28-Pre-Proposal_Conference_Slide_Show.pdf
PDF 648 KB Posted
- Attached to
- FY18 Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA4407-18-R-0002
About this file
Attachment 28 Pre-Proposal Conference Slide Show
View the file
Other files for this federal contract opportunity
Show all 50
FY18 Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLEASE SIGN IN
375th CONTRACTING
SQUADRON
Pre-Proposal Conference FY18 Multiple Award Construction Contract
(MACC)
Please turn off cell phones
Conference Overview Introductions Multiple Award IDIQ Features MACC Solicitation Features Proposal Submission Requirements Sample Project Description/Expectations Labor Considerations Q & A Rules of Engagement Project Site Visit
Key Personnel “The Acquisition Team”
Contracting Team
– Mr. A.T. Bealer; Director, Business Operations
(DBO)
– Mr. Rodney Brown; LGCA Flight Chief
Civil Engineering Team
– Major Eric Diehl; Chief, Engineering Flight
End User/Customer Contractors
Multiple Award IDIQ Features
IDIQ - Indefinite Delivery/Indefinite Quantity Guaranteed Minimum Anticipate awarding up to 14 contracts
– Six awards reserved for SBA-certified 8(a) firms Evaluation of Sample project will be based on technical, past performance, and price Future Task Orders awarded based on criteria identified in the RFP package
MACC Solicitation Features
RFP No. FA4407-18-R-0002 Total 5-year program ceiling = $90M Sample Project (Exhibit 1) Repair (SUS), HVAC, CPO B50
Proposals Due: 3:00 PM, 9 May 2018
– Must be received by 375 CONS
• AMRDEC
Solicitation Features (cont)
Evaluation Process described in Section M is for the Sample project
Evaluation criteria may be tailored for follow-on task orders
Technical/Risk and Past Performance when combined are approximately equal to cost/price
Sample Project Repair HVAC, CPO, Bldg. 50
Design-Build for Reconfiguration of Space
100% HVAC Design
Options Remove Space Saver Cabinets 375 CONS Furniture Package Swing Space Furniture Package
Proposal Submission Requirements
SF 1442, blocks 14, 15, 16,17, 19, 20A,20B, 20C
Section G (Administration Data) Section I (fill in clauses) Section K (SAM, ORCA)
Proposal Submission Requirements (cont.)
Section L-2, Proposal Preparation
– Part I: Contract Documents
– Part II: Work Plan
– Part III: Past Performance Information, three (3) references within past three (3) years
Labor Considerations Davis Bacon Act applies Prevailing wages in effect at time of award apply to all base year projects Prevailing wages in effect at time options exercised apply to option period projects Employees subject to labor interviews Must have applicable posters at job site
Sampling of Projects Project Title Magnitude of Construction
REPAIR, UG High Voltage Cable; F8310 $1,000,000 - $5,000,000 REPAIR, Fire Suppression and Detection (FSD), Warehouse; B4001 $500,000 - $1,000,000 REPAIR, Fire Alarm & Mass Notification System Panel; B5 $250,000 - $500,000 REPAIR, Fire Suppression System; B750 $250,000 - $500,000 REPAIR, Lightning Protection System; B1575 & B750 $250,000 - $500,000 REPAIR, HVAC, Band; B868 $250,000 - $500,000 REPAIR, Multi System Components, James Gym; B1987 $500,000 - $1,000,000 CONST, Pedestrian Access Gate, Scott School; B4782 $250,000 - $500,000 REPAIR, Replace EMCS Controls, B3689 $100,000 - $250,000 REPAIR; Replace EMCS Controls; B859 $100,000 - $250,000 REPAIR, Flooring, CDC Classrooms; B1805 $100,000 - $250,000 REPAIR, Roof, Gutter & Downspout Cleaning; BASEWIDE $100,000 - $250,000 REPAIR, Exterior Enclosure, AFNIC; B1700 $1,000,000 - $2,500,000 REPAIR, Egress Stairwell (FSD), AFNIC; B1700 $500,000 - $1,000,000 REPAIR, East Wall, Facility MX; B60 $250,000 - $500,000
Q&A Rules of Engagement No changes to RFP unless amended Submit questions in writing to SSgt Jorge
Alvarez AND Mr. Rodney Brown via e-mail at: jorge.alavarez.7@us.af.mil
Rodney.brown.10@us.af.mil Cut-off for questions is: 30 April 2018 4:00
PM local time Questions & Answers will be posted on
FedBizOpps website mailto:jorge.alavarez.7@us.af.mil mailto:Rodney.brown.10@us.af.mil
QUESTIONS?
375th CONTRACTING
SQUADRON
| PLEASE SIGN IN |
| Slide Number 2 |
| Slide Number 3 |
| Conference Overview |
| Key Personnel�“The Acquisition Team” |
| Multiple Award IDIQ Features |
| MACC Solicitation Features |
| Solicitation Features (cont) |
| Sample Project |
| Proposal Submission Requirements |
| Proposal Submission Requirements (cont.) |
| Labor Considerations |
| Sampling of Projects |
| Q&A Rules of Engagement |
| Slide Number 15 |