EXHIBIT_H__Q_Feeder_Typical_vault.pdf

PDF 472 KB Posted

Attached to
SPECIFICATIONS TO PROCURE AND CONSTRUCT ADSS FIBER OPTIC LINE
Solicitation number
FKEC BID #26-14
Issued by
Florida

About this file

This file is a technical specification exhibit for Florida Keys Electric Cooperative Association, Inc. (FKEC) related to an All Dielectric Self-Supporting (ADSS) fiber optic line installation project connecting Crawl Key Substation to Marathon Substation in Florida. Exhibit H presents detailed engineering drawings and specifications for a typical Q feeder vault pullbox, prepared by KC Technologies Inc. of Clearwater, Florida. The exhibit includes plan views, elevation details for four walls (A, B, C, and D), and material specifications for the underground vault structure. Key features detailed in the drawings include stainless steel flush-mount pulling irons, galvanized hook lifters, conduit configurations with provisions for fiber optic cable routing, slack fiber brackets for cable management, and a pullbox measuring 90 inches by 60 inches by 60 inches. The specifications note that fiber bracket placement and extra fiber wrapping should be positioned on the wall opposite the primary conductor, with conduit configurations reversed for fiber routing as indicated in the technical drawings.

The exhibit serves as a construction standard for the turn-key ADSS fiber optic installation project, ensuring consistent vault design and installation practices across the project scope. No pricing information, set-asides, incumbents, bidding timelines, or other procurement-related details are contained within this technical specification document, which functions solely as a reference guide for qualified contractors bidding on or executing the project work.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S U

R V

E Y

D A

T A

C ou nt y/

S ta te

Q ua dr an gl e:

S ec

T

R

S P

C

H or z D at um

V er t D at um

K C

I T

EC

H N

O

LO

G

IE

S

IN

C

R

IO

V

IS

TA

D

R

IV

E C

LE

AR

W

AT

ER

, F

L

TE

L

3-

0-

FA

X

3-

0-w w w .k ci .c om

FK

EK

W

AR

N

IN

G

HI

GH

V O

LT

AG

E

TOP SLAB DETAIL

SEE FKEC ASSEMBLY UNIT:

UG-PBC FOR LID DETAILS

PLAN DETAIL

WALL "A" ELEVATION WALL "B" ELEVATION

A

D B

C

A

D B

C

7'-6"

5'-0"

7'-6" 6"

6'-6" 6"

1'-1"

5"

6"

4'-0"

6"

8" STAINLESS STEEL FLUSH

MOUNT PULLING IRONS

5.5" GALVANIZED

HOOK LIFTERS

5" (TYP.)

5"

2"

2"3'-2"

2"

2"

6"

5'-0"

2"

2"

2"

6"

5"

6"

3'-0"

NOTES:

Fiber bracket and extra fiber to wrapped on wall opposite to primary conductor.

SLACK FIBER

BRACKET

WALL "C" ELEVATION WALL "D" ELEVATION

5" (TYP.)

5"

2"

2"3'-2"

2"

2"

6"

5'-0"

2"

2"

2"

6"

5"

6"

3'-0"

90" X 60" X 60" PULLBOX SPECIFICATIONS

Reverse the conduit shown in green for fiber

EXHIBIT H

Sheets and Views
Q Feeder Typical-Typical

File details come from the government source that posted it. Updated .