Attachment 1 - Comment Matrix.docx

DOCX document 43 KB Posted

Attached to
Initial Pilot Training (IPT) (See Solicitation FA300225SC001) Federal contract opportunity
Solicitation number
FA300224RFI-EIFT
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is a standardized comment matrix template to be used for submitting comments on draft publications and program directives. The template includes columns for tracking the item number, source of the comment, comment type (critical, major, substantive, or administrative), page, paragraph, the actual comment, rationale for the comment, and decision (accept, reject, or accept with modification) along with the rationale for the decision.

The related federal contract opportunity is a Request for Information (RFI)/Sources Sought notice for the Initial Pilot Training (Previously Expanded Initial Flight Training - E-IFT) requirement. The Department of the Air Force Air Education and Training Command is seeking information from qualified sources, both large and small businesses, regarding their availability and capability to perform this potential requirement. The government does not intend to award a contract based on this notice, and contact with government personnel other than those specified is not permitted.

View the file

Other files for this federal contract opportunity

Other files attached to Initial Pilot Training (IPT) (See Solicitation FA300225SC001), newest first.
File Type Posted
IPT CSO Industry Questions CRM FINAL.pdf PDF
Request for Information Draft SB Subcontracting Plan _25APR2025.pdf PDF
IPT Synopsis 2025 .pdf PDF
AETC Responses to IPT CSO and SOO Questions.pdf PDF
Industry Day Brief 4 Feb 25 Final.pdf PDF
IPT Industry Day Attendees and QA.pdf PDF
AETC IPT Commercial Solution Opening (CSO) 24 Jan 25 DRAFT.pdf PDF
AETC IPT Statement of Objectives (SOO) 24 Jan 25 DRAFT.pdf PDF
AETC IPT CRM.xlsx XLSX spreadsheet
Initial Pilot Training (IPT) Industry Day Announcement (4 Feb 25).pdf PDF
Initial Pilot Training (IPT) Industry Day Announcement (4 Feb 25).pdf PDF
Initial Pilot Training (IPT) Industry Day Announcement (3 Feb 25).pdf PDF
Initial Pilot Training (IPT) Industry Day Announcement (4 Feb 25).docx DOCX document
Initial Pilot Training Scaling Plan.pdf PDF
IPT RFI 06Nov2024.docx DOCX document
IPT Consolidated RFI_PWS Responses v1.0.pdf PDF
IPT RFI - 12 June 2024.docx DOCX document
IPT Draft PWS - V1.pdf PDF
AETC E-IFT QA 14 Dec 2023.pdf PDF
AETC E-IFT RFI QA 13 Dec 2023.pdf PDF
E-IFT RFI - Amendment 1.pdf PDF
E-IFT RFI QA.pdf PDF
E-IFT RFI.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Initial Pilot Training (IPT) Performance Work Statement (PWS) Review

ITEM
SOURCE
TYPE

(C/M/S/A)

PAGE
PARA
LINE
COMMENT
RATIONALE
DECISION

(A/R/M)

RATIONALE

STANDARDIZED COMMENT MATRIX PRIMER

Initial Pilot Training (IPT) Performance Work Statement (PWS) Review

The comments matrix below is a Word document table to be used for submitting comments on draft publications and draft program directives. Except as noted below, an entry is required in each of the columns. To facilitate consolidating matrixes from various sources, do not adjust the column widths. Use the column headings in the document header as a guide to adjust column widths. Specific comments submitted in line-in/line-out format will be considered. General or vague comments will be acknowledged, but usually they will not be considered.

Column 1 – ITEM Numeric order of comments. Accomplish when all comments from all sources are entered and sorted. To number the matrix rows, highlight this column only and then select the numbering ICON on the formatting tool bar.

Column 2 – SOURCE Specify Organization, Office Symbol, POC (e.g., AETC/A3LM, name of POC)

Column 3 – TYPE C – Critical (Contentious issue that will cause non-concurrence with publication) M – Major (Incorrect material that may cause non-concurrence with publication) S – Substantive (Factually incorrect material) A – Administrative (grammar, punctuation, style, etc.)

Column 4 – PAGE

Column 5 – PARA Paragraph number that pertains to the comment.

Column 6 – COMMENT Change, delete, or add to the document. We can only consider comments submitted in line-in/line-out format. Generalized comments that make no changes to the document will be accepted, but no changes will be made to the document.

Column 7 - RATIONALE Provide concise objective explanation of the rationale for the comment.

Column 8 – DECISION (OPR WILL FILL IN)

A - ACCEPT

R – REJECT (Rationale required for rejection.)

M - ACCEPT with modification (Rationale required for modification.)

Column 9 – RATIONALE (OPR WILL FILL IN) Provide concise explanation of the rationale for the decision.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

File details come from the government source that posted it. Updated .