FY18_MACC_RFI_Log_(0009).pdf

PDF 121 KB Posted

Attached to
FY18 Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA4407-18-R-0002
Issued by
Department of the Air Force Air Mobility Command

About this file

Answers to RFIs

View the file

Other files for this federal contract opportunity

Other files attached to FY18 Multiple Award Construction Contract (MACC), newest first.
File Type Posted
FBO_Posting.pdf PDF
50_A-4_4_REFLECTED_CEILING_PLAN.PDF PDF
50_A-3_3_ARCHITECTUAL_FLOOR_PLAN.PDF PDF
50_First_Floor_Revised.pdf PDF
13-B50_SOW_Rev_5.pdf PDF
50_FP-1_12_FIRE_PROTECTION_FLOOR_PLAN.PDF PDF
50_A-2_2_ARCHTECTUAL_DEMOLITION_PLAN.PDF PDF
50_A-5_5_SCHEDULES_DETAILS.PDF PDF
50_47926_P1_Bathroom_Plumbing.PDF PDF
50_A-1_1_TITLE_SHEET.PDF PDF
50_9_E-1_ELECTRICAL_DEMOLITION_PLAN.PDF PDF
50_E-3_11_POWER_FLOOR_PLAN.PDF PDF
50_A-3_FLOOR_PLAN_DETAILS.PDF PDF
50_F-442-A_FOUNDATION_PLAN_DETAILS.PDF PDF
50_P-1_8_PLUMBING_FLOOR_PLAN.PDF PDF
50_P-2_PLUMBING_DEMOLITION.PDF PDF
FA440718R00020004_(Conformed_0004).pdf PDF
29-Pre-Proposal_Conference_Sign_In_Sheet.pdf PDF
28-Pre-Proposal_Conference_Slide_Show.pdf PDF
FA440718R0002-0003.pdf PDF
26-FY18_MACC_RFI_Log_(0003).pdf PDF
FA440718R00020002-0002.pdf PDF
26-FY18_MACC_RFI_Log_(0002).pdf PDF
27-Visitor_Instructions.pdf PDF
01c-Historic_Preservation.pdf PDF
11-PPI_(20180412).docx DOCX document
26-FY18_MACC_RFI_Log_(0001).pdf PDF
1d-UFC_Table_6-1.pdf PDF
16-B50_Drawings.pdf PDF
06-WD-IL17_(IL180017-20180216).pdf PDF
25-Price_Schedule.pdf PDF
08-SAFB_Map.pdf PDF
14-B50_Specifications.pdf PDF
01a-TO_Procedures.pdf PDF
FA440718R0002.pdf PDF
04-NAF_GP.pdf PDF
01b-MACC_Gen_Rqmts.pdf PDF
20-B50_Cubicle_Typicals.pdf PDF
09-AMRDEC.pdf PDF
12-PPQ.pdf PDF
15-B50_Design_Analysis.pdf PDF
03-SAFB_Arch_Comp_Plan.pdf PDF
17-B50_Schedule_of_Submittals.pdf PDF
21-B50_Existing_Floor_Plan.pdf PDF
18-B50_PWS_New_Furniture.pdf PDF
13-B50_SOW_Rev_4.pdf PDF
10-Real_ID_Act_(v21).pdf PDF
05-WD-IL7_(IL180007-20180316).pdf PDF
19-B50_Reconfigured_Floor_Plan.pdf PDF
07-SAFB_Climatic_Data.pdf PDF
Show all 50

FY18 Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI No. Date Received Question / Comment Company POC Name POC Email SME Name Date Sent to

SME SME Response Response Date Publish Action Action Date

R0001 10-Apr-18

Architectural, Electrical and Plumbing packages (including Demo): We are responsible for full design/build of the architectural, electrical and plumbing packages?

The Korte Company Brent Holman brent.holman@korteco.com CE PM 12-Apr-18 In lieu of a 100% design the contractor is responsible for the design/build of any system requiring design.

13-Apr-18 A01 16-Apr-18

R0002 10-Apr-18 HVAC: We are to use the 100% completed HVAC design provided (including Hot Water Flow Diagram), and provide As-Built drawings upon project completion?

The Korte Company Brent Holman brent.holman@korteco.com CE PM 12-Apr-18

Contractor to use 100% design while maintaining compliance with all current applicable codes and standards. At the completion of the project, As-Built drawings are to be provided.

13-Apr-18 A01 16-Apr-18

R0003 10-Apr-18 Fire Protection: We are to use the plan provided and provide a FPE certification letter, as noted in document? The Korte Company Brent Holman brent.holman@korteco.com CE PM 12-Apr-18 Use the plans provided to the extent required to obtain FPE certification. 13-Apr-18 A01 16-Apr-18

R0004 10-Apr-18 HVAC – Do we have the option of going design/build on the HVAC if we think we can achieve the desired results more economically than what the drawings show?

The Korte Company Brent Holman brent.holman@korteco.com CE PM 12-Apr-18

The option to do design/build can be bid as a betterment to the original RFP.

But you must provide a bid for the original design.

13-Apr-18 A01 16-Apr-18

R0005 11-Apr-18

Attachment 11 I. Specify, by name, any key individual(s) who participated in this program and are proposed to support the instant acquisition. Also, indicate their contractual roles for both acquisitions. Could you clarify what the “Instant Acquisition” would be? Is that the seed project? By “both acquisitions” do you mean the seed project and the MACC Program? You are asking for their name, but not any resume’s, is that correct?

RB Construction Company Bob Hemmer rhemmer@rb-construction.com CONS SME 12-Apr-18

Paragraph I of Attachment 11 is requiring offerors to state which individuals from the offeror's company performed on the project referenced on

Attachment 11 and will also perform under the FY18 MACC and the sample project (the "instant acquisition" in this case). Only personnel names are requested, no resumes.

12-Apr-18 A01 16-Apr-18

R0006 11-Apr-18

Attachment 11 H. For each of the applicable sub-factors under the Technical factor in Section M, illustrate how your experience on this program applies to that sub-factor.

Please clarify which subfactors you are referring to because I cannot find any “sub-factors” listed on pages 48 and 49 of 50.

RB Construction Company Bob Hemmer rhemmer@rb-construction.com CONS SME 12-Apr-18 There are no technical subfactors, Attachment 11 has been revised as part of Amendment 01 to the solicitation.

12-Apr-18 A01 16-Apr-18

R0007 12-Apr-18

The Pre-Solicitation Notice states that these services would be performed “The FY18 MACC will encompass a wide variety of construction tasks, including design-build;

facility repair, renovation, additions, upgrades, and new construction integrating multiple construction trades and disciplines; utility work; airfield paving and repair; road repair; and other similar types of work…” Are these items highly relevant, if so will they be added to the Scope of

Services listed in the solicitation issued on 09-Apr-2018?

Environmental Quality Management, Inc. Lori Mathews imathews@eqm.com CONS SME 13-Apr-18

If the "Scope of Work" in question is paragraph M-4.2.2 of Section M, the answer is no. The relevancy determination will remain as written. If this is not what is being asked, please clarify the portion of the solicitation.

13-Apr-18 A01 16-Apr-18

R0008 12-Apr-18

Attachment 11, PAST PERFORMANCE INFORMATION, lists a question “I.” and then an “L.”

Are the questions for letters J through K missing? Also these two questions seem to refer to the current sample project and not a past completed project, please clarify.

Environmental Quality Management, Inc. Lori Mathews imathews@eqm.com CONS SME 13-Apr-18

The paragraph numbering has been corrected in the version of Attachment 11 included in Amendment 01 to the solicitation.

13-Apr-18 A01 16-Apr-18

R0009 18-Apr-18

Because the structural renovations are directly related to supporting the new HVAC system (100% drawings provided), can we assume no other structural design services will be required in our scope? We are only to provide As-Builts?

The Korte Company Brent Holman brent.holman@korteco.com CE PM 18-Apr-18 Yes, no other structural design will be necessary. As-builts are to be provided at the conclusion of any project.

19-Apr-18 A02 19-Apr-18

Request for Information (RFI) Subject Matter Expert (SME)

R0010 18-Apr-18

The drawings are detailing height extensions to the existing stud walls in the areas we’re renovating, but the notes provided indicate to demo these walls and build new walls to the new correct height. Please confirm which method is required.

The Korte Company Brent Holman brent.holman@korteco.com CE PM 18-Apr-18

Please refer to the Statement of Work;

Objectives, Project Scope and Structural/Building Envelope, regarding the reconfiguration and construction of offices, conference room, etc. Because of the reconfiguration the walls shall be demolished.

19-Apr-18 A02 19-Apr-18

R0011 18-Apr-18 How should the PPI sheets be delivered? Would you like hand delivery or email? Pugsley Services Melody Durham mel@pugsleyservice.com CONS SME 18-Apr-18 Email only. 18-Apr-18 A02 19-Apr-18

R0012 18-Apr-18

Please clarify if the offeror’s projects with completed Past Performance Information (PPI) sheets must have a project award value of $250,000 to $5,000,000 to be deemed relevant.

EQM Lori Mathews lmathews@eqm.com CONS SME 19-Apr-18

The first sentence in Section M, paragraph M-4.2.2 applies to each project submitted for past performance evaluation.

19-Apr-18 A02 19-Apr-18

R0013 18-Apr-18 Would a project with a Past Performance Information

(PPI) Sheet that has an award value over $5 be considered relevant?

EQM Lori Mathews lmathews@eqm.com CONS SME 19-Apr-18 Please refer to Section M, paragraph M-

4.2.2. 19-Apr-18 A02 19-Apr-18

R0014 19-Apr-18

Please advise how many PPIs will be reviewed by the Government.

Amendment 1 indicates that “no less than three (3) PPIs” should be submitted – suggesting that more than three (3) can be submitted. The PPI form, first paragraph, directs offerors to submit in accordance with the limitations outlined in L-2.2.3.1. L-2.2.3.1 directs to “Submit three

(3) completed copies of Attachment 11, Past Performance Information (PPI) Sheet.

MKB Marcia Beckwith marcia@mkbconstruction.com CONS SME 19-Apr-18 Please refer to Amendment 0001, which corrected this conflict. 19-Apr-18 A02 19-Apr-18

R0015 19-Apr-18

The PPI for the above referenced solicitation requires a FAX number. Many agencies no longer support a FAX.

Is the e-mail address for the reference provided acceptable in lieu of a FAX number when no FAX is available?

MKB Marcia Beckwith marcia@mkbconstruction.com CONS SME 19-Apr-18 Yes, an email address in lieu of a fax number is acceptable. 19-Apr-18 A02 19-Apr-18

R0016 20-Apr-18

In addition to the submitted PPI forms, is it permissible to send out additional PPQs to our previous clients, having them return said PPQs directly to you before the date of bid submission?

RAADLLC Christina Caputo christinac@Raadllc.com CONS SME 20-Apr-18 No 20-Apr-18 A03 20-Apr-18

R0017 20-Apr-18 Concerning the PPI. Please confirm if design-bid-build projects may be submitted for Factor 1.

Accel Construction Services Group, LLC Rianna Domanico rdomanico@acceldevgroup.com CONS SME 20-Apr-18

No. Please refer to Section M, paragraph M-2.1. However, design-bid-build can be submitted for Factor 2.

20-Apr-18 A03 20-Apr-18

R0018 20-Apr-18

Given that most task orders within the current MACC are design-bid-build, please confirm if the government will more favorably review design-build projects over design-bid-build.

Accel Construction Services Group, LLC Rianna Domanico rdomanico@acceldevgroup.com CONS SME 20-Apr-18 Please refer to Section M, paragraph M-

4.2.1. 20-Apr-18 A03 20-Apr-18

R0019 24-Apr-18 Will the price submitted be a firm price if low bid and a contract is awarded? What effect does the price provided have on the award of the MACC?

Kozeny Wagner Stephen Stremlau sstremlau@kozenywagner.com CONS SME 24-Apr-18

To answer the first question please reference Section L paragraph L-1.11, L-2.2.4 and L-2.2.4.1, also take into account Section M paragraph M-1.3 and M-1.1. To answer the 2nd question please reference Section M paragraph

M-3.

24-Apr-18 A04 25-Apr-18

R0020 24-Apr-18 Concerning Section M, paragraph M-3, what price will be evaluated initially? USAF SSgt Jorge

Alvarez jorge.alvarez.7@us.af.mil CONS SME 24-Apr-18

The total proposed price to include all options will be evaluated initially.

Please reference Attachment 25; "Total (CLINs 0001 + 0002 + 0003)"

24-Apr-18 A04 25-Apr-18

R0021 24-Apr-18 If I did not submit a Past Performance Information (PPI) sheet does that disqualify us from submitting a proposal or being awarded the contract?

Lake Contracting Mark Albert mark.albert04@yahoo.com CONS SME 24-Apr-18

Please submit your PPI as soon as possible. In accordance with Section L paragraph L-1.2, L-2.1, and L-2.2.3.1, the only official due date is the proposal due date.

25-Apr-18 A04 25-Apr-18

R0022 24-Apr-18 Are there any as-built drawings for Building 50 that provide information related to the existing plumbing fixtures and piping or the existing room finishes?

J&B Builders, Inc. Julie Salyers julie@jbbuilders.com CE PM 25-Apr-18

CE can provide dated as-built plumbing/piping drawings from 1992;

no guarantee on the accuracy of the drawings. These drawings can be provided if needed.

25-Apr-18 A04 25-Apr-18

R0023 25-Apr-18 Does exterior door replacement include the aluminum storefront main entry door and inner vestibule door? Pangea Billind Darwish bdarwish@pangea-group.com CE PM 26-Apr-18 No, these doors are not included. 3-May-18 A05 3-May-18

R0024 25-Apr-18

Does the attic insulation replacement follow the most recent AHREA 90.1 requirement? Response #38 does not indicate if this walls attic or both. The R-13 minimum value is not consistent with any current code.

Pangea Billind Darwish bdarwish@pangea-group.com CE PM 26-Apr-18 Per UFC 1-200-02, we must follow ASHRAE requirements. 3-May-18 A05 3-May-18

R0025 25-Apr-18 Does the wall insulation follow the most recent ASHREA

90.1 requirement? Pangea Billind Darwish bdarwish@pangea-group.com CE PM 26-Apr-18 Per UFC 1-200-02, we must follow ASHRAE requirements. 3-May-18 A05 3-May-18

R0026 25-Apr-18

Does the extent of the original building” masonry” wall define the building envelope, or is the PEMB addition of Room 114 Garage and Mechanical to be considered for insulation improvements?

Pangea Billind Darwish bdarwish@pangea-group.com CE PM 26-Apr-18 The extent of the original building is defined by the masonry wall and does not include the PEMB addition.

3-May-18 A05 3-May-18

R0027 25-Apr-18 Does this project require a “air/vapor barrier”? Pangea Billind Darwish bdarwish@pangea-group.com CE PM 26-Apr-18 air/ vapor barrier inclusion or exclusion shall be determined by the requirements of the applicable section of the International Building Code

3-May-18 A05 3-May-18

R0028 25-Apr-18 If a “air/vapor barrier is required will it be tested and to what criteria? Pangea Billind Darwish bdarwish@pangea-group.com CE PM 26-Apr-18 air/ vapor barrier inclusion or exclusion shall be determined by the requirements of the applicable section of the International Building Code

3-May-18 A05 3-May-18

R0029 25-Apr-18 Will AutoCAD or REVIT files of the document set

(REPAIR (SUS), HVAC, CPO; B50) be provided upon award?

Pangea Billind Darwish bdarwish@pangea-group.com CE PM 26-Apr-18 Yes. 3-May-18 A05 3-May-18

R0030 25-Apr-18 Are AT/FP requirements limited to new exterior doors and building ventilation? Pangea Billind Darwish bdarwish@pangea-group.com CE PM 26-Apr-18 Follow requirements per UFC 4-010-01 within the scope of this project 3-May-18 A05 3-May-18

R0031 25-Apr-18 Are AT/FP requirements limited to new exterior doors and building ventilation? Pangea Billind Darwish bdarwish@pangea-group.com CE PM 26-Apr-18 Follow requirements per UFC 4-010-01 within the scope of this project 3-May-18 A05 3-May-18

R0032 25-Apr-18 Are AT/FP requirements limited to new exterior doors and building ventilation? Pangea Billind Darwish bdarwish@pangea-group.com CE PM 26-Apr-18 Follow requirements per UFC 4-010-01 within the scope of this project 3-May-18 A05 3-May-18

R0033 26-Apr-18 Could you please clarify as to whether or not the Building 50 Sample Project sales tax exempt? Mantle Group, Inc. Jason Mantle jason@mantle.us CONS SME 26-Apr-18

Yes, procuring construction materials and equipment for the sample project will be Illinois and/or Missouri Tax

Exempt. As long as the materials and equipment are strictly for government use at Scott AFB. Furthermore, all materials and equipment purchased will remain on Scott AFB and will become the property of the U.S. Government.

3-May-18 A05 3-May-18

R0034 26-Apr-18 Is there a geographical requirement, of General

Contractors/Subcontractors, to Scott Air Force Base? Is it required we have to be “X” number of hours/miles away?

Troop Contracting, Inc. Keri Norris keri@troopcontracting.com CONS SME 26-Apr-18 No, there is no geographical requirement. 3-May-18 A05 3-May-18

R0035 26-Apr-18 Could you please clarify as to whether or not new wall tile is desired in the restrooms? The Mantle Group, Inc Jason Mantle jason@mantle.us CE PM 26-Apr-18 Wall tile is not desired. 3-May-18 A05 3-May-18

R0036 26-Apr-18

Could you please clarify as to whether or not all of the scope of work show on the Attachment 16 -REPAIR (SUS), HVAC, CPO; B50 drawings is required even though not listed in Attachment 13 – Statement of Work.

For example, is the new blown-in insulation and catwalk work required in the attic?

The Mantle Group, Inc Jason Mantle jason@mantle.us CE PM 26-Apr-18 Yes, new blown-in insulation and catwalk work is required. 3-May-18 A05 3-May-18

R0037 26-Apr-18

Article 2.b.(5).(a).ii on page 4 of the SOW states that the “Contractor shall remove Room 109 (demolish all non-exterior walls).” Detail 2/A-1 shows Room 109 walls being replaced with above ceiling walls per Note 9.1. Are the walls in Room 109 to be demolished or replaced with above ceiling walls? Which are we to include in our scope of work?

Poettker Construction Justin Luitjohan jluitjohan@poettkerconstruction.co m CE PM 26-Apr-18

Please refer to response to R0010 above. Walls are to be demolished.

(Ref SOW Para 5 (a) ii) 3-May-18 A05 3-May-18

R0038 26-Apr-18

Attachment 24, Q&A – Question 27 “Reference is made to various SOW work items regarding the bathroom refresh per SOW paragraph 2.b. (8). The SOW directs the contractor to demolish existing water supply and drain lines from plumbing fixtures and replace same. For bidding purposes, should the contractor assume demo and replace to the face of the wall only since wall finishes are to remain?” The answer was Yes. Please confirm that the same number of water closets/urinals/sinks for each bathroom should match existing and basically we are just installing new fixtures without any modifications to underground or in wall lines.

J&B Builders, Inc. Julie Salyers julie@jbbuilders.com CE PM 26-Apr-18 Yes, no additional sinks, urinals, or water closets are installed. Only the piping to the wall is replaced.

3-May-18 A05 3-May-18

R0039 26-Apr-18

Attachment 24, Q&A – Question 31 is in reference to the main waste line. Please provide additional information regarding the location of the main waste line that is to be replaced. Also, please indicate why the main line requires replacement.

J&B Builders, Inc. Julie Salyers julie@jbbuilders.com CE PM 26-Apr-18 As-builts will be provided. For bidding purposes please plan for 50 feet of main drain line replacement.

3-May-18 A05 3-May-18

R0040 26-Apr-18

Could you please clarify if the contractor will be responsible for abatement or for notification to the EPA for the renovation? If so, has a Phase 1 Environmental report been done for the facility or will that be the responsibility of the contractor?

The Mantle Group, Inc Jason Mantle jason@mantle.us CE PM 26-Apr-18 Contractor is repsonsible for EPA notification. Currently no known reports are available for this faciltiy.

3-May-18 A05 3-May-18

R0041 26-Apr-18 Concerning site supervision, can the Superintendent act as site safety also? Will a fulltime QC manager be required on-site?

The Mantle Group, Inc Jason Mantle jason@mantle.us CE PM 26-Apr-18 Superintendent can act as safety rep.

And a fulltime QC manager is required. 3-May-18 A05 3-May-18

R0042 27-Apr-18

On page 1 of the Specification Attachment 14, drawings are referenced. We were unable to locate these drawings.

Are they available? Specifically, we are looking for existing plumbing rough-in and structural drawings.

The Mantle Group, Inc Jason Mantle jason@mantle.us CE PM 27-Apr-18 Yes, all as-builts have been provided. 3-May-18 A05 3-May-18

R0043 27-Apr-18 What do the “R” and “E” represent on the Demolition Dwg 2 of 15? RAAD LLC Christina Caputo christinac@Raadllc.com CE PM 27-Apr-18 Please reference the mecahnical drawings - R = Returns; E = Exhaust 3-May-18 A05 3-May-18

R0044 27-Apr-18 What do the circles with the dots represent on Dwg 2 of 15? RAAD LLC Christina Caputo christinac@Raadllc.com CE PM 27-Apr-18 Sprinkler heads. 3-May-18 A05 3-May-18

R0045 27-Apr-18

There are 57 unidentified bolded symbols the New Work Reflected Ceiling Plan. They look like fans however the fans are called out to be the lighter fan symbols. What are these bolded symbols that look like fans

RAAD LLC Christina Caputo christinac@Raadllc.com CE PM 27-Apr-18 As depicted in later mechanical drawings, those are new diffusers. 3-May-18 A05 3-May-18

R0046 27-Apr-18 The blown in insulation in the attic, is called for as both 3” and 4” which is it? RAAD LLC Christina Caputo christinac@Raadllc.com CE PM 27-Apr-18 Per UFC 1-200-02, we must follow

ASHRAE requirements. 3-May-18 A05 3-May-18

R0047 27-Apr-18

The Historic Preservation document issued in amendment 1 lists preservation issues with flaking and peeling of paint on wood surfaces and issues with the brick veneer.

Can you confirm if this work is to be included? If so, does any of this work include hazardous materials, such as lead based paint and are we to include abatement of these materials?

The Korte Company Brent Holman brent.holman@korteco.com CE PM 27-Apr-18

Exterior enclosure work is not included outside of the replacement of exterior doors. Presence of hazardous materials is unknown at this time and should not be included in any bid.

3-May-18 A05 3-May-18

R0048 27-Apr-18

Are there any hazardous materials associated with the interior work and has a survey been done? If hazardous materials are present, who is responsible for the abatement of the hazardous materials?

The Korte Company Brent Holman brent.holman@korteco.com CE PM 27-Apr-18

Hazardous materials are unknown at this time and will not be included in any bid. If discovered later we will modify the contract to include abatement at the governments cost.

3-May-18 A05 3-May-18

R0049 27-Apr-18 Water/Sewer supply and drain lines – are we replacing piping in walls only or will concrete demo be required? The Korte Company Brent Holman brent.holman@korteco.com CE PM 27-Apr-18

Piping will only be replaced up to the wall for each fixture. And plan for 50' of drain line replacement for this project.

3-May-18 A05 3-May-18

R0050 27-Apr-18 Please confirm a project schedule will not be required as part of our submittal. The Korte Company Brent Holman brent.holman@korteco.com CONS SME 1-May-18 Please refer to the SOW, Section 3

Schedule 3-May-18 A05 3-May-18

R0051 27-Apr-18

Statement of Work, 4 (c) indicates each workstation is to have two data and one voice port then later in the

Statement of Work under Options 2 and 3 it details the quantity and type of systems furniture and indicates that

“Workstations wired with 3 data ports” for all workstations but Type 001AS which indicates

“Workstations wired with 1 data port”

Can you clarify how many data and how many voice are required for each work station?

J&B Builders, Inc. Julie Salyers julie@jbbuilders.com CE PM 27-Apr-18 Each workstation requires 2 data ports and 1 voice port. 3-May-18 A05 3-May-18

R0052 27-Apr-18

P4 of 403 in the specifications provided appears to contain a drawing list from a different project, is a correct version available, or is the expectation that the contractor provide it as part of the design?

Batir Partners JV Neil Francis neil@industriainc.com CE PM 27-Apr-18 The drawing list is incorrect in the specifications and separate drawings are being provided.

3-May-18 A05 3-May-18

R0053 27-Apr-18

Amendment 0001 included attachment 1c “Historic Preservation Treatment Recommendations”, p43 of which contains “Urgent” and “Secondary” Preservation issues related to B50, is the intent for the contractor to incorporate these into the design for the seed project?

Batir Partners JV Neil Francis neil@industriainc.com CE PM 27-Apr-18 No, the document is for information pertaining only to work being done on the exterior doors being replaced.

3-May-18 A05 3-May-18

R0054 27-Apr-18 Does the government intend to review all submittals for the project, or just the HVAC? Batir Partners JV Neil Francis neil@industriainc.com CE PM 27-Apr-18 Government will review all submittals 3-May-18 A05 3-May-18

R0055 27-Apr-18 Does the government desire the contractor’s designer to review submittals related to their design work? Batir Partners JV Neil Francis neil@industriainc.com CE PM 27-Apr-18 Government will review all submittals 3-May-18 A05 3-May-18

R0056 27-Apr-18

With regards to Attachment 17, Schedule of Submittals, is it intended to be a sample document, or the actual desired submittals? We ask because it contains submittals for Cooling Towers, which are not called out as part of the

Scope of Work nor in the 100% HVAC drawings.

Batir Partners JV Neil Francis neil@industriainc.com CE PM 27-Apr-18

Contractor should use the submittal schedule to the extend of the equipment and products required for this project IAW the SOW, specifications and drawings.

3-May-18 A05 3-May-18

R0057 27-Apr-18 Will there be new furniture in Conference room 101, Office Space 104, Flight Chief 109, Office 109A, Conference 112? If so, what bid option is that?

Korteco Caitlin Schauster Caitlin.Schauster@korteco.com CONS SME 30-Apr-18 No requirement for furniture in these rooms. 3-May-18 A05 3-May-18

R0058 27-Apr-18 With any new workstations, are we to include task seating? Any seating requirements? Korteco Caitlin Schauster Caitlin.Schauster@korteco.com CONS SME 30-Apr-18 No 3-May-18 A05 3-May-18

R0059 27-Apr-18 Option 2. Is the contractor responsible for storing and installing the existing furniture on the north side. Korteco Caitlin Schauster Caitlin.Schauster@korteco.com CONS SME 30-Apr-18 Yes, Contractor is responsible for storing furniture. 3-May-18 A05 3-May-18

R0060 27-Apr-18

Wanted to verify the workstation typicals.

Option 2:

1. 0001AE double typical shows 2 workstations. SOW says 2 each. Does that mean 2 total workstations or qty2 of the typical shown 2 (so 4 total workstations)

2. 0001AF quad typical shows 4 workstations. SOW says 4 each. Does that mean 4 total workstations or qty4 of the typical shown 4 (so 16 total workstations) Option 3:

1. 0001AR colalboration typical shows 4 workstations.

SOW says 2 each. Does that mean 4 total workstations or qty2 of the typical shown 4 (so 8 total workstations)

Korteco Caitlin Schauster Caitlin.Schauster@korteco.com CONS SME 1-May-18

All are Quantity of each style, i.e 0001AE 2 doubles, 0001AF is 4 quads, etc. Additional work stations are included for this option

3-May-18 A05 3-May-18

R0061 27-Apr-18 Please provide the manufacturer, model and any other identifying information on the existing carpet. MKB Marcia Beckwith marcia@mkbconstruction.com CONS SME 1-May-18 MFR: Shaw, Style: Parody Tile

(59245), Color: Effervescence (24330) 3-May-18 A05 3-May-18

R0062 27-Apr-18

Once the existing systems furniture is removed, the carpet below the furniture will have holes in it where the power and communications for the systems furniture has been supplied from below the raised floor. For bidding purposes, how does the Government want the carpet to be addressed, replace carpet or reuse existing carpet with holes in it?

MKB Marcia Beckwith marcia@mkbconstruction.com CONS SME 1-May-18 Use available salvaged carpet to the maximum extent possible. 3-May-18 A05 3-May-18

R0063 27-Apr-18 Please provide the as-built drawings for the sanitary drain system from the fixtures to the main sewer connection. MKB Marcia Beckwith marcia@mkbconstruction.com CONS SME 1-May-18 Unavailable at this time 3-May-18 A05 3-May-18

R0064 27-Apr-18

There is an existing systems furniture wall currently in place that divides the 375th CONS section for the CPO area. We find no mention of the wall in the SOW. Does the Government want the wall reinstalled to divide the 375th CONS area (new South area) from the new Swing Space area (new North end)?

MKB Marcia Beckwith marcia@mkbconstruction.com CONS SME 30-Apr-18

Attachment 19 is a basic concept of the reconfigured space. This is a design-build with the objectives stated in the SOW for the contractor to develop.

3-May-18 A05 3-May-18

R0065 27-Apr-18

The solicitation includes Attachment 25, Sample Project Questions and Answers, which appears to be answers to questions submitted at a previous time. Do these questions and answers apply to the current solicitation?

MKB Marcia Beckwith marcia@mkbconstruction.com CONS SME 30-Apr-18 Yes, this information is for this solicitation 3-May-18 A05 3-May-18

R0066 27-Apr-18 Please provide the manufacturer, make, model and any other identifying information on the existing raised floor system.

MKB Marcia Beckwith marcia@mkbconstruction.com CONS SME 1-May-18 Unknown 3-May-18 A05 3-May-18

R0067 27-Apr-18

Reference is made to SOW paragraph (8) (b) (x) which calls for a Lineal Foot price for a new main drain line.

Where should the price be included? There is no CLIN on Attachment 25, Price Schedule.

MKB Marcia Beckwith marcia@mkbconstruction.com CONS SME 1-May-18 Please refer to response to R0039.

Pricing per lineaar foot removed from

SOW.

3-May-18 A05 3-May-18

R0068 27-Apr-18

Reference is made to SOW, bid Option (1) Remove ‘Spacesaver’ Storage Cabinets. Does the existing carpet extend under the cabinet(s) to be removed? If not, how does the Government want to address this condition, either leave existing floor under cabinet in place or replace with new carpet?

MKB Marcia Beckwith marcia@mkbconstruction.com CONS SME 30-Apr-18 Area under "Spacesaver is partially carpeted. 3-May-18 A05 3-May-18

R0069 27-Apr-18 Does the Government have any attic stock of the existing carpet? MKB Marcia Beckwith marcia@mkbconstruction.com CONS SME 30-Apr-18 No 3-May-18 A05 3-May-18

R0070 30-Apr-18

SOW_Rev_4, (2) NEW OFFICES (a) and (b) indicate to construct new offices. The reconfigured floor plan drawing does not show any additional offices than the existing floor plan drawing. Please clarify where these offices are located.

Midnight Sun Global Service Michael Fischer mfischer@msgsllc.com CONS SME 30-Apr-18

Attachment 19 is a basic concept of the reconfigured space. This is a design-build with the objectives stated in the SOW for the contractor to develop.

R0071 30-Apr-18

SOW_Rev_4, (5) STRUCTURAL/BUILDING ENVELOPE, (b) Doors, iii indicate to install double glass doors with metal frame in new conference room. Are these to be hollow metal doors and frames with glass? How large will the glass be in each door?

Midnight Sun Global Service Michael Fischer mfischer@msgsllc.com CONS SME 30-Apr-18 Doors should be metal framed doors with full length glass. 3-May-18 A05 3-May-18

R0072 30-Apr-18 Are there any hazardous materials present in the building Midnight Sun Global

Service Michael Fischer mfischer@msgsllc.com CONS SME 1-May-18 Please refer to RFI response R0048. 3-May-18 A05 3-May-18

R0073 30-Apr-18 Amendment 1 included historic preservation recommendations, which are all exterior related. Please clarify what is relevant to this project.

Midnight Sun Global Service Michael Fischer mfischer@msgsllc.com CE PM Only those parts that are affected by the installation of exterior doors. 3-May-18 A05 3-May-18

R0074 30-Apr-18

SOW_Rev_4, (7), (d). Indicates to remove/ Protect/ store existing furniture according to Attachment 22, however no furniture is shown on this attachment. Please provide clarification what furniture is to be removed and stored by Contractor.

Midnight Sun Global Service Michael Fischer mfischer@msgsllc.com CONS SME 30-Apr-18 All Furniture 3-May-18 A05 3-May-18

R0075 30-Apr-18 Will all other furnishings be removed by others prior to start of work?

Midnight Sun Global Service Michael Fischer mfischer@msgsllc.com CONS SME 30-Apr-18

Government will remove computers, documents, office supplies and personal items.

3-May-18 A05 3-May-18

R0076 30-Apr-18 Will any portion of the project be occupied? Midnight Sun Global Service Michael Fischer mfischer@msgsllc.com CONS SME 30-Apr-18 No 3-May-18 A05 3-May-18

R0077 30-Apr-18 Please confirm Communication Closet 110 walls are to be removed and replaced with new walls to deck; Hammer LGC Inc Mike Cento mcento@hammer-lgc.com CONS SME 30-Apr-18 Please refer to SOW paragragh 5

Structural/Building envelope 3-May-18 A05 3-May-18

R0078 30-Apr-18 Please clarify on the plan, where the new wall is to go for Break Room 104; Hammer LGC Inc Mike Cento mcento@hammer-lgc.com CONS SME 30-Apr-18

Attachment 19 is a basic concept of the reconfigured space. This is a design-build with the objectives stated in the SOW for the contractor to develop.

3-May-18 A05 3-May-18

R0079 30-Apr-18 Please clarify on the plan where the new office is to be located for the Flight Chief (12x14 office); Is this the same as the office on the North side?

Hammer LGC Inc Mike Cento mcento@hammer-lgc.com CONS SME 30-Apr-18

Attachment 19 is a basic concept of the reconfigured space. This is a design-build with the objectives stated in the SOW for the contractor to develop.

3-May-18 A05 3-May-18

R0080 30-Apr-18 Please clarify on the plan where the new 12x14 office (with window) is to be located on the North side; Hammer LGC Inc Mike Cento mcento@hammer-lgc.com CONS SME 30-Apr-18

Attachment 19 is a basic concept of the reconfigured space. This is a design-build with the objectives stated in the SOW for the contractor to develop.

3-May-18 A05 3-May-18

R0081 30-Apr-18 Please confirm, new walls for Conference 112 are to be built in the same location as the existing walls; Hammer LGC Inc Mike Cento mcento@hammer-lgc.com CONS SME 30-Apr-18 Please refer to SOW paragragh 5

Structural/Building envelope 3-May-18 A05 3-May-18

R0082 30-Apr-18 Is ceramic tile wainscot in Restrooms to be removed also? Hammer LGC Inc Mike Cento mcento@hammer-lgc.com CE PM 2-May-18 No 3-May-18 A05 3-May-18

R0083 30-Apr-18 Confirm removal of existing doors and frames; What type of new doors and frames are to be installed? Hammer LGC Inc Mike Cento mcento@hammer-lgc.com CE PM 2-May-18 Doors should match existing. Metal frames, solid wooden doors for interior. 3-May-18 A05 3-May-18

R0084 30-Apr-18 Respectfully request a copy of the CAD drawings of the existing building. RB Construction Company Renee Brennan rbrennan@rb-construction.com CE PM 2-May-18 Available as-builts provided 3-May-18 A05 3-May-18

R0085 30-Apr-18 What is the amount of time the design team should allow for the gov’ts review of design submissions? (35%, 65%, 95% and 100%) Batir Partners JV Paula Price pprice@batirarch.com CE PM 2-May-18 14 calendar days, per genreal

Requirements 3-May-18 A05 3-May-18

R0086 30-Apr-18 What is the amount of time that the construction team should allow for the gov’t to review and approve all submittals?

Batir Partners JV Paula Price pprice@batirarch.com CE PM 2-May-18 14 calendar days, per genreal

Requirements 3-May-18 A05 3-May-18

R0087 30-Apr-18 Is new chair rail needed to match existing chair rail on new wall partitions? Poettker Construction Justin Luitjohan jluitjohan@poettkerconstruction.co m CE PM 2-May-18 Yes 3-May-18 A05 3-May-18

R0088 30-Apr-18 In the Kitchen Room 107, is just the counter getting replaced? Or are the cabinets to be replaced as well? Poettker Construction Justin Luitjohan jluitjohan@poettkerconstruction.co m CONS SME 1-May-18 Countertops, sink and fixtures only. 3-May-18 A05 3-May-18

R0089 30-Apr-18

In the South End Break Room (Reconfigured Space, Room 104), how large of an area is needed for the new break room? What is going into the remaining space to the West?

Poettker Construction Justin Luitjohan jluitjohan@poettkerconstruction.co m CONS SME 1-May-18

Attachment 19 is a basic concept of the reconfigured space. This is a design-build with the objectives stated in the SOW for the contractor to develop.

R0090 30-Apr-18

Please verify the TOTAL number of workstations to be included in (2) 375 CONS New Furniture Package. CLIN

AE is a 2 pack and consists of 2 stations. What is the quantity of AE, 2 (4 workstations) or 1 (2 workstations)?

Likewise, CLIN AF is a 4 pack and consists of 4 workstations. What is the quantity of AF, 4 (16 workstations) or 1 (4 workstations)?

Poettker Construction Justin Luitjohan jluitjohan@poettkerconstruction.co m CONS SME 1-May-18

All are Quantity of each style, i.e 0001AE 2 doubles, 0001AF is 4 quads, etc. Additional work stations are included for this option

3-May-18 A05 3-May-18

R0091 30-Apr-18

. Drawing S-1 states to provide an additional 3” of insulation over existing insulation in entire attic area. The

Statement of Work does not mention this additional insulation. Please verify whether the additional 3” of insulation is included in the scope?

Poettker Construction Justin Luitjohan jluitjohan@poettkerconstruction.co m CONS SME 1-May-18 Please refer to RFI response R0036.

Additional insulation is required. 3-May-18 A05 3-May-18

R0092 30-Apr-18

The existing rooms have ceramic tile floors and walls (up to 7’ (+/-). The SOW calls for new ceramic tile for the floor and base, but doesn’t mention the walls. Please clarify the desired wall finish. Is painting above the wall tile and the ceiling required?

River City Construction Jacob Sanabia jsanabia@rccllc.com CE PM 2-May-18 wall tile remains, plan on painting above wall tile; there is no need to paint the ceiling

3-May-18 A05 3-May-18

R0093 30-Apr-18 Are the past performance in Volume III different than the ones already submitted, or do we resend the same 3 PPI’s? River City Construction Jacob Sanabia jsanabia@rccllc.com CONS SME 1-May-18 Yes 3-May-18 A05 3-May-18

R0094 30-Apr-18

There is no SF 30 for amendment 4. There is no acknowledgement of receipt for amendments 1, 3, 4. Do we need to include all pages or just the signature pages for the SF30’s?

River City Construction Jacob Sanabia jsanabia@rccllc.com CONS SME 1-May-18 Please refer to RFP document, page 2, block 19 to acknowledge receipt of amendments.

3-May-18 A05 3-May-18

R0095 30-Apr-18 . Regarding RFI question 24, is a FPE stamp only required for the 2 new sprinkler heads or is the entire system being certified?

River City Construction Jacob Sanabia jsanabia@rccllc.com CE PM 2-May-18 Yes 3-May-18 A05 3-May-18

R0096 30-Apr-18 For the doors hardware, do we match existing? River City Construction Jacob Sanabia jsanabia@rccllc.com CE PM 2-May-18 Yes 3-May-18 A05 3-May-18

R0097 30-Apr-18 Do the second set of glass doors in the vestibule get replaced? River City Construction Jacob Sanabia jsanabia@rccllc.com CE PM 2-May-18 No 3-May-18 A05 3-May-18

R0098 30-Apr-18 What is the quantity of power and communication required in the new offices? River City Construction Jacob Sanabia jsanabia@rccllc.com CE PM 2-May-18 Electric shall meet applicable code;

comm will be 2 data; 1 phone 3-May-18 A05 3-May-18

R0099 30-Apr-18 Will the facility be unoccupied during construction? Are phases required? River City Construction Jacob Sanabia jsanabia@rccllc.com CONS SME 1-May-18 No 3-May-18 A05 3-May-18

R0100 30-Apr-18

Is the existing wood chair rail to be re-used / reinstalled on existing walls after the wall paper is removed and walls are painted? There is existing painted and/or stained wood chair rail on most of the interior walls. It probably needs to be removed and re-installed after the wall paper is removed and walls are painted.

River City Construction Jacob Sanabia jsanabia@rccllc.com CE PM 2-May-18 Replace 3-May-18 A05 3-May-18

R0101 30-Apr-18

Clarify the floor finish for the new Break Room/104. The existing space is carpet tile. There is no mention of changing the carpet tile as a part of the project. We add a new partition to separate the room and add cabinets and a counter top at one end of the room. The carpet will stain quickly from spills.

River City Construction Jacob Sanabia jsanabia@rccllc.com CONS SME 1-May-18

SOW revised: The contractor shall remove existing carpet and replace with

12 x 12 porcelain floor tile. 3-May-18 A05 3-May-18

R0102 30-Apr-18

The existing interior doors vary in materials and finishes.

Please clarify the finish on the doors as paint or stain.

Please confirm the restroom doors need to be hollow metal.

River City Construction Jacob Sanabia jsanabia@rccllc.com CE PM 2-May-18 Match Existing 3-May-18 A05 3-May-18

R0103 30-Apr-18 Clarify re-use of the existing ceiling fans. Are the ceiling fans being re-used after the hvac systems replacement? River City Construction Jacob Sanabia jsanabia@rccllc.com CONS SME 1-May-18 No 3-May-18 A05 3-May-18

R0104 30-Apr-18

Does Unified Facilities Criteria UFC-3-580-01

(TELECOMMUNICATIONS BUILDING CABLING

SYSTEMS PLANNING AND DESIGN) apply to this project?

Comm Squad Bill Crocker bill.crocker@commsquad.com CONS SME 2-May-18 Yes 3-May-18 A05 3-May-18

R0105 30-Apr-18 Is a Registered Communications Distribution Designer

(RCDD) stamp required for the telecommunication system design drawings?

Comm Squad Bill Crocker bill.crocker@commsquad.com CE PM 2-May-18 No 3-May-18 A05 3-May-18

R0106 30-Apr-18 Is an on-staff RCDD required to manage the telecommunication portion of the project? Comm Squad Bill Crocker bill.crocker@commsquad.com CE PM 2-May-18 No 3-May-18 A05 3-May-18

R0107 30-Apr-18 Will any portion of Building 50 be occupied during the entire duration of the remodel project? Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18 No 3-May-18 A05 3-May-18

R0108 30-Apr-18 Who is responsible for removing, storing and reinstalling all items off walls/on desks such as photos, maps, computers, etc.?

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18 Government 3-May-18 A05 3-May-18

R0109 30-Apr-18 Please confirm all walls in rooms 109, 110 and 112 are to be removed and rebuilt with new metal stud walls above ceiling?

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18 Please refer to SOW paragragh 5

Structural/Building envelope (a) I & ii 3-May-18 A05 3-May-18

R0110 30-Apr-18 What size and gauge of metal studs are required for all new walls? Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18 Follow applicable codes for commercial construction 3-May-18 A05 3-May-18

R0111 30-Apr-18

Please confirm that the following rooms are to receive new 12x12 porcelain tile:

105, 106, 107 and the area directly outside the bathroom entrances.

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18 yes 3-May-18 A05 3-May-18

R0113 30-Apr-18 Are there any plans to remove and replace all carpet or will the existing carpet that is remaining in almost all rooms need to be protected during construction?

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18 Please refer to SOW,(7)

PAINT/CARPET/FURNITURE, © 3-May-18 A05 3-May-18

R0114 30-Apr-18

SOW (Revision 4) 2 (5) (a) i. states in part to “remove existing walls and replace with above ceiling walls in

Rooms 110 and 112, AS WELL AS IN SELECT AREAS”.

Please define SELECT AREAS?

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18 Please refer to SOW, (b) South End Break Room (Reconfigured Space, Room 104) 3-May-18 A05 3-May-18

R0116 30-Apr-18 Are there any UL rating requirements for any new walls or drywall ceiling patches that will be required at the HVAC demo areas?

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18 No 3-May-18 A05 3-May-18

R0117 30-Apr-18 Are the second pair of interior glass doors in the Vestibule/Main Entrance Area to be replaced? Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18 No 3-May-18 A05 3-May-18

R0118 30-Apr-18

SOW (Revision 4) 2 (5) (b) i. states in part “replace all exterior man doors.” Please confirm that the exterior man doors at the Mechanical Room and Garage are to be replaced along with the pair of doors in Room 107 and the two single doors on the North of the building?

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18 No 3-May-18 A05 3-May-18

R0119 30-Apr-18 Will Seismic work be required during the rebuild or total replacement of the acoustical ceiling tile and grid? Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18 No 3-May-18 A05 3-May-18

R0120 30-Apr-18

Other than electrical, is there any work to be performed in the vestibule/entry area directly South of Communication Closet 110 or in the Mechanical Room adjacent to Room

101?

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18 No 3-May-18 A05 3-May-18

R0121 30-Apr-18

Please confirm that the following interior doors are NOT to be replaced. Closet door in Room 101, Rooms 103, 113, Door between 107 and 108, Door between 104 and 108, Door between 104 and 107 and Door in 109.

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18 Refer to the SOW for the doors requiring replacement 3-May-18 A05 3-May-18

R0123 30-Apr-18 Are there to be new doors provided in the two new 12 x

14 offices? Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18 Yes 3-May-18 A05 3-May-18

R0124 30-Apr-18 Can one of the doors in either 101 or 102 be salvaged and installed in the new Break Room Wall? Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18

Ref: 52.236-5 -- Material and Workmanship. All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract...

3-May-18 A05 3-May-18

R0125 30-Apr-18 Does the vinyl chair rail trim in Room 107 get painted?

Are the stained doors and trim in Room 107 to be painted over?

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18 Per the SOW, all walls, door jambs, window trims, chair railings, and wood base moldings should be painted

3-May-18 A05 3-May-18

R0126 30-Apr-18 What type, size, profile, etc. of counter top is to be installed in Break Room 104? Countertop height? Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18

Please refer to (b) South End Break Room (Reconfigured Space, Room

104), iii.

3-May-18 A05 3-May-18

R0127 30-Apr-18 What size, type, finish, etc. of cabinets are to be installed in Break Room 104? Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18

This is a design-build with the objectives stated in the SOW for the contractor to develop.

3-May-18 A05 3-May-18

R0128 30-Apr-18

Please specify the glass/metal frame doors that are to be installed in Break Room 104 and double glass doors in new conference room 101/102? Wood door with glass and metal frame, metal door with glass and metal frame, etc.

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18 Metal door with glass and metal frame 3-May-18 A05 3-May-18

R0129 30-Apr-18 Does the new office for Flight Chief have two, three or four new drywall partition walls? Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18

This is a design-build with the objectives stated in the SOW for the contractor to develop.

3-May-18 A05 3-May-18

R0130 30-Apr-18 Has this building been tested for lead, asbestos, etc.? Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 3-May-18 A05 3-May-18

R0131 30-Apr-18 Please confirm ALL vinyl wall covering/wall paper is to be removed including the paper on the bottom side of the window soffits?

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18 Please refer to SOW, (7)

PAINT/CARPET/FURNITURE (a) 3-May-18 A05 3-May-18

R0132 30-Apr-18 The doors in the bathrooms and janitor closet are not the same type of door so which door do we match? Hollow core, solid core, flat slab, painted, six panel, stained, etc.

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18 Doors are to be painted solid core doors 3-May-18 A05 3-May-18

R0133 30-Apr-18 Do you want all stained wood doors, trim, jambs, etc. to be painted over? Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18

Per the SOW, all walls, door jambs, window trims, chair railings, and wood base moldings should be painted 3-May-18 A05 3-May-18

R0134 30-Apr-18

SOW (Revision 4) 2. b. (7) (d) states in part to “remove and dispose of existing furniture and partition walls”

Please confirm “partition walls” are moveable furniture and not drywall partition walls.

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18 Yes 3-May-18 A05 3-May-18

R0135 30-Apr-18

SOW (Revision 4) 2. b. (7) (e) Flight Chief Office with above ceiling walls. Please confirm this is the same office as requested in SOW (Revision 4) 2. b. (2) (a) and that there is a total of 2 new 12 x 14 offices drywall partition offices to be installed on this project.

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18 Yes, there are 2 new 12' x 14' offices to be constructed. 3-May-18 A05 3-May-18

R0137 30-Apr-18

Please confirm the flooring for the following aeeas: 12 x 12 porcelain tile to be installed on the floors of both bathrooms, the entire Kitchen 107 and the area between the bathroom doors. Janitors closet remains existing.

New Break Room 104 is all existing carpet.

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18 See revised SOW V5. 12 x 12 porecelain tile added to breakroom 104. 3-May-18 A05 3-May-18

R0138 30-Apr-18 Are there any new or existing rooms that are to receive new carpet? Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18 No 3-May-18 A05 3-May-18

R0139 30-Apr-18 If existing carpet is not installed underneath the wall that is to be removed in the new Conference Room 101/102, do we patch this area with salvaged carpet from 112?

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18

Contractor shall salavage all carpet possible and re-use to patch areas due to removal of existing walls, etc.

R0140 30-Apr-18

Carpet tiles in 112 are to be salvaged and used to patch in at removed Super Saver Cabinet per SOW (Revision 4) 2.

c. Options (1)(a) What type of new flooring is to be installed in 112?

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18 No flooring is scheduled for room 112. 3-May-18 A05 3-May-18

R0141 30-Apr-18 Does the existing vinyl base remain throughout? What type of wall base is to be installed on all new walls? Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18 Existing vinyl base to remain. Match existing vinyl base for new walls. 3-May-18 A05 3-May-18

R0142 30-Apr-18 Is new ceramic coved wall base to be installed where we remove the existing wall base tile in both bathrooms? Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18 Yes, only the floor tile and cove get replaced 3-May-18 A05 3-May-18

R0143 30-Apr-18 Will the new water fountain be in the way of entering the ADA bathroom doors? Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CONS SME 1-May-18

Attachment 19 is a basic concept of the reconfigured space. This is a design-build with the objectives stated in the SOW for the contractor to develop.

3-May-18 A05 3-May-18

R0144 30-Apr-18 If main drain line is to be replaced do we include the cost of removing/patching back the floor and any wall/floor finishes in the LF cost?

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18 Yes 3-May-18 A05 3-May-18

R0145 30-Apr-18 Will all new data and power lines feeding the new furniture be required to be fed under the floor? Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18 Most efficient method that still meets applicable codes 3-May-18 A05 3-May-18

R0146 30-Apr-18

Please confirm if SPF #2 (Non-Sanded) lumber can be used to rebuild/build the catwalk floor and handrail. Do the tongue and groove deck boards need to be a full 2” or can they be 11/2” in actual thickness? Can the horizontal rails be surfaced installed on vertical posts or do they need to be recessed or cut to fit in between posts?

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18 Most efficient method that still meets applicable codes 3-May-18 A05 3-May-18

R0147 30-Apr-18 Does the catwalk deck need to be at the same elevation whether it runs parallel or perpendicular to the existing

2x12 joists?

Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18 Yes 3-May-18 A05 3-May-18

R0148 30-Apr-18 Will the reinstalled acoustical ceiling grid need to be cleaned and/or painted? Davinroy Mechanical Mark Davinroy davinroymech@peaknet.net CE PM 2-May-18

Per SOW, ceiling grid and tiles should be replaced…please specify which acoustic tiles you are referring to

3-May-18 A05 3-May-18

R0149 30-Apr-18 Please confirm what…