Exhibit M9 - Preventative Maintenance (PM) 2018 GSA OM Guide.pdf
PDF 300 KB Posted
- Attached to
- Full Maintenance and Operations, Laredo, TX
- Solicitation number
- 47PH0220R0014
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Services Administration Public Buildings
Service
PUBLIC BUILDINGS
MAINTENANCE
STANDARDS FINAL
December 31, 2018 General Services Administration Preventive Maintenance Guide Effective Date: December 31, TABLE OF CONTENTS
Maintenance Practices and General Information for Federal Buildings
79 SECTION 1: Introduction and Maintenance Standard List .......................................................... 80 General Overview:
.................................................................................................................... 80 Maintenance Standard Numbers: .............................................................................................. 80 Equipment
Attributes: ............................................................................................................... 80 Good Maintenance Practices
Electrical test equipment Suitability of Test Equipment Tools:
STANDARD TOOLS - BASIC
TOOL GROUP A
TOOL GROUP B ............................................................................................................. 84 TOOL GROUP C ............................................................................................................. 85 TOOL
GROUP D - STORMWATER .............................................................................. 85 SECTION 2:
Maintenance Standard Listing ................................................................................ 86 SECTION
3: Preventative Maintenance Standards
ARCHITECTURAL AND STRUCTURAL
ARCS-BAR-01-06M
Security Bollards/Barricade Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-DAV-01-01Y
Davits Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-DOR-01-06M
Door, Power Operated Application:
General Services Administration Preventive Maintenance Guide Effective Date: December 31, Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-DOR-02-03M
113 Door; Hydraulic, Electric or Pneumatic Operated 113 Application:
113 Special Instructions:
113 Check Points:
113 Recommended Tools, Materials, and Equipment:
114 ARCS-DOR-03-06M
.......................................................................................................... 114 Door, Manual, Overhead ................................................................................................ 114 Application:
.................................................................................................................... 114 Special
Instructions: ........................................................................................................ 114 Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-DOR-04-06M
115 Door, Manually Operated Entrance 115 Application:
115 Special Instructions:
115 Check Points:
115 Recommended Tools, Materials, and Equipment:
116 ARCS-FPL-01-01M
........................................................................................................... 116 Fireplace
Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-FPL-02-01Y
117 Incinerator 117 Application:
117 Special Instructions:
117 Check Points:
118 Recommended Tools, Materials, and Equipment:
118 ARCS-LND-01-06M
General Services Administration Preventive Maintenance Guide Effective Date: December 31, Fountain, Memorial or Decorative Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-LND-02-06M
120 Gates and Fences, Security and Access 120 Application:
120 Special Instructions:
120 Check Points:
120 Recommended Tools, Materials, and Equipment:
121 ARCS-LND-03-01Y
........................................................................................................... 122 Lawn Sprinkler Nozzles ................................................................................................. 122 Application:
.................................................................................................................... 122 Special Instructions: ........................................................................................................ 122 Check
Points:
Recommended Tools, Materials, and Equipment:
ARCS-LND-04-03M
123 Flag Pole, Electric and Manual 123 Application:
123 Special Instructions:
123 Check Points:
123 Recommended Tools, Materials, and Equipment:
124 ARCS-LND-05-06M
.......................................................................................................... 124 Lawn Mower and
Edger ................................................................................................. 124 Application:
.................................................................................................................... 124 Special
Instructions: ........................................................................................................ 124 Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-MHL-01-01Y
125 Manhole, Electrical 125 Application:
125 Special Instructions:
125 Check Points:
General Services Administration Preventive Maintenance Guide Effective Date: December 31, Recommended Tools, Materials, and Equipment:
ARCS-MHL-02-03M
126 Manhole, Sewer 126 Application:
126 Special Instructions:
126 Check Points:
126 Recommended Tools, Materials, and Equipment:
126 ARCS-MHL-03-06M
......................................................................................................... 127 Manhole (Water, Steam, and Fuel Oil) ........................................................................... 127 Application:
.................................................................................................................... 127 Special
Instructions: ........................................................................................................ 127 Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-RFS-01-06M
128 Roof Inspection, Built Up Type 128 Application:
128 Special Instructions:
128 Check Points:
129 Recommended Tools, Materials, and Equipment:
129 ROOF INSPECTION CHECKLISTS
131 ARCS-RFS-02-06M
........................................................................................................... 136 Roof Inspection, Shingle Type ....................................................................................... 136 Application:
.................................................................................................................... 136 Special
Instructions: ........................................................................................................ 136 Check Points:
Recommended Tools, Materials, and Equipment:
ROOF INSPECTION CHECKLISTS
ARCS-RFS-03-03M
137 Extensive and Intensive Vegetative Roof 137 Application:
137 Special Instructions:
137 Check Points:
138 Recommended Tools, Materials, and Equipment:
138 ARCS-SCT-01-03M
General Services Administration Preventive Maintenance Guide Effective Date: December 31, Key Card System Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-SCT-02-01Y
139 Parking Arm Gates 139 Application:
139 Special Instructions:
139 Check Points:
139 Recommended Tools, Materials, and Equipment:
140 ARCS-STR-01-01Y
............................................................................................................ 140 Lightning
Protection Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-SWM-01-01Y
141 Stormwater Management, Green Roofs - Vegetation Coverage 141 Application:
141 Special Instructions:
141 Check Points:
141 Recommended Tools, Materials, and Equipment:
141 ARCS-SWM-01-03M
......................................................................................................... 141 Stormwater
Management, Green Roofs - Weeding ........................................................ 141 Application:
.................................................................................................................... 141 Special
Instructions: ........................................................................................................ 142 Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-SWM-01-06M
142 Stormwater Management, Green Roofs - Membrane and Drainage 142 Application:
142 Special Instructions:
142 Check Points:
General Services Administration Preventive Maintenance Guide Effective Date: December 31, Recommended Tools, Materials, and Equipment:
ARCS-SWM-02-01Y
Stormwater Management, Rainwater Harvesting - System Components Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-SWM-02-03M
143 Stormwater Management, Rainwater Harvesting - Prescreening 143 Application:
143 Special Instructions:
143 Check Points:
144 Recommended Tools, Materials, and Equipment:
144 ARCS-SWM-02-03Y
144 Stormwater Management, Rainwater Harvesting - Roof 144 Application:
144 Special Instructions:
144 Check Points:
144 Recommended Tools, Materials, and Equipment:
144 ARCS-SWM-02-04M
......................................................................................................... 144 Stormwater
Management, Rainwater Harvesting - Tank, Inflows and Outflows .......... 144 Application:
.................................................................................................................... 144 Special
Instructions: ........................................................................................................ 144 Check
Points:
Recommended Tools, Materials, and Equipment:
ARCS-SWM-02-06M
145 Stormwater Management, Rainwater Harvesting - Gutters and Downspouts 145 Application:
145 Special Instructions:
145 Check Points:
145 Recommended Tools, Materials, and Equipment:
145 ARCS-SWM-02-06MA
...................................................................................................... 145 Stormwater
Management, Rainwater Harvesting - Winterizing .................................... 145 Application:
General Services Administration Preventive Maintenance Guide Effective Date: December 31, Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-SWM-04-01M
146 Stormwater Management, Permeable Paving - Mowing 146 Application:
146 Special Instructions:
146 Check Points:
146 Recommended Tools, Materials, and Equipment:
147 ARCS-SWM-04-01Y
147 Stormwater Management, Permeable Paving - Sediment Removal 147 Application:
147 Special Instructions:
147 Check Points:
147 Recommended Tools, Materials, and Equipment:
147 ARCS-SWM-04-01YA
....................................................................................................... 148 Stormwater
Management, Permeable Paving - Mechanically Sweep ............................ 148 Application:
.................................................................................................................... 148 Special
Instructions: ........................................................................................................ 148 Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-SWM-04-06M
148 Stormwater Management, Permeable Paving - Repair Surface 148 Application:
149 Special Instructions:
149 Check Points:
149 Recommended Tools, Materials, and Equipment:
149 ARCS-SWM-05-01Y
149 Stormwater Management, Bioretention - Inspection and Plants 149 Application:
149 Special Instructions:
150 Check Points:
150 Recommended Tools, Materials, and Equipment:
150 ARCS-SWM-05-01YB
General Services Administration Preventive Maintenance Guide Effective Date: December 31, Stormwater Management, Bioretention - Rain Garden - Inspection and Plants Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-SWM-05-03M
151 Stormwater Management, Bioretention - Clear Debris 151 Application:
151 Special Instructions:
151 Check Points:
151 Recommended Tools, Materials, and Equipment:
151 ARCS-SWM-05-03Y
152 Stormwater Management, Bioretention - Mulch 152 Application:
152 Special Instructions:
152 Check Points:
152 Recommended Tools, Materials, and Equipment:
152 ARCS-SWM-05A-01M
...................................................................................................... 152 Stormwater Management, Bioretention - Spot Weed ..................................................... 152 Application:
.................................................................................................................... 152 Special Instructions: ........................................................................................................ 152 Check
Points:
Recommended Tools, Materials, and Equipment:
ARCS-SWM-05B-01M
153 Stormwater Management, Bioretention - Rain Garden - Spot Weed 153 Application:
153 Special Instructions:
153 Check Points:
153 Recommended Tools, Materials, and Equipment:
153 ARCS-SWM-05B-03M
...................................................................................................... 153 Stormwater
Management, Bioretention - Rain Garden - Mow ...................................... 153 Application:
.................................................................................................................... 153 Special
Instructions: ........................................................................................................ 153 Check Points:
General Services Administration Preventive Maintenance Guide Effective Date: December 31, Recommended Tools, Materials, and Equipment:
ARCS-SWM-05B-03Y
154 Stormwater Management, Bioretention - Rain Garden - Mulch or Ground Cover 154 Application:
154 Special Instructions:
154 Check Points:
154 Recommended Tools, Materials, and Equipment:
154 ARCS-SWM-05C-03M
...................................................................................................... 154 Stormwater
Management, Bioretention - Rain Garden - Clear Debris .......................... 154 Application:
.................................................................................................................... 154 Special
Instructions: ........................................................................................................ 154 Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-SWM-06-01Y
155 Stormwater Management, Underground Sand Filter- Inspection and Best Practices 155 Application:
155 Special Instructions:
155 Check Points:
155 Recommended Tools, Materials, and Equipment:
156 ARCS-SWM-07-01Y
......................................................................................................... 156 Stormwater
Management, Infiltration - Pretreatment Cell ............................................. 156 Application:
.................................................................................................................... 156 Special
Instructions: ........................................................................................................ 156 Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-SWM-07-03M
156 Stormwater Management, Infiltration - Drainage 156 Application:
156 Special Instructions:
156 Check Points:
157 Recommended Tools, Materials, and Equipment:
157 ARCS-SWM-07-03MA
...................................................................................................... 157 Stormwater
Management, Infiltration - Mow ................................................................. 157 Application:
General Services Administration Preventive Maintenance Guide Effective Date: December 31, Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-SWM-07-06M
Stormwater Management, Infiltration - Ponding Water Check Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-SWM-09-01Y
Stormwater Management, Ponds - Wet Ponds - Inspection
Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-SWM-09-03M
Stormwater Management, Ponds - Wet Ponds - Spillway and Erosion Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-SWM-09-06M
Stormwater Management, Ponds - Wet Ponds - Mow Buffer Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
ARCS-WIN-01-01Y
Window Washing Scaffold, Power Operated Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
CHILD CARE
General Services Administration Preventive Maintenance Guide Effective Date: December 31, CHLD-EQP-01-01M
Child Care Equipment Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
CHLD-SEC-01-01M
Child Care secured perimeter systems Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
CHLD-SPC-01-01M
Child Care Areas Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
CLEANING
167 CLNG-SCB-01-03M
167 Scrubbing Machine, Battery or Propane Powered Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
CLNG-SNO-01-01Y
Snow Blower Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
CLNG-SWP-01-06M
Sweeper, Riding Application:
General Services Administration Preventive Maintenance Guide Effective Date: December 31, Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
CLNG-TCP-01-01Y
Trash Compactor Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
CLNG-VAC-01-06M
Vacuum Cleaner, Heavy Duty, Tank Type Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
CLNG-VAC-02-01Y
Vacuum, Central System Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
CONTROLS
175 CTRL-DDC-01-01M
175 BAS Server
Application:
Special Instructions:
Children of this Parent Piece of Equipment Check Points:
CTRL-DDC-01-01W
BAS Server Application:
Special Instructions:
Children of this Parent Piece of Equipment Check Points:
General Services Administration Preventive Maintenance Guide Effective Date: December 31, CTRL-DDC-01-01Y
177 BAS Server 177 Application:
177 Special Instructions:
177 Children of this Parent Piece of Equipment 177 Check Points:
177 Recommended Tools, Materials, and Equipment:
178 CTRL-DDC-01-03M
.......................................................................................................... 178 BAS Server
..................................................................................................................... 178 Application:
.................................................................................................................... 178 Special
Instructions: ........................................................................................................ 178 Children of this Parent Piece of Equipment ................................................................... 179 Check
Points:
Recommended Tools, Materials, and Equipment:
CTRL-DDC-02-01M
179 BAS Server Client Workstation 179 Application:
179 Special Instructions:
179 Check Points:
180 CTRL-DDC-02-01W
.......................................................................................................... 180 BAS Server Client
Workstation ...................................................................................... 180 Application:
.................................................................................................................... 180 Special
Instructions: ........................................................................................................ 180 Check Points:
CTRL-DDC-02-01Y
181 BAS Server Client Workstation 181 Application:
181 Special Instructions:
181 Check Points:
181 Recommended Tools, Materials, and Equipment:
182 CTRL-DDC-02-03M
.......................................................................................................... 182 BAS Server Client
Workstation ...................................................................................... 182 Application:
.................................................................................................................... 182 Special
Instructions:
General Services Administration Preventive Maintenance Guide Effective Date: December 31, Check Points:
Recommended Tools, Materials, and Equipment:
CTRL-DDC-03-01Y
183 Network, Management Level 183 Application:
183 Special Instructions:
183 Children of this Parent Piece of Equipment 183 Check Points:
184 Recommended Tools, Materials, and Equipment:
184 CTRL-DDC-03-03M
.......................................................................................................... 184 Network, Management Level
Application:
Special Instructions:
Check Points:
CTRL-DDC-04-01Y
185 Network, Building Level 185 Application:
185 Special Instructions:
185 Parent of this Piece of Equipment 185 Children of this Parent Piece of Equipment 186 Check Points:
186 Recommended Tools, Materials, and Equipment:
186 CTRL-DDC-04-03M
.......................................................................................................... 187 Network, Building
Level ................................................................................................ 187 Application:
.................................................................................................................... 187 Special
Instructions: ........................................................................................................ 187 Parent of this Piece of Equipment .................................................................................. 187 Children of this Parent Piece of Equipment ................................................................... 187 Check Points:
CTRL-DDC-05-01Y
188 Field Panel 188 Application:
188 Special Instructions:
188 Parent of this Piece of Equipment
Children of this Parent Piece of Equipment Check Points:
Recommended Tools, Materials, and Equipment:
CTRL-DDC-06-01Y
189 Controller 189 Application:
189 Special Instructions:
189 Parent of this Piece of Equipment 190 Children of this Parent Piece of Equipment 190 Check Points:
190 Recommended Tools, Materials, and Equipment:
191 CTRL-DDC-07-01Y
........................................................................................................... 191 Sensors, Electronic
......................................................................................................... 191 Application:
.................................................................................................................... 191 Special
Instructions: ........................................................................................................ 191 Parent of this Piece of Equipment .................................................................................. 192 Check
Points:
Recommended Tools, Materials, and Equipment:
CTRL-DDC-08-01M
193 Alarm Maintenance 193 Application:
193 Special Instructions:
193 Parent of this Piece of Equipment 194 Check Points:
194 CTRL-DDC-09-01Y
........................................................................................................... 194 BAS Wireless
Electronic/Pneumatic end devices (Thermostats) ................................... 194 Application:
.................................................................................................................... 194 Special
Instructions: ........................................................................................................ 195 Parent of this Piece of Equipment .................................................................................. 195 Check
Points:
CTRL-DDC-09-06M
195 BAS Wireless Electronic/Pneumatic end devices (Thermostats) 195 Application:
196 Special Instructions:
Parent of this Piece of Equipment Check Points:
CTRL-END-01-01Y
End Devices Application:
Special Instructions:
Parent of this Piece of Equipment Check Points:
Recommended Tools, Materials, and Equipment:
CTRL-PNU-01-06M
Control Air System Application:
Special Instructions:
Children of this Parent Piece of Equipment Check Points:
Recommended Tools, Materials, and Equipment:
CTRL-PNU-02-06M
Receiver Controllers Application:
Special Instructions:
Children of this Parent Piece of Equipment Check Points:
Recommended Tools, Materials, and Equipment:
CTRL-PNU-03-03M
Control Air Filter Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
ELECTRICAL
205 ELEC-ATS-01-01M
205 Automatic Transfer Switches Application:
Special Instructions:
General Services Administration Preventive Maintenance Guide Effective Date: December 31, Check Points:
ELEC-ATS-01-01Y
205 Automatic Transfer Switches 205 Application:
205 Special Instructions:
205 Check Points:
206 ELEC-BDT-01-01Y
........................................................................................................... 206 Metal Enclosed Busways (Busduct) ............................................................................... 206 Application:
.................................................................................................................... 206 Special Instructions:
ELEC-BDT-01-03Y
207 Metal Enclosed Busways (Busduct) 207 Application:
207 Special Instructions:
207 Check Points:
207 ELEC-CAP-01-01Y
............................................................................................................ 207 Capacitors
....................................................................................................................... 207 Application:
.................................................................................................................... 207 Special
Instructions:
ELEC-CAP-01-03Y
208 Capacitors 208 Application:
208 Special Instructions:
208 Check Points:
208 ELEC-CAP-02-01Y
Reactors-Dry-Type, Thermographic Survey Application:
Special Instructions:
ELEC-CAP-02-03Y
209 Reactors- Dry-Type 209 Application:
209 Special Instructions:
209 Check Points:
209 ELEC-CAP-03-01M
General Services Administration Preventive Maintenance Guide Effective Date: December 31, Reactors, Liquid-Filled, Oil Leakage Application:
Special Instructions:
Check Points:
ELEC-CAP-03-01Y
210 Reactors, Liquid-Filled, Oil Sampling 210 Application:
210 Special Instructions:
210 Check Points:
211 ELEC-CAP-03-03Y
............................................................................................................ 211 Reactors, Liquid-Filled Application:
Special Instructions:
Check Points:
ELEC-CBL-01-01Y
212 Cables, Low Voltage 600 Volt Maximum, Thermographic Survey 212 Application:
212 Special Instructions:
212 ELEC-CBL-01-03Y
............................................................................................................ 212 Cables, Low
Voltage 600 Volt Maximum ...................................................................... 212 Application:
.................................................................................................................... 212 Special
Instructions: ........................................................................................................ 212 Check Points:
ELEC-CBL-02-01Y
213 Cables, Medium Voltage
213 Application:
213 Special Instructions:
213 ELEC-CBL-02-03Y
............................................................................................................ 213 Cables, Medium-and High-Voltage ............................................................................... 213 Application:
.................................................................................................................... 213 Special
Instructions: ........................................................................................................ 213 Check Points:
ELEC-CKB-01-01Y
214 Circuit Breakers, Air, Insulated-Case/Molded-Case
General Services Administration Preventive Maintenance Guide Effective Date: December 31, Application:
Special Instructions:
ELEC-CKB-01-03Y
214 Circuit Breakers, Air, Insulated-Case/Molded-Case 214 Application:
214 Special Instructions:
215 Check Points:
215 ELEC-CKB-02-01Y
........................................................................................................... 215 Circuit Breakers, Air, Low-Voltage Power .................................................................... 215 Application:
.................................................................................................................... 215 Special
Instructions:
ELEC-CKB-02-03Y
216 Circuit Breakers, Air, Low-Voltage Power 216 Application:
216 Special Instructions:
216 Check Points:
216 ELEC-CKB-03-01Y
........................................................................................................... 216 Circuit Breakers, Air, Medium Voltage ......................................................................... 216 Application:
.................................................................................................................... 216 Special
Instructions:
ELEC-CKB-03-03Y
217 Circuit Breakers, Air, Medium Voltage 217 Application:
217 Special Instructions:
217 Check Points:
217 ELEC-CKB-04-01M
........................................................................................................... 217 Circuit Breakers, Oil, Medium-Voltage ......................................................................... 217 Application:
.................................................................................................................... 217 Special
Instructions: ........................................................................................................ 218 Check Points:
ELEC-CKB-04-01Y
218 Circuit Breakers, Oil, Medium-Voltage 218 Application:
218 Special Instructions:
General Services Administration Preventive Maintenance Guide Effective Date: December 31, Check Points:
ELEC-CKB-04-03Y
219 Circuit Breakers, Oil, Medium-Voltage 219 Application:
219 Special Instructions:
219 Check Points:
219 ELEC-CKB-05-01Y
........................................................................................................... 219 Circuit Breakers, Vacuum, Medium-Voltage ................................................................. 219 Application:
.................................................................................................................... 219 Special
Instructions:
ELEC-CKB-05-03Y
220 Circuit Breakers, Vacuum, Medium-Voltage 220 Application:
220 Special Instructions:
220 Check Points:
220 ELEC-CLK-01-06M
........................................................................................................... 221 Clocks, Central System ................................................................................................... 221 Application:
.................................................................................................................... 221 Special Instructions: ........................................................................................................ 221 Check
Points:
Recommended Tools, Materials, and Equipment:
ELEC-DCS-01-01M
221 DC Battery System, Lead Acid 221 Application:
221 Special Instructions:
222 Check Points:
222 ELEC-DCS-01-01Y
............................................................................................................ 222 DC Battery
System, Lead Acid ...................................................................................... 222 Application:
.................................................................................................................... 222 Special
Instructions: ........................................................................................................ 222 Check Points:
Recommended Tools, Materials, and Equipment:
ELEC-DCS-02-01M
223 Primary Battery (Dry Cell)
General Services Administration Preventive Maintenance Guide Effective Date: December 31, Application:
Special Instructions:
Check Points:
Recommended Tools, Materials, and Equipment:
ELEC-DCS-03-03M
224 Nickel Cadmium Battery 224 Application:
224 Special Instructions:
224 Check Points:
225 Recommended Tools, Materials, and Equipment:
226 ELEC-DCS-04-01M
........................................................................................................... 226 DC Battery System, Chargers ......................................................................................... 226 Application:
.................................................................................................................... 226 Special
Instructions: ........................................................................................................ 226 Check Points:
ELEC-DCS-04-01Y
227 DC Battery System, Chargers 227 Application:
227 Special Instructions:
227 Check Points:
227 ELEC-EMG-01-01M
.......................................................................................................... 227 Emergency
Generator, Electrical .................................................................................... 227 Application:
.................................................................................................................... 227 Special
Instructions: ........................................................................................................ 228 Check Points:
ELEC-EMG-01-01Y
228 Emergency Generator, Electrical 228 Application:
228 Special Instructions:
228 Children of this Piece of Equipment 229 Check Points:
229 ELEC-GRD-01-01Y
........................................................................................................... 229 Grounding Systems
......................................................................................................... 229 Application:
General Services Administration Preventive Maintenance Guide Effective Date: December 31, Special Instructions:
Check Points:
ELEC-GRD-01-03Y
230 Grounding Systems 230 Application:
230 Special Instructions:
230 Check Points:
230 ELEC-ITR-01-01Y
............................................................................................................. 230 Instrument Transformers ................................................................................................ 230 Application:
.................................................................................................................... 230 Special Instructions:
ELEC-ITR-01-03Y
231 Instrument Transformers 231 Application:
231 Special Instructions:
231 Check Points:
231 ELEC-LTG-01-03M
........................................................................................................... 231 Dimmer and
Control, Stage and General Lighting ......................................................... 231 Application:
.................................................................................................................... 232 Special
Instructions: ........................................................................................................ 232 Check Points:
Recommended Tools, Materials, and Equipment:
ELEC-LTG-02-02Y
233 Fluorescent Lighting Fixture, Washing and Relamping 233 Application:
233 Special Instructions:
233 Check Points:
234 Recommended Tools, Materials, and Equipment:
234 ELEC-LTG-02-05Y
............................................................................................................ 235 Fluorescent
Lighting Fixture, Relamping Only .............................................................. 235 Application:
.................................................................................................................... 235 Special
Instructions: ........................................................................................................ 235 Check Points:
Recommended Tools, Materials, and Equipment:
General Services Administration Preventive Maintenance Guide Effective Date: December 31, ELEC-LTG-03-01Y
236 Lighting, Special Feature 236 Application:
236 Special Instructions:
236 Check Points:
236 Recommended Tools, Materials, and Equipment:
237 ELEC-LTG-04-05Y
............................................................................................................ 237 Lighting, Outside
Mercury Vapor, High Pressure Sodium or Metal Halide .................. 237 Application:
.................................................................................................................... 237 Special
Instructions: ........................................................................................................ 237 Check Points:
Recommended Tools, Materials, and Equipment:
ELEC-LTG-04-06M
238 Lighting, Outside Incandescent and Fluorescent 238 Application:
238 Special Instructions:
238 Check Points:
238 Recommended Tools, Materials, and Equipment:
238 ELEC-LTG-05-01M
........................................................................................................... 239 Spotlights, Fixed and Portable ........................................................................................ 239 Application:
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .