FA2486-19-R-0003_Appdx_E_EPAWSS_Mod (19 Dec 19).pdf

PDF 41 KB Posted

Attached to
Eglin Backshop Maintenance Federal contract opportunity
Solicitation number
FA2486-19-R-0003
Issued by
Department of the Air Force Materiel Command Test Center

About this file

This document contains a memorandum of understanding and a solicitation for the Eglin Aircraft Maintenance Backshop acquisition. The memorandum of understanding extracts details regarding maintenance support to be provided by the 96th Maintenance Group at Eglin Air Force Base for modifications to F-15 aircraft under the Eagle Passive/Active Warning Survivability System program. Support includes planning and scheduling, backshop specialties like aircraft repair and sheet metal, non-destructive inspection, egress system maintenance, corrosion control, and resolving non-modification discrepancies. The solicitation seeks proposals for backshop maintenance to fulfill 96th Test Wing mission requirements. Proposals are due by 1:00 PM CST on February 24, 2020. The solicitation supersedes all previous questions and responses. Communications should be directed to the procuring contracting officer with a copy to a named individual. Competition is encouraged and all proposals will receive fair consideration.

View the file

Other files for this federal contract opportunity

Other files attached to Eglin Backshop Maintenance, newest first.
File Type Posted
Attachment 10 Section L 12 Feb 20.pdf PDF
Amendment 2.pdf PDF
Final Q&As on FRFP.pdf PDF
AttachmentL6CostFormatD 3 Feb 20.xlsx XLSX spreadsheet
Attachment L7 Example Release_Cover Letter 3 Feb 20.pdf PDF
Attachment 11 Section M 3 Feb 20.pdf PDF
Attachment 10 Section L 3 Feb 20.pdf PDF
Final RFP Q&A 5 Feb 20.pdf PDF
Attachment 5 Option CLINs w_Base Year 3 Feb 20.xlsx XLSX spreadsheet
Attachment 1 PWS 3 Feb 20.pdf PDF
Amendment 1 FA2486-19-R-0003.pdf PDF
Exhibit A Contract Data Requirement List 6 Feb 20.pdf PDF
Attachment 10 Section L 30 Jan 20.pdf PDF
Attachment 10 Section L 27 Jan 20.pdf PDF
Q&A following Draft RFP.pdf PDF
FA2486-19-R-0003 Eglin Backshop 23 Jan 20.pdf PDF
Attachment L1 Section L 25 Nov 2019.pdf PDF
AttachmentL6CostFormatD (16 Dec 2019).xlsx XLSX spreadsheet
FA2486-19-R-0003_Draft_CMO_Form_2 (25 Oct 19).pdf PDF
FA2486-19-R-0003_Appdx_A_Workload_Data (20 Dec 19).pdf PDF
FA2486-19-R-0003 Eglin Backshop dated 16 Jan 20.pdf PDF
ATTACHMENT 7 Strike Plan.pdf PDF
Attachment L4 Section L 25 Nov 2019.pdf PDF
FA2486-19-R-0003_Appdx_D_Pubs_TOs_Forms (16 Oct 19).pdf PDF
Exhibit A Contract Data Requirement List.pdf PDF
20191007 - AATC_T2_MOD_Policy_Ltr_Signed (9 Oct 19).pdf PDF
FA2486-19-R-0003_Appdx_C2_Forward_Supply_Points_Munitions_Acount (16 Oct 19).pdf PDF
ATTACHMENT 8 Contingency Plan.pdf PDF
Attachment 3 Collective Bargaining Agreement.pdf PDF
Attachment 2 DD Form 254.pdf PDF
Attachment 4 Government Furnished Property.pdf PDF
FA2486-19-R-0003_Backshop_PWS (23 Jan 20).pdf PDF
FA2486-19-R-0003_Appdx_C5_GFP_Air_Compressors (16 Oct 19).pdf PDF
FA2486-19-R-0003_F-15_Appendices A through H (19 Dec 19).pdf PDF
Attachment 11 Section M 15 Dec 2019.pdf PDF
FA2486-19-R-0003_Appdx_C4_GFP_Composite_Took_Kits (16 Oct 19).pdf PDF
Attachment L2 Section L 25 Nov 2019.pdf PDF
Attachment 10 Section L 13 Jan 20.pdf PDF
FA2486-19-R-0003 Appdx C3 IT Equipment.pdf PDF
FA2486-19-R-0003_F-15_Aircraft_Maintenance_Addendum (19 Dec 19).pdf PDF
FA2486-19-R-0003_Appdx_C1_Govt Facilities (16 Dec 19).pdf PDF
Attachment L3 Section L 15 Dec 2019.pdf PDF
ATTACHMENT 9 Quality Control Plan.pdf PDF
FA2486-19-R-0003_Large_Aircraft_Wash_Addendum (22 Oct 19).pdf PDF
FA2486-19-R-0003_Appdx_F_Safety_Rqmts (16 Dec 19).pdf PDF
FB2823-18218-0045 between 96 TW and NGB ISO AATC OL-F15C.pdf PDF
FA2486-19-R-0003_Appdx_G CAP_CAE_Repair_Service_Ltrs (25 Oct 19).pdf PDF
FA2486-19-R-0003_Appdx_B_Base_Map (16 Oct 19).pdf PDF
Attachment 5 Option CLINs w_Base Year 15 Dec 19.xlsx XLSX spreadsheet
FA2486-19-R-0003 Appdx C Equipment SPRAM.pdf PDF
Show all 50

Eglin Backshop Maintenance has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX E

Eagle Passive/Active Warning Survivability System (EPAWSS)

T-2 MODIFICATIONS

MEMORANDUM OF UNDERSTANDING (MOU) EXTRACT

1. General Information This is an extraction from an MOU between the F-15 Division (AFLCMC/WWQ), the 96th Operations Group (96 OG), the 96th Maintenance Group (96 MXG), the 53d Test and Evaluation Group (53 TEO), and the 57th Maintenance Group (57 MXG). These efforts also support by a Statement of Capability (SOC) between AFLCMC/WWQ and OFP CFT/CC support the modification ten (10) F-15 aircraft with potential to extend to a total of twelve (12) from 5 December 2017 thru 30 March 2021. This is to communicate the work functions which temporarily impact this services contract:

10.13 The 96 MXG Maintenance Group Plans and Scheduling will schedule a pre-dock and post-dock meeting for Eglin and Nellis aircraft. For Eglin assigned aircraft, Plans & Scheduling will annotate Integrated Maintenance Data System (IMDS)/Eagle Modification Action Plan (EMAP) to reflect T-2 Modification completion.

10.22 The 96 MXG will provide specialized back shop support in support of the EPAWSS modification (A/R, Machine Shop, Sheet Metal, Aerospace Ground Equipment, Precision Measurement Equipment Lab, Egress, and Corrosion) as required for the duration of the EPAWSS modification. This assistance will be on a non-interference basis of local flying and test efforts. If EPAWSS assistance conflicts with local priorities AFLCMC will coordinate with the 96 MXG or 57 MXG to resolve conflicts. This assistance will be funded through the

EPAWSS JON.

10.23 The 96 MXG/AR will provide support as required for all Nellis and Eglin aircraft in support of the EPAWSS mod. This support includes but is not limited to removing components for EPAWSS instrumentation installation and removing and installing canopies. This assistance will be funded through the EPAWSS JON.

10.24 The 96 MXG/NDI will provide required Non-Destructive Inspection (NDI) support at the modification site. This is currently estimated to be approximately 16 hours per aircraft of recurring effort. Additional effort may be required. This assistance will be funded through the EPAWSS JON.

10.26 The 96 MXG/Egress will provide support to remove/install/store ejection seats and Shielded Mild Detonating Cord (SMDC) from Nellis and Eglin aircraft entering mod line. The 96 MXG is responsible for all scheduled/unscheduled egress inspections. The 96 MXG is responsible for 36 month seat inspections on all Eglin aircraft. This assistance will be funded through the EPAWSS JON. In accordance with para 12.6, the 57 MXG is responsible for ensuring aircraft seat inspections are current through the duration of EPAWSS Mod, and all egress time change items need to be waived/completed/scheduled to be complete prior to induction to the mod line.

10.27 The 96 MXG/Corrosion will support by preparing and painting Nellis and Eglin F-l 5C leading edge wings after wing modification is complete. This will be scheduled during the weekly shared resources meeting. Additionally, corrosion may be required for paint touch up on a case by case basis. This assistance will be funded through the EPAWSS JON.

10.28 The 96 MXG (A/R, Machine Shop, Sheet Metal, Aerospace Ground Equipment, Precision Measurement Equipment Lab, Egress, and Corrosion) will support non-modification discrepancies on Nellis and Eglin aircraft on a non-interference basis. Non-modification discrepancies are defined as any pre- existing problem discovered during the course of executing the scope of the T-2 modification. For Nellis assigned aircraft, this maintenance will be charged to the account established in paragraph 12.5.

File details come from the government source that posted it. Updated .