Questions and Answers Set 1.docx

DOCX document 21 KB Posted

Attached to
Base Alarm Services - Los Angeles Air Force Base
Solicitation number
FA2816Q0002
Issued by

About this file

This is a Questions and Answers document for the Base Alarm Services solicitation (FA2816Q0002) at Los Angeles Air Force Base. The Q&A clarifies key contract requirements and expectations for offerors.

The requirement calls for full-time on-site alarm and CCTV support services with a minimum of two employees, all of whom must hold active Secret security clearances. Contractor personnel will support the MDI Enterprise 5000 alarm and access control system, Genetec surveillance system, BCD video archivers, and CISCO network infrastructure. Work includes maintenance and repair of alarm systems, access control readers, surveillance equipment, VPN maintenance, and network troubleshooting across multiple base buildings and offsite perimeter locations. Normal duty hours are Monday through Friday, 0700 to 1600, with 24/7 support including four-hour onsite response for after-hours, weekend, and holiday service calls. The contract is priced as Firm-Fixed Price (FFP) under CLIN X001 series, with all direct and indirect labor costs, profit, and after-hour calls included in the base price. Equipment and parts funding is provided by the government, though contractors must maintain an on-hand stock of replacement parts and work with the Contracting Officer's Representative (COR) to ensure parts and equipment costs remain within limits. Preventive maintenance is scheduled by contractor employees and must be completed by the last working day of each month. The government will provide a laptop or desktop PC, base printer, Windows software, and landline telephone for contract performance. The document does not address specific response or award dates, as these details are contained in other solicitation documents.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Alarm Services Q&A Solicitation ID #: FA2816Q0002

1. Could you please confirm whether this requirement anticipates a full-time on-site technician or an on-call service model?

Answer: Full time with as needed service calls as stated in PWS.

2. To confirm that our team holds the necessary proprietary certifications referenced in the PWS, can the Government identify the manufacturer and model of the primary alarm system, access control platform, and CCTV/NVR system currently installed at LAAFB?

Answer: MDI enterprise 5000 covers AECS and IDS, Genetec surveillance system, BCD video archivers and directories.

3. What is the anticipated period of performance, including the base year and the number of option periods?

Answer: Refer to SF 1449 in solicitation

4. Will contractor personnel be required to hold active security clearances, or is base access eligibility and a favorable background check sufficient to perform the work?

Answer: Yes, secret clearance is mandatory

5. CLIN is not showing options for 2 employees. Do you want the quote to combine both employee salaries on Item 0001?

Answer: A minimum of 2 employees are required per the PWS. CLIN X001 series is FFP and should be all-inclusive for direct and indirect labor costs as well as profit. This would include after hour calls.

6. CLIN does not itemize the SCIF PWS. Is this grouped into the proposed salary?

Answer: Yes, CLIN X001 series is FFP and should be all-inclusive for direct and indirect labor costs as well as profit. This would include after hour calls.

7. In reference to equipment and parts 'Not to Exceed' - Awarded company will cover the additional costs if exceeded?

Answer: Contractor will work with COR to replace equipment, this will ensure proper logging to not exceed limit.

Would you please confirm whether a site map, floor plan, or alarm/CCTV layout is available for this requirement? If so, please share it or let us know how it can be obtained. This information would be helpful for proposal preparation and pricing.

Answer: Providing a layout or a site map could compromise the security of these facilities and other locations that are protected. The alarm quantity and camera quantity are provided. PWS identifies number of buildings, perimeter offsite locations which also include number of buildings.

8. Could you please confirm the intended pricing structure for parts and materials under this requirement? Specifically, should offerors price this as labor only, fixed-price service with an allowance for materials, or fixed-price labor with parts/materials handled separately on an approved reimbursable basis?

Answer: CLIN X001 series is FFP and should be all-inclusive for direct and indirect labor costs as well as profit. This would include after hour calls. Refer to SF 1449 to CLIN X002 series.

9. The PWS references software support, updates, corrections, patches, and Genetec-related support. Could you please confirm whether the Government currently owns and maintains all required software licenses, subscriptions, and support agreements, or whether the contractor is expected to provide or renew any licenses or software support coverage?

Answer:

10. We noted language regarding backup verification that appears to reference different frequencies. Could you please clarify the required backup frequency and the contractor’s exact responsibility for monitoring and confirming backups?

Answer: To verify that the data bases, Alarm and Surveillance system are working properly and data is being backup to specific location with the system

11. Could you please confirm what Government-furnished equipment, workstations, network access, and system/software access will be provided to support contract performance onsite?

Answer: That information is furnished in the PWS. The Base will provide a laptop or desktop PC for emails and storing alarm and surveillance data, a base printer and windows base software, and a landline for official use only.

12. With respect to security requirements, please clarify whether this requirement calls for a company-level Facility Clearance, individual Secret clearances for contractor personnel, or both. If applicable, please also confirm whether interim clearances would be acceptable at contract start for any portion of the work.

Answer: In the event of a loss of one of the supporting employees the company would be required to provide a replacement employee that meets the secret clearance requirement. All prior supporting companies have had company level clearance. The last part of the questioned is answered in the PWS

13. The PWS identifies normal duty hours as Monday through Friday, 0700 to 1600, but also requires year-round support and four-hour onsite response for service calls. Please confirm whether after-hours, weekend, holiday, and emergency response support is included within the base requirement or should be treated separately.

Answer: All the above will be included in the X001 series of CLINS.

14. For pricing accuracy, could the Government provide or confirm the availability of a more detailed equipment inventory by location, including installed manufacturer/model information, software versions, and any available as-builts, network diagrams, or deficiency lists?

Answer: Refer to questions #2, a detailed inventory is provided in the PWS, as for locations that would create a security vulnerability. Please understand that this is not a commercial building but a government facility.

15. For work requiring access to controlled or escorted areas, please clarify the process for scheduling access and escorts, including whether escort availability may affect response or performance timelines.

Answer: The security manager will contact the contractor if any work is required. The only time a contractor will contact a controlled area is when alarm testing is scheduled.

16. The PWS states a minimum of two employees. Could you please confirm whether this is only a minimum threshold or whether the Government anticipates a larger onsite staffing level to adequately support the full scope across all covered locations?

Answer: This is the minimum threshold we anticipate.

17. Beyond the required four-hour onsite response, could you please clarify whether there are any specific performance metrics or service level requirements for repair completion times, preventive maintenance completion, system uptime, or similar measurable standards?

Answer: There are no requirements covering a completion time, the work is completed when it is completed. PMs are scheduled by the contract employees onsite not the government. The contractor will determine the time it will take to complete the work of the PM. So long as work is completed by the last working day of the month it is deemed acceptable

18. Is there a list of approved manufacturer part numbers and quantities associated with this requirement?

Answer: The contractor is responsible for ensuring all replacement parts meet government requirements and standards.

19. If not, should offerors assume that parts will be purchased only on an as-needed basis with Government approval?

Answer: A stock of parts should always be on and as identified in the PWS

20. Are the equipment/device quantities shown in the appendix intended for pricing assumptions, or are they provided for reference only?

Answer: Pricing

21. Should parts be included in the quotation now, or will they be handled separately if and when needed during contract performance?

Answer: Parts funding is provided by the government