This file contains architectural and design drawings for a facility renovation project at Scott Air Force Base (SAFB) in Illinois. The project is identified as "SCOTT SDDC" (Scott Supply and Distribution Center) and includes comprehensive construction documentation for the renovation of multiple floors of a building.
The drawings encompass Phase 1 and Phase 3 (1st Floor) and Phase 2 and Phase 4 (2nd Floor) renovations, with detailed floor plans, elevations, sections, and specifications. Key deliverables include floor plans showing workspace layouts with modular furniture systems (workstations designated WS-2, WS-3, and WS-5), door and window schedules with specifications for multiple room types, reflected ceiling plans with lighting and mechanical systems, building sections showing structural details, and architectural details for column enclosures, wall assemblies, and roof systems. The drawings indicate various room finish schedules, material specifications (including PCPF, PCMF, NSS panel types), and work sequencing information. Design elements include modifications such as replacing 40H panels with 65H panels in certain areas, relocating existing workstations, and adding new stations. The project documents include building code analysis per IBC 2006, egress width calculations, and detailed construction specifications. Designer credits are attributed to W. Ballard with Select Architects (1716 Hidden Creek Ct, St. Louis, MO 63131), and the documents bear revision dates ranging from 2007 to 2011, indicating a multi-phase project with ongoing design refinements.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
72 20
20 7220 727220
20 72
72 20
7220 7220
20 72
20 72
7220 2072
72 20
20 7220 72 7220 7220
20 72
20 72
72 20 2072
72 20
20 7220 72
20 72
20 72
7220 7220
2072 7220 207272 20
207272 20
20 7220 72 7220 7220
2072 72 20
2072 7220 207272 20
207272 20
20 7220 72 7220 7220
2072 7220
2072 7220
20727220
20 7220 72
20727220 2072 72 20
7220 7220
2072 72 20
20 72
20 72
72 20
20 72
20 72
2072 2072
20 72 7220 20 727220
72 2072 20
2 2
20 72
7220 20 72
20 72
20 72
7220 7220
2072 7220
20 72
20 72
72202072
72 20
207272
20 7220 727220 7220
72 72
20 72
20 72
202072
72 20
207272 20
20 7220 72
7220 7220
2072 72 20
20 72
20 72
72 20
207272 20
20 7220 72 7220 7220
2072 7220 20727220
20 72
2072 72 20 20727220
72 20
207272 20
20 727220
72 20
20 72
72 20
20 72
72 20
7220 7220
2072 72 20
20 72
20 72
72 20
20 20
72 72
72 20
20 72
72 20
20 7220 727220 722020 7220 727220 7220
2072 72 20
20 72
20 72
72 20
20 72
PC
PFPCMF
PCMF
NSS
PC
PF
PCMF
NS090
PC
PF
PC
M
F N S
SN
S S
PCPFPC
M
F
PC
M
F
N S S
PCPF
PC
M
F
N S
PC
PFPCMF
N S
PC
PFPCMF
PCMF
NSS
PC
PF
PCMF
PCMFNSS
PC
PFPCMF
PCMF
NSS
PC
PFPCMF
PCMF
NSS
PCPFPC
M
F
PC
M
F
N S S
PCPFPC
M
F
PC
M
F
N S S
PC
PF PCMF
PCMF
NSS
PC
PF
PCMF
PCMF NSS
PC
PFPCMF
N S
PCPFPC
M
F
PC
M
F
N S S
PC
PF
PC
M
F N S S N
S S
PCPF
PC
M
F
PC
M
F N S S
PC
PF
PCMF
NS090
PC
PF PCMF
PCMF
NSS
PC
PFPCMF
N S
PC
PFPCMF
PCMF
NSS
PC
PFPCMF
PCMF
NSS
PC
PFPCMF
PCMF
NSS
PC
PF
PCMF
PCMFNSS
PC
PFPCMF
N S ph as e di vi di ng li ne
PHASE 1--1ST FLOOR WEST PHASE 3--1ST FLOOR EAST
20 20
72 72
20 20
72 72
20 20
72 72
20 20
72 72
WS-2 WS-2 WS-2 WS-2 WS-2 WS-2 WS-2 WS-2 WS-2
WS-2 WS-2 WS-2 WS-2
WS-2 WS-2 WS-2 WS-2
WS-2WS-2WS-2WS-2WS-2WS-2WS-2WS-2WS-2WS-2WS-2 WS-2
WS-3
WS-3
WS-3
WS-3
WS-3
WS-3
WS-3
WS-3
WS-3
WS-3
WS-3
WS-3
WS-2
WS-5
WS-6 WS-6
WS-6WS-6
WS-6 WS-6
WS-6WS-6
WS-3
WS-3
WS-3
WS-3
WS-3
3'-4"
3'-01 4" 3'-21
2" 3'-2" 3'-21
2" 3'-11 4"
3'-2"3'-2"3'-2"3'-21 2"
'-2
3 4
'-6
4'-03 4" 4'-11"
'-4
3 4
3'-91 4" 2'-113
4"
6'-01 2"
'-0
1 4
3'-1" 2'-113 4" 3'-01
2" 3'-11 4"
3'-1" 3'-01 2"
'-7
1 4
'-1
3 4
'-1
01 2
2'-101 2" 2'-101
2"
3'-91 2" 3'-8" 3'-8" 3'-31
2" 3'-8" 3'-71 2"
3'-8" 3'-8" 3'-8" 3'-8"
4'-4"
4'-21 4"
4'-21 4"
'-8
1 2
'-1
1 2
3'-8" 3'-41 4"
3'-8" 3'-31
2"
72 20
WS-6 WS-6
WS-6
WS-6 WS-6
WS-6
WS-6WS-6
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
80/36 80/3680/3680/36
D11
D11
D11
D11
D11
D1180/3680/36 80/3680/36
D11
/1
/1
/3
/6
80H PANELS W/
15H STACK-ONS
4'-9 1/4"
PROPOSED 11.20.08
ADD 2 NEW
STATIONS
8'-51 2"
PROPOSED 11.20.08
ADD 1 NEW STATION
72 20
20 72
3036 20
1W104
1W105
1W111
1E171-29 1E171-30
1E171-NEW
4' 11.16.09
REPLACE EXISTING
40H PANELS IN
SPINE WITH 65H
20 72
1E171-19 11.16.09
Designer:
Date:
Scale:
Revisions:
Approval:
Date
Name
1716 HIDDEN CREEK CT
ST. LOUIS, MO 63131
p: 314.909.1990 f: 314.909.1911 w.ballard
3 03.07.07 wlb
T r a n s c o m
S D
D C s t
F l o o r
P h a s e s a n d
S A
F B
I L
S A
F B
D D
C
P
P
1ST FLOOR EAST
inst 04.17.07 wlb
4 02.23.11 als
3/32" = 1'-0"
20 72
7220 7220 7220
207272 20
20 7220 72
20 72
20 72
20727220
20 7220 72
20 72
72 20
20 72
72 20
20 72
20 72
20 7220 72
20 72 7220
20 72
7220 7220
2072 7220
72 20
20 72
20727220
20 7220 727220
7220 7220
2072 72 20 207272 20
20 7220 72 20 72
2072 7220207272 20
72 20
20 72 7220
2072 20722072
20 72
20 72
72 20 72 2072 20
20 727220
PH
A S
IN
G D
IV
ID
IN
G
L
IN
E
PHASE 2--2ND WEST
PHASE 4--2ND EAST
40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
40/3640/3640/3640/36 40/3640/3640/3640/3640/3640/3640/3640/3640/3640/36
WS-2 WS-2 WS-2 WS-2 WS-2 WS-2 WS-2 WS-2
WS-2
WS-2WS-2WS-2WS-2WS-2WS-2
WS-3
WS-3
WS-3
WS-3
WS-3
WS-3
WS-3
WS-3
WS-3
WS-3
120--90 degree cantilever with flat bracket
120--90 degree cantilever with flat bracket
120--90 degree cantilever with flat bracket
120--90 degree cantilever with flat bracket desk end panel desk end panel panel to work surface bracket panel to work surface bracket panel to work surface bracket no surfaces to be specified wtih cantilevers. Add them separately and use the 120 style ones!
There will be a panel to worksurface bracket in the center of the 72" surface to tie the surface to the panels.
In the single stations there will either be 2 desk end panels, or where they meet a full size panel there will be a cantilever.7220 each station has a bbf and a ff floor supported Series 2 pedestal now.
and of course the ones with 65"high panels..which is most of them, will have a 72" shelf and a task light.---1 vwm80 per every 4 tasklights.
There are some instances where the panels are all 40" high. In front of the windows there will be 40"high panels as well.
All stations are considered WS-1 unless otherwise noted. Please see typical sheets.
4'-9 1/4"
3'-73 4" 3'-91
2"
3'-41 2" 3'-51
2"
3'-41 2" 3'-51
2"
3'-31 2" 3'-4"
3'-4"
3'-23 4"
3'-43 4"
3'-33 4"
'-1
1 4
3'-111 2"
5'-31 2"
5'-31 2"
3'-31 4"
6'-71 4"
3'-1"4'-0"3'-31 4"
'-1
01 2"
3'-21 2"
3'-23 4" 3'-21
4"
/3
/3
PCPF
PCPFPCMF
PCMF
LOWER PANELS
& ADD TRANS.
COUNTER
ADD WING
PANEL
40/24
/3
/3
PCPFNS090
2E287-34
PROPOSED 1.30.08
SECURITY
KEY PAD
CIRCUIT BOXES
LOCATED ON
COLUMN FACE
3'-21 2" 3'-4"
72 20
72 20
40/3640/36 4040
EXIS
T
RELOCATE
EXISTING
2-POD
NEW "L"
POST
CCC
36/39S
CCC
36/39SEXIST EXIST
EXIST-COPY
EXIST-MICRO
EXIS
T-PR
IN
TER
S
/3
/3
/3
O C L
PC
M
F N S S
PC
PF
PC
M
F N S S N
S S
72 20
/3
TR2
TR2
TR
TR
TR
TR
TR
TR
TR
ROOM 272
TEAR DOWN 2 STATIONS
USE PARTS FOR INVENTORY
72 20
40/36 40/36
ROOM 287
AREA 3
40/36 40/3640PCPF
PCPF
NSS
NSS
NSS
NSS
ROOM 287
AREA 2
06.02.08
NSS
'-0
PCPFNS090
ROOM 287
AREA 1
06.02.08
A
A B
ED F
C
MOVE EXISTING STATION B & C
UP TO ALIGN WITH CONNECTING
STATIONS
NEW 36W SURFACE
(EXTENDED ONE END)
NEW STATIONNEW STATION
NEW STATION
NEW STATION
3'-81 4"
'-6
A
NEW STATION
B
NEW STATION
72 20
20 7220 72
20722072
20 72
20 72
/3
/3
/3
ROOM 254 ROOM 255
ROOM 219
72 20
/3
/3
/3
OPTION 2
10.06.08
/3
OPTION 2
10.06.08
MOVE EXSTING 2-POD
UP APPROX. 20"
ADD NEW STATION
10.06.08
Designer:
Date:
Scale:
Revisions:
Approval:
Date
Name
1716 HIDDEN CREEK CT
ST. LOUIS, MO 63131
p: 314.909.1990 f: 314.909.1911
11.07.06 w.ballard
3 03.07.07 wlb
T r a n s c o m
S D
D C n d
F l o a s e
A
F B
S A
D
C
P
P
2ND FLOOR
inst 04.17.07 wlb
20 72
7220 7220 7220
207272 20
20 7220 72
20 72
20 72
20727220
20 7220 72
20 72
72 20
20 72
72 20
20 72
20 72
20 7220 72
20 72 7220
20 72
7220 7220
2072 7220
72 20
20 72
20727220
20 7220 727220
7220 7220
2072 72 20 207272 20
20 7220 72 20 72
2072 7220207272 20
72 20
20 72 7220
2072 20722072
20 72
20 72
72 20 72 2072 20
20 727220
PH
A S
IN
G D
IV
ID
IN
G
L
IN
E
PHASE 2--2ND WEST
PHASE 4--2ND EAST
40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36 40/36
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
40/3640/3640/3640/36 40/3640/3640/3640/3640/3640/3640/3640/3640/3640/36
WS-2 WS-2 WS-2 WS-2 WS-2 WS-2 WS-2 WS-2
WS-2
WS-2WS-2WS-2WS-2WS-2WS-2
WS-3
WS-3
WS-3
WS-3
WS-3
WS-3
WS-3
WS-3
WS-3
WS-3
120--90 degree cantilever with flat bracket
120--90 degree cantilever with flat bracket
120--90 degree cantilever with flat bracket
120--90 degree cantilever with flat bracket desk end panel desk end panel panel to work surface bracket panel to work surface bracket panel to work surface bracket no surfaces to be specified wtih cantilevers. Add them separately and use the 120 style ones!
There will be a panel to worksurface bracket in the center of the 72" surface to tie the surface to the panels.
In the single stations there will either be 2 desk end panels, or where they meet a full size panel there will be a cantilever.7220 each station has a bbf and a ff floor supported Series 2 pedestal now.
and of course the ones with 65"high panels..which is most of them, will have a 72" shelf and a task light.---1 vwm80 per every 4 tasklights.
There are some instances where the panels are all 40" high. In front of the windows there will be 40"high panels as well.
All stations are considered WS-1 unless otherwise noted. Please see typical sheets.
4'-9 1/4"
3'-73 4" 3'-91
2"
3'-41 2" 3'-51
2"
3'-41 2" 3'-51
2"
3'-31 2" 3'-4"
3'-4"
3'-23 4"
3'-43 4"
3'-33 4"
'-1
1 4
3'-111 2"
5'-31 2"
5'-31 2"
3'-31 4"
6'-71 4"
3'-1"4'-0"3'-31 4"
'-1
01 2"
3'-21 2"
3'-23 4" 3'-21
4"
/3
/3
PCPF
PCPFPCMF
PCMF
LOWER PANELS
& ADD TRANS.
COUNTER
ADD WING
PANEL
40/24
/3
/3
PCPFNS090
2E287-34
PROPOSED 1.30.08
SECURITY
KEY PAD
CIRCUIT BOXES
LOCATED ON
COLUMN FACE
3'-21 2" 3'-4"
72 20
72 20
40/3640/36 4040
EXIS
T
RELOCATE
EXISTING
2-POD
NEW "L"
POST
CCC
36/39S
CCC
36/39SEXIST EXIST
EXIST-COPY
EXIST-MICRO
EXIS
T-PR
IN
TER
S
/3
/3
/3
O C L
PC
M
F N S S
PC
PF
PC
M
F N S S N
S S
72 20
/3
TR2
TR2
TR
TR
TR
TR
TR
TR
TR
ROOM 272
TEAR DOWN 2 STATIONS
USE PARTS FOR INVENTORY
72 20
40/36 40/36
ROOM 287
AREA 3
40/36 40/3640PCPF
PCPF
NSS
NSS
NSS
NSS
ROOM 287
AREA 2
06.02.08
NSS
'-0
PCPFNS090
ROOM 287
AREA 1
06.02.08
A
A B
ED F
C
MOVE EXISTING STATION B & C
UP TO ALIGN WITH CONNECTING
STATIONS
NEW 36W SURFACE
(EXTENDED ONE END)
NEW STATIONNEW STATION
NEW STATION
NEW STATION
3'-81 4"
'-6
A
NEW STATION
B
NEW STATION
72 20
20 7220 72
20722072
20 72
20 72
/3
/3
/3
ROOM 254 ROOM 255
ROOM 219
72 20
/3
/3
/3
OPTION 2
10.06.08
/3
OPTION 2
10.06.08
MOVE EXSTING 2-POD
UP APPROX. 20"
ADD NEW STATION
10.06.08
Designer:
Date:
Scale:
Revisions:
Approval:
Date
Name
1716 HIDDEN CREEK CT
ST. LOUIS, MO 63131
p: 314.909.1990 f: 314.909.1911 w.ballard
3 03.07.07 wlb
T r a n s c o m
S D
D C n d
F l o a s e
A
F B
S A
D
C
P
P
2ND FLOOR
inst 04.17.07 wlb
| 1990_1.pdf |
| Sheets and Views |
| 1st floor-122206-24x36(D) |
| 1990_2.pdf |
| Sheets and Views |
| 2nd floor-122206-Layout1-24x36(D) |
| A-904.pdf |
| A-903.pdf |
| A-902.pdf |
| A-900.pdf |
| A-801.pdf |
| A-800.pdf |
| A-901.pdf |
| A-700.pdf |
| A-603.pdf |
| A-602.pdf |
| A-601.pdf |
| A-600.pdf |
| A-500.pdf |
| A-401.pdf |
| A-400.pdf |
| A-300.pdf |
| A-201.pdf |
| A-200.pdf |
| A-104.pdf |
| A-103.pdf |
| A-102.pdf |
| A-101.pdf |
| A-100.pdf |
| A-000.pdf |
| 1990_2_.pdf |
| Sheets and Views |
| 2nd floor-122206-Layout1-24x36(D) |
File details come from the government source that posted it. Updated .