Exhibit C5 - Erosion and Sediment Control.pdf

PDF 252 KB Posted

Attached to
Full Maintenance and Operations, Laredo, TX Federal contract opportunity
Solicitation number
47PH0220R0014
Issued by
General Services Administration Public Buildings Service Region 7

View the file

Other files for this federal contract opportunity

Other files attached to Full Maintenance and Operations, Laredo, TX, newest first.
File Type Posted
SF30 Amend 005 47PH0220R0014.pdf PDF
SF33 Amend 005.pdf PDF
BL2 Inventory to include Fire Alarm Devices (Amend 004) .pdf PDF
Figure B-3 Pricing 5 YEAR- TOTAL_ESTIMATES (Amend 003).xlsx XLSX spreadsheet
iii.FM Laredo R7 Specifications 2021.01.06 (Amend 003).pdf PDF
i.Fire Sprinkler Reports (Amend 003).pdf PDF
Figure L-1 Combined Management Plan (Amend 003).xlsx XLSX spreadsheet
ii.FM Laredo Contractor Q&A-Amend 003- 2021.01.06.pdf PDF
SF30 Amend 003 47PH0220F0014.pdf PDF
SF30.Solicitation Amendment 002 47PH0220R0014-2020.12.22.pdf PDF
Amendment Exhibit C5 - Erosion and Sediment Control.pdf PDF
001 Amendment Revisions 47PH0220R0014 Solicitation FM Laredo Texas.pdf PDF
Solicitation Amendment 0001 47PH0220R0014.pdf PDF
Amendment BL2 Inventory to Include Fire Alarm Devices.pdf PDF
Amendment Exhibit C1 Building Information Sheet_Laredo USCH (1).pdf PDF
Amendment Exhibit C4 - Building Exterior and Hardscape Plan.pdf PDF
Amendment BL1 Extinguisher Report.pdf PDF
Amendment BL6 Work Order History.pdf PDF
Amendment Exhibit C6 - Recycle Solid Water Trash Report.pdf PDF
Figure L-1 Management Plan Baseline Worksheet.xlsx XLSX spreadsheet
(Attachment 3) Service Contract Act (SCA) Wage determination Webb County TX.pdf PDF
BL1 Extinguisher Report.pdf PDF
Exhibit M9 - Preventative Maintenance (PM) 2018 GSA OM Guide.pdf PDF
Exhibit M6 - Water Treatment .pdf PDF
Exhibit M4 - Building Operating Plan Template.pdf PDF
Exhibit C1 Building Information Sheet_World Trade LPOE.pdf PDF
Exhibit C1 Building Information Sheet_Border Patrol Sector HQ.pdf PDF
47PH0220R0014 Full Maintenance Specifications Laredo-Texas.pdf PDF
Exhibit C8 - GSA Form 3638 Pest Control Work and Inspection Report (1).pdf PDF
FIGURE B-1 Contractor Staffing Declaration.xlsx XLSX spreadsheet
(Attachment 1) Collective Bargaining Agreement (CBA) executed.pdf PDF
Exhibit C1 Building Information Sheet_JuarezLincoln LPOE.pdf PDF
Exhibit C1 Building Information Sheet_Columbia LPOE.pdf PDF
(Attachment 2) CBA-Wage Determination- Standard Form 98 Confirmation Page.pdf PDF
BL6 Work Order History.xlsx XLSX spreadsheet
BL3 Local General Information.pdf PDF
BL2 Inventory to Include Fire Alarm Devices.pdf PDF
Exhibit M7 - Qualificaiton of Electrical Testing Technicians (ETT).pdf PDF
Exhibit M5 - Smart Buildings GSA Smart and Susteinable Buildings.pdf PDF
Exhibit M3 - Environmentally Sustainable Products and GSA Attibute Preferences.pdf PDF
Exhibit M2 - Green Purchasing Report.pdf PDF
Exhibit M1 C2 Operations MaintenanceCustodial Quality Assurance Surveillance Plan. (QUASP).pdf PDF
Exhibit C7 - PBS Waste Audits.pdf PDF
Exhibit C6 - Recycle Solid Waste Trash Report.pdf PDF
Exhibit C4 - Building Exterior and Hardscape Plan (1).pdf PDF
Figure B-3 Pricing of Services.xlsx XLSX spreadsheet
Figure B-2 SCA DOL Combination Wage Adjustment Spreadsheet.xlsx XLSX spreadsheet
BL5 Roof Information.pdf PDF
Exhibit M10- Photovoltaic Maintenance Checklist.pdf PDF
Exhibit M8 - Miscellaneous Best Practices Shave Energy.pdf PDF
Show all 50

Full Maintenance and Operations, Laredo, TX has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT

C5

EROSION AND SEDIMENT

CONTROL

IPM, Erosion Control, Landscape

Management Plan

Used only when Contractor is required to perform activities that disturbs the existing grounds conditions

The Contractor shall employ strategies such as temporary and permanent seeding, mulching, earth dikes, silt fencing, sediment traps and sediment basins to correct existing erosion such as typically found as the result of foot traffic killing the vegetation, steep slopes where sheet flow from storm water exceeds existing vegetation holding power, or point storm water outflow that exceeds the holding power of the vegetation covering the soil. The Contractor shall submit to the CO an

IPM Erosion Control, Landscape Management Plan outlining how this will be accomplished. At a minimum, the custodial and related services portion of the plan shall address the following items:

• Goals and

Scope

• Responsible

Parties

• Guidance for Resources and

Implementation

• Performance

Measurement

• Training

• Chemical Treatment Purchasing and

Application

• Integrated Pest Management

(IPM)

• Erosion and Sediment

Control

• Storm-Water Management

Plan

• Landscape Management and Grounds

Maintenance

Composting

• Quality Assurance/Quality Control

Processes

1 This is a sample and is not intended to be comprehensive. Excerpts are from

United States Green Building Council (USGBC).

File details come from the government source that posted it. Updated .