Sheppard_BMC_Summary_of_Changes__3_Aug_2017.pdf

PDF 55 KB Posted

Attached to
AWARD NOTICE: Sheppard Air Force Base, Base Maintenance Contract (BMC)
Solicitation number
FA3002-16-R-0019
Issued by

About this file

Summary of Changes dated 3 Aug 2017

View the file

Other files

File Type Posted
Atch 6_PPI Tool Instructions _7 Aug 17.pdf PDF
FA3002-16-R-0019-0003.docx DOCX document
Sheppard AFB BMC PWS Summary of Changes_18Aug17.pdf PDF
Tech Library_SAFB Snow and Ice Control Plan 4-4-16.pdf PDF
Atch 8_Manpower Matrix_7 Aug 17.xlsx XLSX spreadsheet
Sheppard AFB BMC PWS_18Aug17.pdf PDF
QA Government Response_21Aug17.xlsx XLSX spreadsheet
Atch 21_Sections L and M_21Aug17.docx DOCX document
FA3002-16-R-0019-0002.docx DOCX document
Sheppard_Pre-Proposal_Conf_Sign-In_Sheets.pdf PDF
Sheppard_BMC_PWS_3_Aug_2017.pdf PDF
https://www.fbo.gov/utils/view?id=772bf55182c342f8dcff6522131f3264 —
Atch_11_-_Performance_Incentive_Plan_2_Aug_2017.docx DOCX document
Sheppard_BMC_Pre-Proposal_Conf_Brief_Final.ppt PPT presentation
Atch_21_Sections_L_and_M_2_Aug_2017.docx DOCX document
FA3002-16-R-0019-0001.pdf PDF
FA3002-16-R-0019-0001.pdf PDF
FA3002-16-R-0019-0001.pdf PDF
Atch 21_Sections L and M_30 Jun 2017.docx DOCX document
Atch 2_ SCA WD 15-5263.pdf PDF
Atch 8_Manpower Matrix.xlsx XLSX spreadsheet
Atch 6_PPI Tool Instructions.pdf PDF
Atch 9_Q and A Template.xlsx XLSX spreadsheet
1_Sheppard Pre-Proposal Conference and Site Visit Invitation.docx DOCX document
2_Sheppard Site Visit.xlsx XLSX spreadsheet
Atch 1_Sheppard PWS_11 Jul 2017.pdf PDF
4_Sheppard Map.pdf PDF
Atch 20_SB Ind Subcontracting Plan Checklist.docx DOCX document
Atch 19a_FY16 Inventory_Software.pdf PDF
Atch 16_WBS SAFB_16 Mar 2016.xlsx XLSX spreadsheet
Atch 17_Incidental to Place of Performance.xls XLS spreadsheet
Atch 18_ECS and ME Functions - 09 Nov 16.docx DOCX document
RFP_Package.zip ZIP file
Atch 12_Tech Library Notice.docx DOCX document
Atch 13 - Workforce Demographic.docx DOCX document
3_MapToSheppardClub.pdf PDF
Atch 10_ Consolidated GFP Attachment _v1_Sheppard.xlsx XLSX spreadsheet
Atch 19b_FY16 Inventory_ITE.PDF PDF
Atch 14_Section B and Price Proposal Workbook.xlsx XLSX spreadsheet
Atch 7_ Sample Client Authorization Letter.docx DOCX document
Atch 5_ Sample Subcontractor Letter of Consent.docx DOCX document
1_FA3002-16-R-0019 - Sheppard BMC RFP - 11Jul2017.pdf PDF
Atch 11 - Performance Incentive Plan_23 Jun 17.docx DOCX document
Atch 4_DDForm254.pdf PDF
Atch 3_CBA FY17 PAE SAFB.PDF PDF
Atch 15_QASP_SAFB.pdf PDF
Sheppard_Draft_RFP_Master_Q&A_17May17.xlsx XLSX spreadsheet
Sheppard_BMC_DRAFT_RFP_documents.zip ZIP file
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheppard’s BMC PWS Summary of Changes

Section 2 All- Services PWS Section Summary of Change PWS Page 2-1 Added “Section J Attachment 10 to Para. 2.1.1 2-1-1

2-1 Paragraph 2.1.2.8.1 was revised for requirement clarification

2-1-8 and 2-1-9

2-1 Added paragraph 2.1.2.8.2 2-1-9 2-1 Added “ACO” to paragraph

2.1.2.17.13.3 2-1-16

2-1 Added Section J Attachment 10 to paragraph 2.1.2.20.3

2-1-20

2-1 Added Section J Attachment 17 to paragraph 2.1.2.20.3 and 2.1.2.20.7

2-1-20 and 2-1-21

2-1 Deleted CLIN X0026 from paragraph 2.1.2.26

2-1-23

2-1 Added Section J Attachment 10 to paragraph 2.1.1.26

2-1-23

2-2 Change to “95%” Performance Objective 2.2.2

2-2-1

2-3 Deleted “Furnished” paragraph 2.3.2.2

2-3-1

2-3 Revised paragraphs 2.3.2.3.4 and 2.3.2.3.5

2-3-3

2-3 Define requirement of Government Provided Service Contract paragraph 2.3.3

2-3-4-thru 2-3-6

2-3 Removed the words ‘Rental Cars” from paragraph 2.3.8

2-3-8

2-A Revised the complete document (validated dated and requirements)

2A-1thru 2A-21

2-D Revised “Required Reports” Added “ACO” in the Submit Col.

2-D-1

2FA Revised Government Facilities Table

2-FA-1 and 2-FA-2

2-FG Deleted the word “Furnished from

2FG.1

2-FG-1

2-G Added the definition for “Key Position”

2-G-9

2-G Added the definition for “Dedicated Personnel”

2-G-7

2-H Removed the requirement to have a “SAFB Refrigerant Management Plan”

2-H-2

2-I Revised qualification for Quality Control Manager and Inspector

2-I-1

Section 10 –Installation Management

10-1 Revised paragraph 10.1.2.3:

Entire requirement rewritten for clarification

10-1-5 and 10-1-6

10-1 Revised paragraph 10.1.2.3.1:

Entire requirement rewritten for clarification

10-1-6 and 10-1-7

10-1 Revised paragraph 10.1.2.3.6:

Entire requirement rewritten for clarification

10-1-8

10-1 Revised paragraph 10.1.2.5.2:

Added sentence “SP will be required to provide cradle to grave management on post 1984 contamination sites.”

10-1-11

10-B Added workload to table 10-B-4 10-2 Removed the word “Formatted” from Performance Objective 10.2.1

10-2-1

10-2 Removed SS 10.2.29 10-2-4 10-3 Added “/ACO” to paragraph

10.2.3 10-3-1

10-3 Revised paragraph 10.3.7.6:

Entire requirement rewritten for clarification

10-3-6-

10I Change “10 Year” to “7 Years for Interdisciplinary Environmental Supervisor

10-I-1

Section 11– Operation and Maintenance

11-1 Remove the following from the paragraph 11.1.2.2.1.1“The SP will be responsible for the completion of all roofing projects approved by the Government that

11-1-4 are valued at $150,000 or less, on Sheppard AFB, and any attached or related properties under the control of Sheppard AFB.”

11-1 Added paragraph 11.1.2.2.3.7- Exhaust Hoods, Grease and Sand& Grit Traps to clarify BMC contractor responsibility for this equipment.

11-1-8

11-1 Removed the word “furnished” from paragraph 11.1.2.2.4.2 and added the “ACO” to 11.1.2.2.4.2

11-1-11

11-3 Removed equipment tables 11-3-4 thru 11-3-8 11-3 Added new paragraph “11.3.12.

There is a verbal agreement with the City of Wichita Falls for stray animal collection. The SP will be responsible for contacting the City of Wichita Falls. The agreement is for the City of Wichita Falls to use their resources and manpower up to approximately 5 times annually.

The SP will not be provided air conditioned vehicle for control activities of domestic animals nor have to have all the state required licenses.

11-3-4

11-5 Installed equipment tables 11B-116 thru 11B-119 11-5 Added workload Table for asbestos disposal Table 5 11B-3

11I Identified “Key Position “ in the table

11-I-1 thru 11-I-5

Section 12 Installation Engineering

PWS Section Summary of Change PWS Page 12-1 Added “Manage Construction

Task Order (CTO) Development

– Built infrastructure projects will be populated into a CTO for coordination. The title, cost and the acquisition strategy will be listed for each project and shall be coordinated with Base

12-1-2 and 12-1-3 leadership including base contracting and AFCEC. Time on Target dates represent the date by which a Request For Funds (RFF) should be submitted to AFCEC. Installations, AFIMSC Detachments, and MAJCOMs will be provided the opportunity to review and adjust execution methods and agents prior to CTO publication. A tripartite agreement between AFIMSC/RM, AFICA/CC, and AFCEC/CL will provide funds assurance and Authority to Advertise in the jointly approved CTO, establishing the approved FSRM program. An appropriate Time on Target date for each project will be requested by CF soon after the CTO is approved to paragraph 12.1.2.1.1.2

12-1 Added “Texas registration” to line 10 paragraph 12.1.2.1.5.1

12-1-10

12-1 Deleted the sentence “The SP must have authorization by the government prior to using any outside agency (non-SP) for design services paragraph 12.1.2.1.5.1

12-1-10

12-1 Added on technical acceptable proposals paragraph 12.1.2.1.5.9

12-1-12

12-1 Revised the sentence to read “Focus shall be on management of current information resource rather than the acquisition of future IT equipment paragraph 12.1.2.1.5.15.1

12-1-13

12-3 Added “/ACO” to paragraph 12.3.4

12-3-1

Appendix 12-I Deleted “requirement for ABET accredited from Special Training, Certification, or Licensed Column

12-I-1

Appendix 12-I Deleted “requirement for ABET accredited from Special Training, 12-I-2

Certification, or Licensed

Section 14 Emergency Management

PWS Section Summary of Change PWS Page 14-1 Renumbered paragraph

14.1.2.1.6 thru 14.1.2.8 14-1-4 thru 14-1-5

14-1 Para 14.1.2.1.4 Change “30” to “60” calendar days

14-1-3

14-1 Para 14.1.2.1.5 Change “30” to “60” calendar days

14-1-3

14-1 Removed the words Barcode Inventory Tracking Systems (BITS) paragraph 14.1.2.1.8

14-1-5

14-2 Removed the words “Bits and” from SS 14.2.11

14-2-2

14-2 SS 14.2.12. Change “30” to “60” calendar days

14-2-2

14-3 Added “/ACO” to paragraph 14.3.4

14-3-1

Technical Library

Updated new 7115 Dated Jul 2017

Table of Content

Section 2 –All Services General Information and

Publication page count

File details come from the government source that posted it. Updated .