BL5 Roof Information.pdf

PDF 52 KB Posted

Attached to
Full Maintenance and Operations, Laredo, TX
Solicitation number
47PH0220R0014
Issued by

View the file

Other files

File Type Posted
SF30 Amend 005 47PH0220R0014.pdf PDF
SF33 Amend 005.pdf PDF
BL2 Inventory to include Fire Alarm Devices (Amend 004) .pdf PDF
Figure B-3 Pricing 5 YEAR- TOTAL_ESTIMATES (Amend 003).xlsx XLSX spreadsheet
ii.FM Laredo Contractor Q&A-Amend 003- 2021.01.06.pdf PDF
Figure L-1 Combined Management Plan (Amend 003).xlsx XLSX spreadsheet
i.Fire Sprinkler Reports (Amend 003).pdf PDF
iii.FM Laredo R7 Specifications 2021.01.06 (Amend 003).pdf PDF
SF30 Amend 003 47PH0220F0014.pdf PDF
SF30.Solicitation Amendment 002 47PH0220R0014-2020.12.22.pdf PDF
Amendment Exhibit C5 - Erosion and Sediment Control.pdf PDF
Amendment Exhibit C4 - Building Exterior and Hardscape Plan.pdf PDF
001 Amendment Revisions 47PH0220R0014 Solicitation FM Laredo Texas.pdf PDF
Amendment Exhibit C6 - Recycle Solid Water Trash Report.pdf PDF
Solicitation Amendment 0001 47PH0220R0014.pdf PDF
Amendment BL2 Inventory to Include Fire Alarm Devices.pdf PDF
Amendment BL6 Work Order History.pdf PDF
Amendment Exhibit C1 Building Information Sheet_Laredo USCH (1).pdf PDF
Amendment BL1 Extinguisher Report.pdf PDF
Amendment BL2 Convent Inventory to Include Fire Alarm Devices.pdf PDF
Amendment Exhibit C7 - PBS Waste Audits.pdf PDF
Figure L-2 Past Performance Questionnaire (1).pdf PDF
Exhibit C6 - Recycle Solid Waste Trash Report.pdf PDF
Exhibit C1 Building Information Sheet_Border Patrol Sector HQ.pdf PDF
Exhibit M9 - Preventative Maintenance (PM) 2018 GSA OM Guide.pdf PDF
Figure L-1 Management Plan Baseline Worksheet.xlsx XLSX spreadsheet
Exhibit C7 - PBS Waste Audits.pdf PDF
BL3 Local General Information.pdf PDF
Exhibit C4 - Building Exterior and Hardscape Plan (1).pdf PDF
Exhibit M1 C2 Operations MaintenanceCustodial Quality Assurance Surveillance Plan. (QUASP).pdf PDF
Exhibit M5 - Smart Buildings GSA Smart and Susteinable Buildings.pdf PDF
BL6 Work Order History.xlsx XLSX spreadsheet
Exhibit M4 - Building Operating Plan Template.pdf PDF
Exhibit C1 Building Information Sheet_World Trade LPOE.pdf PDF
(Attachment 1) Collective Bargaining Agreement (CBA) executed.pdf PDF
FIGURE B-1 Contractor Staffing Declaration.xlsx XLSX spreadsheet
Exhibit C8 - GSA Form 3638 Pest Control Work and Inspection Report (1).pdf PDF
Exhibit C1 Building Information Sheet_JuarezLincoln LPOE.pdf PDF
Exhibit C1 Building Information Sheet_Columbia LPOE.pdf PDF
Exhibit C5 - Erosion and Sediment Control.pdf PDF
Exhibit M6 - Water Treatment .pdf PDF
BL1 Extinguisher Report.pdf PDF
Exhibit M2 - Green Purchasing Report.pdf PDF
47PH0220R0014 Full Maintenance Specifications Laredo-Texas.pdf PDF
(Attachment 3) Service Contract Act (SCA) Wage determination Webb County TX.pdf PDF
Exhibit M3 - Environmentally Sustainable Products and GSA Attibute Preferences.pdf PDF
(Attachment 2) CBA-Wage Determination- Standard Form 98 Confirmation Page.pdf PDF
Exhibit M7 - Qualificaiton of Electrical Testing Technicians (ETT).pdf PDF
BL2 Inventory to Include Fire Alarm Devices.pdf PDF
Figure B-3 Pricing of Services.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roof Material Composition

For

Isaac Parker Courthouse 30 S. 6th Street Fort Smith, AR.

AR0021ZZ

Roof installed 2010 time frame and is a Siplast product. Roof drainage is directed to internal roof drain or scuppers at perimeter locations. The composition as provided by on site personnel is as follows:

- Structural Concrete Deck

- Base Sheet

- 2” Polyisocyanurate Insulation

- ½” Dens Deck

- Siplast Paradiene 20 SBS Modified Bitumen Membrane (2 Plies)

- Siplast Paradiene 30 SBS Modified Bitumen Membrane

Secondary roofing exists in the form of a batten seam copper hipped roof in the center of the original building. The roof drains into a built in gutter system. Additionally, a metal canopy covers an exterior stairway.

JP Hammerschmidt Fed Bldg/CTHS 35 E Mountain Street

Fayetteville, AR

AR0084ZZ

Roof installed 1998

- Vapor Barrier – 1 ply Modified Bitumen Membrane

- Two layers of 1 1/2 “ Polyisocyanurate Insulation on Low Slope Roof Area

- ½” tapered insulation installed in approximate 4’x4’ area around roof drains

- ¼” tapered insulation crickets installed between roof drains and other locations

- 1” thick Polyisocyanurate insulation with ½” fiver board facing on steep slope roof

- ½” DensDeck

- Siplast Paradiene 30 SBS Modified Bitumen Membrane (4 Plies)

- Counter flashing, scuppers, etc. associated with roof is 16 oz copper

- Counter flashing fastened to ferrous metal is 24 ga. Stainless Steel

- Copper cap on parapet walls is 20 oz lead coated copper

- Wall panels on parapet walls is 14 ga pre finished (Kynar 500) panels

File details come from the government source that posted it. Updated .