Appendix 9-SUBMITTAL REGISTER.pdf
PDF 582 KB Posted
- Attached to
- DRAFT RFP - Repairs, Operations, Maintenance, and Engineering (ROME) Services - DRAFT RFP Federal contract opportunity
- Solicitation number
- 80GSFC22R0011-DRFP
About this file
This draft request for proposal solicits facilities operations and maintenance, architect-engineering, construction, and information resources services. The contractor shall provide support at NASA's Goddard Space Flight Center in Greenbelt, Maryland and Wallops Flight Facility in Wallops Island, Virginia, including all associated sites. Services include facilities O&M, A-E, construction, and information resources support. Facilities range from office buildings and clean rooms to launch facilities, an airfield, and warehouses. Utilities supported comprise electrical power, water, wastewater, storm water, steam, chilled water, gas, fire alarm, and control systems. Custodial work is excluded.
View the file
Other files for this federal contract opportunity
Show all 50
DRAFT RFP - Repairs, Operations, Maintenance, and Engineering (ROME) Services - DRAFT RFP has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 96 PAGES
ROME Contract Construction Specifications
01 10 00 SD-01 Preconstruction Submittals
1.10 GMobilization Plan
1.10.1 GContractor Contact List
1.13.1 GExcavation Permit
1.13.2 GHot Work Permit
1.13.3 GConfined Space Entry Permit
1.13.4 GUtility Outage Plan
1.13.4 GUtility Outage Request
1.15 GC&D Waste Management Plan
SD-11 Closeout Submittals
1.12 GDelivery Report
1.14 GTransportation Report
1.15 GC&D Waste Report
01 31 00 SD-01 Preconstruction Submittals
3.3 GProgress Schedule
3.4 GSubmittal Register
SD-11 Closeout Submittals
3.5 GAs-Built Drawings
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.8 GAccident Prevention Plan
1.8.1 GConfined Space Entry Plan
1.8.1 GSite Demolition Plan
1.8.1 GExcavation Plan
1.15 GEgress and Exit Closure Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 96 PAGES
01 35 26 3.2.2 GFire Suppression Outage Plan
1.8.1 GCrane Lift Plan
SD-07 Certificates
1.7.1.1 GSite Safety and Health Officer
Qualifications
1.7.1.2 GCrane Operators Qualifications
1.13 GAccident Reports
1.16 GGas Test Readings
3.5.1 GCertificate of Compliance
3.5.1 GCrane Reports
01 35 43 SD-01 Preconstruction Submittals
1.8 GEnvironmental Protection Plan
01 41 00 SD-07 Certificates
1.8.1 GSpecial Inspector Qualifications
1.7 G AEStatement of Special Inspection
SD-09 Manufacturer’s Field
Reports
3.3 G AESpecial Inspector's Report
SD-11 Closeout Submittals
3.3 G AESpecial Inspection Final Report
01 45 10 SD-01 Preconstruction Submittals
1.5 GSupplemental Contractor Quality
Control (CQC) Plan
SD-07 Certificates
3.6.1 GCQC Daily Report
3.6.2 GReceiving Inspection List
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 96 PAGES
01 45 10 3.6.3 GMaster Deficiency List
01 45 20 SD-01 Preconstruction Submittals
1.5 GSupplemental Contractor Quality
Control (CQC) Plan
SD-07 Certificates
3.7.1 GCQC Daily Report
3.7.2 GReceiving Inspection List
3.7.3 GMaster Deficiency List
01 50 00 SD-01 Preconstruction Submittals
1.6 GConstruction Site Plan
3.3.2 GTraffic Control Plan
01 56 39 SD-01 Preconstruction Submittals
1.7.3 G AETree Pruning Schedule
1.7.4 G AETree Maintenance Schedule
SD-03 Product Data
2.1.1 G AEDrainage fill
2.1.2 G AETopsoil
2.1.3 G AEFilter fabric
2.1.4 G AEChain-Link Fence
2.1.5 G AEOrganic Mulch
1.7.1 G AETree Service Firm Qualifications
1.7.2 G AEArborist Qualifications
1.7.5 G AEArborist Certification
01 65 00 SD-04 Samples
2.1 GGOMAR Tags
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 96 PAGES
01 65 00 3.1 GGOMAR Tagging Schedule
01 73 00 SD-07 Certificates
3.4 GSalvaged Items List
01 78 00 SD-11 Closeout Submittals
1.6 GSpare Parts Data
3.1 GAs-Built Drawings
3.2 GRecord Drawings
1.10.1 GModified Facility Turnover
Checklist
01 78 24 SD-11 Closeout Submittals
1.3.1 GElectronic Facility Data, Progress
Submittal
1.3.2 GElectronic Facility Data, Prefinal
Submittal
1.3.3 GElectronic Facility Data, Final
Submittal
01 86 12 SD-02 Shop Drawings
3.1 G AECoupled or Gear-Driven
Equipment
3.2 G AEBelt-Driven Equipment
3.3 G AEFans
3.4 G AECentrifugal and Vertical Pumps
SD-03 Product Data
2.1.3.1 G AENatural or Metallic Aggregate
Grout
2.1.3.2 G AEEpoxy Resin Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 96 PAGES
01 86 12 SD-05 Design Data
3.1 G AECoupled or Gear-Driven
Equipment
3.2 G AEBelt-Driven Equipment
3.3 G AEFans
3.4 G AECentrifugal and Vertical Pumps
SD-06 Test Reports
3.1.5 G AEAlignment Reports
3.2 G AEAlignment Reports
3.3 G AEAlignment Reports
3.4 G AEAlignment Reports
SD-07 Certificates
1.6 GTechnician Qualifications
01 91 13 SD-02 Shop Drawings
1.14 G CxCPre-Functional Checklists
SD-03 Product Data
1.14Equipment Data
G, CxC, CxA
SD-06 Test Reports
1.14TAB Report
G, CxC, CxA
SD-07 Certificates
1.18.1Commissioning Firm
Qualifications
G, CxC, CxA
1.19Test Equipment Calibration
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 96 PAGES
01 91 13 SD-10 Operation and Maintenance
Data
3.11Operations & Maintenance Staff
Training
G, CxC, CxA
1.16 G CxASystems Manual
SD-11 Closeout Submittals
3.13 G CxAFinal Commissioning Report
3.13 G CxA10-Month Warranty Review
Report
02 82 14 SD-01 Preconstruction Submittals
1.8 GAsbestos Abatement Work Plan
1.8.1 GAccident Prevention Plan (APP)
1.8.1 GAsbestos Hazard Plan (AHAP)
1.8.2 GActivity Hazard Analyses (AHAs)
SD-06 Test Reports
3.18 GAir Monitoring
3.18.2 GFinal Clearance Air Monitoring
Report
3.18.3 GAggressive Air Monitoring Report
SD-07 Certificates
1.7.1 GAsbestos Abatement
Organization Qualifications
1.7.1 GProject Designer Qualifications
1.7.1 GCompetent Person/Supervisor
Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 96 PAGES
02 82 14 1.7.1 GAsbestos Worker Qualifications
1.7.1 GAsbestos Waste Disposal Facility
Qualifications
1.7.1 GTransporter Qualifications
1.7.1 GTesting Laboratory Qualifications
SD-11 Closeout Submittals
1.7.2 GWaste Manifests
03 30 00 SD-02 Shop Drawings
1.8.5 G AEReinforcing Steel
3.10.9 G AEEquipment Pad Drawings
SD-03 Product Data
2.1.1.1 G AEFly Ash
2.1.1.2 G AERaw or Calcined Natural
Pozzolan
2.1.1.3 G AEUltra Fine Fly Ash and Ultra Fine
Pozzolan
1.8.7 G AEGround Granulated Blast-Furnace
Slag
2.1.1.4 G AEGround Granulated Blast-Furnace
Slag
2.1.1.5 G AEPortland Cement
2.1.1.6 G AEBlended Cements
2.1.4 G AENonshrink Grout
2.1.5 G AEAdmixtures
2.1.6 G AEVapor Barriers and Retarders
2.1.8 G AEJoint Filler
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 96 PAGES
03 30 00 2.1.9 G AEJoint Sealants
2.3 G AEReady Mix Concrete
2.5.1 G AEWaterstops
2.5.2 G AEPerimeter Insulation
2.6.5 G AESynthetic Reinforcing Fibers
2.7.1 G AELiquid Chemical Floor Hardener
SD-05 Design Data
1.8.4 G AEConcrete Mix Design
SD-06 Test Reports
1.8.4 G AEConcrete Mix Design
1.8.7 G AEFly Ash and Pozzolan Content
1.8.7 G AEGround Granulated Blast-Furnace
Slag
2.1.1.4 G AEGround Granulated Blast-Furnace
Slag
1.8.7 G AEFiber-Reinforced Concrete
2.1.3 G AEAggregates
3.10.4.1 G AETolerance Report
3.13.2.1 G AESlump Tests
3.13.2.4 G AECompressive Strength Tests
SD-07 Certificates
1.8.1 GConcrete Testing Service
Qualifications
1.8.1 GConcrete Field Testing
Technician
1.8.1 GConcrete Construction Inspector
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 96 PAGES
03 30 00 1.8.2 GWelder Qualifications
1.8.3 GTesting Laboratory Qualifications
SD-08 Manufacturer’s Instructions
1.8.6 GMaterial Safety Data Sheets
04 20 00 SD-02 Shop Drawings
1.6.3 G AEReinforcing Steel shop drawings
1.6.3 G AEWall reinforcement
1.6.3 G AEControl and Expansion Joints
1.6.3 G AELintel Units
2.3.3 G AELintel Units
SD-03 Product Data
1.7.2 G AECold Weather Construction
Procedures
2.2.1 G AEFacing Brick
2.2.2 G AEBuilding Brick
2.3 G AEConcrete Masonry Units (CMU)
2.3.1 G AEArchitectural CMU
2.3.2 G AEFire-Rated CMU
2.4 G AEMortar
2.4.1 G AEColored Mortar
2.5 G AEMortar Admixtures
2.6 G AEWater-Repellant Admixtures
2.7 G AEGrout
2.8 G AEGrout Admixtures
2.9 G AEGrout Barriers
2.10.1 G AEWall Ties
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 96 PAGES
04 20 00 2.10.2 G AEDovetail Anchors
2.10.3 G AEAdjustable Veneer Anchors
2.10.4 G AEBar Positioners
2.11 G AEJoint Reinforcement
2.12 G AEReinforcing Steel Bars and Rods
2.13.1 G AEControl Joint Keys
2.13.2 G AEExpansion-Joint Filler
2.14 G AECavity Drainage Material
2.15 G AEWeep Vents
SD-04 Samples
1.6.4 G AEMockup Wall Panel
2.2.1 G AEFacing Brick
2.4 G AEMortar
2.4.1 G AEColored Mortar
SD-06 Test Reports
1.6.2 G AEMasonry Inspector Reports
1.6.5.1 G AEField Testing of Mortar
1.6.5.2 G AEField Testing of Grout
1.6.5.3 G AEEfflorescence Testing
1.6.5.4 G AEPrism Testing
SD-07 Certificates
1.6.2 G AEMasonry Inspector Qualifications
05 12 00 SD-02 Shop Drawings
1.7.3 G AEErection Drawings
1.7.4 G AEFabrication Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 96 PAGES
05 12 00 2.1 G AESteel
2.2 G AEBolts, Nuts, and Washers
2.3 G AEHigh-Strength Bolts, Nuts, and
Washers
2.4 G AEFoundation Anchorage
2.5 G AEStructural Steel Accessories
SD-06 Test Reports
3.7.2 G AEDaily Inspection Report
SD-07 Certificates
1.7.1 G AEWelder Qualifications
1.7.2 G AEAISC Certification
05 21 23 SD-02 Shop Drawings
1.6.2 G AEShop Drawings
SD-05 Design Data
2.1 G AEJoists, Joist Girders, and
Accessories
SD-06 Test Reports
3.4.2 G AEDaily Inspection Report
SD-07 Certificates
1.6.1.1 GWelder Qualifications
05 30 00 SD-02 Shop Drawings
1.8.3 G AEFabrication and Installation
Drawings
SD-03 Product Data
2.1.1 G AESteel Sheet
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 96 PAGES
05 30 00 2.3 G AEComposite Floor Deck
2.4 G AERoof Deck
2.5 G AEForm Deck
SD-06 Test Reports
3.9.2 G AEDaily Inspection Report
SD-07 Certificates
1.8.1 G AEPowder-Actuated Tool Operator
Qualifications
1.8.2 G AEWelder Qualifications
1.7.1 G AEFire-Test Response
Characteristics
1.7.2 G AEWind Uplift Resistance
05 40 00 SD-02 Shop Drawings
2.2 G AEWall Framing
2.2.3 G AEFraming Accessories
SD-03 Product Data
2.1.3 G AEGalvanizing Repair Paint
2.2.1 G AESteel Studs
2.2.2 G AESteel Track
2.2.3 G AEFraming Accessories
2.4.1 G AESteel Shapes and Clips
2.4.2 G AEExpansion Anchors
2.4.3 G AEPowder-Actuated Anchors
2.4.4 G AEMechanical Fasteners
2.4.5 G AEPlastic Grommets
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 96 PAGES
05 40 00 1.10 G AECalculations
SD-06 Test Reports
1.9.3 G AEProduct Testing Reports
3.5.1 G AEDaily Inspection Report
SD-07 Certificates
1.9.1 G AEProfessional Engineer
Qualifications
1.9.2 G AETesting Agency Qualifications
1.9.4 G AEWelder Qualifications
05 50 13 SD-02 Shop Drawings
2.4.1 G AEAngles and Plates
2.4.2 G AESteel Lintels
2.4.3 G AEAccess Panels and Frames
2.4.4 G AEControl Joint Covers
2.4.5 G AEExpansion Joint Covers
2.4.6 G AECover Plates and Frames
2.4.7 G AEGuard Posts (Bollards)
2.4.8 G AEFrames for Floor Grilles
2.4.9 G AEMetal Bar Gratings
2.4.10 G AEStructural Steel Door Frames
2.4.11 G AESteel Pipe Railings and
Guardrails
2.4.12 G AERoof Hatch
SD-07 Certificates
1.6.1 G AEWelder Qualifications
05 51 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 96 PAGES
05 51 00 2.4.1 G AEConcrete-Filled Metal Pan Stairs
2.4.2 G AESteel Plate Treads and Platforms
2.4.3 G AEMetal Bar Grating Treads and
Platforms
2.4.4 G AESteel Pipe Railings and
Guardrails
SD-06 Test Reports
3.9.2 G AEDaily Inspection Report
SD-07 Certificates
1.6.1 G AEFabricator Qualifications
1.6.2 G AEProfessional Engineer
Qualifications
1.6.3 G AEWelder Qualifications
05 51 33 SD-02 Shop Drawings
2.4.1 G AEMetal Ladders
2.4.2 G AELadder Cages
SD-06 Test Reports
3.9.2 G AEDaily Inspection Report
SD-07 Certificates
1.6.1 G AEFabricator Qualifications
1.6.2 G AEProfessional Engineer
Qualifications
1.6.3 G AEWelder Qualifications
05 72 00 SD-02 Shop Drawings
2.4.1 G AEBuilding Identification Numbers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 96 PAGES
05 72 00 2.4.2 G AEExpansion Joint Cover
Assemblies
2.4.3 G AEGravel Stop Assemblies
SD-04 Samples
2.3 G AEAluminum Finishes
2.3 G AEShop-Applied Paint Finish
SD-07 Certificates
1.6.1 G AEWelder Qualifications
SD-10 Operation and Maintenance
Data
3.10 G AEMaintenance Instructions
06 10 00 SD-03 Product Data
2.7 G AEAdhesives
SD-07 Certificates
1.7 G AEMoisture Content
1.8 G AEPressure-Preservative Treatment
1.9 G AEFire-Retardant Treatment
06 20 00 SD-02 Shop Drawings
1.6.1 G AEDetail Drawings
06 41 16 SD-02 Shop Drawings
1.6.5 G AEDetail Drawings
SD-03 Product Data
2.1.1 G AEPlastic Laminate (PL-1)
2.1.2 G AEPlastic Laminate (PL-2)
2.1.3 G AEHigh Pressure Laminate (PL-3);
2.1.4 G AEHigh Pressure Laminate (PL-4);
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 96 PAGES
06 41 16 2.2 G AESubstrates
2.5 G AECabinet Hardware
SD-04 Samples
2.1.1 G AEPlastic Laminate (PL-1)
2.1.2 G AEPlastic Laminate (PL-2)
2.1.3 G AEHigh Pressure Laminate (PL-3);
2.1.4 G AEHigh Pressure Laminate (PL-4);
2.5 G AECabinet Hardware
SD-07 Certificates
1.6.3 GFabricator Qualifications
1.6.4 GInstaller Qualifications
SD-11 Closeout Submittals
1.7 GSample Warranty
06 61 16 SD-02 Shop Drawings
1.6.6 G AEDetail Drawings
SD-03 Product Data
2.1 G AESolid Surface Material
2.2 G AESealants and Adhesives
SD-04 Samples
2.1 G AESolid Surface Material
SD-06 Test Reports
2.1 G AESolid Surface Material
2.2 G AESealants and Adhesives
SD-07 Certificates
1.6.4 GFabricator Qualifications
1.6.5 GInstaller Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 96 PAGES
06 61 16 SD-10 Operation and Maintenance
Data
3.3 GMaintenance Instructions
SD-11 Closeout Submittals
1.8 GSample Warranty
07 11 13 SD-03 Product Data
2.1.1 GAsphalt (Hot-Applied)
2.1.2Asphalt Saturated Felt
2.1.3Asphalt Emulsion (Cold-Applied)
2.1.4Protection Board
SD-07 Certificates
1.6.1 GManufacturer Qualifications
1.6.2 GInstaller Qualifications
SD-08 Manufacturer’s Instructions
1.7 GCold Weather Installation
07 14 00 SD-03 Product Data
2.1 G AEFluid-Applied Membrane
2.2 G AEMembrane Primer
2.8 G AEElastomeric Sheet
2.9 G AEFoam-Backed Elastomeric Sheet
2.11 G AEDrainage Panel
2.12 G AEProtection Board
2.14 G AEInsulation
SD-07 Certificates
1.6.2 GManufacturer Qualifications
1.6.3 GInstaller Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 96 PAGES
07 14 00 SD-11 Closeout Submittals
3.4 GInformation Card
07 21 13 SD-03 Product Data
2.1.1 G AERigid Foam Board
2.2.1 G AEAdhesive
SD-07 Certificates
1.6 GFire-Test Response
Characteristics
07 21 16 SD-03 Product Data
2.1.1 G AEGlass Fiber Batts, Unfaced
2.1.2 G AEGlass Fiber Batts, Faced
2.2Accessories
SD-07 Certificates
1.6 GFire-Test Response
Characteristics
07 22 00 SD-02 Shop Drawings
3.3 G AECants and Edge Strips
Installation
3.6 G AERigid Insulation Installation
2.7 G AEFasteners
SD-03 Product Data
2.1 G AEInsulation Boards
2.3 G AEAdhesive Materials
2.4 G AEVapor Retarders
2.5 G AESubstrate Boards
2.6 G AEProtection Boards
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 96 PAGES
07 22 00 2.7 G AEFasteners
SD-07 Certificates
1.7.1 GInstaller Qualifications
1.6 GFire-Test Response
Characteristics
07 26 16 SD-03 Product Data
2.1.1 G AEVapor Barriers And Retarders
2.1.2 G AESealing Tape
2.1.3 G AEMastic
SD-04 Samples
2.1.1 G AEVapor Barriers And Retarders
2.1.2 G AESealing Tape
SD-06 Test Reports
1.6.4 GIndependent Testing
SD-07 Certificates
1.6.2 GManufacturer Qualifications
1.6.3 GInstaller Qualifications
SD-11 Closeout Submittals
1.7 GSample Warranty
07 52 00 SD-02 Shop Drawings
1.8.4 G AEDetail Drawings
SD-03 Product Data
2.1.1 G AEAsphalt
2.1.2 G AERoof Cement
2.1.3 G AEPrimer
2.1.4 G AEVenting Base Sheet
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 96 PAGES
07 52 00 2.1.5 G AEFiberglass Felt Base Sheet
2.1.6 G AESBS Modified Base Sheet
2.1.8 G AEMembrane Liner
2.1.9 G AESBS Modified Cap Sheet
2.6 G AEFasteners and Plates
2.7.1 G AEPre-fabricated Curbs
2.7.3 G AEEquipment Supports
2.7.4 G AERoof Protection Pads
2.7.5 G AEPavers
SD-05 Design Data
1.5.1 GWind Uplift Calculations
SD-06 Test Reports
3.2.1 GMoisture Test Results
SD-07 Certificates
1.8.1 GManufacturer Qualifications
1.8.2 GInstaller Qualifications
1.6 GFire-Test Response
Characteristics
SD-08 Manufacturer’s Instructions
1.9 GCold Weather Installation
SD-10 Operation and Maintenance
Data
3.15 GCare and Maintenance
Instructions
SD-11 Closeout Submittals
1.10.1 GManufacturer's Warranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 96 PAGES
07 52 00 1.10.2 GInstaller Warranty
07 60 00 SD-02 Shop Drawings
3.2.1 G AEFriction Reglets
3.2.2 G AECaulked Reglets
3.2.3 G AEBase Flashing
3.2.4 G AECap and Counterflashing
3.2.5 G AEFlashing at Roof Penetrations
and Equipment Supports
3.3 G AEGravel Stop-Fascias
3.4.1 G AEGutters
3.5 G AEDownspouts
3.6 G AEScuppers
3.7 G AERoof Expansion Joints
SD-07 Certificates
1.7.1 G AEFabricator Qualifications
07 84 00 SD-02 Shop Drawings
1.6.4 G AEDetail Drawings
SD-03 Product Data
2.1 G AEFirestopping Materials
SD-04 Samples
3.3.1 G AEMockup Sample
SD-07 Certificates
1.6.3 GThird-Party Firestop Inspector
Qualifications
2.1 GFirestopping Materials
1.6.2 GInstaller Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 96 PAGES
07 84 00 SD-06 Test Reports
3.3.2 GInspection Report
07 92 00 SD-03 Product Data
2.1 G AESealants
2.2 G AEPrimers
2.3 G AEBond Breakers
2.4 G AEBackstops
2.5 G AECaulk
2.6 G AECleaning Solvents
SD-11 Closeout Submittals
1.7 GSample Warranty
08 11 13 SD-02 Shop Drawings
2.1.1 G AEHeavy Duty Steel Doors
2.1.2 G AEExtra Heavy Duty Steel Doors
2.4.1 G AEWelded Frames
2.4.2 G AEKnock-Down Frames
SD-03 Product Data
2.1.1 G AEHeavy Duty Steel Doors
2.1.2 G AEExtra Heavy Duty Steel Doors
2.2 G AEInsulated Core
2.4.1 G AEWelded Frames
2.4.2 G AEKnock-Down Frames
SD-07 Certificates
1.6.2 GManufacturer Qualifications
1.6.3 GInstaller Qualifications
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 96 PAGES
08 11 13 1.7 GSample Warranty
08 14 00 SD-02 Shop Drawings
2.2 G AEInterior Flush Wood Doors
SD-03 Product Data
2.2 G AEInterior Flush Wood Doors
1.6.3 G AESound Transmission Class
Rating
2.2.7 G AEAdhesives
SD-04 Samples
2.4.1 G AEField-Applied Finish Samples
2.4.2 G AEFactory-Applied Finish Samples
SD-06 Test Reports
1.6.1 GCycle-Slam Testing
1.6.2 GHinge Loading Testing
SD-07 Certificates
1.8.2 GManufacturer Qualifications
1.8.3 GInstaller Qualifications
SD-11 Closeout Submittals
1.9 GSample Warranty
08 33 23 SD-02 Shop Drawings
1.8.4 G AEDetail Drawings
1.8.5 G AEOverhead Coiling Door
Assemblies
SD-03 Product Data
2.2 G AENon-insulated Curtains
2.3 G AEInsulated Curtains
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 96 PAGES
08 33 23 2.4 G AEGuides
2.5 G AEBrackets
2.6 G AECounterbalance Mechanism
2.7 G AEHood
2.8 G AELocking Devices
2.9 G AEWeatherstripping
2.11 G AEManual Door Operators
2.12 G AEElectric Door Operators
2.13 G AEFire-Rated Door Assemblies
SD-07 Certificates
1.8.2 GManufacturer Qualifications
1.8.3 GInstaller Qualifications
SD-10 Operation and Maintenance
Data
1.8.5 GOverhead Coiling Door
Assemblies
SD-11 Closeout Submittals
1.10 GSample Warranty
08 41 13 SD-02 Shop Drawings
1.7.4 G AEDetail Drawings
SD-04 Samples
2.1.1 G AEFinish and Color
SD-07 Certificates
1.7.2 GManufacturer Qualifications
1.7.3 GInstaller Qualifications
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 96 PAGES
08 41 13 1.8 GSample Warranty
08 51 13 SD-02 Shop Drawings
1.7.4 G AEDetail Drawings
SD-03 Product Data
2.1 G AEMaterials
2.2 G AEFabrication
SD-04 Samples
2.4 G AEFinishes
SD-05 Design Data
1.6.1 G AEWind Loading Design Pressure
1.6.2 G AEThermal and Condensation
Performance
1.6.3 G AESound Attenuation
SD-07 Certificates
1.7.2 GManufacturer Qualifications
1.7.3 GInstaller Qualifications
SD-11 Closeout Submittals
1.8 GSample Warranty
1.7.5 GCertification
08 71 00 SD-03 Product Data
2.1 G AEHardware Items
SD-07 Certificates
1.6.1 GInstaller Qualifications
1.6.2 GSupplier Qualifications
1.6.3 GArchitectural Hardware
Consultant Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 96 PAGES
08 71 00 SD-08 Manufacturer’s Instructions
2.1 GInstallation Instructions
SD-10 Operation and Maintenance
Data
1.10 GMaintenance Instructions
SD-11 Closeout Submittals
1.11 GWarranty
1.10 GSpecialized Tools
08 71 13 SD-02 Shop Drawings
2.1 G AEAutomatic Door Operators
SD-03 Product Data
2.2 G AEOperator
2.3 G AEControl Unit
2.4 G AEHardware
2.5 G AEControl Device
SD-04 Samples
2.6 G AEFinishes
SD-07 Certificates
1.5.2 GInstaller Qualifications
1.5.3 GSupplier Qualifications
SD-11 Closeout Submittals
1.6 GWarranty
08 81 00 SD-03 Product Data
2.1 G AEGlass
2.2 G AEInsulating Glass Units
2.3 G AESetting and Sealing Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 96 PAGES
08 81 00 SD-04 Samples
2.1 G AEGlass
2.2 G AEInsulating Glass Units
2.3 G AESetting and Sealing Materials
SD-07 Certificates
1.8.2 GManufacturer Qualifications
1.8.3 GInstaller Qualifications
SD-11 Closeout Submittals
1.9.1 GSample Warranty
08 91 00 SD-02 Shop Drawings
2.2 G AEExterior Wall Louvers
2.4 G AEExterior Door Louvers
2.5 G AEInterior Door Louvers
SD-03 Product Data
2.2 G AEExterior Wall Louvers
2.4 G AEExterior Door Louvers
2.5 G AEInterior Door Louvers
SD-04 Samples
2.6 G AEFinishes
SD-07 Certificates
1.6.2 GManufacturer Qualifications
1.6.3 GInstaller Qualifications
SD-11 Closeout Submittals
1.7 GSample Warranty
09 22 00 SD-02 Shop Drawings
2.2 G AEWall Framing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 96 PAGES
09 22 00 2.2.3 G AEFraming Accessories
SD-03 Product Data
2.1.3 G AEGalvanizing Repair Paint
2.2.1 G AEMetal Studs
2.2.2 G AEMetal Channel Runners
2.2.3 G AEFraming Accessories
2.4.1 G AESteel Shapes and Clips
2.4.2 G AEExpansion Anchors
2.4.3 G AEPowder-Actuated Anchors
2.4.4 G AEMechanical Fasteners
09 29 00 SD-03 Product Data
2.2 G AEGypsum Board
2.3 G AEFire-Rated Gypsum Board
2.4 G AEGypsum Ceiling Board
2.5 G AEGlass Mat Faced Gypsum Board
2.6 G AEAbuse Resistant Gypsum Board
2.7 G AEImpact Resistant Gypsum Board
2.8 G AEWater-Resistant Gypsum Backing
Board
2.9 G AEShaftwall Liner Panel
2.10.1 G AEEmbedding Compound
2.10.2 G AEFinishing or Topping Compound
2.10.3 G AEAll-Purpose Compound
2.10.4 G AESetting or Hardening Type
Compound
2.10.5 G AEJoint Tape
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 96 PAGES
09 29 00 2.11 G AEFasteners
2.12 G AEAdhesives
2.13 G AEAccessories
SD-10 Operation and Maintenance
Data
2.1 GMaintenance Instructions
09 30 13 SD-03 Product Data
2.1 G AETile
2.2 G AESetting Bed
2.4 G AEMortar, Grout, and Adhesive
2.5.2 G AEMarble Thresholds
2.6 G AEMembrane Materials
SD-04 Samples
2.1 G AETile
2.4 G AEMortar, Grout, and Adhesive
2.5.1 G AEAluminum Transition Strips
2.5.2 G AEMarble Thresholds
SD-07 Certificates
1.6.2 GInstaller Qualifications
SD-10 Operation and Maintenance
Data
3.7 GCleaning Instructions
SD-11 Closeout Submittals
1.9 GSample Warranty
09 51 00 SD-03 Product Data
2.1 G AEAcoustical Ceiling System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 96 PAGES
09 51 00 SD-04 Samples
2.2.1 G AEAcoustical Ceiling Tile (ACT-1)
2.2.2 G AEAcoustical Ceiling Tile (ACT-2)
2.2.3 G AEVinyl-Faced Ceiling Tile (ACT-3)
2.2.4 G AEMylar-Wrapped Ceiling Tile
(ACT-4)
2.2.5 G AEFire-Rated Acoustical Ceiling Tile
(ACT-5)
2.3.1 G AEStandard Grid
2.3.2 G AEFire-Rated Grid
2.3.3 G AEGasketed Grid
2.4 G AEHanger Inserts
2.5 G AEHangar Wire
2.6.1 G AEHold-Down Clips
SD-06 Test Reports
1.7 G AEFire Resistive Ceilings
SD-11 Closeout Submittals
1.8 GSample Warranty
09 65 00 SD-03 Product Data
2.4 G AEVinyl Composition Tile
2.5 G AESheet Vinyl Flooring
2.6 G AERubber Tile
2.7 G AERubber Sheet Flooring
2.8 G AESolid Vinyl Tile
2.9.2 G AEWall Base
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 96 PAGES
09 65 00 2.9.3 G AEStair Treads, Risers, and
Stringers
2.9.4 G AETransition Strips
2.9.1 G AEAdhesives
SD-04 Samples
2.4 G AEVinyl Composition Tile
2.5 G AESheet Vinyl Flooring
2.6 G AERubber Tile
2.7 G AERubber Sheet Flooring
2.8 G AESolid Vinyl Tile
2.9.2 G AEWall Base
2.9.3 G AEStair Treads, Risers, and
Stringers
2.9.4 G AETransition Strips
SD-06 Test Reports
1.9.1 GRelative Humidity Testing
1.9.2 GAlkalinity Testing
SD-07 Certificates
1.7.1 GInstaller Qualifications
SD-10 Operation and Maintenance
Data
2.11 G AEResilient Flooring and
Accessories
SD-11 Closeout Submittals
1.10 GSample Warranty
09 67 23 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 96 PAGES
09 67 23 2.3 G AEDecorative Resinous Flooring
(RF-1)
2.4 G AEHigh-Performance Resinous
Flooring, Electrostatic Conductive
(RF-2)
2.5 G AEHigh-Performance Resinous
Flooring, Electrostatic Dissipative
(RF-3)
SD-03 Product Data
2.3 G AEDecorative Resinous Flooring
(RF-1)
2.4 G AEHigh-Performance Resinous
Flooring, Electrostatic Conductive
(RF-2)
2.5 G AEHigh-Performance Resinous
Flooring, Electrostatic Dissipative
(RF-3)
2.6.1 G AEPatching and Fill Material
2.6.2 G AEJoint Sealant
SD-04 Samples
2.3 G AEDecorative Resinous Flooring
(RF-1)
2.4 G AEHigh-Performance Resinous
Flooring, Electrostatic Conductive
(RF-2)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 96 PAGES
09 67 23 2.5 G AEHigh-Performance Resinous
Flooring, Electrostatic Dissipative
(RF-3)
SD-06 Test Reports
3.8.1 G AEElectrical Resistance
1.6.1 GRelative Humidity Testing
1.6.2 GAlkalinity Testing
SD-07 Certificates
1.5.2 GInstaller qualifications
1.5.3 GField Technical Service
Representative qualifications
SD-08 Manufacturer’s Instructions
3.5 GProportion and Mixing
Requirements
SD-10 Operation and Maintenance
Data
2.7 G AEResinous Epoxy Flooring
Systems and Accessories
SD-11 Closeout Submittals
1.7 GSample Warranty
09 68 13 SD-02 Shop Drawings
2.4 G AEInstallation Drawings
SD-03 Product Data
2.2.1 G AECarpet Tile (CPT-1)
2.2.2 G AECarpet Tile (CPT-2)
2.2.3 G AECarpet Tile (CPT-3)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 96 PAGES
09 68 13 2.3.1 G AEAdhesives
SD-04 Samples
2.2.1 G AECarpet Tile (CPT-1)
2.2.2 G AECarpet Tile (CPT-2)
2.2.3 G AECarpet Tile (CPT-3)
SD-06 Test Reports
1.10.1 GRelative Humidity Testing
1.10.2 GAlkalinity Testing
SD-07 Certificates
1.8.1 GInstaller Qualifications
SD-10 Operation and Maintenance
Data
2.4 GTile Carpeting and Accessories
SD-11 Closeout Submittals
1.11 GSample Warranty
09 69 13 SD-02 Shop Drawings
1.7.3 G AEInstallation Drawings
SD-03 Product Data
2.1 G AEFloor Panels
2.2 G AEFloor Covering
2.3 G AEPanel Support System
2.4 G AEAccessories
SD-04 Samples
2.2 G AEFloor Covering
SD-06 Test Reports
1.6.1 GConcentrated Load Performance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 96 PAGES
09 69 13 1.6.2 GUniform Load Performance
1.6.3 GUltimate Load Performance
1.6.4 GRolling Load Performance
1.6.5 GImpact Load Performance
SD-07 Certificates
1.7.2 GInstaller Qualifications
SD-09 Manufacturer’s Field
Reports
3.2.1 GElectrical Resistance
SD-11 Closeout Submittals
1.8 GSample Warranty
3.5 GMaintenance Instructions
09 72 00 SD-03 Product Data
2.1 G AEWallcoverings and Accessories
2.2 G AEVinyl Wallcovering
2.3 G AETextile Wallcovering
2.4 G AEAcoustical Wallcovering
2.5 G AEPresentation Dry Erase
Wallcovering
2.6 G AEWall Liner
2.7 G AECorner Guards
2.8 G AEPrimer and Adhesive
SD-04 Samples
2.1 G AEWallcoverings and Accessories
2.2 G AEVinyl Wallcovering
2.3 G AETextile Wallcovering
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 96 PAGES
09 72 00 2.4 G AEAcoustical Wallcovering
2.5 G AEPresentation Dry Erase
Wallcovering
2.6 G AEWall Liner
2.7 G AECorner Guards
SD-07 Certificates
1.6.1 GInstaller Qualifications
1.5 GFire-Test Response
Characteristics
SD-08 Manufacturer’s Instructions
2.1 GInstallation Instructions
SD-10 Operation and Maintenance
Data
2.1 GWallcoverings and Accessories
2.2 GVinyl Wallcovering
2.3 GTextile Wallcovering
2.4 GAcoustical Wallcovering
2.5 GPresentation Dry Erase
Wallcovering
SD-11 Closeout Submittals
1.8 GSample Warranty
09 90 00 SD-03 Product Data
2.4.1 G AEPrimers, Sealers, and Coatings
2.5.2 G AEInterior Paints
2.5.1 G AEExterior Paints
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 96 PAGES
09 90 00 2.4.1 G AEPrimers, Sealers, and Coatings
2.5.2 G AEInterior Paints
2.5.1 G AEExterior Paints
3.9 G AEPiping Identification
SD-07 Certificates
1.7.2 GApplicator Qualifications
1.7.1 GManufacturer Qualifications
SD-10 Operation and Maintenance
Data
1.9.2 GMaterial Safety Data Sheets
SD-11 Closeout Submittals
1.12 GSample Warranty
10 14 00 SD-02 Shop Drawings
1.6.5 G AEDetail Drawings
SD-03 Product Data
1.6.4 G AEBuilding Code-Required Signage
1.6.4 G AERoom Identification Signage
SD-04 Samples
1.6.4 G AEBuilding Code-Required Signage
1.6.4 G AERoom Identification Signage
SD-07 Certificates
1.6.2 G AEFabricator Qualifications
1.6.3 G AEInstaller Qualifications
SD-10 Operation and Maintenance
Data
3.3 G AECleaning Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 96 PAGES
10 14 00 SD-11 Closeout Submittals
1.8 G AEWarranty
10 14 01 SD-02 Shop Drawings
1.6.4 G AEDetail Drawings
SD-03 Product Data
1.4.1 G AECalculations and Design Analysis
SD-04 Samples
1.4.3 G AESamples
SD-07 Certificates
1.6.1 GSign Manufacturer Qualifications
1.6.2 GSign Installer Qualifications
1.6.3 GProfessional Engineer
Qualifications
SD-10 Operation and Maintenance
Data
3.4 GMaintenance Instructions
SD-11 Closeout Submittals
1.7 GSample Warranty
10 21 13 SD-02 Shop Drawings
1.8.2 G AEDetail Drawings
SD-03 Product Data
2.1 G AEMaterials
2.2.1 G AEToilet Enclosures
2.2.2 G AERoom Entrance Screens
2.2.3 G AEUrinal Screens
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 96 PAGES
10 21 13 2.5 G AEColors and Finishes
SD-11 Closeout Submittals
1.10 GSample Warranty
10 22 19 SD-02 Shop Drawings
1.7.3 G AEInstallation Drawings
SD-03 Product Data
2.1 G AEDemountable Partition System
SD-04 Samples
2.5 G AEFinishes
2.3.1 G AECeiling Trim
2.3.2 G AEBase Trim
2.3.3 G AEInterchangeable Partition Panel
2.3.7 G AEHorizontal Top and Bottom Seal
2.3.8 G AEVertical Partition Post Seal
SD-05 Design Data
2.1 GMaterial Safety Data
SD-07 Certificates
1.7.2 GInstaller Qualifications
1.5.1 GFire-Test Response
Characteristics
SD-11 Closeout Submittals
1.8 GSample Warranty
10 26 13 SD-02 Shop Drawings
1.6.2 G AEDetail Drawings
SD-03 Product Data
2.2 G AECorner Guards
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 96 PAGES
10 26 13 2.3 G AEWall Guards (Bumper Guards)
2.4 G AETrim, Fasteners and Anchors
SD-04 Samples
2.5 GColors and Finishes
SD-11 Closeout Submittals
1.8 GSample Warranty
10 28 13 SD-03 Product Data
2.3.1 G AERecessed Waste Receptacle
(TA-1)
2.3.2 G AECombination Paper Towel
Dispenser/Waste Receptacle
(TA-2)
2.3.3 G AESeat-Cover Dispenser (TA-3)
2.3.4 G AESanitary Napkin Disposer (TA-4)
2.3.5 G AEShelf (TA-5)
2.3.6 G AEFramed Mirror (TA-6)
2.3.7 G AETilted Framed Mirror (TA-7)
2.3.8 G AEGrab Bar (TA-8)
2.3.9 G AETowel Bar (TA-9)
2.3.10 G AEShower Curtain Rod (TA-10)
2.3.11 G AEShower Curtain (TA-11)
2.3.12 G AERobe Hook (TA-12)
2.3.13 G AEMop and Broom Holder (TA-13)
SD-04 Samples
2.2 G AEFinish Samples
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 96 PAGES
10 28 13 1.8 GSample Warranty
10 44 16 SD-02 Shop Drawings
2.2 G AECabinets
2.3 G AEHanging Brackets
2.4 G AEBacking Panels
SD-03 Product Data
2.1.1 G AEDry-Chemical Type
2.1.2 G AEClean Agent Type
2.2 G AECabinets
2.3 G AEHanging Brackets
2.4 G AEBacking Panels
2.5 G AESignage
SD-10 Operation and Maintenance
Data
2.1.1 GDry-Chemical Type
2.1.2 GClean Agent Type
SD-11 Closeout Submittals
1.6 GSample Warranty
11 13 10 SD-02 Shop Drawings
1.8.4 G AEDetail Drawings
SD-03 Product Data
1.8.6 G AELoading Dock Levelers
2.1 G AELoading Dock Levelers
2.3 G AEConstruction and Materials
2.4 G AEElectrohydraulic System
2.5 G AEElectrical Requirements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 96 PAGES
11 13 10 2.6.1 G AERestraining Device
2.6.2 G AEDock Bumpers
SD-07 Certificates
1.8.2 GManufacturer Qualifications
1.8.3 GInstaller Qualifications
SD-06 Test Reports
3.4.1 GRoll-Over Load Tests
3.4.2 GDrop Tests
3.4.3 GAcceptance Tests
SD-10 Operation and Maintenance
Data
1.8.6 GLoading Dock Levelers
2.1 GLoading Dock Levelers
2.6.1 GRestraining…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .