Exhibit C5 - Erosion and Sediment Control.pdf
PDF 252 KB Posted
- Attached to
- Full Maintenance and Operations, Laredo, TX Federal contract opportunity
- Solicitation number
- 47PH0220R0014
View the file
Other files for this federal contract opportunity
Show all 50
Full Maintenance and Operations, Laredo, TX has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT
C5
EROSION AND SEDIMENT
CONTROL
IPM, Erosion Control, Landscape
Management Plan
Used only when Contractor is required to perform activities that disturbs the existing grounds conditions
The Contractor shall employ strategies such as temporary and permanent seeding, mulching, earth dikes, silt fencing, sediment traps and sediment basins to correct existing erosion such as typically found as the result of foot traffic killing the vegetation, steep slopes where sheet flow from storm water exceeds existing vegetation holding power, or point storm water outflow that exceeds the holding power of the vegetation covering the soil. The Contractor shall submit to the CO an
IPM Erosion Control, Landscape Management Plan outlining how this will be accomplished. At a minimum, the custodial and related services portion of the plan shall address the following items:
• Goals and
Scope
• Responsible
Parties
• Guidance for Resources and
Implementation
• Performance
Measurement
• Training
• Chemical Treatment Purchasing and
Application
• Integrated Pest Management
(IPM)
• Erosion and Sediment
Control
• Storm-Water Management
Plan
• Landscape Management and Grounds
Maintenance
Composting
• Quality Assurance/Quality Control
Processes
1 This is a sample and is not intended to be comprehensive. Excerpts are from
United States Green Building Council (USGBC).
File details come from the government source that posted it. Updated .