This document contains samples of engineering tasks and obsolescence tasks for the Instrumentation Range Support Program (IRSP III) solicitation issued by the Department of the Air Force Space Command. Key details include:
-
The solicitation seeks to provide subject matter experts to assist with supporting radar assets at the Pacific Missile Range Facility during high-cost tests with specific windows, including field service manweek support through IRSP for specialists in ROSA and COSIP radars. Support is required for technical, operations, analysis, and level 3 maintenance capabilities.
-
Sample engineering tasks involve fault isolation and repairs on various radar systems such as replacing faulty components on MOTR and FPS-134 radars at Cape Canaveral Air Force Station. Additional samples cover tasks such as properly installing and aligning an elevation encoder on a telemetry pedestal at White Sands Missile Range.
-
Sample obsolescence tasks illustrate form, fit, function replacement steps for obsolete pump/motor parts for an MPS-25 system, as well as requirements for reverse engineering an obsolete servo drive motor for the same system that is no longer manufactured.
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For Official Use Only Source Selection Information – See FAR 2.101 and 3.104
FA2521-19-R-A007
(REF FA2521-18-R-0024)
Attachment L-06
23 Sep 19
Sample Engineering Tasks
RANGE SYSTEM AFFECTED DESCRIPTION OF PROBLEM DESCRIPTION OF SOLUTION ASSUMPTIONS
45 SW
AN/MPS-39 and AN/FPS-
Evaluate recent failures of the MOTR transmitter and Rosa ( FPS-134) transmitter
MOTR radar - Fault isolation and repair of MOTR transmitter determined CCTWT was bad and replaced with on-site spare, and reseated the input connector for the RF drive to the
TWT.
FPS-134 Radar - Isolated fault to chiller unit. Determined the chiller needed to be replaced.
Replaced chiller with on-site spare. Assumption is range personnel changed the chiller.
96 TW RIR-980 Investigate modulator oil leaks
Determined four couplers needed to be replaced. Replaced couplers with on-site spares.
Due to leak, transformer had to be refilled with oil. Required any air that had entered the closed system while it had been opened to refill with transformer oil, to be evacuated.
Performed a performance check upon completion to ensure the unit was operating normally, with full oil flow visible in the flow indicator and no air bubbles visible in the sight glass.
The quick-disconnect couplers in the modulator oil cooling system supply and return lines incurred a slow leak over an unspecified amount of time. The leak rate had been noted to increase in recent months to the point where it was messy and the oil level loss in the modulator was becoming a concern.
WSMR-Proper J-56 Viasat Telemetry Pedestal Not Functioning correctly Installed and aligned elevation encoder properly and restored system to operation.
Assumption an elevation encoder was found to have been improperly serviced by range personnel and the corrective action was to reinstall and align the encoder
PMRF
Radars - ROSA and
COSIP
PMRF requires Subject Matter Experts (SME) to assist in supporting the Radar assets during high cost test that have specific test windows.
Field Service manweek support through IRSP for SMEs with ROSA and COSIP technical, operations, analysis, and level 3 maintenance capabilities.
Support is to provide the necessary SMEs either through direct employee pool or sub-vendor with required SMEs. All personnel will have SECRET clearance and dependent on mission may require Top Secret. Must be able to do trusted download and courier of radar data.
Mission tests can last between 10 to 25 days and will be continuous.
Some missions will be followed by additional missions and will require extended travel requirements that my exceed 30 days. Must be able to review real time data and make specific event calls. Will use 10 day mission for this example to determine the number of hours.
Sample Obsolescence Tasks
Form, Fit, Function (FFF) Replacement COMPONENT NAME SYSTEM NSN or PN ASSUMPTIONS
Pump/motor MPS-25 P/N: 8004510-10 Assume these parts are obsolete and cannot be obtained from a known source of supply. List steps to provide a FFF replacement.
Reverse Engineering COMPONENT NAME SYSTEM NSN or PN ASSUMPTIONS
Servo Drive Motor MPS-25 P/N: TT-4204-3001C
Assume these parts are obsolete. Motors no longer manufactured. Vendor has not built these motors for 15+ years. Reverse Engineer will require a complete set of specification documents that provides electrical and mechanical drawings.
Engineering/Obsolescence Sample Tasks Note: This sample is used only for Technical Evaluation. Does not apply to pricing in L-11, Cost Workbook.