16-B50_Drawings.pdf

PDF 15 MB Posted

Attached to
FY18 Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA4407-18-R-0002
Issued by
Department of the Air Force Air Mobility Command

About this file

Attachment 16-B50 Drawings

View the file

Other files for this federal contract opportunity

Other files attached to FY18 Multiple Award Construction Contract (MACC), newest first.
File Type Posted
FBO_Posting.pdf PDF
50_A-4_4_REFLECTED_CEILING_PLAN.PDF PDF
50_A-3_3_ARCHITECTUAL_FLOOR_PLAN.PDF PDF
50_First_Floor_Revised.pdf PDF
13-B50_SOW_Rev_5.pdf PDF
50_FP-1_12_FIRE_PROTECTION_FLOOR_PLAN.PDF PDF
50_A-2_2_ARCHTECTUAL_DEMOLITION_PLAN.PDF PDF
50_A-5_5_SCHEDULES_DETAILS.PDF PDF
50_47926_P1_Bathroom_Plumbing.PDF PDF
50_A-1_1_TITLE_SHEET.PDF PDF
50_9_E-1_ELECTRICAL_DEMOLITION_PLAN.PDF PDF
50_E-3_11_POWER_FLOOR_PLAN.PDF PDF
50_A-3_FLOOR_PLAN_DETAILS.PDF PDF
50_F-442-A_FOUNDATION_PLAN_DETAILS.PDF PDF
50_P-1_8_PLUMBING_FLOOR_PLAN.PDF PDF
50_P-2_PLUMBING_DEMOLITION.PDF PDF
50_P-1_BATHROOM_PLUMBING.PDF PDF
FA440718R00020004_(Conformed_0004).pdf PDF
29-Pre-Proposal_Conference_Sign_In_Sheet.pdf PDF
28-Pre-Proposal_Conference_Slide_Show.pdf PDF
FA440718R0002-0003.pdf PDF
26-FY18_MACC_RFI_Log_(0003).pdf PDF
FA440718R00020002-0002.pdf PDF
26-FY18_MACC_RFI_Log_(0002).pdf PDF
27-Visitor_Instructions.pdf PDF
01c-Historic_Preservation.pdf PDF
11-PPI_(20180412).docx DOCX document
26-FY18_MACC_RFI_Log_(0001).pdf PDF
1d-UFC_Table_6-1.pdf PDF
06-WD-IL17_(IL180017-20180216).pdf PDF
25-Price_Schedule.pdf PDF
08-SAFB_Map.pdf PDF
14-B50_Specifications.pdf PDF
01a-TO_Procedures.pdf PDF
FA440718R0002.pdf PDF
04-NAF_GP.pdf PDF
01b-MACC_Gen_Rqmts.pdf PDF
20-B50_Cubicle_Typicals.pdf PDF
09-AMRDEC.pdf PDF
12-PPQ.pdf PDF
15-B50_Design_Analysis.pdf PDF
03-SAFB_Arch_Comp_Plan.pdf PDF
17-B50_Schedule_of_Submittals.pdf PDF
21-B50_Existing_Floor_Plan.pdf PDF
18-B50_PWS_New_Furniture.pdf PDF
13-B50_SOW_Rev_4.pdf PDF
10-Real_ID_Act_(v21).pdf PDF
05-WD-IL7_(IL180007-20180316).pdf PDF
19-B50_Reconfigured_Floor_Plan.pdf PDF
07-SAFB_Climatic_Data.pdf PDF
Show all 50

FY18 Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PATRIOT'S

LANDING

S E

N

TR

Y C

T

PHOENIX CT

H

AN

N

AH

C H

AS

E

LN

NIGHTHAWK CT

HUEY CT

D

YE

SS

C

T

4405 4409

44004404 4408

432843

OUTER DR

O N

TA

R

IO

S

T

15941595

294233

30 43

431443104308

4305 4309

438743

LINCOLN'S

LANDING

S E

C

TI

O N

L

IN

E R

D

PAUL REVERE DR

HANCOCK

CT

42574256

4225 4481

44754477

44644466

44584460

E N

LI

S

TE

D

D R

IV

E

SCOTT

ELEMENTARY

SCHOOL

A S

H C

R E

E K

D R

3152J3152I3152F 3152E

3151J3151I

PRYOR DR

EAST DR

W

AR

E

AV

E

SC

O

TT

L

AK

E

R D5540

PROJECT No.

VDYD 12-1211

Consulting Engineers

DESCRIPTION

SCALE

CHIEF ENGINEER

SUBMITTED

DRAWN BY

PROJECT NO.

CIVIL ENGINEER

APPROVED

DESIGNED BY

REV DATE

COMMANDER

APPROVED

DRAWING NO.

DATE SHEET

DRAWN APPR'D

A

LL

R

IG

H

TS

R E

S E

R V

E D c C

O P

Y R

IG

H

T

PAGE

2-23-2016 of 15

FA440718R0002

Attachment 16

P

M

RR

RR

R

R

R

E

R

E

R

P

M

DP4 DP3 LP1 D

P

D P

D P

D P

2.1

2.2

2.3

2.4

2.5

TYP.

2.6

TYP.

2.4

2.4

TYP.

2.3

TYP.

2.3

TYP.

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2 2.1

101 102

111 112

1102.7

2.8

TYP.

9.1

9.1

9.1

9.1

9.2

9.2

9.2

9.2

9.3

9.3

9.3 9.3

9.3

9.3

9.3

9.3

9.4

9.4

23.1

23.2

26.1

TYP.

A-1

KEYED NOTES #

(DEMOLITION)

KEYED NOTES

(NEW WORK)

EXISTING WOOD JOISTS AND TRUSSES.

EXISTING BLOWN-IN INSULATION.

EXISTING GYPSUM BOARD.

METAL STUD BRACE @ 4'-0" O.C.

PATCH ACT (SEE PLAN).

5/8" GYPSUM BOARD (MATCH

EXISTING THICKNESS).

METAL STUD AT 2'-0" OC (MATCH

EXIST STUD).

REMOVE TOP 6" OF GYPSUM BOARD.

EXIST METAL STUD.

F .V

F .V

E X

IS

T

P A R

T

IA

L H E

IG

H T W

A L L

4" BLOWN-IN INSULATION.

EXISTING BEAM IN

MECHANICAL ROOM.

REMOVE PART OF

EXISTING BRICKED-IN

WINDOW.

EXISTING BRICK WALL.

EXISTING GWB @

BOTTOM TRUSS.

EXISTING CEILING

CAVITY.

EXISTING CEILING

GRID WITH NEW TILES.

A F F

A F F

A F F

2'-0"

5/8" GYPSUM BOARD

ON METAL STUD

FRAMING.

N

M

L

K

J

I

H

G

F

E

D

C

B

A O 1 2 63 4 5 7 8 9

DESCRIPTION

AIR MOBILITY COMMAND

SCOTT AIR FORCE BASE

SCALE

CHIEF ENGINEER

SUBMITTED

DRAWN BY

PROJECT NO.

CIVIL ENGINEER

APPROVED

DESIGNED BY

REV DATE

COMMANDER

APPROVED

DRAWING NO.

DATE SHEET

DRAWN APPR'D

1110 12 13 14 15 16 17 18 19 A L L

R

IG

H T S

R E S E R V E D c C O P Y R

IG

H T

B .C

.C .L

.T

I N C

PAGE

2-23-2016 of 15

Biagi, Chance, Cummins, London, Titzer, Inc.

Consulting Engineers

BUILDING 50

REPAIR (SUS), HVAC, CPO; B50

VDYD 12-1211

2/22/2016 5:32:05 PM

DEMOLITION AND NEW

WORK REFLECTED CEILING

PLANS

1/8" = 1'-0"1

MAIN LEVEL DEMOLITION REFLECTED CEILING PLAN

1/8" = 1'-0"2

MAIN LEVEL NEW WORK REFLECTED CEILING PLAN

2.1 REMOVE ACOUSTICAL CEILING TILE AND GRID.

2.2 REMOVE ACOUSTICAL CEILING TILE ONLY - GRID TO REMAIN. (GRID

TO BE REMOVED AS REQUIRED FOR MECHANICAL AND ELECTRICAL

WORK ABOVE CEILING. REINSTALL OR PROVIDE NEW TO PATCH

AND MATCH EXISTING.

2.3 CEILING FAN TO REMAIN. CLEAN AND ADJUST.

2.4 REMOVE PARTAIL HEIGHT WALL CAP AND GYPSUM BOARD AS

REQUIRED TO EXTEND WALL ABOVE CEILING.

2.5 REMOVE LIGHT FIXTURES - REF ELECTRICAL DRAWINGS.

2.6 REMOVE DIFFUSERS - REF MECHANICAL DRAWINGS.

2.7 REMOVE PART OF EXISTING BRICKED WINDOW AS REQUIRED FOR

NEW MECHANICAL WORK. SEE MECHANICAL.

2.8 REMOVE PORTION OF EXISTING CEILING GRID AS REQUIRED TO

CREATE NEW SOFFIT. SEE NEW WORK PLAN.

9.1 EXTEND WALLS ABOVE ACT CEILINGS TO GYPSUM BOARD AT

BOTTOM OF TRUSS. REFERENCE DETAIL 3/A6.1

9.2 PATCH CEILING GRID WHERE WALL IS EXTENDED ABOVE CEILING.

9.3 ACOUSTICAL CEILING TILE IN EXISTING GRID.

9.4 ACOUSTICAL CEILING TILE AND GRID.

23.1 DIFFUSER - REF. MECHANICAL DRAWINGS.

23.2 EXISTING FAN TO REMAIN.

26.1 LIGHT FIXTURE - REF. ELECTRICAL DRAWINGS.

1" = 1'-0"3

PARTITION EXTENSION DETAIL

1/20/16 %95 CONSTRUCTION DOCUMENTS

0' 8'4' 16' 32'

0' 8'4' 16' 32'

A-1

3/4" = 1'-0"4

SOFFIT DETAIL

FA440718R0002

FA440718R0002

GLYCOL FEED SYSTEM

MECHANICAL ROOM CONTROL DAMPER SEQUENCE OF OPERATION

01 - X-1
02 - A-1
03 - S-1
04 - FP-1
05 - M-1
06 - M-2
07 - M-3
08 - M-4
09 - M-5
10 - M-6
11 - M-7
12 - M-8
13 - E-1
14 - E-2
15 - E-3

File details come from the government source that posted it.