FA2521-13-R-0008
EXHIBIT 2
ESTIMATED OVERHAUL SCHEDULE
1 Oct 15 – 30 Sep 16
OPTICS
| 2. |
| NAWC/WD-C |
| FPS-105 |
| ROTR 1 |
| China Lake, CA |
| F |
| Pacific Tracker, Portland, OR |
| F |
P
P
| 7. |
| PMRF |
| TCS 7.3 |
| 2 |
| MATSS-MRSS |
| P |
| 10. |
| WSMR |
| MOTR-3 (MPS-39) |
| 3 |
| Rita Site |
| F |
| 11. |
| 96 TW |
| FPS-16 |
| 31 |
| Ft Walton Beach, FL |
| P |
| 12. |
| 96 TW |
| SA #4 |
| 104 |
| Port St. Joe, FL |
| P (pedestal only) |
| 13. |
| 96 TW |
| Datron #1 |
| 101 |
| Ft. Walton Beach, FL |
| P (pedestal only) |
| 14. |
| UK |
| NIDIR |
| 1 |
| Hebrides |
| P |
| 15. |
| UK |
| NIDIR |
| 4 |
| Hebrides |
| P |
F
Note 1: Projected overhauls are workload indicators for the FY indicated. There will be changes, additives, and deletions during the annual program requirements call based on mission needs and funding availability.
Note 2: The “Desired Date” is negotiable between the contractor and Range Managers. In the event of a conflict, a final determination will be made by the IRSP government Program Manager.
EXHIBIT 2
ESTIMATED OVERHAUL SCHEDULE
1 Oct 16 – 30 Sep 17
OPTICS
| 1. |
| NAWC/WD-C |
| RPM 2510 |
| ROTR 2 |
| China Lake, CA |
| F |
| 3. |
| WSMR-PRST |
| TTS-1 |
| 22680RH |
| Pacific Collector, Portland, OR |
| F |
| 4. |
| NAWC/WD-C |
| KTM |
| 209 |
| China Lake, CA |
| F |
F
| 6. |
| NAWC/WD-C |
| KTM |
| 204 |
| China Lake, CA |
| F |
P
| 10. |
| PMRF |
| TCS 7.3 |
| 2 |
| MATSS-MRSS |
| P |
J-56A
F
| J-56 |
| Bldg 22885 (Dry Site) |
| F |
| 14. |
| 96 TW |
| Datron #2 |
| 102 |
| Ft. Walton Beach, FL |
| P (pedestal only) |
| 15. |
| 96 TW |
| FPS-16 |
| 27 |
| Port St. Joe, FL |
| P |
| 16. |
| 96 TW |
| Malibu SRI |
| 106 |
| Ft. Walton Beach, FL |
| P (pedestal only) |
| 17. |
| UK |
| MPS-39 |
| 5 |
| Aberporth, Wales |
| F |
F
Note 1: Projected overhauls are workload indicators for the FY indicated. There will be changes, additives, and deletions during the annual program requirements call based on mission needs and funding availability.
Note 2: The “Desired Date” is negotiable between the contractor and Range Managers. In the event of a conflict, a final determination will be made by the IRSP government Program Manager.
EXHIBIT 2
1 Oct 17 – 30 Sep 18
OPTICS
| 1. |
| NAWC/WD-C |
| RPM 2510 |
| ROTR 3 |
| China Lake, CA |
| F |
| 2. |
| NAWC/WD-C |
| CW Doppler |
| 1 |
F
| 3. |
| NAWC/WD-C |
| KTM |
| 221 |
| China Lake, CA |
| F |
| 4. |
| NAWC/WD-C |
| TCS 3000 |
| AP1515 |
| ECR G100 China Lake, CA |
| F |
| 5. |
| WSMR-PRST |
| TTS-3 |
| 24273TE |
| Mobile System, Kwajalein Atoll |
| F |
| 6. |
| PMRF |
| FPQ-16 |
| Q3 |
| Kokee Park, HI |
| P |
P
P
| 10. |
| WSMR |
| MTS |
| 4 |
| North Range |
| F |
| 11. |
| DOE |
| EMP 51290 |
| 1529-1001 |
| Tonopah, NV |
| P |
| 12. |
| 96 TW |
| FPS-16 |
| 20 |
| Ft. Walton Beach, FL |
| P |
| 13. |
| 96 TW |
| Datron #3 |
| 103 |
| Ft. Walton Beach, FL |
| P (pedestal only) |
| 14. |
| 96 TW |
| SA #6 |
| 106 |
| Panama City, FL |
| P (pedestal only) |
| 15. |
| UK |
| TPQ-39 |
| 2 |
| Aberporth, Wales |
| F |
F
Note 1: Projected overhauls are workload indicators for the FY indicated. There will be changes, additives, and deletions during the annual program requirements call based on mission needs and funding availability.
Note 2: The “Desired Date” is negotiable between the contractor and Range Managers. In the event of a conflict, a final determination will be made by the IRSP government Program Manager.
EXHIBIT 2
1 Oct 18 – 30 Sep 19
OPTICS
| 1. |
| NAWC/WD-C |
| RPM 2510 |
| ROTR 4 |
| China Lake, CA |
| F |
| 2. |
| NAWC/WD-C |
| CW Doppler |
| 2 |
F
| 3. |
| NAWC/WD-C |
| KTM |
| 222 |
| China Lake, CA |
| F |
F
P
| 6. |
| WSMR |
| MTS |
| 2 |
| Alamogordo, NM |
| F |
| 7. |
| DOE |
| RIR-778C |
| 888111 |
| Tonopah, NV |
| F |
| 8. |
| 96 TW |
| FPS-16 |
| 23 |
| Port St. Joe, FL |
| P |
| 9. |
| 96 TW |
| Malibu FLTM #2 |
| 103 |
| Ft. Walton Beach, FL |
| P (pedestal only) |
| 10. |
| 96 TW |
| SA #1 |
| 101 |
| Ft. Walton Beach, FL |
| P (pedestal only) |
| 11. |
| UK |
| CW Doppler |
| DRX41320 |
| Shoeburyness, Essex |
| F |
F
Note 1: Projected overhauls are workload indicators for the FY indicated. There will be changes, additives, and deletions during the annual program requirements call based on mission needs and funding availability.
Note 2: The “Desired Date” is negotiable between the contractor and Range Managers. In the event of a conflict, a final determination will be made by the IRSP government Program Manager.
EXHIBIT 2
1 Oct 19 – 30 Sep 20
OPTICS
P
| 2. |
| NAWC/WD-C |
| RPM 2510 |
| ROTR 5 |
| ECHO Range |
| F |
| 3. |
| NAWC/WD-C |
| KTM |
| 223 |
| China Lake, CA |
| F |
| 4. |
| NAWC/WD-C |
| TCS 5000 |
| 1004 |
| Coso Peak China Lake, CA |
| F |
| 5. |
| WSMR-PRST |
| TTS-4 |
| 24272TE |
| Mobile System, Kwajalein Atoll |
| F |
P
| 9. |
| PMRF |
| TCS 7.3 |
| 2 |
| MATSS-MRSS |
| P |
| 11. |
| WSMR |
| MTS |
| 3 |
| Dry Site |
| F |
| 12. |
| WSMR |
| MOTR 1 (MPS-39) |
| 1 |
| “C” Station, WSMR |
| F |
| 13. |
| DOE |
| MR-710 |
| 59099-110 |
| Tonopah, NV |
| P |
| 14. |
| 96 TW |
| FPS-16 |
| 39 |
| Niceville, FL |
| P |
| 15. |
| 96 TW |
| Malibu #TAS1 |
| 101 |
| Ft. Walton Beach, FL |
| P (pedestal only) |
| 16. |
| 96 TW |
| Malibu 7.3m #TAS2 |
| 101 |
| Ft. Walton Beach, FL |
| P (pedestal only) |
| 17. |
| UK |
| RIR-779 |
| 2 |
| So. Uist, Hebrides |
| F |
Note 1: Projected overhauls are workload indicators for the FY indicated. There will be changes, additives, and deletions during the annual program requirements call based on mission needs and funding availability.
Note 2: The “Desired Date” is negotiable between the contractor and Range Managers. In the event of a conflict, a final determination will be made by the IRSP government Program Manager.
EXHIBIT 2
ESTIMATED OVERHAUL SCHEDULE
1 Oct 20 – 30 Sep 21
OPTICS
| 1. |
| NAWC/WD-C |
| RPM 2510 |
| ROTR 6 |
| ECHO Range |
| F |
| 3. |
| NAWC/WD-C |
| KTM |
| 224 |
| China Lake, CA |
| F |
| 4. |
| NAWC/WD-C |
| EMP-50-8 |
| Cinder |
| China Lake, CA |
| F |
P
P
| 9. |
| PMRF |
| TCS 7.3 |
| 2 |
| MATSS-MRSS |
| P |
| 11. |
| WSMR |
| MTS |
| 1 |
| Alamogordo, NM |
| F |
| 12. |
| DOE |
| 8 FT SA TM Antenna |
| 91 |
| Tonopah, NV |
| P |
| 14. |
| 96 TW |
| SA #5 |
| 105 |
| Niceville, FL |
| P (pedestal only) |
| 15. |
| 96 TW |
| Malibu TCS (GR-MIC) Mobile |
| Ft. Walton Beach, FL |
| P (pedestal only) |
| 16. |
| UK |
| RIR-779 |
| 1 |
| So. Uist, Hebrides |
| F |
| 17. |
| AUSTRALIA |
| MPS-36 |
| 10 |
| Woomera, Australia |
| F |
F
Note 1: Projected overhauls are workload indicators for the FY indicated. There will be changes, additives, and deletions during the annual program requirements call based on mission needs and funding availability.
Note 2: The “Desired Date” is negotiable between the contractor and Range Managers. In the event of a conflict, a final determination will be made by the IRSP government Program Manager.
EXHIBIT 2
1 Oct 21 – 30 Sep 22
OPTICS
| 1. |
| NAWC/WD-C |
| CF-17 |
| Coles Flat |
| China Lake, CA |
| F |
| 2. |
| NAWC/WD-C |
| KTM |
| 225 |
| China Lake, CA |
| F |
| 3. |
| NAWC/WD-C |
| EMP-50-8 |
| J-62 |
| China Lake, CA |
| F |
| 4. |
| WSMR-PRST |
| TTS-5 |
| S1002 |
| Mobile System, Kwajalein Atoll |
| F |
| 5. |
| PMRF |
| FPQ-16 |
| Q3 |
| Kokee Park, HI |
| P |
P
P
| 11. |
| UK |
| MPS-39 |
| 5 |
| Aberporth, Wales |
| F |
F
Note 1: Projected overhauls are workload indicators for the FY indicated. There will be changes, additives, and deletions during the annual program requirements call based on mission needs and funding availability.
Note 2: The “Desired Date” is negotiable between the contractor and Range Managers. In the event of a conflict, a final determination will be made by the IRSP government Program Manager.