FA2486-19-R-0003_Appdx_G CAP_CAE_Repair_Service_Ltrs (25 Oct 19).pdf

PDF 126 KB Posted

Attached to
Eglin Backshop Maintenance
Solicitation number
FA2486-19-R-0003
Issued by

About this file

This document contains a request for proposal and related attachments for aircraft maintenance backshop services. The 96th Test Wing is seeking proposals to provide the most effective, productive and efficient approach to fulfill mission requirements. Potential offerors should read the final RFP carefully. Proposals are due by 1:00 PM CST on February 24, 2020. The solicitation involves products and services to support aircraft and aerospace equipment maintenance at Eglin Air Force Base. The federal agency is the Department of the Air Force Materiel Command Test Center. Communications regarding the solicitation should be directed to the specified procuring contracting officer.

View the file

Other files

File Type Posted
Final Q&As on FRFP.pdf PDF
Attachment 10 Section L 12 Feb 20.pdf PDF
Amendment 2.pdf PDF
Exhibit A Contract Data Requirement List 6 Feb 20.pdf PDF
AttachmentL6CostFormatD 3 Feb 20.xlsx XLSX spreadsheet
Final RFP Q&A 5 Feb 20.pdf PDF
Attachment 10 Section L 3 Feb 20.pdf PDF
Attachment 5 Option CLINs w_Base Year 3 Feb 20.xlsx XLSX spreadsheet
Attachment 11 Section M 3 Feb 20.pdf PDF
Attachment L7 Example Release_Cover Letter 3 Feb 20.pdf PDF
Attachment 1 PWS 3 Feb 20.pdf PDF
Amendment 1 FA2486-19-R-0003.pdf PDF
Attachment 10 Section L 30 Jan 20.pdf PDF
FA2486-19-R-0003 Eglin Backshop 30 Jan 2020.pdf PDF
Attachment 10 Section L 27 Jan 20.pdf PDF
Q&A following Draft RFP.pdf PDF
FA2486-19-R-0003 Eglin Backshop 23 Jan 20.pdf PDF
FA2486-19-R-0003_Appdx_C5_GFP_Air_Compressors (16 Oct 19).pdf PDF
FA2486-19-R-0003_F-15_Aircraft_Maintenance_Addendum (19 Dec 19).pdf PDF
FA2486-19-R-0003_Draft_CMO_Form_2 (25 Oct 19).pdf PDF
ATTACHMENT 8 Contingency Plan.pdf PDF
Attachment L1 Section L 25 Nov 2019.pdf PDF
FA2486-19-R-0003_Backshop_PWS (23 Jan 20).pdf PDF
Exhibit A Contract Data Requirement List.pdf PDF
Attachment L3 Section L 15 Dec 2019.pdf PDF
FA2486-19-R-0003_Appdx_D_Pubs_TOs_Forms (16 Oct 19).pdf PDF
AttachmentL6CostFormatD (16 Dec 2019).xlsx XLSX spreadsheet
ATTACHMENT 7 Strike Plan.pdf PDF
FA2486-19-R-0003_Large_Aircraft_Wash_Addendum (22 Oct 19).pdf PDF
ATTACHMENT 9 Quality Control Plan.pdf PDF
FA2486-19-R-0003 Appdx C Equipment SPRAM.pdf PDF
Attachment L4 Section L 25 Nov 2019.pdf PDF
Attachment 3 Collective Bargaining Agreement.pdf PDF
FA2486-19-R-0003 Eglin Backshop dated 16 Jan 20.pdf PDF
FA2486-19-R-0003_Appx_C6 Phone lines and EZGOCarts.pdf PDF
C-130 Wash Addendum LOA (20 Nov 18).pdf PDF
Attachment 2 DD Form 254.pdf PDF
ATTACHMENT 6 Small Business Plan.pdf PDF
FA2486-19-R-0003_Appdx_C2_Forward_Supply_Points_Munitions_Acount (16 Oct 19).pdf PDF
20191007 - AATC_T2_MOD_Policy_Ltr_Signed (9 Oct 19).pdf PDF
Attachment 4 Government Furnished Property.pdf PDF
FA2486-19-R-0003_Appdx_F_Safety_Rqmts (16 Dec 19).pdf PDF
FA2486-19-R-0003_Appdx_B_Base_Map (16 Oct 19).pdf PDF
FA2486-19-R-0003_Appdx_E_EPAWSS_Mod (19 Dec 19).pdf PDF
FA2486-19-R-0003_Appdx_A_Workload_Data (20 Dec 19).pdf PDF
Attachment 5 Option CLINs w_Base Year 15 Dec 19.xlsx XLSX spreadsheet
FB2823-18218-0045 between 96 TW and NGB ISO AATC OL-F15C.pdf PDF
AttachmentL5 CostFormatsAthroughC 23 Jan 2020.doc DOC document
FA2486-19-R-0003_Appdx_C1_Govt Facilities (16 Dec 19).pdf PDF
FA2486-19-R-0003_F-15_Appendices A through H (19 Dec 19).pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix G

CAP/CAE Parts/Maintenance/Repair/Service and Procurement Attachments

All attachments are samples

Attachment 1

Local Purchase Order Request Form

Attachment 2

Work Statement - (SAMPLE)

MEMORANDUM FOR 96MXG/MXQCB

FROM:

SUBJECT: Work Statement, Ingersoll Rand Air Compressors

1. General Information:

A. Two each Ingersoll Rand Air Compressors require quarterly service to remain operational in support of the 96 Test Wing.

2. Requirement: Quarterly service requirement on 2 each Ingersoll Rand Air Compressors model numbers I-R EP300, located in the 96 MXS Corrosion Control Element, Bldg. 72 and I-R HP40SE, located in the 96 MXS Structural Repair Element Bldg. 129. The service will consist of four site visits per year at approximately three-month intervals. The service must meet the manufacturer’s specifications and will include inspection of the following listed items.

A. LABOR: Servicing of EP300 Air Compressor SN DE1382U00019, Located in Bldg. 72, Corrosion Control. Service provider shall also provide complete inspection of refrigerated air dryer and confirm proper operation of the discharge dewpoint. Confirm proper operation of condensation drain, change Air Filter, Separator Element, Coolant and/or Oil, and grease motor. Inspect and maintain Inlet Control Value and Electric Control Equipment.

B. PARTS & MATERIALS: Vendor shall provide a detailed invoice to include cost of all materials used during the inspection and repair of the air compressors. Consisting of Air Filters, Oil Filters, Oil & Water Separator Element, Lubricants & Coolant, V-Belts as needed.

3. If you have any questions concerning this requirement, POC: is Mr./Mrs. XXXX XXXX, at XXX-XXXX.

Contractor Signature

Attachment 3

Mission Impact Statement - (SAMPLE)

MEMORANDUM FOR 96 MXG/MXO

FROM:

SUBJECT: Mission Impact Statement, Repair of Fuji FPM6000 Automatic Film Processor

1. Requirement: The Fuji FPM6000 Automatic Film Processor is in need of repair to complete radiographic operations in direct support of the 96th Test Wing aircraft and associated aerospace support equipment. Repair service is requested not later than 15 May 2014.

2. The loss of the capabilities of the Fuji FPM6000 Automatic Film Processor severely impedes the ability to support the mission of the 96th Test Wing. In the event of the film processor becoming totally inoperable, we would be forced to transport the film to Tyndall AFB to process.

This would require several additional man-hours for transportation, development and any re-shots which may be required. A replacement film processor has been on order since April 2013. We currently have an estimated delivery date of December 2014.

3. Alternative Solution: As a work-around, we are currently operating the Fuji FPM6000 Automatic Film Processor in “self-test bypass” mode which allows the rollers to continually operate instead of turning off when there is no film processing. This self-test bypass mode is meant to be used to carry out an urgent operation or continue with operation until the service personnel arrives, continued use in the self-test bypass mode could result in further damage to the machine.

4. This request will allow relief from extended downtime for test mission critical airframes. For the above reasons, priority handling of this matter is hereby requested. If there are any questions or concerns, please contact Mr./Mrs. XXXXXX XXXXXX at XXX-XXXX.

Contractor Signature

Approve/Disapprove

Commander (or equiv) signature

Attachment 4

Sole Source Justification - (SAMPLE)

MEMORANDUM FOR 96 MXG/MXQCB

FROM:

SUBJECT: Justification for Other Than Full and Open Competition, Sole Source Justification for REQUIREMENT NAME, PR # XXXXXXX

1. Contractor Name is looking to procure REQUIREMENT NAME for the CUSTOMER ORG.

Under the contract, the contractor will provide the following equipment/ to the CUSTOMER

ORG:

(a) QTY(8) EA, ITEM DESCRIPTION/SPECS, MFR: XXXX, P/N: PART NUMBER

(b) QTY(8) EA, ITEM DESCRIPTION/SPECS, MFR: XXXX, P/N: PART NUMBER

(c) QTY(8) EA, ITEM DESCRIPTION/SPECS, MFR: XXXX, P/N: PART NUMBER Total Estimated cost: $XX, XXX.XX

2. The Statutory authority permitting other than full and open competition is FAR 6.302-1(a).

3. The primary system to be acquired is the REQUIREMENT NAME.

(a) The ITEM NAME(S) are/ is necessary to support CUSTOMER ORG test missions. The CUSTOMER ORG requires these ITEM(S) to operate in conjunction with previously acquired parts to meet new mission requirements and will operate NAME OF EQUIPMENT OR SYSTEM. The ITEM(S) from REQUESTED SOLE SOURCE MANUFACTURER are currently the only Commercial off the Shelf (COTS) parts that meets the Government’s technical requirements of functioning in conjunction with a same brand and model previously acquired to meet the mission requirements.

(b) The ITEM(S) from REQUESTED SOLE SOURCE MANUFACTURER are the only parts that are compatible and are able to be swapped out with each other without the need to re-adjust/fine tune the parts and pieces as well as re-writing programs to make other brands communicate with the system to continue the test should a failure occur. This would cause significant time delays to the test missions and timelines.

(c) The CUSTOMER ORG believes that award to any other brand would result in substantial duplication of cost to the Government that is not expected to be recovered through competition and unacceptable delays in fulfilling the Air Force’s requirements.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/06.htm

(d) An award to another brand would result in both substantial delay and increase in cost, as the award would jeopardize compatibility and performance with existing hardware. If another brand of part was acquired, mission integrity would be compromised and the necessary criteria would not be met. The increased cost for the government is approximately $XXXX.XX based on an estimated XX number of hours from a GS-XX employee ($XX.XX/hr.) and O/E-XX military personnel ($XX.XX/hr.) or some statement that expresses how a quantitative number cannot be determined for the actual cost to the Government.

(e) Accordingly, REQUESTED SOLE SOURCE MANUFACTURER is the only brand capable of providing the supplies and services described above without the U.S. Air Force experiencing unacceptable delays in fulfilling its requirements.

4. Market research conducted for this acquisition included both Google and GSA Advantage searches to determine if another product and/or manufacturer existed that offered a part that met the Government’s requirements as well as matching the technical capabilities for the ITEM(S) by SOLE SOURCE NAME MANUFACTURER, none were found. No other substitute will meet the Government’s minimum requirements.

5. The Government chose not to use technical data packages, specifications, statements of work, or full and open competition as the Government believes pursuing the purchase of another COTS ITEM(S) meeting the Government’s minimum requirements would result in substantial increased time delays and costs to the Government.

6. The source that expressed interest in this requirement is REQUESTED SOLE SOURCE

MANUFACTURER.

7. We will continue monitoring the industry through trade journals, technical symposia, and contact with industry representatives should a future need arise. Any future requirements will be researched thoroughly. If a product meeting the technical requirements is identified, a competitive acquisition for the requirement will definitely be considered.

8. The undersigned personnel certify that the justification is accurate and complete to the best of their knowledge and belief.

Contractor signature

File details come from the government source that posted it. Updated .