Solicitation Attachment YS Seed Project Specifications.pdf

PDF 15 MB Posted

Attached to
Joint Base Charleston (JB CHS) Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA441822R0019
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to Joint Base Charleston (JB CHS) Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Solicitation Amendment 01 - Attachment 6 - Berkeley County WD SC20210022.pdf PDF
Solicitation Amendment 01 - Attachment 10 - Wayne County WD NC20220041.pdf PDF
Solicitation Amendment 01 - Attachment 3 - As Built Drawings B63.pdf PDF
Solicitation Amendment 01 - Attachment 5 - Solicitation Section B - Seed Project - 08 Nov 22.pdf PDF
Solicitation Amendment 01 - Attachment 7 - Charleston County WD SC20220023.pdf PDF
Solicitation Amendment 01 - Attachment 1 - Addendum 01 - Repair Aircraft MX Facility B63 Revised Drawing Sheets.pdf PDF
Solicitation Amendment 01 - Attachment 4 - Addendum 01 SOW - 08 Nov 22.pdf PDF
Solicitation Amendment 01 - Attachment 9 - Orangeburg County WD SC20220016.pdf PDF
Solicitation Amendment 01 - Attachment 2 - As Built Drawings B61.pdf PDF
Solicitation Amendment 01 - Attachment 8 - Dorchester WD SC20220024.pdf PDF
JB CHS MACC - Questions and Answers - 09 Nov 22.pdf PDF
Update 1 - JB CHS MACC - Pre-Proposal Conference Slides.pdf PDF
Update 2 - JB CHS MACC - Sign-In Sheet for Attendees.pdf PDF
Amendment 1 - JB CHS MACC - Pre-Proposal Conference Slides.pptx PPTX presentation
Solicitation Attachment YT Seed Project Drawings -Updated.pdf PDF
Solicitation - FA441822R0019.pdf PDF
Solicitation Attachment XY - On and Off-Ramp Procedures.pdf PDF
Solicitation Attachment YV Seed Project Fire Pump Curves.pdf PDF
Statement of Work - Attachment 6 - 01 32 00 - Attachment A - Schedule and Pay Request Calendar Example 1.pdf PDF
Statement of Work - Attachment 10 - 01 33 00 - Attachment B - JB CHS RFI Form.pdf PDF
Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form 4288-R (Submittal Register).xlsx XLSX spreadsheet
Statement of Work - Attachment 17 - 01 78 00 - Closeout Requirements.docx DOCX document
Solicitation Attachment XW - JB Charleston MACC Work Load Estimate.pdf PDF
Statement of Work - Attachment 1 - JB Charleston Statement of Work for Architect_Engineering (A_E) Services.pdf PDF
Statement of Work - Attachment 2 - Architectural Compatibility Plan.pdf PDF
Statement of Work - Attachment 3 - 01 11 00 - Summary of Work.docx DOCX document
Statement of Work - Attachment 8 - 01 32 00 - Project Schedule.docx DOCX document
Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form 4288-R (Submittal Register).pdf PDF
Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form 4289-R (RFI Register).xlsx XLSX spreadsheet
Statement of Work - Attachment 13 - 01 33 00 - Submittal Procedures.docx DOCX document
Statement of Work - Attachment 14 - 01 35 26 - Attachment A - Accident Investigation Form (CIRS).pdf PDF
Statement of Work - Attachment 15 - 01 35 26 - Governmental Safety Requirements.docx DOCX document
Statement of Work - Attachment 16 - 01 45 00 - Quality Control.docx DOCX document
Solicitation Attachment XT - JB Charleston - Question and Answer Form.xlsx XLSX spreadsheet
Solicitation Attachment XU - Past Performance Customer Questionnaire.pdf PDF
Solicitation Attachment XV - Past Performance Survey.pdf PDF
Solicitation Attachment XX - TOPR - Seed Project - B63.xlsx XLSX spreadsheet
Solicitation Attachment YT Seed Project Drawings.pdf PDF
Statement of Work - JB CHS MACC.pdf PDF
Statement of Work - Attachment 4 - 01 14 00 - Work Restrictions.docx DOCX document
Statement of Work - Attachment 9 - 01 33 00 - Attachment A - JB CHS Transmittal Form 4025.pdf PDF
Solicitation Attachment XZ - Past Performance Project List.xlsx XLSX spreadsheet
Solicitation Attachment YU Seed Project Hydraulics.pdf PDF
Solicitation Section B - JB CHS MACC - Seed.pdf PDF
Statement of Work - Attachment 5 - 01 30 00 - Administrative Requirements.docx DOCX document
Statement of Work - Attachment 7 - 01 32 00 - Attachment A - Schedule and Pay Request Calendar Example 2.xlsx XLSX spreadsheet
Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form 4289-R (RFI Register).pdf PDF
Solicitation Attachment XX - TOPR - Seed Project - B63.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications

TWCF REPAIR AIRCRAFT MX FACILITY B.63

Joint Base Charleston, SC

Project Number: DKFX 1069825

Final Submittal April 2022

This page intentionally left blank.

TWCF- REPAIR AIRCRAFT MX FACILITY B.63

JOINT BASE CHARLESTON, SC

FINAL DESIGN SUBMITTAL

PROJECT NO.: DKFX 1069825

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 01 14 00 01 20 00 01 30 00 01 32 00 01 33 00 01 33 29 01 35 26 01 42 00 01 45 00 01 45 35 01 50 00 01 50 10 01 54 00.00 31 01 57 19 01 57 19.00 31 01 57 20.00 31 01 74 19.00 31 01 78 00 01 91 00.15 10

SUMMARY OF WORK

WORK RESTRICTIONS

PRICE AND PAYMENT PROCEDURES

ADMINISTRATIVE REQUIREMENTS

PROJECT SCHEDULE

SUBMITTAL PROCEDURES

SUSTAINABILITY REQUIREMENTS AND REPORTING

GOVERNMENTAL SAFETY REQUIREMENTS

SOURCES FOR REFERENCE PUBLICATIONS

QUALITY CONTROL

SPECIAL INSPECTIONS

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

ENVIRONMENTAL

GREEN PROCUREMENT (JB CHS-7/2014)

TEMPORARY ENVIRONMENTAL CONTROLS

TEMPORARY ENVIRONMENTAL CONTROLS (JB CHS-7/2014)

ENVIRONMENTAL PROTECTION

CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT AND DISPOSAL

CLOSEOUT REQUIREMENTS

TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 82 00 ASBESTOS REMEDIATION

02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 42 16.05 INSULATED CORE METAL WALL PANELS

07 54 20 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

FINAL DESIGN SUBMITTAL

PROJECT NO.: DKFX 1069825

PROJECT TABLE OF CONTENTS Page 2

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

07 95 00 EXPANSION CONTROL

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 31 00 ACCESS DOORS AND PANELS

08 51 23 STEEL WINDOWS

08 60 45 TRANSLUCENT PANELS (Bid Option)

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 06 00 SCHEDULES FOR FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES

DIVISION 10 - SPECIALTIES

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 26 00 WALL PROTECTION

10 28 13 TOILET ACCESSORIES

10 51 13 METAL LOCKERS

DIVISION 21 - FIRE SUPPRESSION

21 13 13 21 13 25

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

HIGH-EXPANSION FOAM SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 15 COMMON PIPING FOR HVAC

23 05 48.19 SEISMIC BRACING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 11 20 FACILITY GAS PIPING

23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

23 23 00 REFRIGERANT PIPING

23 30 00 HVAC AIR DISTRIBUTION

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

FINAL DESIGN SUBMITTAL

PROJECT NO.: DKFX 1069825

PROJECT TABLE OF CONTENTS Page 3

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 19.10 10 INSULATED WIRE AND CABLE

26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 41 01.00 10 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,

ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT

32 11 23 AGGREGATE BASE COURSES

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

APPENDICES

Appendix A Air Force Sustainability Requirements Scoresheet Appendix B Lead-Based Paint & Asbestos Survey Report Appendix C Hangar Acceptance Test Procedures Appendix D Existing Record Drawings (included on CD-ROM only)

-- End of Project Table of Contents --

This page intentionally left blank.

TWCF – REPAIR AIRCRAFT MX FACILITY B.63

FINAL DESIGN SUBMITTAL

JOINT BASE CHARLESTON, SC PROJECT NO.: DKVX 1069825

Section 01 11 00 Page 1

SECTION 01 11 00

SUMMARY OF WORK

JB Charleston (Dec 2021)

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

The work includes repair and renovation of TWCF - Aircraft Maintenance Facility B.63 which involves but not limited to repair/replacement of fire suppressions system, fire alarm/mass notification system, roof, HVAC, Electrical, renovate locker room/shower/restrooms/offices, repair/repaint exterior siding, repair/replace translucent panels, clean/repaint interior of hangar bay, replace select hangar floor slabs, demolition, and incidental related work.

1.1.2 Location

The work shall be located on Joint Base Charleston (JBC) Air Base (AB), South Carolina, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.2 OCCUPANCY OF PREMISES

Building(s) will not be occupied during performance of work under this Contract.

Before work is started, the Contractor shall arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.3 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer or Contracting Officer’s Representative. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.4 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located on Joint Base Charleston.

TWCF – REPAIR AIRCRAFT MX FACILITY B.63

FINAL DESIGN SUBMITTAL

Section 01 11 00 Page 2

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

TWCF – REPAIR AIRCRAFT MX FACILITY B.63 FINAL DESIGN SUBMITTAL

Section 01 14 00 Page 1

SECTION 01 14 00

WORK RESTRICTIONS

PART 1 GENERAL

1.1 SUBMITTALS

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Air Force – Base Civil Engineering – Dig Permit Request; G

Approved Utility Outage Request; G

Approved Road Closure Requests; G

List of Contact Personnel; FIO

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

Requirements for security and base access varies between various locations within Joint Base Charleston. It is incumbent on the Contractor to ascertain the current security and base access requirements appropriate to the project location and incorporate the cost, if any, for compliance to said requirements into Contractor's proposal. Lack of knowledge of current requirements does not constitute a basis for an adjustment to the contract.

Should requirements change during the construction timeframe, Contractor may be eligible, subject to documentation acceptable to the Government, for an adjustment to the contract.

1.3.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.3.1.2 Tobacco Use Policy

Tobacco use is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation.

Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.3.2 Working Hours

Section 01 14 00 Page 2

Regular working hours will consist of an 8 1/2 hour period, between 7 a.m.

and 3:30 p.m., Monday through Friday, excluding Government holidays.

1.3.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.

1.3.5 Occupied and Existing Buildings

The Contractor shall be working in an existing building which in not occupied and working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.

The existing buildings and their contents must be kept secure at all times.

Provide temporary closures as required to maintain security as directed by the Contracting Officer.

Provide dust covers or protective enclosures to protect existing work that remains, and Government material located in the building 63 during the construction period.

Leave attached equipment in place, and protect them against damage, or temporarily disconnect, relocate, protect, and reinstall them at the completion of the work.

The Government will remove and relocate other Government property in the areas of the building 63 scheduled to receive work.

1.3.6 Road Closure and Utility Outage Requests

a. Make road closures and utility outages after normal working hours or on Saturdays, Sundays, and Government holidays when practical. Road closure and utility outage requests shall be transmitted to the Contracting Officer or the Contracting Officer’s Representative for coordination and Government approval at least 21 calendar days prior to the desired outage or closure date. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS. Road closure and utility outage requests shall be identified on the Contractor’s Three (3)-Week Look Ahead Schedule.

b. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.

1.3.7 ON-SITE PERMITS

1.3.7.1 Dig Permit Request

Section 01 14 00 Page 3

1.3.7.1.1 South Carolina 811

a. Prior to submitting a dig permit request, the Contractor shall contact

South Carolina Palmetto Utility Protection Services (PUPS) and obtain a PUPS tracking number.

b. Locators use the APWA Uniform color code to mark underground facilities. Each color represents a different type of utility:

Red – Electric Power Lines, Cables, Conduit or Lightning Cables Yellow – Gas, Oil, Steam, Petroleum or Gaseous Material Orange – Communication, Cable TV, Signal Cables, or Telephone Blue – Potable Water Green – Sewer or Drain Lines Pink – Temporary Survey Markings Purple – Reclaimed Water, Irrigation, or Slurry Lines White – Proposed Excavation

1.3.7.1.2 Air Force – Base Civil Engineering – Dig Permit Request

a. Complete the Air Force – Base Civil Engineering – Dig Permit Request and transmit to the Contracting Officer or the Contracting Officer Representative for routing and approval 14 calendar days prior to the desired outage or closure date.

b. The Contractor is responsible for verifying all utilities prior to excavation. The Contractor is responsible for maintaining all markings on the project site throughout excavation. The markings shall be kept current throughout the contract period of performance – transmit to the Contracting Officer or the Contracting Officer Representative for routing and re-approval every 21 Calendar Days after initial approval to avoid an expired permit.

c. The Contractor is responsible to verify the elevations of existing piping, utilities, and any type of underground or encased obstruction not indicated to be specified or removed but indicated or discovered in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

d. Notify the Contracting Officer or the Contracting Officer Representative at least 48 hours prior to starting excavation work.

Not Used

TWCF- REPAI R AI RCRAFT MX FACI LI TY B. 63 FI NAL DESI GN SUBMI TTAL

JOI NT BASE CHARLESTON, SC PROJECT NO. : DKFX 1069825

SECTI ON 01 20 00

PRI CE AND PAYMENT PROCEDURES

11/ 20, CHG 1: 02/ 21

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EP 1110- 1- 8 ( 2016) Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Schedul e of Pr i ces; G

1. 3 SCHEDULE OF PRI CES

1. 3. 1 Dat a Requi r ed

Pr ovi de a det ai l ed br eakdown of t he Cont r act pr i ce, gi v i ng quant i t i es f or each of t he var i ous k i nds of wor k, uni t pr i ces and ext ended pr i ces.

Cont r act or over head and pr of i t i ncl udi ng sal ar i es f or f i el d of f i ce per sonnel , i f appl i cabl e, must be pr opor t i onat el y spr ead over al l pay i t ems and not i ncl uded as i ndi v i dual pay i t ems. Schedul e of Pr i ces must have cost summar i sed and t ot al s pr ovi ded f or each const r uct i on cat egor y.

1. 3. 2 Payment Schedul e I nst r uct i ons

Payment s wi l l not be made unt i l t he Schedul e of Pr i ces has been submi t t ed t o and accept ed by t he Cont r act i ng Of f i cer .

Addi t i onal l y, t he Schedul e of Pr i ces must be separ at ed as f ol l ows:

a. Pr i mar y Faci l i t i es Cost Br eakdown:

Def i ned as wor k on t he pr i mar y f aci l i t i es out t o t he 5 f oot l i ne.

Wor k out t o t he 5 f oot l i ne i ncl udes const r uct i on encompassed wi t hi n a t heor et i cal l i ne 5 f oot f r om t he f ace of ext er i or wal l s and i ncl udes at t endant const r uct i on, such as pad mount ed HVAC cool i ng equi pment , cool i ng t ower s, and t r ansf or mer s pl aced beyond t he 5 f oot l i ne.

b. Suppor t i ng Faci l i t i es Cost Br eakdown:

SECTI ON 01 20 00 Page 1

Def i ned as s i t e wor k, i ncl udi ng i nci dent al wor k, out s i de t he 5 f oot line.

1. 4 CONTRACT COST BREAKDOWN

The Cont r act or must f ur ni sh wi t hi n 30 days af t er t he dat e of Not i ce t o Pr oceed, and pr i or t o t he submi ssi on of i t s f i r st par t i al payment est i mat e, a br eakdown of i t s s i ngl e j ob pay i t em or i t ems whi ch wi l l be r evi ewed by t he Cont r act i ng Of f i cer as t o pr opr i et y of di st r i but i on of t he t ot al cost t o t he var i ous account s. Any unbal anced i t ems as bet ween ear l y and l at e payment i t ems or ot her di scr epanci es wi l l be r evi sed by t he Cont r act i ng Of f i cer t o agr ee wi t h a r easonabl e cost of t he wor k i ncl uded i n t he var i ous i t ems. Thi s Cont r act cost br eakdown wi l l t hen be ut i l i zed as t he basi s f or pr ogr ess payment s t o t he Cont r act or .

1. 5 CONTRACT MODI FI CATI ONS

I n conj unct i on wi t h t he Cont r act Cl ause DFARS 252. 236- 7000 Modi f i cat i on Pr oposal s- Pr i ce Br eakdown, and wher e act ual owner shi p and oper at i ng cost s of const r uct i on equi pment cannot be det er mi ned f r om Cont r act or account i ng r ecor ds, base equi pment use r at es upon t he appl i cabl e pr ovi s i ons of t he

EP 1110- 1- 8.

1. 6 CONTRACTOR' S I NVOI CE AND CONTRACT PERFORMANCE STATEMENT

1. 6. 1 Cont ent of I nvoi ce

Request s f or payment wi l l be pr ocessed i n accor dance wi t h t he Cont r act Cl ause FAR 52. 232- 27 Pr ompt Payment f or Const r uct i on Cont r act s and FAR

52. 232- 5 Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s. I nvoi ces not compl et ed i n accor dance wi t h cont r act r equi r ement s wi l l be r et ur ned t o t he Cont r act or f or cor r ect i on of t he def i c i enci es. The r equest s f or payment shal l i ncl ude t he document s l i s t ed bel ow.

a. The Cont r act or ' s i nvoi ce, on NAVFAC For m 7300/ 30 f ur ni shed by t he Gover nment , showi ng i n summar y f or m, t he basi s f or ar r i v i ng at t he amount of t he i nvoi ce. For m 7300/ 30 must i ncl ude cer t i f i cat i on by Qual i t y Cont r ol ( QC) Manager as r equi r ed by t he Cont r act .

b. The Est i mat e f or Voucher / Cont r act Per f or mance St at ement on NAVFAC For m 4330/ 54 f ur ni shed by t he Gover nment . Use NAVFAC For m 4330, unl ess ot her wi se di r ect ed by t he Cont r act i ng Of f i cer , on NAVFAC Cont r act s when a Mont hl y Est i mat e f or Voucher i s r equi r ed.

c. Cont r act or ' s Mont hl y Est i mat e f or Voucher and Cont r act or s Cer t i f i cat i on ( NAVFAC For m 4330) wi t h Subcont r act or and suppl i er payment cer t i f i cat i on. Ot her document s, i ncl udi ng but not l i mi t ed t o, t hat need t o be r ecei ved pr i or t o pr ocessi ng payment i ncl ude t he f ol l owi ng submi t t al s as r equi r ed. These i t ems ar e st i l l r equi r ed mont hl y even when a pay voucher i s not submi t t ed.

d. Mont hl y Wor k- hour r epor t .

e. Updat ed Const r uct i on Pr ogr ess Schedul e and t abul ar r epor t s r equi r ed by t he cont r act .

f . Cont r act or Saf et y Sel f Eval uat i on Checkl i st .

SECTI ON 01 20 00 Page 2

g. Updat ed submi t t al r egi st er .

h. Sol i d Wast e Di sposal Repor t .

i . Cer t i f i ed payr ol l s.

j . Updat ed t est i ng l ogs.

k. Ot her suppor t i ng document s as r equest ed.

1. 6. 2 Submi ssi on of I nvoi ces

I f DFARS Cl ause 252. 232- 7006 Wi de Ar ea Wor kFl ow Payment I nst r uct i ons i s i ncl uded i n t he Cont r act , pr ovi de t he document s l i s t ed i n above par agr aph CONTENT OF I NVOI CE i n t hei r ent i r et y as at t achment s i n Wi de Ar ea Wor k Fl ow ( WAWF) f or each i nvoi ce submi t t ed. The maxi mum si ze of each WAWF at t achment i s t wo megabyt es, but t her e ar e no l i mi t s on t he number of at t achment s. I f a document cannot be at t ached i n WAWF due t o syst em or s i ze r est r i ct i on, pr ovi de i t as i nst r uct ed by t he Cont r act i ng Of f i cer .

Mont hl y i nvoi ces and suppor t i ng f or ms f or wor k per f or med t hr ough t he anni ver sar y awar d dat e of t he Cont r act must be submi t t ed t o t he Cont r act i ng Of f i cer wi t hi n 5 cal endar days of t he dat e of i nvoi ce. For exampl e, i f Cont r act awar d dat e i s t he 7t h of t he mont h, t he dat e of each mont hl y i nvoi ce must be t he 7t h and t he i nvoi ce must be submi t t ed by t he 12t h of t he mont h.

1. 6. 3 Fi nal I nvoi ce

a. A f i nal i nvoi ce must be accompani ed by t he cer t i f i cat i on r equi r ed by DFARS 252. 247. 7023 Tr anspor t at i on of Suppl i es by Sea, and t he Cont r act or ' s Fi nal Rel ease. I f t he Cont r act or i s i ncor por at ed, t he Fi nal Rel ease must cont ai n t he cor por at e seal . An of f i cer of t he cor por at i on must s i gn and t he cor por at e secr et ar y must cer t i f y t he Fi nal Rel ease.

b. For f i nal i nvoi ces bei ng submi t t ed v i a WAWF, t he or i gi nal Cont r act or ' s Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea must be pr ovi ded di r ect l y t o t he r espect i ve Cont r act i ng Of f i cer pr i or t o submi ssi on of t he f i nal i nvoi ce. Once r ecei pt of t he or i gi nal Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea has been conf i r med by t he Cont r act i ng Of f i cer , t he Cont r act or must t hen submi t f i nal i nvoi ce and at t ach a copy of t he Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea i n WAWF.

c. Fi nal i nvoi ces not accompani ed by t he Cont r act or ' s Fi nal Rel ease and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea wi l l be consi der ed i ncompl et e and wi l l be r et ur ned t o t he Cont r act or .

1. 7 PAYMENTS TO THE CONTRACTOR

Payment s wi l l be made on submi ssi on of i t emi zed r equest s by t he Cont r act or whi ch compl y wi t h t he r equi r ement s of t hi s sect i on, and wi l l be subj ect t o r educt i on f or over payment s or i ncr ease f or under payment s made on pr evi ous payment s t o t he Cont r act or .

SECTI ON 01 20 00 Page 3

1. 7. 1 Obl i gat i on of Gover nment Payment s

The obl i gat i on of t he Gover nment t o make payment s r equi r ed under t he pr ovi s i ons of t hi s Cont r act wi l l , at t he di scr et i on of t he Cont r act i ng Of f i cer , be subj ect t o r educt i ons and suspensi ons per mi t t ed under t he FAR and agency r egul at i ons i ncl udi ng t he f ol l owi ng i n accor dance wi t h FAR FAR

32. 103 Pr ogr ess Payment s Under Const r uct i on Cont r act s:

a. Reasonabl e deduct i ons due t o def ect s i n mat er i al or wor kmanshi p;

b. Cl ai ms whi ch t he Gover nment may have agai nst t he Cont r act or under or i n connect i on wi t h t hi s Cont r act ;

c. Unl ess ot her wi se adj ust ed, r epayment t o t he Gover nment upon demand f or over payment s made t o t he Cont r act or ; and

d. Fai l ur e t o mai nt ai n accur at e " as- bui l t " or r ecor d dr awi ngs i n accor dance wi t h FAR 52. 236. 21.

1. 7. 2 Payment f or Onsi t e and Of f s i t e Mat er i al s

Pr ogr ess payment s may be made t o t he Cont r act or f or mat er i al s del i ver ed on t he si t e, f or mat er i al s st or ed of f const r uct i on s i t es, or mat er i al s t hat ar e i n t r ansi t t o t he const r uct i on s i t es under t he f ol l owi ng condi t i ons:

a. FAR 52. 232- 5( b) Payment s Under Fi xed Pr i ce Const r uct i on Cont r act s.

b. Mat er i al s del i ver ed on t he si t e but not i nst al l ed, i ncl udi ng compl et ed pr epar at or y wor k, and of f - s i t e mat er i al s t o be consi der ed f or pr ogr ess payment must be maj or hi gh cost , l ong l ead, speci al or der , or speci al t y i t ems, not suscept i bl e t o det er i or at i on or physi cal damage i n st or age or i n t r ansi t t o t he const r uct i on s i t e. Exampl es of mat er i al s accept abl e f or payment consi der at i on i ncl ude, but ar e not l i mi t ed t o, st r uct ur al st eel , non- magnet i c st eel , non- magnet i c aggr egat e, equi pment , machi ner y, l ar ge pi pe and f i t t i ngs, pr ecast / pr est r essed concr et e pr oduct s, pl ast i c l umber ( e. g. , f ender pi l es/ cur bs) , and hi gh- vol t age el ect r i cal cabl e. Mat er i al s not accept abl e f or payment i ncl ude consumabl e mat er i al s such as nai l s, f ast ener s, condui t s, gypsum boar d, gl ass, i nsul at i on, and wal l coverings.

c. Mat er i al s t o be consi der ed f or pr ogr ess payment pr i or t o i nst al l at i on must be speci f i cal l y and separ at el y i dent i f i ed i n t he Cont r act or ' s est i mat es of wor k submi t t ed f or t he Cont r act i ng Of f i cer ' s appr oval i n accor dance wi t h Schedul e of Pr i ces r equi r ement of t hi s Cont r act .

Request s f or pr ogr ess payment consi der at i on f or such i t ems must be suppor t ed by document s est abl i shi ng t hei r val ue and t hat t he t i t l e r equi r ement s of t he c l ause at FAR 52. 232- 5 Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s have been met .

d. Mat er i al s ar e adequat el y i nsur ed and pr ot ect ed f r om t hef t and exposur e.

e. Pr ovi de a wr i t t en consent f r om t he sur et y company wi t h each payment r equest f or of f s i t e mat er i al s.

f . Mat er i al s t o be consi der ed f or pr ogr ess payment s pr i or t o i nst al l at i on must be st or ed ei t her i n Hawai i , Guam, Puer t o Ri co, or t he Cont i nent al Uni t ed St at es. Ot her l ocat i ons ar e subj ect t o wr i t t en appr oval by t he Cont r act i ng Of f i cer .

SECTI ON 01 20 00 Page 4

g. Mat er i al s i n t r ansi t t o t he j ob s i t e or st or age si t e ar e not accept abl e f or payment .

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

- - End of Sect i on - -

SECTI ON 01 20 00 Page 5

C O

N

TR

A C

T P

R O

G R

E S

S S

C H

E D

U

LE

Fo rm

A pp ro ve d O

M B

N O

-0

(S ee

C on tr ac to r's

In st ru ct io ns o n

R ev er se

P ub lic re po rt in g bu rd en fo r t hi s co lle ct io n of in fo rm at io n is e st im at ed to a ve ra ge m in ut es p er re sp on se , i nc lu di ng th e tim e fo r r ev ie w in g in st ru ct io ns , s ea rc hi ng e xi st in g da ta s ou rc es , g at he rin g an d m ai nt ai ni ng th e da ta n ee de d, a nd c om pl et in g an d re vi ew in g th e co lle ct io n of in fo rm at io n.

S en d co m m en ts re ga rd in g th is b ur de n es tim at e or a ny o th er a sp ec t o f t hi s co lle ct io n of in fo rm at io n, in cl ud in g su gg es tio ns fo r r ed uc in g th is b ur de n to

D ep ar tm en t o f D ef en se

, W as hi ng to n

H ea dq ua rte rs

S er vi ce s, D ire ct or at e fo r I nf or m at io n, O pe ra tio ns a nd

R ep or ts

, 1

Je ffe rs on D av is

H ig hw ay

, S ui te

4, A rli ng to n V

A

-4

2, a nd to th e

O ffi ce o f M an ag em en t a nd B ud ge t P ap er w or k

R ed uc tio n P ro je ct

4-

, W as hi ng to n

D C

P le as e

D O

N O

T R

E

TU

R N y ou r f or m /q ue st io nn ai re to e ith er o f t he se a dd re ss es . S en d yo ur c om pl et ed fo rm /q ue st io nn ai re to

S A

F/ A

Q C

P , 1

A ir

Fo rc e P en ta go n, W as hi ng to n

D C

-1

D A

TE

S

IG

N

E D

D A

TE

S

IG

N

E D

C O

N

TR

A C

TI

N

G O

FF

IC

E R

'S S

IG

N

A

TU

R E

C O

N

TR

A C

TO

R

'S N

AM

E

(L as t, Fi rs t, M id dl e

In iti al

1.

C

O N

TR

A

C T

N O

8.

P R

O

JE

C T

TI

TL

E

3.

C

O M

P

LE

TI

O

N D

A

TE

4.

P

U R

C H

A S

E R

E Q

U E

S T

N O

LI

N

E

N O A

W O

R K

E

LE

M E

N

TS

% C

W E

E K

S

D E

F G

H I

J K

L M

N O

P Q

A P

P R

O V

A L

R E

C O

M M

E N

D E

D B

Y:

D A

TE

S

IG

N

E D

2.

S

TA

R

TI

N

G D

A

TE

IN

S

TA

LL

A

TI

O N

S E

N G

IN

E

E R

'S S

IG

N

A

TU

R E

5.

P

R O

JE

C

T N

O

6.

A

C

TU

A L

S

TA

R

TI

N G

D A

TE

7.

A

C

TU

A L

C O

M P

LE

TI

O N

D A

TE

9.

S

U B

M

IT

TE

D

B Y: A D

D R

E S

S (S tre et

, C ity

, S ta te , Z ip C od e)

C O

N

TR

A C

TO

R

'S S

IG

N

A

TU

R E

A P

P R

O V

E D

B Y:

A F

IM

T

, 2

1, V

P

R E

V

IO

U S

E D

IT

IO

N S

A R

E O

B S

O

LE

TE

C lic k to s ig n

C lic k to s ig n C lic k to s ig n

IN

S

TR

U

C

TI

O N

S T

O C

O N

TR

A

C

TO

R S

1.

P re pa re th re e co pi es o f A F

Fo rm

4, in a cc or da nc e w ith th es e in st ru ct io ns , a nd s ub m it to th e co nt ra ct in g of fic er a t t he ti m e st at ed in th e co nt ra ct o r a s es ta bl is he d by th e co nt ra ct in g of fic er

2.

B lo ck s 1, , a nd

E nt er th e co nt ra ct n um be r, st ar tin g da te

, a nd c om pl et io n da te a s sh ow n on th e co nt ra ct

3.

B lo ck

E nt er th e tit le o f t he p ro je ct a s sh ow n on th e co nt ra ct

4.

B lo ck

E nt er n am e an d ad dr es s of y ou r f irm

Th e th re e co pi es s ub m itt ed to th e co nt ra ct in g of fic er m us t b e da te d an d si gn ed b y th e co nt ra ct or o r a n au th or iz ed re pr es en ta tiv e of th e fir m

5.

L in es th ro ug h

M aj or e le m en ts o f w or k (w he th er u ni t p ric e or lu m p su m c on tra ct

)s uc h as e xc av at io n, c on cr et e w or k, c ar pe nt ry , e ng in ee rin g, in st al la tio n of c om m un ic at io n el ec tro ni c fa ci lit ie s, e tc w ill b e sh ow n in C ol um n B in lo gi ca l s eq ue nc e an d in s uf fic ie nt d et ai l t o id en tif y th e el em en t.

If th e co nt ra ct c al ls fo r m or e th an w or k el em en ts , a dd iti on al c op ie s of th e A

F Fo rm m ay b e us ed as a c on tin ua tio n fo r t he w or k el em en ts

6.

T he p er ce nt ag e of e ac h lis te d w or k el em en t t o th e co m pl et e jo b w ill b e sh ow n op po si te e ac h el em en t i n

C ol um n

C

A s an e xa m pl e, if w or k el em en ts a re s ho w n:

e xc av at io n, c on cr et e w or k, a nd b ac kf ill an d it is e st im at ed th at e xc av at io n is

0% o f t he to ta l j ob , c on cr et e

, a nd b ac kf ill

0%

, t he se p er ce nt ag es w ill b e sh ow n op po si te e ac h el em en t.

T he to ta l m us t e qu al

7.

C ol um ns D th ro ug h

Q w ill b e us ed to s ho w p la nn ed p er io di c pr og re ss

, a s re qu ire d by th e co nt ra ct in g of fic er

, d ur in g th e pe rio d of th e co nt ra ct

O nl y th e to p ha lf of th e sp ac e un de r t he se c ol um ns w ill b e us ed b y co nt ra ct or s.

U si ng th e ex am pl e ci te d ab ov e an d as su m in g th at th e co nt ra ct p er io d fo r p er fo rm an ce is w ee ks , a nd it is p la nn ed to a cc om pl is h o f t he e xc av at io n w or k th e

1s t w ee k an d ea ch w ee k un til e xc av at io n is c om pl et e, w ou ld b e sh ow n in th e up pe r h al f o f L in e un de r C ol um n

D , 2 un de r C ol um n E

, a nd un de r C ol um n

F fo r a to ta l o f 5 0%

If it is p la nn ed to a cc om pl is h th e co nc re te w or k du rin g th e 4t h, th , a nd th w ee ks in e qu al a m ou nt s, w ou ld b e en te re d un de r C ol um ns

G , H

, a nd

I on

L in e 2.

A ss um in g th e ba ck fil l w ill b e ac co m pl is he d du rin g th e

7t h an d

8t h w ee ks w ou ld b e en te re d un de r C ol um ns

J a nd K o n

Li ne

If th e co nt ra ct e xt en ds b ey on d w ee ks , a dd iti on al c op ie s of A

F Fo rm m ay b e us ed a s a co nt in ua tio n of p er fo rm an ce re co rd

8.

T ot al a m ou nt o f w or k pl an ne d at in te rv al s as s ho w n in

C ol um ns

D th ro ug h Q w ill b e to ta le d an d en te re d in th e to p ha lf of th e sp ac e un de r t he a pp ro pr ia te c ol um n of

L in e

A ga in

, u si ng th e ex am pl e ci te d ab ov e, th e to ta ls u nd er C ol um ns D th ro ug h

K w ou ld re ad

0, 0, 0, 0, 0, 0, 0, fo r a to ta l o f 1

Th es e to ta ls w ill b e us ed to p lo t a n ov er la y gr ap h us in g

Li ne s th ro ug h

, b eg in ni ng w ith

C ol um n D a nd e xt en di ng to th e rig ht th e nu m be r o f c ol um ns

(w ee ks au th or iz ed b y th e co nt ra ct fo r p er fo rm an ce ti m e.

9.

I n th e ev en t t he c on tra ct is m od ifi ed b y th e co nt ra ct in g of fic er u nd er te rm s of th e co nt ra ct

, c ha ng in g th e pr og re ss o f w or k as o rig in al ly s ch ed ul ed

, a dd in g or d el et in g w or k or c ha ng in g th e or ig in al co m pl et io n da te

, a re vi se d pr og re ss s ch ed ul e w ill b e pr ep ar ed a nd s ub m itt ed to th e co nt ra ct in g of fic er fo r a pp ro va l.

In p re pa rin g th e re vi se d sc he du le , t he a m ou nt o f w or k co m pl et ed w ill b e co ns id er ed to ge th er w ith th e ch an ge d ne w c om pl et io n da te s et fo rth in th e co nt ra ct m od ifi ca tio n.

C on si de rin g th es e fa ct or s, th e w or k un de r t he c on tra ct w ill b e re sc he du le d ov er th e ne w to ta l p er fo rm an ce ti m e in th e sa m e m an ne r t ha t t he o rig in al s ch ed ul e w as p re pa re d.

T he n ew c om pl et io n da te w ill b e en te re d in B lo ck

"F irs t R ev is ed

S ch ed ul e, "S ec on d

R ev is ed

S ch ed ul e, et c.

, w ill b e en te re d to th e le ft of th e fo rm ti tle

Ti m e of s ub m is si on o f t he re vi se d sc he du le w ill b e de te rm in ed b y th e co nt ra ct in g of fic er

A t s uc h in te rv al s as m ay b e es ta bl is he d by th e co nt ra ct in g of fic er

, t he c on tra ct or w ill s ub m it to th e co nt ra ct in g of fic er A

F Fo rm

5, C on tra ct P ro gr es s

R ep or t," in di ca tin g th e pe rc en ta ge o f w or k ac co m pl is he d fo r e ac h w or k el em en t d ur in g th e es ta bl is he d re po rti ng p er io d.

A cc ur at e re po rts a re o f t he u tm os t i m po rta nc e to th e co nt ra ct or a nd to th e

G ov er nm en t, si nc e th e pe rc en ta ge o f c om pl et io n, or p ro gr es s, th us re po rte d is u se d in a dm in is tra tio n of th e co nt ra ct a nd m ay b e us ed in c on ne ct io n w ith a pp ro va l o f p ar tia l p ay m en ts u nd er th e co nt ra ct

C ar e sh ou ld b e ta ke n to p la n th e w or k in s uc h m an ne r t ha t i t c an b e ac co m pl is he d as s ta te d in th is s ch ed ul e.

I f, fo r a ny re as on , i t b ec om es k no w n th at a ny p ar t o f t he p ro gr es s un de r t hi s co nt ra ct w ill b e de la ye d, th is fa ct s ho ul d be re po rte d to th e co nt ra ct in g of fic er im m ed ia te ly

A F

IM

T

, 2

1, V

P

R E

V

IO

U S

E D

IT

IO

N S

A R

E O

B S

O

LE

TE

OMB NO. 0704-0188CONTRACT PROGRESS REPORT

Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO : SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060.

CONTRACTOR ADDRESS

REPORT NO. PERIOD COVERED

FROM:

PROJECT NO. CONTRACT NO. COMPLETION DATE

TO:

LINE

NO.

% OF

TOTAL JOB

% COMPLETED

THIS PERIOD

% COMPLETED

CUMULATIVE

WORK ELEMENT

TOTAL

REMARKS

At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.

PROGRESS OR COMPLETION CERTIFICATE

I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.

SUBMITTED BY OR FOR

CONTRACTOR BASE CIVIL ENGINEER

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

Click to sign

Click to sign

Section 01 30 00 Page 1

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

Resume for the proposed Superintendent; G

Preconstruction Survey; FIO

SD-04 Samples

Color Boards; G

SD-07 Certificates

Progress and Completion Pictures; FIO

1.2 COLOR BOARDS FOR AIR FORCE PROJECTS

Submit three sets of color boards within 90 calendar days after Contract Award for Design/Bid/Build construction contracts and no later than the 95% Design Submittal for Design/Build contracts. Each set of boards shall include samples of colors and finishes of interior surfaces, such as walls, floors, and ceilings. Samples shall be presented on 8 by 10-1/2 inches boards (modules) with a maximum spread of 24 by 31-1/2 inches for foldouts.

Modules shall be designed to fit in a standard loose-leaf, three-ring binder. Where special finishes such as architectural concrete, carpet, or prefinished textured metal panels are required, samples not less than 12 inches square shall be submitted with the board. If more space is needed, more than one board per set may be submitted. The Contractor shall certify that he has reviewed the color samples in detail and that the color samples are in strict accordance with contract drawings and specifications, except as may be otherwise explicitly stated. Submittal of color samples shall not relieve the Contractor of the responsibility to submit samples required elsewhere herein.

Section 01 30 00 Page 2

1.3 PRECONSTRUCTION SURVEY AND PROGRESS AND COMPLETION PICTURES

Photographically document site conditions prior to start of construction operations. Submit these photographs with a narrative report indicating the existing conditions of the project site prior to mobilization.

Provide monthly, and within one month of the completion of work, digital photographs, 1600 x 1200 x 24 bit true color 5-megapixel minimum resolution in jpeg file format showing the sequence and progress of work.

Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten views from points located by the Contracting Officer’s Representative. Submit a view location sketch indicating points of view upon request.

Photographs for each month shall be in a separate monthly directory and each file name shall include a date designator. Cross-reference submittals in the appropriate daily report. Photographs shall be provided for unrestricted use by the Government.

1.4 MINIMUM INSURANCE REQUIREMENTS

Procure and maintain during the entire period of performance under this contract the following minimum insurance coverage:

a. Comprehensive general liability: $500,000 per occurrence

b. Automobile liability: $200,000 per person, $500,000 per occurrence for bodily injury, $20,000 per occurrence for property damage

c. Workmen's compensation as required by Federal and State workers' compensation and occupational disease laws.

d. Employer's liability coverage of $100,000, except in States where workers compensation may not be written by private carriers.

e. Others as required by State law.

1.5 CONTRACTOR SPECIAL REQUIREMENTS

1.5.1 Space Temperature Control, HVAC TAB, and Apparatus Inspection

All contract requirements of Section 23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC, and Section 23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC shall be accomplished directly by a first tier subcontractor, including the Commissioning Agent. No work required by Section 23 05 93, or 23 09 13 shall be accomplished by a second tier subcontractor.

1.6 SUPERVISION

1.6.1 Minimum Communication Requirements

Have at least one qualified superintendent capable of reading, writing, and conversing fluently in the English language, on the job-site during working hours. In addition, if a Quality Control (QC) representative is required on the contract, then that individual must also have fluent English communication skills.

Section 01 30 00 Page 3

1.6.2 Superintendent Qualifications

Superintendent must have a minimum of 5 years experience as a project manager, project engineer, superintendent, or quality control manager on projects similar in size, scope and complexity to this project as identified in Section 01 11 00. The project superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to ensure timely completion.

Furthermore, the Contracting Officer may issue an order stopping work on all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop work orders shall be made the subject of a claim for extension of time for excess costs or damages by the contractor.

Approval of the project superintendent is required prior to the start of construction. Provide a resume for the proposed superintendent describing their experience with references and qualifications to the contracting officer for approval. The contracting officer reserves the right to interview the proposed project superintendent at any time in order to verify the submitted qualifications.

1.7 PRECONSTRUCTION CONFERENCE

After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer to discuss and develop a mutual understanding relative to the administration of the contract and safety program, preparation of the schedule of prices, shop drawings, and other submittals, scheduling programming, prosecution of the work, and clear expectations of the "Interim DD Form 1354" Submittal. Major subcontractors who will engage in the work must also attend.

1.8 AVAILABILITY OF CADD DRAWING FILES

After award and upon request, the electronic "Computer-Aided Drafting and Design (CADD)" drawing files will only be made available to the Contractor for use in preparation of construction drawings and data related to the referenced contract subject to the following terms and conditions.

Data contained on these electronic files shall not be used for any purpose other than as a convenience in the preparation of construction drawings and data for the referenced project. Any other use or reuse shall be at the sole risk of the Contractor and without liability or legal exposure to the Government. The Contractor shall make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the Government, its agents or sub consultants that may arise out of or in connection with the use of these electronic files. The Contractor shall, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.

These electronic CADD drawing files are not construction documents.

Differences may exist between the CADD files and the corresponding construction documents. The Government makes no representation regarding the accuracy or completeness of the electronic CADD files, nor does it make

Section 01 30 00 Page 4 representation to the compatibility of these files with the Contractors hardware or software. In the event that a conflict arises between signed and sealed construction documents prepared by the Government and the furnished CADD files, the signed and sealed construction documents shall govern. The Contractor is responsible for determining if any conflict exists. Use of these CADD files does not relieve the Contractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordinate the work of all contractors for the project.

If the Contractor uses, duplicates and/or modifies these electronic CADD files for use in producing construction drawings and data related to this contract, all previous indicia of ownership (seals, logos, signatures, initials and dates) shall be removed.

1.9 ELECTRONIC MAIL (E-MAIL) ADDRESS

The Contractor shall establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments in Microsoft, Adobe Acrobat, and other similar formats. Within 10 days after contract award, the Contractor shall provide the Contracting Officer a single (only one) e-mail address for electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes or terrorist threats, etc.. Multiple email addresses will not allowed.

It is the Contractor's responsibility to make timely distribution of all Contracting Officer initiated e-mail with its own organization including field office(s). The Contractor shall promptly notify the Contracting Officer, in writing, of any changes to this email address.

SECTION 01 32 00

PROJECT SCHEDULE

1.1 SUBMITTALS

Government approval is required for submittals with a "G" classification.

Submittals not having a "G" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

Project Scheduler Qualifications; G

Baseline Cost Loaded Critical Path Method (CPM) Project Schedule; G

Schedule and Pay Request Calendar; G

SD-07 Certificates

Monthly Cost Loaded CPM Project Schedule Updates; G

SD-11 Closeout Submittals

As-Built Schedule; G

1.2 PROJECT SCHEDULER QUALIFICATIONS

Designate an authorized representative to be responsible for the preparation of the schedule and all required updating and production of reports. The authorized representative must have a minimum of 5-years’ experience scheduling construction projects similar in size and nature, as identified in Section 01 11 00, to this project with scheduling software that meets the requirements of this specification.

Representative must have a comprehensive knowledge of CPM scheduling principles and application. A resume outlining the individual’s qualifications shall be submitted for acceptance by the Contracting Officer.

2.1 SOFTWARE

The scheduling software utilized to produce and update the schedules required herein must be capable of meeting all requirements of this specification.

2.1.1 Contractor Software

Scheduling software used by the contractor must be commercially available from the software vendor for purchase with vendor software support agreements available.

2.1.1.1 Primavera

If Primavera P6 is selected for use, provide the P6 "xer" export file.

Additionally, provide an exported .pdf files for submittal review IAW the “Schedule Reports” paragraph.

3.1 GENERAL REQUIREMENTS

Prepare for approval a Project Schedule, as specified herein, pursuant to FAR Clause 52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required. The scheduling of construction is the responsibility of the Contractor. Contractor management personnel shall actively participate in the development of the schedule and coordinate closely with the Contracting Officer, Contracting Officer's Representative, and Facility Manager(s) in its maintenance. Subcontractors and suppliers working on the project must also contribute in developing and maintaining an accurate Project Schedule. Provide a schedule that is a forward planning as well as a project monitoring tool. Use the Critical Path Method (CPM) of network calculation to generate all Project Schedules.

Prepare each Project Schedule using the Precedence Diagram Method (PDM) to control, budget, and invoice project activities. For consistency, when scheduling software terminology is used in this specification, the terms in Primavera’s scheduling programs are used.

3.2 BASIS FOR PAYMENT AND COST LOADING

The Baseline Cost Loaded CPM Project Schedule is the basis for determining contract earnings during each update period and therefore the amount of each progress payment. The aggregate value of all activities coded to a contract CLIN must equal the value of the CLIN.

Lack of an approved updated Cost Loaded CPM Project Schedule may result in an inability of the Contracting Officer to evaluate the Contractor's progress for the purposes of payment. The Baseline Cost Loaded CPM Project Schedule shall be submitted for approval within 30 calendar days after the Notice of Award has been acknowledged.

The Contractor is responsible for scheduling, sequencing, budgeting, and executing work to comply with the requirements of the Contract Documents.

Government acceptance extends only to the activities of the Contractor’s schedule that the Government has been assigned responsibility and agrees it is responsible. Comments offered on other parts of the schedule, to which the Contractor is assigned responsibility, are offered as a courtesy and are not conditions of Government acceptance; but are for the general conformance with established industry scheduling concepts.

The Contractor shall submit a Schedule and Pay Request Calendar with the Baseline Cost Loaded CPM Project Schedule within 30 calendar days after the Notice of Award has been acknowledged. Reference Attachment A as an example. The Schedule and Pay Request Calendar shall forecast dates for the following:

a. Contractor Provides Draft Monthly Cost Loaded CPM Schedule Update and Narrative to JB Charleston.

b. Contractor Conducts Monthly Periodic Schedule Meeting with JB Charleston.

c. Contractor Submits Final Monthly Cost Loaded CPM Schedule Update and all Reports.

d. Contractor…