Amendment 1 - JB CHS MACC - Pre-Proposal Conference Slides.pptx

PPTX presentation 245 KB Posted

Attached to
Joint Base Charleston (JB CHS) Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA441822R0019
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to Joint Base Charleston (JB CHS) Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Solicitation Amendment 01 - Attachment 6 - Berkeley County WD SC20210022.pdf PDF
Solicitation Amendment 01 - Attachment 10 - Wayne County WD NC20220041.pdf PDF
Solicitation Amendment 01 - Attachment 3 - As Built Drawings B63.pdf PDF
Solicitation Amendment 01 - Attachment 5 - Solicitation Section B - Seed Project - 08 Nov 22.pdf PDF
Solicitation Amendment 01 - Attachment 7 - Charleston County WD SC20220023.pdf PDF
Solicitation Amendment 01 - Attachment 1 - Addendum 01 - Repair Aircraft MX Facility B63 Revised Drawing Sheets.pdf PDF
Solicitation Amendment 01 - Attachment 4 - Addendum 01 SOW - 08 Nov 22.pdf PDF
Solicitation Amendment 01 - Attachment 9 - Orangeburg County WD SC20220016.pdf PDF
Solicitation Amendment 01 - Attachment 2 - As Built Drawings B61.pdf PDF
Solicitation Amendment 01 - Attachment 8 - Dorchester WD SC20220024.pdf PDF
JB CHS MACC - Questions and Answers - 09 Nov 22.pdf PDF
Update 1 - JB CHS MACC - Pre-Proposal Conference Slides.pdf PDF
Update 2 - JB CHS MACC - Sign-In Sheet for Attendees.pdf PDF
Solicitation Attachment YT Seed Project Drawings -Updated.pdf PDF
Solicitation - FA441822R0019.pdf PDF
Solicitation Attachment XY - On and Off-Ramp Procedures.pdf PDF
Solicitation Attachment YV Seed Project Fire Pump Curves.pdf PDF
Statement of Work - Attachment 6 - 01 32 00 - Attachment A - Schedule and Pay Request Calendar Example 1.pdf PDF
Statement of Work - Attachment 10 - 01 33 00 - Attachment B - JB CHS RFI Form.pdf PDF
Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form 4288-R (Submittal Register).xlsx XLSX spreadsheet
Statement of Work - Attachment 17 - 01 78 00 - Closeout Requirements.docx DOCX document
Solicitation Attachment XW - JB Charleston MACC Work Load Estimate.pdf PDF
Statement of Work - Attachment 1 - JB Charleston Statement of Work for Architect_Engineering (A_E) Services.pdf PDF
Statement of Work - Attachment 2 - Architectural Compatibility Plan.pdf PDF
Statement of Work - Attachment 3 - 01 11 00 - Summary of Work.docx DOCX document
Statement of Work - Attachment 8 - 01 32 00 - Project Schedule.docx DOCX document
Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form 4288-R (Submittal Register).pdf PDF
Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form 4289-R (RFI Register).xlsx XLSX spreadsheet
Statement of Work - Attachment 13 - 01 33 00 - Submittal Procedures.docx DOCX document
Statement of Work - Attachment 14 - 01 35 26 - Attachment A - Accident Investigation Form (CIRS).pdf PDF
Statement of Work - Attachment 15 - 01 35 26 - Governmental Safety Requirements.docx DOCX document
Statement of Work - Attachment 16 - 01 45 00 - Quality Control.docx DOCX document
Solicitation Attachment XT - JB Charleston - Question and Answer Form.xlsx XLSX spreadsheet
Solicitation Attachment XU - Past Performance Customer Questionnaire.pdf PDF
Solicitation Attachment XV - Past Performance Survey.pdf PDF
Solicitation Attachment XX - TOPR - Seed Project - B63.xlsx XLSX spreadsheet
Solicitation Attachment YS Seed Project Specifications.pdf PDF
Solicitation Attachment YT Seed Project Drawings.pdf PDF
Statement of Work - JB CHS MACC.pdf PDF
Statement of Work - Attachment 4 - 01 14 00 - Work Restrictions.docx DOCX document
Statement of Work - Attachment 9 - 01 33 00 - Attachment A - JB CHS Transmittal Form 4025.pdf PDF
Solicitation Attachment XZ - Past Performance Project List.xlsx XLSX spreadsheet
Solicitation Attachment YU Seed Project Hydraulics.pdf PDF
Solicitation Section B - JB CHS MACC - Seed.pdf PDF
Statement of Work - Attachment 5 - 01 30 00 - Administrative Requirements.docx DOCX document
Statement of Work - Attachment 7 - 01 32 00 - Attachment A - Schedule and Pay Request Calendar Example 2.xlsx XLSX spreadsheet
Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form 4289-R (RFI Register).pdf PDF
Solicitation Attachment XX - TOPR - Seed Project - B63.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Joint Base Charleston Multiple Award Construction Contract (MACC) Pre-Proposal Conference 18 Oct 2022

Thank you for attending!

Please sign in

Ready Warfighters, Charting Our Future…Together!

Please Note This is not a solicitation document. This document is provided to highlight certain aspects of the solicitation. All contractual requirements can be found within the solicitation sections and the appropriate attachments.

Overview General Information regarding JB Charleston’s MACC Off Ramp Considerations Proposal Information Evaluation Information Teaming Arrangements & Joint Ventures Seed Project, B63 Information Continue to Seed Project, B63 Site Visit

General Information Summary of Solicitation Documents Solicitation FA441822R0019 Solicitation Attachments XT - YV Solicitation Section B – JB CHS MACC – Seed Statement of Work – JB CHS MACC Statement of Work – Attachments 1 & 2 Statement of Work – Attachments 3 -17

Design Build Sample Division 01 Specifications Provided for Future T.O.’s Provided for Future T.O.’s For Seed Project Only For Overall MACC Information

(Ref. Section H): All Questions due 21 Oct 2022 @ 4:00 p.m. EST Please utilize the Question and Answer Form (Solicitation Attachment XT)

(Ref. Section M): Up to 5 Awarded & 2 On-Ramp Identified Contractors

(Ref. Section B, Overall): $96M Overall Capacity

(Ref. Section B, Overall): 5-1/2 Years 12 Month Base, (4-Ea) Option Years, (1-Ea) 6 Month Option

(Ref. Section H): Task Orders (TO) = $2K - $10M, Majority = $1M - $5M

(Ref. Section H): Shaw AFB & Seymour Johnson AFB for emergency use only General Information

10/12/2022

Work Load Estimate (Ref. Attachment XW)

JB Charleston Multiple Award Construction Contract (MACC)
Work Load Estimate
Fiscal YearPossible TO Rough Order of Magnitude Cost/Number
<$1M$1M - $5M$5M - $10M
FY21151
FY22063
FY23071
FY24090
FY25061
FY26160
FY27060
FY28250

*Numbers provided are projections only based on data currently available and contingent on availability of future funds.

10/12/2022

The Government may off-ramp a contractor for reasons below:

Failure to submit responsive proposals on 75% of task order proposal requests over a twelve (12) month period of performance.

(Ref. Section L) - Site visits for individual TOs will be mandatory for MACC contractors unless otherwise noted in the Task Order Proposal Request (TOPR). If a contractor chooses not to attend the site visit for a specific TO, that contractor’s proposal for the TO will be considered non-responsive.

Late performance of TO workload = completing TOs late or being assessed LDs on TOs.

Inability of prime or subcontractors performing work to maintain proper certification(s).

Poor TO performance as evidenced by CO notification or CPARS ratings under “Satisfactory.”

Unresponsiveness to warranty work.

Failure to provide responsive (72 hrs.) customer service. Maximum of five (5) occurrences over a twelve (12) month period.

Unsafe site conditions resulting in an OSHA discrepancy.

Off Ramp Considerations (Ref. Attachment XY)

10/12/2022

(Ref. Section L): Part I – Factor I = Seed Project – Price Proposal Section A – SF 1442 Repair Aircraft Maintenance Facility, B63 ($5M - $10M ROM) Complete Section B (Seed) - Schedule B for Price Information (CLINs 0001 – 0007) Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For Sections C through I, the Offeror shall submit only those pages that require a fill-in.

(Ref. Section L): Part II – Factor II = Past Performance Information (50 page limitation) Complete Attachment XZ – Past Performance Project List as a Cover Sheet Complete Attachment XV – Past Performance Surveys for each individual project No more than 15 Projects within the last 5 years:

(No more than 2) Design-Build projects (No more than 10) Existing facility whole building renovation projects (No more than 5) Utility infrastructure repair or construction projects Note: Attachment XU – Past Performance Customer Questionnaires do not count toward page limitation.

Proposal Information

(Ref. Section L) - If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. (Note: Clients are highly encouraged to submit questionnaires directly to the Offeror. However, if the client requests, questionnaires may be submitted directly to the Government's Point of Contact, robert.melton.6@us.af.mil.

10/12/2022

(Ref. Section M): Price Evaluation (1st Step) Reasonableness of an Offeror’s price and balance of an offeror’s CLIN structure [Seed Project – B63] All offerors will be ranked, in ascending order, by Price.

(Ref. Section M): Past Performance Evaluation (2nd Step) Recency: One (1) day of performance occurred within five (5) years of the release of the solicitation.

Relevancy:

Occurred within SBA Region IV (SE Region) – AL, FL, GA, KY, MS, NC, SC, TN Contracts with a preponderance of work associated with existing facility whole building renovation work involving Mechanical, Electrical, Plumbing, Fire Protection, Building Envelope and other systems, and with values equaling or exceeding $1M-$10M.

Contracts with a preponderance of work associated with Water, Wastewater, or Electrical utility infrastructure, and with values equaling or exceeding $1M-$10M.

Design Build contracts with a preponderance of work associated with existing facility whole building renovation work and/or utility infrastructure work with values equaling or exceeding $1M-$10M.

Offerors will receive an integrated performance confidence assessment rating. Past Performance evaluations will continue in ascending order of Price until seven (7) offerors rated with Substantial Confidence or all offerors have been evaluated, whichever comes first.

Evaluation Information

10/12/2022

Past Performance Relevancy Rating (assigned to each past performance project)

Performance Confidence Assessment (assigned to each evaluated offeror)

(Ref. Section L): The offeror must provide complete information as to the arrangement, including identifying the responsibilities of each entity, and the contractual relationships and authorities of the firms involved. The offeror should provide a list of any relevant and recent past/present performance information on previous teaming arrangements or joint ventures with the same teaming or joint venture partner. Joint ventures must align with the current guidance provided by the Small Business Administration (SBA).

The offeror shall submit a consent letter executed by each teaming partner and/or joint venture partner authorizing the release of adverse past performance information to the offeror. Provide with the proposal a letter from all subcontractors that will perform major or critical aspects of the requirement, consenting to the release of their Past Performance information to the prime contractor.

(Ref. Section M): Consideration will be given to the entity that performed the work. Past performance of the offeror will have a greater weight than past performance of other business entities or personnel. Demonstration of previous working relationships with the proposed entity will have a greater weight than a new relationship. Teaming partners supported by written agreements will have a greater weight than partners with no written agreement.

Teaming Arrangements & Joint Ventures

10/12/2022

(Ref. 01 11 00, para 1.1.1) – Repair/replacement of fire suppression system, fire alarm/mass notification system, roof, HVAC, Electrical, renovate locker room/shower/restrooms/offices, repair/repaint exterior siding, repair/replace translucent panels, clean/repaint interior of hangar bay, replace select hangar floor slabs, demolition, and incidental related work.

(Ref. Block 11 of SF 1442) – 440 Calendar Days after Notice to Proceed (NTP)

(Ref. 01 30 00, para 1.6.1) – One (1) Superintendent required

(Ref. 01 45 00, para 3.2.5.1) – One (1) QC Manager required

(Ref. 01 35 26, para 1.5.1.1) – One (1) Site Safety and Health Officer (SSHO) required (Ref. 01 35 26, para 1.5.1.2) – QC Manager can be the SSHO, if dual qualified

(Ref. 01 32 00, para 3.2) – Cost Loaded CPM Schedule due 30 Days after TO Award.

(Ref. 01 45 00, para 3.2.4.c) – Contractor Code Compliance Affidavit’s required for HVAC, Electrical, Lightning Protection, Fire Protection, & Plumbing trades.

(Ref. 01 45 35) – Special Inspections Required

(Ref. 01 91 00.15 10) – Total Building Commissioning Required Seed Project Information Repair Aircraft Maintenance Facility, B63