Exhibit I Price Matrix.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
(PROJ: 573-16-603) BB - Install Parking Garage Protection
Solicitation number
36C24825R0118
Issued by

About this file

The document is an Excel-based Price Matrix template for a VA construction project involving parking garage fall protection at the Malcolm Randall VA Medical Center in Gainesville, FL. The pricing template provides a comprehensive breakdown of potential bid items (Bid Items 1-5) across 34 construction divisions, including labor and material costs, with sections for overhead, profit, and bonding percentages. Each bid item section allows detailed cost allocation across construction categories such as general requirements, concrete, masonry, electrical, HVAC, and utilities.

The associated federal contract opportunity (Solicitation 36C24825R0118) is a $1-5 million project set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), requiring installation of ballistic quality screen mesh and physical barriers on parking garage levels. Critical project dates include a mandatory site walk on 06/24/2025, Request for Information (RFI) deadline of 06/30/2025, and proposal submission due date of 07/17/2025. The project has a 371-calendar day performance period, applies to Davis-Bacon wage determination FL20250008, and will be executed by the Department of Veterans Affairs Veterans Health Administration.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Item 1 BASE

Bid Item 1 Base Offer Cost Breakdown

Project Number:Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror CityStateZip
ItemDescriptionLabor CostMaterial CostTotal Cost
Division 1General Requirements$-$-$-
Division 2Existing Conditions---
Division 3Concrete---
Division 4Masonry---
Division 5Metals---
Division 6Wood and Plastic---
Division 7Thermal & Moisture Protect---
Division 8Doors and Windows---
Division 9Finishes---
Division 10Specialties---
Division 11Equipment---
Division 12Furnishings---
Division 13Special Construction---
Division 14Conveying Equipment---
Division 21Fire Suppression---
Division 22Plumbing---
Division 23HVAC---
Division 26Electrical---
Division 27Communications---
Division 28Electronic Safety & Security---
Division 31Earthwork---
Division 32Exterior Improvements---
Division 33Utilities---
Division 34Transportation Subtotal---
Division Subtotals :$-$-$-
Overhead %0.00%-
Profit %0.00%-
Bond %0.00%-
Overhead/Profit Subtotals :$-

Total Price $- $- $-

Bid Item 2

Bid Item 1 Offer Cost Breakdown

Project Number:Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror CityStateZip
ItemDescriptionLabor CostMaterial CostTotal Cost
Division 1General Requirements$-$-$-
Division 2Existing Conditions---
Division 3Concrete---
Division 4Masonry---
Division 5Metals---
Division 6Wood and Plastic---
Division 7Thermal & Moisture Protect---
Division 8Doors and Windows---
Division 9Finishes---
Division 10Specialties---
Division 11Equipment---
Division 12Furnishings---
Division 13Special Construction---
Division 14Conveying Equipment---
Division 21Fire Suppression---
Division 22Plumbing---
Division 23HVAC---
Division 26Electrical---
Division 27Communications---
Division 28Electronic Safety & Security---
Division 31Earthwork---
Division 32Exterior Improvements---
Division 33Utilities---
Division 34Transportation Subtotal---
Division Subtotals :$-$-$-
Overhead %0.00%-
Profit %0.00%-
Bond %0.00%-
Overhead/Profit Subtotals :$-

Total Price $- $- $-

Bid Item 3

Bid Item 3 Offer Cost Breakdown

Project Number:Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror CityStateZip
ItemDescriptionLabor CostMaterial CostTotal Cost
Division 1General Requirements$-$-$-
Division 2Existing Conditions---
Division 3Concrete---
Division 4Masonry---
Division 5Metals---
Division 6Wood and Plastic---
Division 7Thermal & Moisture Protect---
Division 8Doors and Windows---
Division 9Finishes---
Division 10Specialties---
Division 11Equipment---
Division 12Furnishings---
Division 13Special Construction---
Division 14Conveying Equipment---
Division 21Fire Suppression---
Division 22Plumbing---
Division 23HVAC---
Division 26Electrical---
Division 27Communications---
Division 28Electronic Safety & Security---
Division 31Earthwork---
Division 32Exterior Improvements---
Division 33Utilities---
Division 34Transportation Subtotal---
Division Subtotals :$-$-$-
Overhead %0.00%-
Profit %0.00%-
Bond %0.00%-
Overhead/Profit Subtotals :$-

Total Price $- $- $-

Bid Item 4

Bid Item 4 Offer Cost Breakdown

Project Number:Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror CityStateZip
ItemDescriptionLabor CostMaterial CostTotal Cost
Division 1General Requirements$-$-$-
Division 2Existing Conditions---
Division 3Concrete---
Division 4Masonry---
Division 5Metals---
Division 6Wood and Plastic---
Division 7Thermal & Moisture Protect---
Division 8Doors and Windows---
Division 9Finishes---
Division 10Specialties---
Division 11Equipment---
Division 12Furnishings---
Division 13Special Construction---
Division 14Conveying Equipment---
Division 21Fire Suppression---
Division 22Plumbing---
Division 23HVAC---
Division 26Electrical---
Division 27Communications---
Division 28Electronic Safety & Security---
Division 31Earthwork---
Division 32Exterior Improvements---
Division 33Utilities---
Division 34Transportation Subtotal---
Division Subtotals :$-$-$-
Overhead %0.00%-
Profit %0.00%-
Bond %0.00%-
Overhead/Profit Subtotals :$-

Total Price $- $- $-

Bid Item 5

Bid Item 5 Offer Cost Breakdown

Project Number:Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror CityStateZip
ItemDescriptionLabor CostMaterial CostTotal Cost
Division 1General Requirements$-$-$-
Division 2Existing Conditions---
Division 3Concrete---
Division 4Masonry---
Division 5Metals---
Division 6Wood and Plastic---
Division 7Thermal & Moisture Protect---
Division 8Doors and Windows---
Division 9Finishes---
Division 10Specialties---
Division 11Equipment---
Division 12Furnishings---
Division 13Special Construction---
Division 14Conveying Equipment---
Division 21Fire Suppression---
Division 22Plumbing---
Division 23HVAC---
Division 26Electrical---
Division 27Communications---
Division 28Electronic Safety & Security---
Division 31Earthwork---
Division 32Exterior Improvements---
Division 33Utilities---
Division 34Transportation Subtotal---
Division Subtotals :$-$-$-
Overhead %0.00%-
Profit %0.00%-
Bond %0.00%-
Overhead/Profit Subtotals :$-

Total Price $- $- $-

File details come from the government source that posted it. Updated .