Atch 6_PPI Tool Instructions _7 Aug 17.pdf

PDF 524 KB Posted

Attached to
AWARD NOTICE: Sheppard Air Force Base, Base Maintenance Contract (BMC)
Solicitation number
FA3002-16-R-0019
Issued by

About this file

PPI Tool Instructions Updated

View the file

Other files

File Type Posted
FA3002-16-R-0019-0003.docx DOCX document
Sheppard AFB BMC PWS Summary of Changes_18Aug17.pdf PDF
Tech Library_SAFB Snow and Ice Control Plan 4-4-16.pdf PDF
Atch 8_Manpower Matrix_7 Aug 17.xlsx XLSX spreadsheet
Sheppard AFB BMC PWS_18Aug17.pdf PDF
QA Government Response_21Aug17.xlsx XLSX spreadsheet
Atch 21_Sections L and M_21Aug17.docx DOCX document
FA3002-16-R-0019-0002.docx DOCX document
Sheppard_Pre-Proposal_Conf_Sign-In_Sheets.pdf PDF
Sheppard_BMC_PWS_3_Aug_2017.pdf PDF
https://www.fbo.gov/utils/view?id=772bf55182c342f8dcff6522131f3264 —
Atch_11_-_Performance_Incentive_Plan_2_Aug_2017.docx DOCX document
Sheppard_BMC_Pre-Proposal_Conf_Brief_Final.ppt PPT presentation
Atch_21_Sections_L_and_M_2_Aug_2017.docx DOCX document
Sheppard_BMC_Summary_of_Changes__3_Aug_2017.pdf PDF
FA3002-16-R-0019-0001.pdf PDF
FA3002-16-R-0019-0001.pdf PDF
FA3002-16-R-0019-0001.pdf PDF
Atch 21_Sections L and M_30 Jun 2017.docx DOCX document
Atch 2_ SCA WD 15-5263.pdf PDF
Atch 8_Manpower Matrix.xlsx XLSX spreadsheet
Atch 6_PPI Tool Instructions.pdf PDF
Atch 9_Q and A Template.xlsx XLSX spreadsheet
1_Sheppard Pre-Proposal Conference and Site Visit Invitation.docx DOCX document
2_Sheppard Site Visit.xlsx XLSX spreadsheet
Atch 1_Sheppard PWS_11 Jul 2017.pdf PDF
4_Sheppard Map.pdf PDF
Atch 20_SB Ind Subcontracting Plan Checklist.docx DOCX document
Atch 19a_FY16 Inventory_Software.pdf PDF
Atch 16_WBS SAFB_16 Mar 2016.xlsx XLSX spreadsheet
Atch 17_Incidental to Place of Performance.xls XLS spreadsheet
Atch 18_ECS and ME Functions - 09 Nov 16.docx DOCX document
RFP_Package.zip ZIP file
Atch 12_Tech Library Notice.docx DOCX document
Atch 13 - Workforce Demographic.docx DOCX document
3_MapToSheppardClub.pdf PDF
Atch 10_ Consolidated GFP Attachment _v1_Sheppard.xlsx XLSX spreadsheet
Atch 19b_FY16 Inventory_ITE.PDF PDF
Atch 14_Section B and Price Proposal Workbook.xlsx XLSX spreadsheet
Atch 7_ Sample Client Authorization Letter.docx DOCX document
Atch 5_ Sample Subcontractor Letter of Consent.docx DOCX document
1_FA3002-16-R-0019 - Sheppard BMC RFP - 11Jul2017.pdf PDF
Atch 11 - Performance Incentive Plan_23 Jun 17.docx DOCX document
Atch 4_DDForm254.pdf PDF
Atch 3_CBA FY17 PAE SAFB.PDF PDF
Atch 15_QASP_SAFB.pdf PDF
Sheppard_Draft_RFP_Master_Q&A_17May17.xlsx XLSX spreadsheet
Sheppard_BMC_DRAFT_RFP_documents.zip ZIP file
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J Attachment “7”

Instructions to Offerors

Past Performance Information (PPI) for Offerors

Offerors must use the PPI Tool (Use latest version from FBO.gov) in order to electronically submit the Past Performance Volume in accordance with the RFP.

Downloading the PPI Tool The PPI Tool can be downloaded by performing the following steps (if you are unable to download the Tool, contact the contracting officer for assistance):

1. Access the FedBizOpps (https://www.fbo.gov/) website.

2. Find the solicitation posting.

3. Locate the “ppi tool” link from the “All Files” column on the solicitation’s “Notice Details” tab .

4. Select the link and save the “ppi tool” to your computer. Name the file as the prime contractor + RFP number + file extension (e.g. XYZCompanyFA861710R6158.accdb).

Note: PPI Tools saved in Microsoft Office versions 2007 and greater will be saved with

“.accdb” file extension.

Entering information in the PPI Tool

After selecting and saving the tool, enter information by performing the following steps:

1. Open the saved PPI Tool.

2. Select the “Options” button from the “Security Warning” banner, if applicable

“Security Alert” pop-up screen displays.

Figure 1: Security Alert Pop-up

. The

Note:

Files saved using Microsoft Office 2010 will have the “Enable Content” button on the

“Security Warning” banner and therefore will not get a Security Alert pop-up.

RFP Attachment 6

------- 6 https://www.fbo.gov/

If a "read only" file is opened, in order to populate data in the file, click "Save As" in the

"Read-Only" message bar. Enter the filename as the prime contractor + RFP number + file extension (e.g. XYZCompanyFA861710R6158.accdb).

3. Select the radio button “Enable this content” and then click “OK.” A setup pop-up screen displays.

Figure 2: Setup Pop-Up

4. Select the “Start” button. The “Application Setup” screen displays.

Figure 3: Application Setup Screen

Note: Once the Offeror’s Name and RFP Number have been entered they can be edited by selecting the “Edit Offeror And RFP Number” button from the “Contractor’s Menu”

5. Enter the Offeror’s Name and RFP Number and then click the “Next” button. The application setup continues.

Figure 4: Continue the Application Setup

6. Choose the appropriate option by selecting the corresponding radio button and then click the

“Next” button. The “Contractor’s Menu” displays.

Figure 5: Contractor’s Menu

7. Click the “Step 1: Set up Business Relationships” button to create a business relationship, if applicable, for each contributing contracting organization before proceeding throughout the PPI Tool (refer to Section L of the RFP for detailed instructions). Identify all prime and sub-prime organizations and categorize them according to the appropriate role in the proposed acquisition. The “Business Relationships” screen displays.

Figure 6: Business Relationships

8. Click the “New” button to create a business relationship for the proposed acquisition. An additional “Business Relationships” screen displays.

Figure 7: Enter New Business Relationship

9. Complete the fields as follows (fields marked on the screen with an asterisk ‘*’ are required):

Contractor’s Name: Self-explanatory

Role in Proposed Acquisition: Choose one of the four options – Prime, Sub, Joint

Venture, or Other (Explain). An explanation comment box will display when you select

“Other.”

Place of Work: Location where contractor will perform work.

Percentage of Work: Identify percentage of work contributed by specified contracting organization.

Responsibilities: Detail responsibilities of specified contracting organization.

10. Select one of the buttons at the bottom of the screen.

Add – Saves the current business relationship and allows for the addition of a new one.

Close – Cancels the current business relationship without saving.

Note: In order to edit or delete an existing business relationship in the list, double-click on it.

11. Select the “Close” button on the “Business Relationships” screen after all of the business relationships has been added.

12. Click the “Step 2: Enter Past Performance Information (PPI)” button to enter the Past Performance Information. The “Past Performance” screen displays.

Figure 8: Past Performance

13. Click the “New” button to enter Past Performance Information for the proposed acquisition.

An additional “Past Performance” screen displays.

Figure 9: Enter Past Performance Information

14. Complete the fields on each of the tabs as follows (fields on the screen marked with an asterisk ‘*’ are required):

Contract Information Tab

Contractor: Select from the dropdown the appropriate contractor.

Cage Code: Self-explanatory.

Contract Number: If you don’t have a contract number, enter “N/A.”

Program Title: Enter full name of program.

Contr Agency/Customer: Enter servicing contracting agency and customer (office symbols suffice).

DUNS Number: Self-explanatory

Delivery Task/Order: If the order is provided as a stand-alone reference, enter the task/call/delivery/purchase order number.

Contract Type: Enter Firm-Fixed-Price (FFP), Cost Plus Fixed-Fee (CPFF), Indefinite

Delivery/Indefinite Quantity (ID/IQ), LH, Blanket Purchase Agreement (BPA), Cost

Plus Incentive-Fee (CPIF), Cost Plus Award Fee (CPAF), etc. For additional clarification, click the question mark button.

Short Program Title (i.e. Acronym): Enter abbreviated title for the program or enter

“N/A.”

Contract Dollar Value:

o Original: Input total contract dollar value, with all options if applicable, in the amount originally awarded on the referenced contract.

If ID/IQ or BPA, provide total ceiling.

If stand-alone task/call/delivery/purchase, provide amount of the individual contract.

o Current: Input total contract dollar value, with all options if applicable, as the contract stands at time of PPI submission.

If ID/IQ or BPA, provide total ceiling.

If stand-alone task/call/delivery/purchase, provide amount of the individual contract.

Period of Performance (mm/dd/yy) o Start Date: Input start date of contract.

o Original End Date: Input original end date based on award.

o Current End Date: Input end date, as the contract stands at time of PPI submission.

o Explain the differences in Period of Performance, if applicable: Enter an explanation of the difference between “Original End Date” and “Current End

Date.”

Program Details Tab

Brief Description of Effort as:

o Select Prime, Sub, Joint Venture, or Other (Explain). An explanation comment box will display when you select “Other.”

o Provide a brief description of the service provided and actual work performed under this contract reference.

o ****If applicable: Provide information on problems encountered on the identified contracts. At a minimum, briefly describe the problem experienced, actions taken to alleviate the problem, and whether or not the problem was satisfactorily overcome.****

Explain how your performance on this contract is relevant for each applicable factor or subfactor, as instructed under Past Performance in Section M of the RFP. Include any unique aspects that demonstrate relevancy in this effort. Provide evidence to support such relevance and the ability to perform the requirements as described in the

RFP.

Include relevant information concerning your compliance with FAR 52.219-8, Utilization of Small Business Concerns, on the contract you are submitting, if applicable.

Identify whether a subcontracting plan was required for the contract you are submitting. If one was required, identify in percentage terms the planned versus achieved goals during contract performance. Explain why goals were not met, if applicable:

POC & Key Individuals Tab

Key Individuals: Click the “New” button to specify any key individual or individuals who participated in this program or who may support the proposed acquisition. Also indicate their roles for both acquisitions, previous and current. To edit or delete an existing key individual, double-click an item from the list.

Note: In accordance with FAR 15.305(a)(2)(iii), relevant experience from key personnel may be evaluated. If you wish to include the past performance of individual key personnel, select the “New” button for each individual and fill out the necessary information.

Customer Points of Contact: Click the “Program/Site Manager,” “Contracting

Officer” or “Admin POC” button for the point of contact that you would like to add, edit, or delete.

Note: For government contracts provide current information on Program Manager, Contracting Officer, and Admin POC, if available.

For commercial contracts provide points of contact fulfilling these same roles, if available.

15. Select from the buttons at the bottom of the Past Performance screen:

Save – Saves the Past Performance Information and displays the “Contract Information” tab on the Past Performance screen.

Close – Closes the Past Performance screen. If there were any updates, a pop-up window displays asking to save before closing.

Delete – Deletes the current PPI record. A pop-up window displays, select “Yes” to delete the record or “No” to close the window without deleting the record.

Note: In order to edit or delete an existing PPI record in the list, double-click on it.

16. Select the “Close” button on the “Past Performance Information” screen after all of the PPI records have been added.

Printing Reports and Submitting PPI Tool

In order to print the Business Relationships and PPI reports, perform the following steps:

1. Click the “Step 3: Print Report” button . A pop-up displays asking which report to print.

Figure 10: Select Report to Print

2. Select separately each of the two options, “Business Relationships” or “Past Performance.”

The Business Relationships and Past Performance documents will print separately; combine the two to create your Past Performance Volume.

In order to submit the Business Relationships and PPI, perform the following steps:

3. Click the “Step 4: Submit” button . The “Submission

Instructions” screen displays.

Figure 11: Submission Instructions

4. Follow the submission instructions. Hard copies of the pages generated from this tool shall be used in the hard copy of the past performance volume subject to the limitations outlined in this RFP and should be Tab 1 of the past performance volume.

Note:

Submit an electronic copy (e.g. CD) of the saved PPI database file with your proposal. If a prime contractor is submitting the file enter the filename as:

o prime contractor + RFP number + file extension (e.g.

XYZCompanyFA861710R6158.accdb)

If a subcontractor is submitting the file enter the filename as:

o subcontractor + RFP number + file extension (e.g.

ABCCompanyFA861710R6158.accdb)

Once the file is saved to a CD or any location that is marked as “Read-only,” it must first be saved to the desktop in order to read/edit the file.

File details come from the government source that posted it. Updated .