Atch 20_SB Ind Subcontracting Plan Checklist.docx

DOCX document 34 KB Posted

Attached to
AWARD NOTICE: Sheppard Air Force Base, Base Maintenance Contract (BMC)
Solicitation number
FA3002-16-R-0019
Issued by

About this file

Not Listed

View the file

Other files

File Type Posted
Atch 6_PPI Tool Instructions _7 Aug 17.pdf PDF
FA3002-16-R-0019-0003.docx DOCX document
Sheppard AFB BMC PWS Summary of Changes_18Aug17.pdf PDF
Tech Library_SAFB Snow and Ice Control Plan 4-4-16.pdf PDF
Atch 8_Manpower Matrix_7 Aug 17.xlsx XLSX spreadsheet
Sheppard AFB BMC PWS_18Aug17.pdf PDF
QA Government Response_21Aug17.xlsx XLSX spreadsheet
Atch 21_Sections L and M_21Aug17.docx DOCX document
FA3002-16-R-0019-0002.docx DOCX document
Sheppard_Pre-Proposal_Conf_Sign-In_Sheets.pdf PDF
Sheppard_BMC_PWS_3_Aug_2017.pdf PDF
https://www.fbo.gov/utils/view?id=772bf55182c342f8dcff6522131f3264 —
Atch_11_-_Performance_Incentive_Plan_2_Aug_2017.docx DOCX document
Sheppard_BMC_Pre-Proposal_Conf_Brief_Final.ppt PPT presentation
Atch_21_Sections_L_and_M_2_Aug_2017.docx DOCX document
Sheppard_BMC_Summary_of_Changes__3_Aug_2017.pdf PDF
FA3002-16-R-0019-0001.pdf PDF
FA3002-16-R-0019-0001.pdf PDF
FA3002-16-R-0019-0001.pdf PDF
Atch 21_Sections L and M_30 Jun 2017.docx DOCX document
Atch 2_ SCA WD 15-5263.pdf PDF
Atch 8_Manpower Matrix.xlsx XLSX spreadsheet
Atch 6_PPI Tool Instructions.pdf PDF
Atch 9_Q and A Template.xlsx XLSX spreadsheet
1_Sheppard Pre-Proposal Conference and Site Visit Invitation.docx DOCX document
2_Sheppard Site Visit.xlsx XLSX spreadsheet
Atch 1_Sheppard PWS_11 Jul 2017.pdf PDF
4_Sheppard Map.pdf PDF
Atch 19a_FY16 Inventory_Software.pdf PDF
Atch 16_WBS SAFB_16 Mar 2016.xlsx XLSX spreadsheet
Atch 17_Incidental to Place of Performance.xls XLS spreadsheet
Atch 18_ECS and ME Functions - 09 Nov 16.docx DOCX document
RFP_Package.zip ZIP file
Atch 12_Tech Library Notice.docx DOCX document
Atch 13 - Workforce Demographic.docx DOCX document
3_MapToSheppardClub.pdf PDF
Atch 10_ Consolidated GFP Attachment _v1_Sheppard.xlsx XLSX spreadsheet
Atch 19b_FY16 Inventory_ITE.PDF PDF
Atch 14_Section B and Price Proposal Workbook.xlsx XLSX spreadsheet
Atch 7_ Sample Client Authorization Letter.docx DOCX document
Atch 5_ Sample Subcontractor Letter of Consent.docx DOCX document
1_FA3002-16-R-0019 - Sheppard BMC RFP - 11Jul2017.pdf PDF
Atch 11 - Performance Incentive Plan_23 Jun 17.docx DOCX document
Atch 4_DDForm254.pdf PDF
Atch 3_CBA FY17 PAE SAFB.PDF PDF
Atch 15_QASP_SAFB.pdf PDF
Sheppard_Draft_RFP_Master_Q&A_17May17.xlsx XLSX spreadsheet
Sheppard_BMC_DRAFT_RFP_documents.zip ZIP file
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP Attachment 20

Attachment 20 Subcontracting Plan Checklist and Review

Solicitation/Contract Number: Date:

Contractor:

Buyer/PCO:

Office Symbol and Phone:

Subcontracting Plan Type: Individual Comprehensive Master Commercial

· The cumulative value of the basic contract and options is used to determine whether a subcontracting plan is required. FAR 19.704(c)

· Options require separate goals. See FAR 52.219-9(c) and 19.704(c)

· If there is a Master Subcontracting Plan in effect for this Contractor, items 4 through 11 below do not apply. Note: Master plans are effective for three years after approval by the contracting officer, but contractors must maintain and update the plans as necessary. Changes must be approved by the originating contracting officer. See FAR 19.704(b)

· Is this a commercial plan? Yes No Follow procedures at Far 19.704(d) Items 1-14 may not apply.

· If the contractor is submitting a Comprehensive Subcontracting Plan, items 1 – 14 are NOT required. (Participants verification: http://www.acq.osd.mil/osbp/programs/csp/participants.html ) DFARS PGI 219_7

· Determination of no subcontracting opportunities must be approved one level above the contracting officer and coordinated with the Small Business Specialist FAR 19.705-2(c) and AFARS 5319.705-2

The PCO/buyer will review the subcontracting plan and coordinate as required with the Contractor and the cognizant contract administration office. After review, the PCO/buyer will complete/sign the checklist and provide the original checklist and a copy of the subcontracting plan to the local Air Force Small Business Office (SB). The SB will review the plan and obtain advice and recommendation from the SBA Procurement Center Representative (PCR). After review and coordination, the SB will notify the PCO/buyer of the results of the review before the start of negotiations.

Y=acceptable; U=not acceptable; N=not included; NI=needs improvement; N/A=does not apply

Total Contract Value: $
Total Subcontracting Dollars: $

Percentage of Total Contract Value: %

Does Plan Include:
PCO
SB
SBA
Reference
1.Total Planned SB Subcontracting Goals:
Amount
% Sub

Contract $ % Total Contract $

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705, AFFARS 5319704(a)(1)

Total $ to SB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705, AFFARS 5319704(a)(1)

Total $ to SDB (See item 12 if less than 5% of Sub-Contracting dollars (includes 8a)

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705, AFFARS 5319704(a)(1)

Total $ to WOSB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705, AFFARS 5319704(a)(1)

$ to Service Disabled VOSB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705, AFFARS 5319704(a)(1)

Total $ to Veteran OSB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705, AFFARS 5319704(a)(1)

Total $ to HUBZone SB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705, AFFARS 5319704(a)(1)

For current DOD goals, see http://www.acq.osd.mil/osbp/index.html

2. Goals listed as a Percentage of Total subcontract value.

Goals listed as a Percentage of Total contract value.

FAR 52.219-9(d)(1), 19.704(a)(1), 19.705 AFFARS 5319.704(a)(1)

3. A description of the principal supplies/services to be subcontracted with sufficient detail to evaluate whether or not SB can do the work.

(Include large business, nonprofit, and not-for-profit work.)

FAR 52.219-9(d)(3), 19.704(a)(3), 19.705

4. A description of the method used to develop goals.

FAR 52.219-9(d)(4), 19.704(a)(4), 19.705

5. A description of the method used to locate potential suppliers.

FAR 52.219-9(d)(5), 19.704(a)(5), 19.705

6. Do the goals include indirect costs?

FAR 52.219-9(d)(6), 19.704(a)(6), 19.705

If indirect costs are included in the goals, does the plan include a description of the cost allocation method?

FAR 52.219-9(d)(6), 19.704(a)(6), 19.705

7. Name and duties of contractor’s subcontracting plan administrator.

FAR 52.219-9(d)(7), 19.704(a)(7), 19.705

Does Plan Include:
PCO
SB
SBA
Reference
8.Description of the efforts the offeror will make to assure that SBs have
an equitable opportunity to compete for subcontracts.

FAR 52.219-9(d)(8), 19.704(a)(8), 19.705

9. Flow Down assurances.

FAR 52.219-9(d)(9), 19.704(a)(9), 19.705

Appropriate subcontract clauses will be used.

FAR 52.219-9(d)(9), 19.704(a)(9), 19.705

Subcontractors will be required to submit a similar plan.

FAR 52.219-9(d)(9), 19.704(a)(9), 19.705

10.Assurance prime contractor will submit required reports and cooperate
in studies and surveys.

FAR 52.219-9(d)(10), 19.704(a)(10), 19.705

11. Recitation of types of records maintained to show compliance with
plan.

FAR 52.219-9(d)(11), 19.704(a)(11), 19.705

12. If the SDB goal for is less than 5% of total Sub-Contracting dollars, approval is one level above contracting officer attached?

DFARS 219.705-4

13. For modifications, is approval attached if the SDB goal is less than 5%? (If SDB goal was below 5% for the basic contract and the reasons have not changed, a new approval is not required)

DFARS 219.705-4

14. Has information and coordination from the ACO been obtained?

FAR 19.706, DFARS 219.706(a)(i)

Central Contractor Registration (CCR): To enhance small business outreach, the contractor should be encouraged to use the SBA Dynamic Small Business Search tool at the CCR web site: http://www.ccr.gov/.

PCO Comments:

PCO Signature and Date:

One Level Above PCO /Signature and Date:

SB Comments:

Air Force Small Business Office Signature and Date:

SBA PCR Comments:

If box is checked, SBA does not have a copy of the current Master Subcontracting Plan on File. Please provide one.

SBA Procurement Center Representative Signature and Date:

SBA will internally report this subcontracting plan, as submitted, as acceptable not acceptable modified on _____________ to be acceptable before award.

SBA may contact the PCO/buyer regarding status of the subcontracting plan at time of award.

Please remember the post-award responsibilities of the Contracting Officer, which are listed in FAR 19.705-6.

The Procurement Center Representative can provide the addresses of the appropriate Area Directors.

(ESC/HNCK Ver. 6/27/2012)

File details come from the government source that posted it. Updated .