Amendment Exhibit C4 - Building Exterior and Hardscape Plan.pdf
PDF 130 KB Posted
- Attached to
- Full Maintenance and Operations, Laredo, TX Federal contract opportunity
- Solicitation number
- 47PH0220R0014
View the file
Other files for this federal contract opportunity
Show all 50
Full Maintenance and Operations, Laredo, TX has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C4
BUILDING EXTERIOR AND HARDSCAPE PLAN
Used only when Contractor is required to provide pressure washing services
The Contractor shall submit to the CO a detailed Building Exterior and Hardscape Plan that addresses the listed work items. The plan helps ensure that grounds/site/building exterior management practices have the lowest environmental impact possible and that these practices preserve ecological integrity, enhance diversity and protect wildlife, while supporting building performance and integration into surrounding landscapes. At a minimum, the custodial and related services portion of the plan shall address the following items:
Goals and Scope
Responsible Party
Guidance for Resources and Implementation
Performance Measurement
Training
Maintenance Equipment
Use of Chemical Concentrates and Dilution Systems
Sustainable Building Exterior, Sidewalks, and Pavement Cleaning
Paints and Sealants Used on the Building Exterior
Snow and Ice removal (Snow and Ice Removal Plan can be substituted for this item)
Cleaning of building exterior
Cleaning equipment
Cleaning of sidewalks, pavement, and other Hardscape
Animal and vegetation pest control
Landscape waste
Fertilizer use
Quality Assurance/Quality Control Processes
File details come from the government source that posted it. Updated .