Exhibits 1-13A ROME COST.pdf

PDF 1 MB Posted

Attached to
DRAFT RFP - Repairs, Operations, Maintenance, and Engineering (ROME) Services - DRAFT RFP Federal contract opportunity
Solicitation number
80GSFC22R0011-DRFP
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document contains cost proposal exhibits for a draft request for proposal for facilities operations and maintenance services. The proposal exhibits provide cost breakdowns by labor categories and direct labor hours, direct labor rates, direct labor costs, overhead costs, and other direct costs such as subcontracts and materials. The costs are broken out by representative task order for facilities support services at NASA's Goddard Space Flight Center in Greenbelt, Maryland and Wallops Flight Facility in Wallops Island, Virginia, including work for the Navy at Wallops. Services include facilities operations and maintenance, architect-engineering, construction, and information resources support across various facility types such as office buildings, laboratories, and launch facilities. Exhibits also include information on cognizant DCMA offices and recurring other direct costs.

View the file

Other files for this federal contract opportunity

Other files attached to DRAFT RFP - Repairs, Operations, Maintenance, and Engineering (ROME) Services - DRAFT RFP, newest first.
File Type Posted
M.1 WD CBA 2022-99 Maryland.pdf r1.pdf PDF
ROME E-Library Documents.zip ZIP file
Attachment A - ROME Contract SOW.pdf PDF
Attachment B IDIQ Cost-Fixed Price Rate Matrix All IDIQ Contract.pdf PDF
Attachment C - List of IAGP.pdf PDF
Attachment D DD254.pdf PDF
Attachment E A-E Const IDIQ Pricing.pdf PDF
Attachment G IT Security Applicable Documents List.pdf PDF
M.1 WD CBA 2022-99 Maryland.pdf PDF
N.1 Davis Bacon Wage Determination MD 20220044.txt TXT text file
O.1 Wage Determination SCA MD 2015-4281.txt TXT text file
Appendix 2 - ROME A-E Specifications.pdf PDF
Appendix 3 - FMD CADD Manual 2021.pdf PDF
Appendix 6 - WFF Asset List and Count.pdf PDF
Appendix 5 - GB Asset Listing and count.pdf PDF
Exhibits 15-15E A-E Const IDIQ Pricing.pdf PDF
Enclosure 1 ROME RTO1 Greenbelt OM IR.pdf PDF
Enclosure 2 ROME RTO2 WFF OM IR.pdf PDF
Enclosure 4 ROME QA Surveillance Plan.pdf PDF
Enclosure 5 IT Security Management Plan Template.pdf PDF
Attachment I OCI Avoidance Plan Outline.pdf PDF
Attachment L ROME FINANCIAL REPORTING 533.pdf PDF
Attachment M Collective Bargaining Agreement.pdf PDF
M.2 WD CBA 2022-134 Virginia.pdf PDF
Attachment O Wage Determinations SCA.pdf PDF
Appendix 8 - RESERVED.pdf PDF
Appendix 16 Snow Removal Sidewalks GB.pdf PDF
Appendix 4 - List of Facilities final.pdf PDF
80GSFC22R0011 SF33 ROME DRFP.pdf PDF
Appendix 4 - List of Facilities.pdf PDF
Appendix 7 - Navy SCSC Assets.pdf PDF
Attachment D DD254-ROME.pdf PDF
Attachment F Quality Control Plan.pdf PDF
Attachment J Contract Historical Data.pdf PDF
O.2 Wage Determination SCA VA 2015-4327.txt TXT text file
Appendix 12 As-Built.pdf PDF
Appendix 10 - ROME Specifications.pdf PDF
Appendix 1 - ROME SRD -2021 .pdf PDF
Appendix 14 Snow and Ice Removal GB.pdf PDF
Appendix 18 Snow Removal Area 200 GB.pdf PDF
80GSFC22R0011 ROME DRFP.pdf PDF
Exhibit 14 ROME Past Perf Questionaire.pdf PDF
Enclosure 3 ROME RTO3 Navy OM IR.pdf PDF
Attachment C1 - GB List of IAGP.pdf PDF
Attachment C2 - Wallops List of IAGP.pdf PDF
Attachment H IT Security Management Plan.pdf PDF
Attachment K Safety and Health Plan.pdf PDF
Attachment N Wage Determinations Building.pdf PDF
N.2 Davis Bacon Wage Determination VA 20220007.txt TXT text file
Appendix 17 Snow Removal Area 100 GB.pdf PDF
Show all 50

DRAFT RFP - Repairs, Operations, Maintenance, and Engineering (ROME) Services - DRAFT RFP has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRFP# 80GSFC22R0011

Proposing Entity

Elements of Cost Month*** Month Month Month Month Month Month Month Month Month Month Month TOTAL

Onsite Direct Labor (DL) Hours Total Prime Onsite Direct Labor Hours (Derived from Exhibit 2A )

Significant Subcontractor Onsite DL Hours* (List total hours separately by company) Total Significant Subcontractors Onsite Direct Labor Hours

TOTAL PRIME AND SIGNIFICANT SUBCONTRACTORS

ONSITE DIRECT LABOR HOURS

TOTAL PRIME ONSITE DIRECT LABOR COSTS (Derived from Exhibit 2A )

ONSITE OVERHEAD COSTS

Other Direct Costs (ODCs) Significant Subcontracts (list separately by company)** Chemical Water Treatment 460,000 Fuel Oil Cleaning (Bi-Annual) 15,000 Utility Locating/Marking 50,000 Fencing Repairs 20,000 Supplies/Materials / Parts 750,000 Major Repairs 1,500,000 Snow Removal Miscellaneous ODCs Other Subcontracts Material Travel Other (Specify)

TOTAL ODCs

SUBTOTAL COST

G&A COSTS

TOTAL ESTIMATED COST

FIXED FEE PERCENTAGE

FIXED FEE

TOTAL COST PLUS FIXED FEE

*Significant Subcontractor (>20% of a RTO estimate) - Insert Direct Labor Hours Only **List each significant subcontractor separately by company - Insert Total Cost and Fees ***Adjust the number of month columns to match RTO period of performance Offerors may adjust elements of cost to be consistent with your current accounting system.

This exhibit contains Source Selection Information. See FAR 3.104.

EXHIBIT 2

PRIME OFFEROR

REPRESENTATIVE TASK ORDER (RTO) ELEMENTS OF COST SUMMARY

RTO No. 1 (GB O&M and IR), Contract Year 1, WBS Level 1

Proposing Entity:

Elements of Cost Labor Type (E or NE) Month* Month Month Month Month Month Month Month Month Month Month Month TOTAL

ONSITE DIRECT LABOR (DL) HOURS:

(List by Individual DL Category)

TOTAL ONSITE DIRECT LABOR HOURS

ONSITE DIRECT LABOR HOURLY RATES:**

(List by Individual DL Category)

ONSITE DIRECT LABOR COSTS:

(List by Individual DL Category)

TOTAL ONSITE DIRECT LABOR COSTS

*Adjust the number of month columns to match RTO period of performance **Rates must match the DL Hourly Rates included in the Contract Attachment entitled, "IDIQ Direct Labor Rates, Indirect Rates, and Fee Matrices."

This exhibit contains Source Selection Information. See FAR 3.104.

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 2A

DIRECT LABOR HOURS, DIRECT LABOR RATES AND DIRECT LABOR COSTS DETAIL

RTO No. 1 (GB O&M and IR), Contract Year 1, and WBS Level 1

Elements of Cost Month* Month Month Month Month Month Month Month Month Month Month Month TOTAL

TOTAL ONSITE DIRECT LABOR HOURS (Derived from Exhibit 2A )

TOTAL ONSITE DIRECT LABOR COSTS (Derived from Exhibit 2A )

ONSITE OVERHEAD COSTS

Other Direct Costs (ODCs):

Other Subcontracts Material Travel Other (Specify)

TOTAL ODCs

SUBTOTAL COST

G&A COSTS

TOTAL ESTIMATED COST

FEE PERCENTAGE

FEE AMOUNT

TOTAL COST PLUS FEE

*Adjust the number of month columns to match RTO period of performance Offerors may adjust elements of cost to be consistent with your current accounting system.

This exhibit contains Source Selection Information. See FAR 3.104.

EXHIBIT 2B

SIGNIFICANT SUBCONTRACTOR

REPRESENTATIVE TASK ORDER (RTO) SUMMARY

RTO No. 1 (GB O&M and IR), Contract Year 1, and WBS Level 1

Proposing Entity

Elements of Cost Month*** Month Month Month Month Month Month Month Month Month Month Month TOTAL

Onsite Direct Labor (DL) Hours Total Prime Onsite Direct Labor Hours (Derived from Exhibit 2A )

Significant Subcontractor Onsite DL Hours* (List total hours separately by company) Total Significant Subcontractors Onsite Direct Labor Hours

TOTAL PRIME AND SIGNIFICANT SUBCONTRACTORS

ONSITE DIRECT LABOR HOURS

TOTAL PRIME ONSITE DIRECT LABOR COSTS (Derived from Exhibit 2A )

ONSITE OVERHEAD COSTS

Other Direct Costs (ODCs) Significant Subcontracts (list separately by company)** Supplies/Materials/Parts 490,000 Fencing Repairs 5,000 Major Repairs 750,000 Snow Removal Miscellaneous ODCs

Other Subcontracts Material Travel Other (Specify)

TOTAL ODCs

SUBTOTAL COST

G&A COSTS

TOTAL ESTIMATED COST

FIXED FEE PERCENTAGE

FIXED FEE

TOTAL COST PLUS FIXED FEE

*Significant Subcontractor (>20% of a RTO estimate) - Insert Direct Labor Hours Only **List each significant subcontractor separately by company - Insert Total Cost and Fees ***Adjust the number of month columns to match RTO period of performance Offerors may adjust elements of cost to be consistent with your current accounting system.

This exhibit contains Source Selection Information. See FAR 3.104.

EXHIBIT 3

PRIME OFFEROR

RTO No. 2 (WFF O&M and IR), Contract Year 1, WBS Level 1

Elements of Cost Labor Type (E or NE) Month* Month Month Month Month Month Month Month Month Month Month Month TOTAL

ONSITE DIRECT LABOR (DL) HOURS:

(List by Individual DL Category)

TOTAL ONSITE DIRECT LABOR HOURS

ONSITE DIRECT LABOR HOURLY RATES:**

(List by Individual DL Category)

ONSITE DIRECT LABOR COSTS:

(List by Individual DL Category)

TOTAL ONSITE DIRECT LABOR COSTS

*Adjust the number of month columns to match RTO period of performance **Rates must match the DL Hourly Rates included in the Contract Attachment entitled, "IDIQ Direct Labor Rates, Indirect Rates, and Fee Matrices."

This exhibit contains Source Selection Information. See FAR 3.104.

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 3A

RTO No.2 (WFF O&M and IR) , Contract Year 1, and WBS Level 1

Elements of Cost Month* Month Month Month Month Month Month Month Month Month Month Month TOTAL

TOTAL ONSITE DIRECT LABOR HOURS (Derived from Exhibit 2A )

TOTAL ONSITE DIRECT LABOR COSTS (Derived from Exhibit 2A )

ONSITE OVERHEAD COSTS

Other Direct Costs (ODCs):

Other Subcontracts Material Travel Other (Specify)

TOTAL ODCs

SUBTOTAL COST

G&A COSTS

TOTAL ESTIMATED COST

FEE PERCENTAGE

FEE AMOUNT

TOTAL COST PLUS FEE

*Adjust the number of month columns to match RTO period of performance Offerors may adjust elements of cost to be consistent with your current accounting system.

This exhibit contains Source Selection Information. See FAR 3.104.

EXHIBIT 3B

SIGNIFICANT SUBCONTRACTOR

RTO No. 2 (WFF O&M and IR), Contract Year 1, and WBS Level 1

Elements of Cost Month*** Month Month Month Month Month Month Month Month Month Month Month TOTAL

Onsite Direct Labor (DL) Hours:

Total Prime Onsite Direct Labor Hours (Derived from Exhibit 2A )

Significant Subcontractor Onsite DL Hours* (List total hours separately by company) Total Significant Subcontractors Onsite Direct Labor Hours

TOTAL PRIME AND SIGNIFICANT SUBCONTRACTORS

ONSITE DIRECT LABOR HOURS

TOTAL PRIME ONSITE DIRECT LABOR COSTS (Derived from Exhibit 2A )

ONSITE OVERHEAD COSTS

Other Direct Costs (ODCs):

Significant Subcontracts (list separately by company)** Other Subcontracts Material Travel Other (Specify)

TOTAL ODCs

SUBTOTAL COST

G&A COSTS

TOTAL ESTIMATED COST

FIXED FEE PERCENTAGE

FIXED FEE

TOTAL COST PLUS FIXED FEE

*Significant Subcontractor (>20% of a RTO estimate) - Insert Direct Labor Hours Only **List each significant subcontractor separately by company - Insert Total Cost and Fees ***Adjust the number of month columns to match RTO period of performance Offerors may adjust elements of cost to be consistent with your current accounting system.

This exhibit contains Source Selection Information. See FAR 3.104.

EXHIBIT 4

PRIME OFFEROR

RTO No. 3 (Navy O&M and IR), Contract Year 1, WBS Level 1

Elements of Cost Labor Type (E or NE) Month* Month Month Month Month Month Month Month Month Month Month Month TOTAL

ONSITE DIRECT LABOR (DL) HOURS:

(List by Individual DL Category)

TOTAL ONSITE DIRECT LABOR HOURS

ONSITE DIRECT LABOR HOURLY RATES:**

(List by Individual DL Category)

ONSITE DIRECT LABOR COSTS:

(List by Individual DL Category)

TOTAL ONSITE DIRECT LABOR COSTS

*Adjust the number of month columns to match RTO period of performance **Rates must match the DL Hourly Rates included in the Contract Attachment entitled, "IDIQ Direct Labor Rates, Indirect Rates, and Fee Matrices."

This exhibit contains Source Selection Information. See FAR 3.104.

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 4A

RTO No. 3 (Navy O&M and IR), Contract Year 1, and WBS Level 1

Elements of Cost Month* Month Month Month Month Month Month Month Month Month Month Month TOTAL

TOTAL ONSITE DIRECT LABOR HOURS (Derived from Exhibit 2A )

TOTAL ONSITE DIRECT LABOR COSTS (Derived from Exhibit 2A )

ONSITE OVERHEAD COSTS

Other Direct Costs (ODCs):

Other Subcontracts Material Travel Other (Specify)

TOTAL ODCs

SUBTOTAL COST

G&A COSTS

TOTAL ESTIMATED COST

FEE PERCENTAGE

FEE AMOUNT

TOTAL COST PLUS FEE

*Adjust the number of month columns to match RTO period of performance Offerors may adjust elements of cost to be consistent with your current accounting system.

This exhibit contains Source Selection Information. See FAR 3.104.

EXHIBIT 4B

SIGNIFICANT SUBCONTRACTOR

RTO No. 3 (Navy O&M and iR), Contract Year 1, and WBS Level 1

Specify ODC** Specify ODC** Specify ODC** Specify ODC** Percentage/Rate/Amount*** Percentage/Rate/Amount*** Percentage/Rate/Amount*** Percentage/Rate/Amount***

Contract Year 1 *Portion of Contractor FY From: to *Portion of Contractor FY From:________to________

Contract Year 1 Composite****

Contract Year 2 *Portion of Contractor FY From: to *Portion of Contractor FY From: to

Contract Year 2 Composite****

Contract Year 3 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From: to

Contract Year 3 Composite****

Contract Year 4 *Portion of Contractor FY From: to *Portion of Contractor FY From: to

Contract Year 4 Composite****

Contract Year 5 *Portion of Contractor FY From: to *Portion of Contractor FY From:________to________

Contract Year 5 Composite****

Contract Year 6 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________

Contract Year 6 Composite****

BASE OF APPLICATION - PECENTAGE/RATE/AMOUNT

APPLIED AGAINST (Specific Base):*****

*Explain Basis of Allocation of Contractor FY Rates to Obtain Contract Year Rates **Type/Name of Recurring ODCs or CERs (i.e. Computer Usage, Program Management, Administrative Support, Depreciation, etc.)

***Specify ODC as either a Percentage (%), Rate, and/or Dollar amount ($)

*****Explanation of Base of Application

This exhibit contains Source Selection Information. See FAR 3.104.

SUMMARY OF RECURRING OTHER DIRECT COSTS (ODCs) / COST ESTIMATING RELATIONSHIPS (CERs)

EXHIBIT 7

[ ] Prime Offeror OR [ ] Significant Subcontractor

****Prime Offeror Contract Year Composite Percentage/Rate/Dollar Amount must match what is included in the Contract Attachment entitled, "IDIQ Direct Labor Rates, Indirect Rates, and Fee Matrices."

DCMA Online Info http://www.dcma.mil

Company Name: DCMA Office

POC: POC:

Phone Number: Phone Number:

FAX Number: FAX Number:

E-Mail Address: E-Mail Address:

Street: Street:

P.O.Box: P.O.Box:

City: City:

State: State:

Zip Code: Zip Code:

Disclosures: Date Audit Report # Contractor Estima ing System Review (CESR) Contractor Purchasing System Review (CPSR) Contractor Billing System Review Contractor Accounting System Review Contractor Disclosure Statement Accuracy Contractor Executive Compensation Review Contractor Property Management System Forward Pricing Rate Agreements Earned Value Management System (EVMS) Level of CAS applicability Determination of Cost Accounting Standards (CAS) applicability

This exhibit contains Source Selection Information. See FAR 3.104.

Note: The submitting entity audit point of contact (POC) and address provided above must be at a location where auditable records supporting the proposed amounts physically reside.

Status:

DRFP# 80GSFC22R0011

Cognizant Defense Contract Management Agency (DCMA) Office Information

Submitting Entity: DCMA Cognizant Office:

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 11A

File details come from the government source that posted it. Updated .