Summary of Exhibit Q, Requirements Traceability Matrix (RTM)

This document is a Requirements Traceability Matrix for RFO No. HHS0017021 issued by the Texas Health and Human Services Commission (HHSC). The contract requires the contractor to provide staffing services comprising 52 managed services staff positions across three service tiers: Enterprise Service Desk (ESD) IT Support Specialist III (22 positions), DFPS Service Desk IT Support Specialist III (10 positions), TIERS IT/IEE Support Specialist III (5 positions), Deskside Support Systems Administrator II (14 positions), and Deskside Services Team Lead (1 position). The transition phase extends up to 60 calendar days from contract execution, during which the contractor must assign all four key personnel staff (Project Manager, Transition Manager, Hiring Manager, and Invoicing Manager) within one business day and achieve full staffing of 52 managed services positions within 30 calendar days. All qualified candidates must be located within a 50-mile radius of 701 W. 51st Street, Austin, Texas 78751. The contractor must participate in weekly transition status meetings, submit weekly transition status reports, and obtain HHSC written approval of an operational readiness checklist prior to commencing the operations phase.

The operations phase imposes comprehensive performance requirements organized into six categories: staffing, onboarding and security, staff changes, reporting and meetings, invoice and timekeeping, and performance and compliance. Key performance measures include maintaining minimum 85 percent monthly staffing compliance, submitting qualified candidate packages within five business days of request, completing staff training within 45 calendar days of hire, maintaining critical role vacancies below 10 business days per calendar month, holding monthly metric meetings by the 15th of each month, submitting weekly timesheets by Friday at 12:00 PM Central Time, and submitting monthly invoices by the 8th calendar day of the following month. The contractor is subject to liquidated damages for performance failures, ranging from $100 per business day for late candidate package submissions to $200 per business day for staffing compliance violations and equipment return failures. Three service level occurrences within a rolling 12-month period require submission of a corrective action plan. The contractor must comply with HHSC-directed staff removals within one business day, return all state property within two business days of separation, provide DFPS agency fingerprint-based background checks for DFPS service desk staff at contractor expense, and assume full liability for repair or replacement of any state property lost or damaged.

View the file

Other files

File Type Posted
Exhibit K, Federal Funding Accountability and Transparency Act (FFATA).pdf PDF
Attachment D, Operational Readiness Checklist.pdf PDF
ESBD_535368_1792009039996_PCS 121 Solicitation Addendum Acknowledgement.pdf PDF
Attachment E, Staff Change Master Notice Email Template.pdf PDF
Attachment H, Candidate Cover Sheet.pdf PDF
Attachment I, Post-Meeting Written Report.pdf PDF
Exhibit A, HHS Solicitation Affirmations.PDF PDF
Attachment B, Corrective Action Plan.pdf PDF
Exhibit P, Managed Services Staff Metrics.pdf PDF
Attachment G, Property Damage Notice Email Template.pdf PDF
Exhibit C, HHS Additional Provisions.pdf PDF
Exhibit J, Certification Regarding Lobbying.pdf PDF
Exhibit I, Assurances Non-Construction Programs.pdf PDF
Attachment A, Candidate Acknowledgement of Requirements.pdf PDF
Exhibit O, Job Descriptions .pdf PDF
ESBD_535368_1792008710528_HHS0017021_Attachment 1 Addendum 1 _ Conference Slide Deck.pdf PDF
Exhibit D, Data Use Agreement (DUA).pdf PDF
Exhibit H, Insurance Review Requirements.pdf PDF
Exhibit M, HHS Online Bid Room Information.pdf PDF
Attachment J, Weekly Transition Status Report.pdf PDF
Exhibit L, Evaluation Tool.pdf PDF
Exhibit E, Exceptions Form.docx DOCX document
Exhibit N, Cost Proposal.xlsx XLSX spreadsheet
ESBD_535368_1791323861927_HHS0017021_ Request for Offer (RFO) PDF.pdf PDF
Exhibit F, Assumptions Form.docx DOCX document
Exhibit D-1, Attachment to DUA, Security and Privacy Inquiry (SPI).pdf PDF
Exhibit B, Health and Human Services (HHS) Uniform Terms and Conditions - Vendor.pdf PDF
Attachment C, Monthly Staffing Report.pdf PDF
Exhibit R, Transition Staffing Schedule.pdf PDF
Exhibit G, Subcontracting Plan Requirements.pdf PDF
Attachment F, Managed Service Staff Request.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit Q, Requirements Traceability Matrix (RTM)

RFO No. HHS0017021

RFO No. HHS0017021 Exhibit Q

Table of Contents

1.0 Requirements

1.1 Transition Phase Requirements

1.2 Operations Phase Requirements

1.2.1 Staffing Requirements

1.2.2 Onboarding & Security Requirements

1.2.3 Staff Change Requirements

1.2.4 Reporting & Meetings Requirements

1.2.5 Invoice & Timekeeping Requirements

1.2.6 Performance & Compliance Requirements

2.0 Key Performance Measures and Liquidated Damages

3.0 Deliverables

1.0 Requirements

The requirements for this Scope of Work are detailed herein. The Contractor must meet or exceed the requirements for Services as specified in this section. Certain requirements reference Table 9: Deliverables (Deliverables Table or “DEL”) and Table 8: Key

Performance& Liquidated Damages(Key Performance Measures or “KPM”), which define associated deliverables, performance standards, and enforcement mechanisms applicable to the Services described herein.

1.1 Transition Phase Requirements

The Transition Phase requirements included in Table 1: Transition Requirements describe the tasks and activities that Contractor will perform during the Transition Phase and must be completed between the Contract Execution Date and the Operations Start Date.

The Contractor must work with HHSC to transition the Services included in the Contract on a schedule approved by HHSC in writing.

Transition is complete once; (1) HHSC determines that the Contractor has successfully completed all Transition activities, and

(2) HHSC provides written notice to the Contractor to proceed with the commencement of the Operations Phase.

Table 1: Transition Requirements

TRA-01

The Contractor must assign no fewer than four (4) Key Personnel Staff, as identified in Exhibit O, Job Descriptions and submit contact information for each role via email to HHSC within one (1) Business Day of the Contract

Execution Date, in accordance with DEL-10 (Key Personnel Staff Contact Information).

Key Personnel Staff

Job Title Number of Positions

Project Manager 1

Transition Manager 1

Hiring Manager 1

Invoicing Manager 1

Total Key Personnel Staff 4

TRA-02

The Contractor must submit Qualified Candidate Package(s) to HHSC for review and approval no later than five (5)

Business Days following the Contract Execution Date and must continue submissions on an ongoing basis until all

Managed Services Staff roles are filled, per KPM-01 (Candidate Package Timeliness) and in accordance with DEL-

04 (Qualified Candidate Package)

TRA-03

The Contractor must achieve the required Managed Services Staff staffing levels during the Transition Phase per KPM-

10 (Initial Staffing Achievement) and in accordance with DEL-02 (Transition Staffing Schedule).

Managed Services Staff

Tier Job Title Number of Positions

Tier 1-ITSD Enterprise Service Desk (ESD) IT Support Specialist III 22

Tier 1-ITSD DFPS Service Desk IT Support Specialist III 10

Tier 1-ITSD TIERS IT/IEE Support Specialist III 5

Tier 2-DSS Deskside Support Systems Administrator II 14

Tier 2-DSS Deskside Services Team Lead 1

Total Managed Services Staff 52

TRA-04

The Contractor must ensure all Key Personnel Staff and any other Contractor staff assigned to support contract management attend the HHSC-coordinated on-site post-award meeting within five (5) Business Days of the Contract

Execution Date at: 701 W 51st Street, Austin TX, 78751.

TRA-05

The Contractor must support a Transition Phase of up to sixty (60) Calendar Days beginning on the Contract Execution

Date and must continue to meet all applicable performance expectations throughout the Transition Phase as described in Table 8: Key Performance& Liquidated Damages.

TRA-06

The Contractor must participate in weekly Transition Status Meetings scheduled and coordinated by HHSC per KPM-

12 (Transition Governance Participation).

TRA-07

The Contractor must submit a Weekly Transition Status Report (Attachment J) to HHSC throughout the Transition

Phase, per KPM-12 (Transition Governance Participation) and in accordance with DEL-01 (Weekly Transition

Status Report).

TRA-08

The Contractor must provide written acknowledgment of the HHSC approved Exhibit R, Transition Staffing

Schedule submitted as part of the Solicitation Response per Article V, Narrative Proposal Requirements, Section

5.1.2 (Project Work Plan), of this Solicitation in accordance with DEL-02 (Transition Staffing Schedule).

TRA-09

The Contractor must provide written acknowledgment of the HHSC approved Operational Readiness Checklist

(Attachment D) prior to the conclusion of the Transition Phase. In accordance with DEL-03 (Operational Readiness

Checklist) written HHSC approval is required before the Operations Phase may commence.

1.2 Operations Phase Requirements

The Operations Phase consists of all contract requirements for ongoing functions including but not limited to:

a. Staffing Requirements (STF);

b. Onboarding & Security Requirements (OS);

c. Staff Change Requirements (SC);

d. Reporting & Meeting Requirements (RM);

e. Invoice & Timekeeping Requirements (INT); and

f. Performance & Compliance Requirements (PC).

1.2.1 Staffing Requirements

The Contractor must provide staffing Services that meet or exceed the requirements specified in Table 2: Staffing Requirements.

Initial staffing ramp up during the Transition Phase is subject to KPM-10 (Initial Staffing Achievement).

Table 2: Staffing Requirements

STF-01

The Contractor must ensure continuity of staffing for all Critical Roles throughout the term of the Contract per KPM05

(Critical Vacancy Duration).

STF-02

The Contractor must ensure that all Qualified Candidates Packages proposed for consideration under this Contract are located within a fifty (50) mile radius of 701 W. 51st Street, Austin, Texas 78751, and meet the requirements specified in Exhibit O, Job Descriptions prior to submission of each Qualified Candidate Package in accordance with

DEL-04 (Qualified Candidate Package).

STF-03

The Contractor must maintain a recruiting pipeline sufficient to meet Contract staffing requirements per KPM-11

(Recruiting Pipeline Sufficiency).

STF-04

The Contractor must submit one (1) Qualified Candidate Package per HHSC request within five (5) Business Days of receiving a Managed Services Staff Request (Attachment F) per KPM-01 (Candidate Package Timeliness) and in accordance with DEL-04 (Qualified Candidate Package).

STF-05

The Contractor must provide written acknowledgment of the approved Candidate Cover Sheet (Attachment H) before any individual is assigned to perform Managed Services Staff duties and must confirm the selected candidate's information to HHSC via email within two (2) Business Days of the candidate's acceptance notice, in accordance with

DEL-04 (Qualified Candidate Package) and DEL-05 (Candidate Cover Sheet).

STF-06

The Contractor must submit two (2) additional Qualified Candidate Packages per job position within five (5) Business

Days of HHSC's written rejection of a Candidate Cover Sheet (Attachment H) and must continue submissions until

HHSC approves a candidate per KPM-11 (Recruiting Pipeline Sufficiency) and in accordance with DEL-04

(Qualified Candidate Package).

1.2.2 Onboarding & Security Requirements

The Contractor must provide Onboarding & Security Services that meets or exceeds the requirements specified in Table 3:

Onboarding & Security Requirements.

Table 3: Onboarding & Security Requirements

OS-01 The Contractor must provide headset equipment compatible with HHSC hardware and software including any necessary replacement headsets for all Managed Services Staff hired under this Contract prior to HHSC granting system access.

OS-02 The Contractor must ensure that all Managed Services Staff meet required background check and eligibility requirements. Additionally, Managed Services Staff assigned to the DFPS Service Desk must complete and clear a

DFPS agency fingerprint-based background check (BGC) at Contractor's expense prior to accessing any DFPS systems, data, or agency information.

OS-03 The Contractor must provide a high-level ITIL Foundation (v4 or v5) overview and HIPAA overview training to all

Managed Services Staff prior to the commencement of classroom and on-the-job training, per Candidate

Acknowledgement of Requirements (Attachment A). All training must be completed and verified by HHSC in accordance with KPM-04 (Training Completion) prior to granting system access.

1.2.3 Staff Change Requirements

The Contractor must provide Staff Change Requirement Services that meets or exceeds the requirements specified in Table 4

(Staffing Change Requirements).

Table 4: Staffing Change Requirements

SC-01

The Contractor must submit a Staff Change Notice using the Staff Change Master Notice Email Template

(Attachment E) to HHSC, the separating Managed Services Staff member, and the relevant ITSDS or DSS point of contact via email at least five (5) Business Days prior to any planned separation and within two (2) Business Hours of an unplanned separation of Managed Services Staff with an explanation of the circumstances, in accordance with DEL-

15 (Staff Change Notice).

SC-02 The Contractor must provide two (2) Qualified Candidate Packages for replacement Managed Services Staff required to fill any separation at no additional cost to HHSC within five (5) Business Days of the written request per KPM-11

(Recruiting Pipeline Sufficiency) and in accordance with DEL-04 (Qualified Candidate Package), using the

Candidate Cover Sheet (Attachment H) and Candidate Acknowledgement of Requirements (Attachment A).

SC-03 The Contractor must submit a Key Personnel Change Notice to HHSC via email at least five (5) Business Days prior to any planned separation of

Key Personnel Staff change or within four (4) Business hours of an unplanned separation and must replace the vacant position within five (5) Business Days of the vacancy, per KPM-11 (Recruiting Pipeline Sufficiency) and in accordance with DEL-17 (Key Personnel Change Notice).

SC-04 The Contractor must comply with HHSC's written direction to remove any Managed Services Staff within one (1)

Business Day of receipt of such notice, or sooner if necessary, notwithstanding any other procedures described in this

Contract.

SC-05 The Contractor must, upon HHSC's request, arrive at HHSC premises within two (2) Business hours to oversee the separation of any Managed Services Staff identified for removal.

SC-06 The Contractor must, upon HHSC's request, provide instruction to the Managed Services Staff regarding the applicable policy violation and the reason for separation.

SC-07 The Contractor must return all State property in the possession of departing Managed Services Staff in acceptable working order to the applicable agency leadership within two (2) Business Days of separation per KPM-03

(Equipment Return) and in accordance with DEL-08 (Equipment Tracking Log).

SC-08 The Contractor must maintain all State property in a secure domain, such as a locked cabinet in Contractor's office space, until the equipment is returned to HHSC.

SC-09 The Contractor must submit a Property Damage Notice using Property Damage Notice Email Template

(Attachment G), to HHSC via email within one (1) Business Day of any loss, destruction, or damage of equipment or property, in accordance with DEL-16 (Property Damage Notice).

SC-10 The Contractor must assume full liability to HHSC and the State for the full cost of repair, reconstruction, or replacement of any State of Texas owned, leased, or occupied property or equipment lost, destroyed, or damaged by the

Contractor, its employees, agents, Subcontractors, or suppliers.

SC-11 The Contractor must reimburse HHSC and the State for any property damage within ten (10) Calendar Days of the

Contractor's receipt of HHSC's or the State's written notice of the amount due.

1.2.4 Reporting & Meetings Requirements

The Contractor must provide Reporting & Meetings Services that meets or exceeds the requirements specified in Table 5: Reporting

& Meetings Requirements.

Table 5: Reporting & Meetings Requirements

RM-01 Contractor must schedule, facilitate, and support Monthly Metric Meetings and related governance activities in accordance with DEL-11 (Monthly Metric Meeting) per KPM-07 (Monthly Metric Meeting Compliance).

RM-02 Contractor must distribute the Monthly Metric Agenda via email within two (2) Business Days prior to the meeting, in accordance with DEL-12 (Monthly Metric Agenda) per KPM-07 (Monthly Metric Meeting Compliance).

RM-03 Contractor must provide an up-to-date copy of the Monthly Staff Report (Attachment C) to HHSC by the first (1st)

Business Day of the month for previous months' candidates in accordance with DEL-06 (Monthly Staff Report). The

Monthly Staff Report (Attachment C) shall list all filled positions, training status updates, and vacancies per KPM-02

(Staffing Compliance Rate) and KPM-04 (Training Completion).

RM-04 Contractor must complete and submit a Post Meeting Report (Attachment I) for each Monthly Metric Meeting in accordance with DEL-07 (Post Meeting Report).

RM-05 Contractor must update and resubmit Post Meeting Report (Attachment I) in accordance with DEL-07 (Post Meeting

Report). In response to HHSC feedback revised reports must be submitted per KPM-06 (Post-Meeting Report

Timeliness).

1.2.5 Invoice & Timekeeping Requirements

The Contractor must provide Invoice & Timekeeping Services that meet or exceed the requirements specified in Table 6: Invoice &

Timekeeping Requirements.

Table 6: Invoice & Timekeeping Requirements

INT-01 The Contractor must submit timesheets weekly by Friday at 12:00 PM Central Time (or the next Business Day if a State or Federal holiday) per KPM-08 (Timesheet & Invoice Submission) and in accordance with DEL-13 (Timesheet

Submission).

INT-02 The Contractor must ensure all Monthly Invoices reflect only authorized work hours and match HHSC-approved timesheets and must submit any corrected invoices as required per KPM-08 (Timesheet & Invoice Submission) and

KPM-09 (Invoice Accuracy) and in accordance with DEL-14 (Monthly Invoice).

INT-03 The Contractor must submit all Monthly Invoices solely in the Contractor's name and using the Contractor's Texas

Identification Number (TIN); HHSC will not remit payment on any invoice issued by or payable to a Subcontractor or any other entity per KPM-09 (Invoice Accuracy) and in accordance with DEL-14 (Monthly Invoice).

1.2.6 Performance & Compliance Requirements

The Contractor must provide Performance & Compliance Services that meet or exceed the requirements specified in Table 7:

Performance & Compliance Requirements.

Table 7: Performance & Compliance Requirements

PC-01 The Contractor must develop and submit a Corrective Action Plan (CAP) (Attachment B) to HHSC within five (5)

Business Days of receipt of HHSC's written notification identifying a failure to meet Contract requirements, in accordance with DEL-09 (Corrective Action Plan (CAP)).

PC-02 The Contractor must implement the HHSC-approved Corrective Action Plan (CAP) (Attachment B) within one (1)

Business Day of written approval, in accordance with DEL-09 (Corrective Action Plan (CAP)).

2.0 Key Performance Measures and Liquidated Damages

HHSC will monitor and evaluate Contractor performance throughout the Contract Term. Key Performance Measures (KPMs) are established to measure Contractor performance for contractual obligations subject to Service Level Occurrences identified in the table below and to assess Contractor’s ability to meet required performance standards. In the event Contractor fails to perform or complete its obligations in accordance with the Contract, HHSC may, in addition to other remedies available under the Contract, impose contractual remedies including corrective action requirements, enhanced monitoring, additional reporting, and the assessment of liquidated damages in accordance with Texas law, as further described in this Contract.

The requirements listed in Table 8: Key Performance & Liquidated Damages below describe the Contract’s Key Performance

Measures and associated Liquidated Damages for instances of noncompliance. Additional operational performance metrics for

Managed Services Staff are included in Exhibit P, Managed Services Staff Metrics.

A failure to meet a Key Performance Measure (KPM) threshold constitutes a Service Level Occurrence. Three (3) Service Level

Occurrences within a rolling twelve (12) month period require submission of a Corrective Action Plan (CAP) (Attachment B) in accordance with Table 7: Performance & Compliance Requirements and DEL-09 (Corrective Action Plan (CAP)).

Table 8: Key Performance & Liquidated Damages

KPM ID KPM Name KPM Description Liquidated Damages

KPM-01

Candidate

Package

Timeliness

The Contractor must provide Qualified Candidate Packages to

HHSC within five (5) Business Days of each written request. All resumes presented to HHSC must be for Qualified Candidates and must include all required candidate information in accordance with

Contract requirements. Failure to submit within the applicable deadline constitutes a Service Level Occurrence. See: STF-04, TRA02, and DEL-04.

$100 per Business Day past the applicable deadline

KPM-02

Staffing

Compliance

Rate

The Contractor must ensure monthly staffing compliance of greater than or equal to eighty-five percent (85%) of the required Managed

Services Staff complement, measured from the first Calendar Day through the last Calendar Day of each month. Staffing Compliance

(%) is calculated as the number of staffed positions divided by total required positions, multiplied by one hundred (100). Any month in which compliance falls below eighty-five percent (85%) constitutes a Service Level Occurrence. See: RM-03, and DEL-06.

$200 per Business Day below the required compliance level; three

(3) Service Level

Occurrences require submission of a

CAP

KPM-03

Equipment

Return

The Contractor must return all HHSC-owned equipment and peripherals in acceptable working order to HHSC within two (2)

Business Days of any Managed Services Staff separation. Failure to return any item within the required timeframe constitutes a Service

Level Occurrence. See: SC-07, SC-09, DEL-16 and DEL-08.

$200 per Business Day for each item not returned within the required timeframe

KPM-04

Training

Completion

HHSC will withhold as credit thirty percent (30%) of payment for any Managed Services Staff classified in training status. The credit will be released upon the Managed Services Staff member's successful completion of all required training activities within forty-five (45) Calendar Days from the date of hire. Training completion status must be reported via DEL-06, See: OS-03.

Thirty percent (30%) credit is forfeited if training is not successfully completed within forty-five (45)

Calendar Days from the date of hire

KPM-05

Critical

Vacancy

Duration

The Contractor must ensure that no Critical Role vacancy exceeds ten

(10) Business Days in any calendar month. Each calendar month in which a Critical Role vacancy exceeds ten (10) Business Days constitutes one (1) Service Level Occurrence, regardless of the number of days exceeded or the number of affected Critical Roles.

See: STF-01.

One (1) Service Level

Occurrence per calendar month in which a Critical

Role vacancy exceeds ten

(10) Business Days

KPM-06

Post-Meeting

Report

Timeliness

The Contractor must: (1) submit the Post Meeting Report

(Attachment I) within two (2) Business Days after each Monthly

Metric Meeting; and (2) provide any required revisions within two (2)

Business Days of HHSC's written request. Failure to timely submit a

Post Meeting Report (Attachment I) or required revision within the specified timeframe constitutes one (1) Service Level Occurrence per meeting cycle, regardless of the number of late days. See: RM-05 and

DEL-07 (Post Meeting Report).

One (1) Service Level

Occurrence per meeting cycle for late submission or late revision

KPM-07

Monthly

Metrics

Meeting

Compliance

The Contractor must: (1) hold the Monthly Metric Meeting no later than the fifteenth (15th) Calendar Day of each month; and (2) distribute the meeting Agenda to HHSC at least two (2) Business

Days prior to the meeting. Failure to meet either requirement for a given month constitutes one (1) Service Level Occurrence per month, regardless of the number of missed governance elements. See: RM01, RM-02, DEL-11 (Monthly Metric Meeting), and DEL-12 (Monthly

Metric Agenda).

One (1) Service Level

Occurrence per month for failure to meet either the meeting timing or agenda distribution requirement

KPM-08

Timesheet &

Invoice

Submission

The Contractor must: (1) submit timesheets weekly by Friday at

12:00 PM Central Time (or the next Business Day if a State or Federal holiday); and (2) submit monthly invoices by the eighth (8th)

Calendar Day of the month for the previous month's actual hours.

Failure to timely submit any required timesheet or monthly invoice within the applicable reporting period constitutes one (1) Service

Level Occurrence per reporting period, regardless of the number of late submissions within that period. See: INT-01, INT-02, DEL-13

(Timesheet Submission) and DEL-14 (Monthly Invoice).

One (1) Service Level

Occurrence per reporting period for any late timesheet or invoice submission

KPM-09

Invoice

Accuracy

The Contractor must ensure that all invoices: (a) match HHSC approved timesheets; (b) do not include hours outside of authorized work hours; and (c) include correct payment information as required under the Contract. Submission of a monthly invoice containing unauthorized hours, discrepancies from HHSC-approved timesheets, or incorrect payment information constitutes one (1) Service Level

Occurrence per invoice. HHSC may withhold payment for disputed line items until corrected. See: INT-02, INT-03 and DEL-14

(Monthly Invoice).

One (1) Service Level

Occurrence per invoice containing unauthorized hours, timesheet discrepancies, or incorrect payment information;

HHSC may withhold payment on disputed items

KPM-10

Initial

Staffing

Achievement

The Contractor must assign the full required Managed Services Staff complement of fifty-two (52) positions within thirty (30) Calendar

Days of the Contract Execution Date. Failure to achieve the required complement within thirty (30) Calendar Days constitutes one (1)

Service Level Occurrence. See: TRA-03, and DEL-02 (Transition

Staffing Schedule).

One (1) Service Level

Occurrence for failure to achieve the 52-position complement within 30

Calendar Days of Contract

Execution Date

KPM-11

Recruiting

Pipeline

Sufficiency

The Contractor must maintain a recruiting pipeline sufficient to meet

Contract staffing requirements at all times. For Managed Services

Staff positions, pipeline sufficiency is met when, upon HHSC request, candidate rejection, or staff replacement need, the Contractor submits at least two (2) Qualified Candidate Packages within five (5) Business

Days and continues submissions as needed until HHSC approves a candidate.

For Key Personnel Staff positions, pipeline sufficiency is met when the Contractor provides notice of the separation in accordance with

DEL-17 (Key Personnel Change Notice) and fills the vacant Key

Personnel position, with at least a temporary staff member, within five

(5) Business Days of the vacancy.

Failure to meet either requirement constitutes one (1) Service Level

Occurrence per affected position.

See: STF-03, STF-06, SC-03, DEL-04 (Qualified Candidate

Package) and DEL-17 (Key Personnel Change Notice).

One (1) Service Level

Occurrence per position request for failure to meet recruiting pipeline sufficiency requirements

KPM-12

Transition

Governance

Participation

During the Transition Phase, the Contractor must participate in one hundred percent (100%) of HHSC-scheduled weekly Transition

Status Meetings and must support all Transition governance activities, including providing required status updates and action item follow-up, in accordance with Contract requirements. Each missed

Transition Status Meeting or failure to provide required Transition status updates as scheduled by HHSC constitutes one (1) Service

Level Occurrence. See: TRA-06, and TRA-07.

One (1) Service Level

Occurrence per missed meeting or failure to provide required status updates as scheduled by

HHSC

3.0 Deliverables

HHSC will use commercially reasonable efforts to review each Deliverable and provide written notice of acceptance or rejection within five (5) Business Days, unless additional review time is required due to the complexity of the Deliverable.

The requirements listed in Table 9: Deliverablebelow describe the Deliverable Requirements, due dates, and submission frequency for each contract deliverable.

Table 9: Deliverable

Deliverable

ID

Deliverable

Name Deliverable

Due Date/

Submission

Update

Frequency

DEL-01

Weekly

Transition

Status

Report

The Contractor must submit a Weekly Transition Status Report

(Attachment J) documenting Transition activities, risks, issues, staffing status, and progress toward Operational Readiness. The report must be submitted via email to the HHSC Contract Manager or assigned representative each week during the Transition Phase. Each report must identify at a minimum, the reporting period, submission date, contractor representative, current transition status, issues requiring HHSC attention, and risks to successful transition completion.

See: TRA-07, and KPM-12 (Transition Governance Participation).

Weekly during

Transition

Phase

Weekly

DEL-02

Transition

Staffing

Schedule

(Exhibit R)

The Contractor must submit Exhibit R, Transition Staffing Schedule identifying staffing quantities, roles, and timelines, as part of the

Contractor Solicitation Response per RFO Article V, Narrative Proposal

Requirements, Section 5.1.2 (Project Work Plan). Updated Transition

Staffing Schedules shall reflect actual staffing progress and cumulative staffed positions achieved as of the submission date.

The Contractor must provide written acknowledgment of the HHSC-approved schedule via email to the HHSC Contract Manager or assigned representative. See:

Per Art. V

§5.1.2

As needed during

Transition

TRA-03, TRA-08, KPM-10 (Initial Staffing Achievement), and KPM-

12 (Transition Governance Participation).

DEL-03

Operational

Readiness

Checklist

(Attachment

D)

The Contractor must complete the HHSC-provided Operational

Readiness Checklist (Attachment D) provide written acknowledgment of its completion and submit to the HHSC Contract Manager or assigned representative via email prior to the Operations Start Date. HHSC written approval is required before the Transition Phase is considered complete.

See: TRA-09.

End of

Transition

Phase; prior to

Operations

Start Date

One-time

DEL-04

Qualified

Candidate

Package (per candidate)

The Contractor must submit one (1) Qualified Candidate Package per candidate to the HHSC Contract Manager or assigned representative via email.

Each package must include, at a minimum:

(1) Original Candidate resume;

(2) Response to HHSC-specified requirements;

(3) Candidate Cover Sheet (Attachment H); and

(4) Signed Candidate Acknowledgement of Requirements

(Attachment A).

Initial packages must be submitted within five (5) Business Days of the

(a) Contract Execution Date or

(b) Receipt of Managed Services Staff Request (Attachment

F).

If HHSC rejects a Candidate Cover Sheet submission, the Contractor shall submit at least two (2) replacement Qualified Candidate Packages within five (5) Business Days of HHSC's written rejection and continue submissions as necessary until HHSC approves a candidate. Each

Candidate Cover Sheet must specify if it is an initial, replacement, or resubmission tied to a previously rejected candidate. These sheets act as the evidentiary record for KPM-11 (Recruiting Pipeline Sufficiency) compliance.

See: TRA-02, STF-02, STF-04, STF-05, STF-06, KPM-01 (Candidate

Package Timeliness), and KPM-11 (Recruiting Pipeline Sufficiency).

Within five

(5) Business

Days of

Contract

Execution

Date or receipt of

Attachment

F (Managed

Services

Staff

Request)

As needed

DEL-05

Candidate

Cover Sheet

(Attachment

H)

The Contractor must submit a completed Candidate Cover Sheet

(Attachment H) for each candidate proposed for Managed Services

Staff assignment, documenting candidate details and assignment authorization, via email to the HHSC Contract Manager or assigned representative prior to staff assignment.

The Contractor must provide written acknowledgment upon HHSC approval. This deliverable is included within DEL-04 (Qualified

Candidate Package). but may be submitted independently for reapproval as needed. See: STF-05.

Prior to staff assignment

Per hire event

DEL-06

Monthly

Staff Report

(Attachment

C)

The Contractor must submit a Monthly Staff Report using the HHSC

Monthly Staff Report (Attachment C) listing all filled positions, training status updates, and vacancies, via email to the HHSC Contract

Manager or assigned representative by the first (1st) Business Day of each month. The report must reflect the previous month's staffing data and comply with KPM-02 (Staffing Compliance Rate), KPM-04

(Training Completion), and KPM-07 (Monthly Metric Meeting

Compliance) requirements. See: RM-03.

1st Business

Day of each month

Monthly

DEL-07

Post

Meeting

Report

(Attachment

I)

The Contractor must prepare and submit a Post Meeting Report

(Attachment I) summarizing each Monthly Metric Meeting including decisions made and action items identified via email to the HHSC

Contract Manager or assigned representative within two (2) Business

Days following each meeting. Revised reports must be resubmitted within two (2) Business Days of any HHSC written request for revisions.

See: RM-04 and RM-05.

Within two

(2) Business

Days following each meeting

DEL-08

Equipment

Tracking

Log

The Contractor must submit an Equipment Tracking Log to the HHSC

Contract Manager or assigned representative via email by the first (1st)

Business Day of each quarter and within two (2) Business Days of any

Managed Services Staff separation. The log must be submitted as a PDF file and identify all separating Managed Services Staff and associated

State property which must include, at a minimum: (a) first and last name;

(b) hardware; (c) software; (d) mobile device; (e) badge; (f) any other

State property; (g) date each item was issued; (h) date of staff separation;

(i) date each item was returned; (j) name of the State employee who received each item returned; (k) KPM-03 (Equipment Return) compliance metric measurement; and (l) contractor’s written acknowledgment of property return. See: SC-07, and SC-09.

1st Business

Day of each quarter/ within two

(2) Business

Days of any

Managed

Services

Staff separation

Quarterly/

As needed

DEL-09

Corrective

Action Plan

(CAP)

(Attachment

B)

The Contractor must develop and submit a Corrective Action Plan

(CAP) (Attachment B) to the HHSC Contract Manager or assigned representative via email within five (5) Business Days of HHSC's written notice of non-compliance. The CAP must address identified performance deficiencies and include specific corrective actions and implementation timelines. HHSC written approval is required before implementation.

See: PC-01, and PC-02.

Within five

(5) Business

Days of

HHSC

notice

As needed

DEL-10

Key

Personnel

Staff

Contact

Information

The Contractor must submit contact information for all four (4) Key

Personnel Staff — Project Manager, Hiring Manager, Invoicing

Manager, and Transition Manager — via email to the HHSC Contract

Manager or assigned representative within one (1) Business Day of the

Contract Execution Date. See: TRA-01.

Within one

(1) Business

Day of

Contract

Execution

Date

One-time

DEL-11

Monthly

Metric

Meeting

The Contractor must schedule and facilitate a Monthly Metric Meeting with HHSC to discuss, at a minimum, compliance with Contract requirements, staffing levels, deliverable status, and action items. The meeting must be held no later than the fifteenth (15th) Calendar Day of each month. Meeting coordination must be communicated to the HHSC

Contract Manager or assigned representative via email. See: RM-01 and

KPM-07 (Monthly Metric Meeting Compliance).

No later than 15th

Calendar

Day of each month

Per meeting

DEL-12

Monthly

Metric

Agenda

The Contractor must prepare and distribute a Monthly Metric Agenda to the HHSC Contract Manager or assigned representative via email at least two (2) Business Days prior to each Monthly Metric Meeting. The agenda must include, at a minimum: (a) review of the Monthly Staff

Report including compliance and vacancy transparency; (b) staffing levels and any compliance below 85%; (c) feedback or approval of deliverables; (d) next steps, action items, and future meeting scheduling;

and (e) certification of staffing data accuracy and proper attestation by

Contractor representatives. See: RM-02 and KPM-07 (Monthly Metric

Meeting Compliance).

At least two

(2) Business

Days prior to each meeting

Per meeting

DEL-13

Timesheet

Submission

The Contractor must submit accurate timesheets for all Managed

Services Staff via the Contractor's designated timekeeping system, as approved by HHSC, with a copy submitted to the HHSC Contract

Manager or assigned representative, every Friday by 12:00 PM Central

Time (or the next Business Day if a State or Federal holiday). ITSDS

Staff hours must match HHSC phone system records. See: INT-01, and

KPM-08 (Timesheet & Invoice Submission).

Every

Friday by

12:00 PM

CT (next

BD if State or Federal holiday)

Weekly

DEL-14

Invoice

The Contractor must submit a Monthly Invoice to the HHSC Contract

Manager or assigned representative via email by the eighth (8th)

Calendar Day of each month for the previous month's actual hours. The invoice must include, at a minimum:

(a) Contractor's name;

(b) Texas Identification Number (TIN);

(c) Address, contact name, phone number, and payment address;

(d) HHSC Contract number;

(e) HHSC Contract Manager;

(f) description of services provided;

(g) Itemized actual hours worked per individual Managed

Services Staff, broken down by month and grouped per

Service Desk;

(h) HHSC purchase order number;

(i) Invoice total to date; and

(j) Any credits itemized at the bottom of the invoice.

If HHSC rejects or returns an invoice for correction, the Contractor shall submit a revised invoice that addresses all identified deficiencies and clearly identifies the changes made from the previously submitted version. The revised invoice must be submitted within five (5) Business

Days of HHSC's notification unless otherwise directed by HHSC.

See: INT-02, INT-03, KPM-08 (Timesheet & Invoice Submission), and

KPM-09 (Invoice Accuracy).

8th

Calendar

Day of each month

DEL-15

Staff Change

Notice

The Contractor must submit a Staff Change Notice using the Staff

Change Master Notice Email Template (Attachment E), via email to the HHSC Contract Manager, the separating staff member, and the relevant ITSDS or DSS point of contact. The notice must be submitted at least five (5) Business Days prior to any planned separation and within four (4) Business Hours of any unplanned separation. The notice must identify the separating staff member, effective separation date, circumstances of the separation, access suspension activities, equipment return activities, and replacement staffing actions, including the anticipated replacement timeline. See SC-01.

Planned separation:

within five

(5) Business

Days;

Unplanned separation:

within four

(4) Business

Hours

As needed

DEL-16

Property

Damage

Notice

(Attachment

G)

The Contractor must submit a Property Damage Notice using the

Property Damage Notice Email Template (Attachment G) via email to the HHSC Contract Manager or assigned representative within one (1)

Business Day of any loss, destruction, or damage of State-owned equipment or property. See SC-09.

Within one

(1) Business

Day of loss, destruction, or damage

As needed

DEL-17

Key

Personnel

Change

Notice

The Contractor must submit a written Key Personnel Change Notice to the HHSC Contract Manager or assigned representative via email within five (5) Business Day any planned Key Personnel Staff change or within two (2) Business Hours of an unplanned separation. The email notice must document: (a) the affected position; (b) the effective date of the change; (c) the reason for the change; and (d) confirmation of replacement within the five (5) Business Day vacancy. See SC-03.

Planned separation:

within five

(5) Business

Days;

Unplanned separation:

within four

(4) Business

Hours