Exhibit C1 Building Information Sheet_JuarezLincoln LPOE.pdf

PDF 46 KB Posted

Attached to
Full Maintenance and Operations, Laredo, TX Federal contract opportunity
Solicitation number
47PH0220R0014
Issued by
General Services Administration Public Buildings Service Region 7

View the file

Other files for this federal contract opportunity

Other files attached to Full Maintenance and Operations, Laredo, TX, newest first.
File Type Posted
BL2 Inventory to include Fire Alarm Devices (Amend 004) .pdf PDF
Figure B-3 Pricing 5 YEAR- TOTAL_ESTIMATES (Amend 003).xlsx XLSX spreadsheet
iii.FM Laredo R7 Specifications 2021.01.06 (Amend 003).pdf PDF
i.Fire Sprinkler Reports (Amend 003).pdf PDF
Figure L-1 Combined Management Plan (Amend 003).xlsx XLSX spreadsheet
SF30.Solicitation Amendment 002 47PH0220R0014-2020.12.22.pdf PDF
Amendment Exhibit C5 - Erosion and Sediment Control.pdf PDF
001 Amendment Revisions 47PH0220R0014 Solicitation FM Laredo Texas.pdf PDF
Solicitation Amendment 0001 47PH0220R0014.pdf PDF
Amendment BL2 Inventory to Include Fire Alarm Devices.pdf PDF
Amendment Exhibit C1 Building Information Sheet_Laredo USCH (1).pdf PDF
Amendment Exhibit C4 - Building Exterior and Hardscape Plan.pdf PDF
Amendment BL2 Convent Inventory to Include Fire Alarm Devices.pdf PDF
Amendment Exhibit C7 - PBS Waste Audits.pdf PDF
Amendment BL1 Extinguisher Report.pdf PDF
Amendment BL6 Work Order History.pdf PDF
Amendment Exhibit C6 - Recycle Solid Water Trash Report.pdf PDF
Figure L-1 Management Plan Baseline Worksheet.xlsx XLSX spreadsheet
(Attachment 3) Service Contract Act (SCA) Wage determination Webb County TX.pdf PDF
BL1 Extinguisher Report.pdf PDF
Exhibit M9 - Preventative Maintenance (PM) 2018 GSA OM Guide.pdf PDF
Exhibit M6 - Water Treatment .pdf PDF
Exhibit M4 - Building Operating Plan Template.pdf PDF
Exhibit C1 Building Information Sheet_World Trade LPOE.pdf PDF
Exhibit C1 Building Information Sheet_Border Patrol Sector HQ.pdf PDF
47PH0220R0014 Full Maintenance Specifications Laredo-Texas.pdf PDF
Exhibit C8 - GSA Form 3638 Pest Control Work and Inspection Report (1).pdf PDF
FIGURE B-1 Contractor Staffing Declaration.xlsx XLSX spreadsheet
(Attachment 1) Collective Bargaining Agreement (CBA) executed.pdf PDF
Exhibit C5 - Erosion and Sediment Control.pdf PDF
Exhibit C1 Building Information Sheet_Columbia LPOE.pdf PDF
Figure B-3 Pricing of Services.xlsx XLSX spreadsheet
Figure B-2 SCA DOL Combination Wage Adjustment Spreadsheet.xlsx XLSX spreadsheet
BL5 Roof Information.pdf PDF
Exhibit M10- Photovoltaic Maintenance Checklist.pdf PDF
Exhibit M8 - Miscellaneous Best Practices Shave Energy.pdf PDF
Exhibit C1 Building Information Sheet_Convent LPOE.pdf PDF
Figure L-2 Past Performance Questionnaire (1).pdf PDF
(Attachment 2) CBA-Wage Determination- Standard Form 98 Confirmation Page.pdf PDF
BL6 Work Order History.xlsx XLSX spreadsheet
BL3 Local General Information.pdf PDF
BL2 Inventory to Include Fire Alarm Devices.pdf PDF
Exhibit M7 - Qualificaiton of Electrical Testing Technicians (ETT).pdf PDF
Exhibit M5 - Smart Buildings GSA Smart and Susteinable Buildings.pdf PDF
Exhibit M3 - Environmentally Sustainable Products and GSA Attibute Preferences.pdf PDF
Exhibit M2 - Green Purchasing Report.pdf PDF
Exhibit M1 C2 Operations MaintenanceCustodial Quality Assurance Surveillance Plan. (QUASP).pdf PDF
Exhibit C7 - PBS Waste Audits.pdf PDF
Exhibit C6 - Recycle Solid Waste Trash Report.pdf PDF
Exhibit C4 - Building Exterior and Hardscape Plan (1).pdf PDF
Show all 50

Full Maintenance and Operations, Laredo, TX has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3 Facility: Lincoln-Juarez Port of Entry 07020841

Location: Termination of I-35, Laredo, TX

Number of Stories:

Buildings 2 and 5: 1 story

Buiildings 1, 6 and Bus Processing: 2 stories

Population: Approximately 180 Official working hours of building occupants:

24 hours a day, 7 days a week, including Federal holidays

Buildings 2, interior of Building 5, and Building 6: 8:00 am to 5:00 pm, Monday through Friday, including Federal holidays

Interior Statistics:

Bus Unload Canopy TX0277JL

Rentable area see below SF

Canopy see below SF

Bus Secondary Inspection Canopy TX0278JL

Rentable area see below SF

Canopy see below SF

FMCSA Bus Inspection Canopy TX0279JL

Rentable area see below SF

Canopy see below SF

Bus Reload Canopy TX0280JL

Rentable area see below SF

Canopy see below SF

Exit Booth TX0281JL

Rentable area 31 SF

Net Cleaning 31 SF

Inspection Booth 31 SF

Building 2 Admin TX0282JL

Rentable area 42,368 SF

Net cleaning 28,257 SF

Corridors, lobbies, entrances, enclosed pedestrian walkways 6,330 SF

Toilet Rooms, holding cells, locker rooms, janitor closets

Floors 1,716 SF

Fixtures 42 Fixtures

General office, file rooms, libraries, conference rooms, ADP rooms, etc. 19,280 SF

Exercise 316 SF

Labs 615 SF

Bus Processing TX0283JL

Rentable area 40,261 SF

Net cleaning 34,845 SF

Corridors, lobbies, entrances, enclosed pedestrian walkways 9,547 SF

Toilet rooms, holding cells, locker rooms, janitor closets

Floors 6,029 SF

Fixtures 60 Fixtures

General office, file rooms, libraries, conference rooms, ADP rooms, etc. 17,851 SF

Interior stairways 2 Flights

Elevators 1 Elevators

Lab 251 SF

Control Booth 122 SF

Garage and Ramps (sally port) 1,045 SF

Bus Hard Secondary TX0285JL

Rentable area 1,768 SF

Net cleaning 163 SF

Toilet rooms, holding cells, locker rooms, janitor closets 82 SF

Floors

Fixtures 2 Fixtures

General office, file rooms, libraries, conference rooms, ADP rooms, etc. 81 SF

POV Hard Secondary TX0286JL

Rentable area 3,308 SF

Net cleaning 250 SF

Toilet rooms, holding cells, locker rooms, janitor closets

Floors 84 SF

Fixtures 2 Fixtures

General office, file rooms, libraries, conference rooms, ADP rooms, etc. 82 SF

Control Booth 84 SF

POV Secd Inspection TX0287JL

Rentable area 20,185 SF

Net cleaning 319 SF

Toilet rooms, holding cells, locker rooms, janitor closets

Floors 164 SF

Fixtures 4 Fixtures

Control Booth 155 SF

TABC Booth TX0288JL

Rentable area 160 SF

Net cleaning 160 SF

Toilet rooms, holding cells, locker rooms, janitor closets 60 SF

Floors

Fixtures 2 Fixtures

Booth 100 SF

Outbound T3 Canopy TX0289JL

Rentable area 5,280 SF

Net cleaning 40 SF

Inspection Booth 40 SF

Building 1 Primary Inspection TX0321JL

Rentable area 22,279 SF

Net cleaning 2,268 SF

Corridors, lobbies, entrances, enclosed pedestrian walkways 1,545 SF

General office, file rooms, libraries, conference rooms, ADP rooms, etc. 14 SF

Inspection Booths 709 SF

Building 5 USDA TX0324JL

Rentable area 6,647 SF

Net cleaning 5,861 SF

Corridors, lobbies, entrances, enclosed pedestrian walkways 509 SF

Toilet Rooms, holding cells, locker rooms, janitor closets

Floors 302 SF

Fixtures 8 Fixtures

General office, file rooms, libraries, conference rooms, ADP rooms, etc. 4,557 SF

Exercise area 69 SF

Lab 424 SF

Building 6 Import Dock TX0325JL

Rentable area 40,765 SF

Net cleaning 36,941 SF

Corridors, lobbies, entrances, enclosed pedestrian walkways 1,603 SF

Toilet Rooms, holding cells, locker rooms, janitor closets

Floors 672 SF

Fixtures 15 Fixtures

General office, file rooms, libraries, conference rooms, ADP rooms, etc. 6,019 SF

Stairways 2 Flights

Passenger elevators 1 Elevators

Loading dock 28,648 SF

Kennel 1 TX0326JL*

Rentable area 632 SF

Net cleaning 0 SF

*All kennels; no cleaning.

Kennel 2 TX0327JL

Rentable area 2,242 SF

Net cleaning 778 SF

Corridors, lobbies, entrances, enclosed pedestrian walkways 147 SF

Toilet Rooms, holding cells, locker rooms, janitor closets

Floors 38 SF

Fixtures 2 Fixtures

General office, file rooms, libraries, conference rooms, ADP rooms, etc. 303 SF

Lab 290 SF

Truck Primary Inspection TX0328JL

Rentable area 3,249 SF

Net cleaning 338 SF

Inspection Booths 338 SF

Guard Booth TX0329JL

Rentable area 36 SF

Net cleaning 36 SF

Inspection Booths 36 SF

Outside Grounds Area:

Lawn, shrub, and planted area 126,528 SF

Paved area 897,936 SF

Garage/Ramps

TX0285JL Bus Hard Secd Inspection 1,482 SF

TX0286JL POV Hard Secd Inspection 2,352 SF

Canopies 122,576 Total SF

Breakdown:

TX0277JL Bus Unload Canopy 5,600 SF

TX0278JL Bus Secd Inspection Canopy 15,003 SF

TX0279JL FMCSA Bus Inspection Canopy 5,518 SF

TX0280JL Bus Reload Canopy 14,488 SF

TX0282JL Admin Bldg Canopy 5,009 SF

TX0289JL Southbound OT3 Canopy 5,280 SF

TX0286JL POV Hard Secd Inspection 493 SF

TX0287JL POV Secd Inspection 19,866 SF

TX0321JL Primary Inspection 19,761 SF

TX0325JL Bldg 6 Import Dock 28,648 SF

TX0328JL Truck Primary Inspection 2,910 SF

Hand Sanitizer Dispensers: 8 total, floor mount

Building #2 TX0282JL:

1 Sentry Entrance

1 Main Hallway

1 Visitor Entrance

Building #5 TX0324JL:

1 Main Entrance

Building #11 TX0283JL:

2 Pedestrian walkway entrance & exit

1 Permit lobby

1 Main Hallway

File details come from the government source that posted it. Updated .