26-FY18_MACC_RFI_Log_(0001).pdf
PDF 775 KB Posted
- Attached to
- FY18 Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA4407-18-R-0002
About this file
Attachment 26-RFI Log (New-0001)
View the file
Other files for this federal contract opportunity
Show all 50
FY18 Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI No.
Date
Received Question / Comment SME Response
Response
Date
Publish
Action
Action
Date
R0001 10-Apr-18
Architectural, Electrical and Plumbing packages (including Demo):
We are responsible for full design/build of the architectural, electrical and plumbing packages?
In lieu of a 100% design the contractor is responsible for the design/build of any system requiring design.
13-Apr-18 A01 16-Apr-18
R0002 10-Apr-18
HVAC: We are to use the 100% completed HVAC design provided
(including Hot Water Flow Diagram), and provide As-Built drawings upon project completion?
Contractor to use 100% design while maintaining compliance with all current applicable codes and standards. At the completion of the project, As-Built drawings are to be provided.
13-Apr-18 A01 16-Apr-18
R0003 10-Apr-18 Fire Protection: We are to use the plan provided and provide a FPE certification letter, as noted in document?
Use the plans provided to the extent required to obtain FPE certification.
13-Apr-18 A01 16-Apr-18
R0004 10-Apr-18
HVAC – Do we have the option of going design/build on the HVAC if we think we can achieve the desired results more economically than what the drawings show?
The option to do design/build can be bid as a betterment to the original RFP. But you must provide a bid for the original design.
13-Apr-18 A01 16-Apr-18
R0005 11-Apr-18
Attachment 11 I. Specify, by name, any key individual(s) who participated in this program and are proposed to support the instant acquisition. Also, indicate their contractual roles for both acquisitions. Could you clarify what the “Instant Acquisition” would be? Is that the seed project? By “both acquisitions” do you mean the seed project and the MACC Program? You are asking for their name, but not any resume’s, is that correct?
Paragraph I of Attachment 11 is requiring offerors to state which individuals from the offeror's company performed on the project referenced on Attachment 11 and will also perform under the FY18 MACC and the sample project (the "instant acquisition" in this case). Only personnel names are requested, no resumes.
12-Apr-18 A01 16-Apr-18
R0006 11-Apr-18
Attachment 11 H. For each of the applicable sub-factors under the
Technical factor in Section M, illustrate how your experience on this program applies to that sub-factor. Please clarify which subfactors you are referring to because I cannot find any “sub-factors” listed on pages 48 and 49 of 50.
There are no technical subfactors, Attachment 11 has been revised as part of Amendment 01 to the solicitation.
12-Apr-18 A01 16-Apr-18
R0007 12-Apr-18
The Pre-Solicitation Notice states that these services would be performed “The FY18 MACC will encompass a wide variety of construction tasks, including design-build; facility repair, renovation, additions, upgrades, and new construction integrating multiple construction trades and disciplines; utility work; airfield paving and repair; road repair; and other similar types of work…”
Are these items highly relevant, if so will they be added to the Scope of Services listed in the solicitation issued on 09-Apr-2018?
If the "Scope of Work" in question is paragraph M-4.2.2 of
Section M, the answer is no. The relevancy determination will remain as written. If this is not what is being asked, please clarify the portion of the solicitation.
13-Apr-18 A01 16-Apr-18
R0008 12-Apr-18
Attachment 11, PAST PERFORMANCE INFORMATION, lists a question “I.” and then an “L.” Are the questions for letters J through
K missing? Also these two questions seem to refer to the current sample project and not a past completed project, please clarify.
The paragraph numbering has been corrected in the version of
Attachment 11 included in Amendment 01 to the solicitation.
13-Apr-18 A01 16-Apr-18
Request for Information (RFI) Subject Matter Expert (SME)
FA440718R0002