. COORDINATE INSTALLATION OF FIXTURES. VERIFY PROPER SPACE AND ARRANGEMENT OF HANGERS AND SUPPORTS.

PLUMBING FIXTURE CONNECTION SCHEDULE

PLAN

MARK DESCRIPTION SANITARY VENT

COLD

WATER HOT WATER

P-1 WATER CLOSETS 4" 3" 1-1/4" -

P-2 LAVATORIES 1-1/2" 1-1/2" 1/2" 1/2"

P-3 SHOWERS 2" 1-1/2" 3/4" 3/4"

P-4 WATER FOUNTAIN 1-1/2" 1-1/2" 1/2" -

WH WALL HYDRANT - - 3/4" -

DOMESTIC WATER HEATER SCHEDULE

PLAN MARK

STORAGE

VOLUME (GAL)

RECOVERY CAPACITY AT 90° F

RISE (GPH)

CAPACITY (KW) LWT (° F) VOLT/PH/HZ REMARKS

WH-1 50 82 18 140 480/3/60 1,2

REMARKS:

1. EQUIPMENT TO BE ON CONCRETE PAD.

2. ASME TEMPERATURE AND PRESSURE RELIEF VALVE.

PUMP SCHEDULE

PLAN

MARK TYPE CAPACITY (GPM) TOT. HEAD (FT) INLET/OUTLET DIAMETER (IN)

MOTOR

VOLT/PH/HZ REMARKSHP

P-1 VERTICAL TURBINE 50 590 2 20 480/3/60 1,2,3,4,5,6

REMARKS:

1. BASED ON EXISTING PUMP. PUMP APPEARS TO BE XYLEM LOWARA 15SV09 BASED ON MOTOR NAMEPLATE DATA, SITE VISIT PHOTOS.

2. BASE MOUNT PUMP ON CONCRETE PAD.

3. PUMP SHALL HAVE MAINTENANCE DISCONNECT. SEE ELECTRICAL SPECIFICATIONS.

4. MINIMUM PUMP EFFICIENCY OF 70%.

5. PROVIDE VFD AND VFD RATED MOTOR.

6. STARTERS AND DISCONNECTS PROVIDED BY UNIT MANUFACTURER.

AIR COMPRESSOR

PLAN MARK TYPE SYSTEM TANK VOLUME (GAL) MOTOR (HP) ACFM

MAX TANK PRESSURE

(PSI)

BASIS OF DESIGN VOLT/PH/HZ REMARKS

AC-1 TANK MOUNTED COMPRESSED AIR 120 7.5 24.9 125.0

GARDNER

DENVER L05

208/3/60 1,2,3,4,5,6

REMARKS

1. OIL FLOODED, SINGLE STAGE ROTARY SCREW AIR COMPRESSOR.

2. AIR COOLED.

3. TEFC MAIN MOTOR.

4. TWO STAGE AIR FILTER.

5. PROVIDE AUTOMATIC CONDENSATE DRAIN VALVE.

6. PROVIDE MOISTURE SEPARATOR.

EXPANSION TANK SCHEDULE

PLAN MARK TYPE SYSTEM

MIN. TANK VOLUME

(GAL)

MIN. ACCEPTANCE

VOLUME (GAL)

MIN TANK PRESSURE

(PSI)

MAX TANK PRESSURE

(PSI)

MAX OPERATING

TEMP. (DEG F)

REMARKS

ET-1 BLADDER DOMESTIC HOT WATER 1.3 0.2 10.8 15.8 140 1,2,3,4,5,6

REMARKS

1. TANK TO BE SELF SUPPORTED FROM PIPING. 5. BUTYL RUBBER BLADDER.

2. CARBON STEEL OUTER SHELL. 6. DESIGNED AND CONSTRUCTED PER ASME CODE SECTION VIII, DIV. 1.

3. EPOXY FINISH ON OUTER SHELL.

4. POLYPROPYLENE LINER.

D E

S

IG

N E

D B

Y

C H

E C

K E

D B

Y

D A

T E

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

R E

V D

E S

C R

IP

T

IO

N

PROJECT NUMBER:

DRAWING SIZE: ANSI D (22X34)

D E

P A

R T

M E

N T

O F

T H

E A

IR

F

O R

C E

A

IR

M O

B

IL

IT

Y

C O

M M

A N

D C

H A

R L

E S

T O

N , S

C

D R

A W

IN

G

R E

V

IS

IO

N

S D

A T

E P

R E

P B

Y A

P P

R 'D

D R

A W

N B

Y

S U

P V

C

H E

N G

R

RECORD DRAWING DATE:

P-601

P L U

M B

IN

G

S C

H E

D U

L E

S

D

IA

G R

A M

S

JO

IN

T B

A S

E C

H A

R L

E S

T O

N

M . B

U S

B Y

D . H

E R

N A

N D

E Z

A P

R

IL

CERTIFIED FINAL DESIGN SUBMITTAL - FOR CONSTRUCTION

R E

P A

IR

A

IR

C

R A

F T

M A

IN

T

E N

A N

C E

F A

C

IL

IT

Y

B .6

DKXF 1069825

D . W

H

IT

A K

E R

C

H A

N G

E D

IN

A

C C

O R

D A

N C

E W

IT

H

A D

D E

N D

U M

/4

/2

M

B

OFFICE

BREAK

LOCKER ROOM

SHOWER

RESTROOM

MECHANICAL

ELECTRICAL

TOOL CRIB

HANGAR

UH-4

UH-6

UH-8 UH-9

UH-7

UH-5

M-402

A3

SS-1

SS-2

EF-11

EF-1

EF-2

EF-3

EF-4 EF-8

EF-7

EF-6

EF-5

1 121.9 2 11.111

A

B

C

D

E

F

H

J

K

L

3 4 5 6 7 8 9 10 M-401

A1

M-401

A5

HP-1

HP-2

K.3

K.2

K.1

G

8.1 8.2 8.3

UH-2

UH-1

UH-3

5 5

EF-9

EF-10

(E) AHU-1

(E) AHU-2

(E) AHU-3

(E) AHU-7 (E) AHU-8

(E) AHU-4

(E) AHU-5

(E) AHU-6

2 1/2" HWS 3" HWS

3" HWR

2 1/2" HWR

2" HWR

2" HWS

1 1/2" HWR

1 1/2" HWS

3" HWS

3" HWR

1 1/2" HWR

1 1/2" HWS

2" HWR

2" HWS

2" HWR

2" HWS

4" HWS

4" HWR

1 1/2" HWR

1 1/2" HWS

2" HWS

2" HWR

4" HWR 4" HWS

2" HWS

2" HWR

1 1/2" HWS 1 1/2" HWR

4" HWS

4" HWR

3/4" HWS

3/4" HWR

2" HWS

2" HWR

3" HWS

3" HWR

2" HWR

2" HWS

3" HWS

3" HWR

2 1/2" HWS

2 1/2" HWR

2" HWR

2" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

D E

S

IG

N E

D B

Y

C H

E C

K E

D B

Y

D A

T E

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

R E

V D

E S

C R

IP

T

IO

N

PROJECT NUMBER:

DRAWING SIZE: ANSI D (22X34)

D E

P A

R T

M E

N T

O F

T H

E A

IR

F

O R

C E

A

IR

M O

B

IL

IT

Y

C O

M M

A N

D C

H A

R L

E S

T O

N , S

C

D R

A W

IN

G

R E

V

IS

IO

N

S D

A T

E P

R E

P B

Y A

P P

R 'D

D R

A W

N B

Y

S U

P V

C

H E

N G

R

RECORD DRAWING DATE:

M-101

M E

C H

A N

IC

A

L F

IR

S

T F

L O

O R

P L A

N

JO

IN

T B

A S

E C

H A

R L

E S

T O

N

M . B

U S

B Y

D . H

E R

N A

N D

E Z

A P

R

IL

CERTIFIED FINAL DESIGN SUBMITTAL - FOR CONSTRUCTION

R E

P A

IR

A

IR

C

R A

F T

M A

IN

T

E N

A N

C E

F A

C

IL

IT

Y

B .6

DKXF 1069825

D . W

H

IT

A K

E R

1. SEE SHEETS M-001 AND M-002 FOR LEGEND,

ABBREVIATIONS, AND GENERAL NOTES.

1. EXISTING H&V UNIT TO REMAIN.

2. NEW DOWNFLOW UNIT HEATER. REUSE EXISTING

PIPING, PROVIDE NEW VALVES, CONTROLS, AND

SEISMIC BRACING AS REQUIRED.

3. EXISTING HOT WATER PIPING TO REMAIN, UNLESS BID

OPTION IS AWARDED, SEE KEYNOTE 5, THIS SHEET,

BELOW.

4. NEW WALL MOUNTED PROPELLER EXHAUST FAN.

CONTRACTOR SHALL FIELD VERIFY SIZE OF EXISTING

OPENING AND COORDINATE PRIOR TO ORDERING

REPLACEMENT FAN TO ENSURE THAT NEW FAN MAY

BE INSTALLED IN THE EXISTING WALL OPENINGS.

PROVIDE NEW MOTOR OPERATED DAMPERS,

CONTROLS, ETC...

5. BID OPTION TO REPLACE EXISTING HWS/HWR FROM

MECHANICAL EQUIPMENT BACK TO MECHANICAL

ROOM PENETRATION POINTS AS SHOWN. REFER TO

CLIN SCHEDULE ON SHEET G-001. IF BID OPTION IS

AWARDED, CONTRACTOR SHALL REPLACE ALL

EXISTING HOT WATER SUPPLY AND RETURN PIPING

OUTSIDE OF THE MECHANICAL ROOM, INCLUDING ALL

VALVES, SENSORS, FITTINGS, AND INSULATION FROM

ALL HEATING EQUIPMENT BACK TO EXISTING HOT

WATER MAINS IN MECHANICAL ROOM.

6. NEW EXHAUST FAN.

GENERAL SHEET NOTES

SHEET KEYNOTES

1/16" = 1'-0"A2

MECHANICAL HVAC OVERALL…

This is the start of the file's text. The full file is on GovTribe.