EXHIBIT_B__ACOE_Permit__20260520.pdf

PDF 3 MB Posted

Attached to
SPECIFICATIONS TO PROCURE AND CONSTRUCT ADSS FIBER OPTIC LINE
Solicitation number
FKEC BID #26-14
Issued by
Florida

About this file

Summary

This is a Department of the Army permit issued by the U.S. Army Corps of Engineers, Jacksonville District, authorizing Florida Keys Electric Cooperative Association to install a 590 linear foot fiber optic cable crossing at Vaca Cut in Marathon, Florida. The permit, designated SAJ-2026-00706 (NWP-ICF), was issued on May 20, 2026, and authorizes the installation of 144-strand All Dielectric Self-Supporting (ADSS) fiber optic cable between existing poles at coordinates 24.730814°, -81.028699° and 24.730464°, -81.030434°. The project involves installing overhead wire above the lowest existing line across the Vaca Cut channel that intersects U.S. Route 1. The permit was issued under Nationwide Permit 57 (Electric Utility Line and Telecommunications Activities) pursuant to Section 10 of the Rivers and Harbors Act of 1899 and is valid until March 15, 2031. The permittee must complete the work within this timeframe and comply with all General Conditions, Jacksonville District Regional Conditions, and project-specific special conditions specified in the permit.

The permit includes comprehensive special conditions addressing safety, cultural resources, water quality certification, coastal zone management, and compliance requirements. Installation safety measures require use of a truck-mounted reel with friction brake assembly and handline control to prevent the fiber from falling into or above Vaca Cut, with no anticipated contact with water or channel floor. The permittee must submit an ENG Form 6285 certification of compliance within 60 days of work completion, maintain a copy of the permit and approved plans at the construction site, and coordinate with utility locating services prior to construction. Additionally, the permittee is responsible for obtaining any required authorizations from the Florida Keys National Marine Sanctuary and must comply with Florida Electric Transmission Line Siting Act requirements and state sovereignty submerged lands regulations. All right-of-ways must be restored to original or better condition, and the permittee must allow Corps representatives to inspect the activity at any time to ensure compliance.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

U.S. ARMY CORPS OF ENGINEERS, JACKSONVILLE DISTRICT

701 SAN MARCO BOULEVARD

JACKSONVILLE, FLORIDA 32207

May 20, 2026

Regulatory Division South Permits Branch Florida Keys Section

SAJ-2026-00706 (NWP-ICF)

Florida Keys Electric Cooperative c/o Sara Hamilton P.O. Box 377 Tavernier, FL 33070 Sent via email: sara.hamilton@fkec.com

Dear Mr. Arnold:

The U.S. Army Corps of Engineers (Corps) has completed the review of your application for a Department of the Army permit received on March 13, 2026. Your application was assigned file number SAJ-2026-00706. A review of the information and drawings provided indicates that the proposed work would result in the installation of a 590 linear foot fiber optic cable from one existing pole to another existing pole on either end of Vaca cut. The activities subject to this permit are authorized pursuant to authorities under Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. § 403). The project would affect waters of the United States associated with Vaca Cut within the Atlantic Ocean. The project is located at a Channel crossing in Marathon, between coordinates 24.730814,º, -81.028699º and 24.730464º, -81.0304340º, in Monroe County, Florida.

Your project, as depicted on the enclosed drawings stamped on May 14, 2026, is authorized by Nationwide Permit (NWP) 57 (Electric Utility Line and Telecommunications Activities). This verification is valid until March 15, 2031. In order for this NWP authorization to be valid, you must ensure that the work is performed in accordance with the Nationwide Permit General Conditions, the Jacksonville District Regional Conditions, and the General and Project-Specific Special Conditions listed below. Furthermore, if you commence or are under contract to commence this activity before the date that the relevant NWP is modified or revoked, you will have 12 months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this NWP. You can access the U.S. Army Corps of Engineers' (Corps) Jacksonville District's Regulatory Source Book webpage for links to view NWP information at:

https://www.saj.usace.army.mil/Missions/Regulatory/Source-Book/. Please be aware this Internet address is case sensitive and should be entered as it appears above. Once there, you will need to select “Nationwide Permits.” Among other things, this part of the Source Book contains links to the federal register containing the text of the pertinent NWP authorization and the associated NWP general conditions, as well as separate links to the regional conditions applicable to the pertinent NWP verification.

mailto:sara.hamilton@fkec.com https://www.saj.usace.army.mil/Missions/Regulatory/Source-Book/

-2-

You must comply with all of the special and general conditions for NWP-57, including any project-specific conditions included in this letter and all conditions incorporated by reference as described above.

General Conditions:

1. The time limit for completing the work authorized ends on March 15, 2031.

2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity, or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area.

3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort of if the site is eligible for listing in the National Register of Historic Places.

4. If you sell the property associated with this permit you must obtain the signature of the new owner on the attached transfer form attached and forward a copy to this office to validate the transfer of this authorization.

5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the certification is attached if it contains such conditions.

6. You must allow a representative from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.

Project Specific Special Conditions:

The following project specific special conditions are included with this verification:

1. Reporting Address: The Permittee shall submit all reports, notifications, documentation, and correspondence required by the general and special conditions of this permit to either (not both) of the following addresses:

a. For electronic mail (preferred): SAJ-RD-Enforcement@usace.army.mil (not to exceed 15 MB).

mailto:SAJ-RD-Enforcement@usace.army.mil

-3-

b. For standard mail: U.S. Army Corps of Engineers, Regulatory Division, Enforcement Section, P.O. Box 4970, Jacksonville, FL 32232-0019.

The Permittee shall reference this permit number, SAJ-2026-00706 (NWP-ICF), on all submittals.

2. Permit Conditions Prevail: If information in the permit attachments conflict with the special conditions of this permit, the requirements of the permit special conditions shall prevail.

3. Posting of Permit: The Permittee shall have available and maintain for review a copy of this permit and approved plans at the construction site.

4. Self-Certification: Within 60 days of completion of the work authorized by this permit, the Permittee shall complete the ENG Form 6285, “Certification of Compliance with Department of Army Permit” (located at https://www.publications.usace.army.mil/Portals/76/Eng_Form_6285_2024%20D ec%20FINAL.pdf) and submit it to the Corps.

5. Cultural Resources/Historic Properties:

a. No structure or work shall adversely affect, impact, or disturb properties listed in the National Register of Historic Places (NRHP), or those eligible for inclusion in the NRHP.

b. If, during the ground disturbing activities and construction work within the permit area, there are archaeological/cultural materials encountered which were not the subject of a previous cultural resources assessment survey (and which shall include, but not be limited to: pottery, modified shell, human remains, ceramics, stone tools or metal implements, dugout canoes, evidence of structures or any other physical remains that could be associated with native cultures or early colonial settlement), the Permittee shall immediately stop all work and ground-disturbing activities within a 100-meter diameter of the discovery and notify the Corps at the addresses listed in the Reporting Address Special Condition within the same business day (8 hours). The Corps shall coordinate with the Florida State Historic Preservation Officer (SHPO) to assess the significance of the discovery and devise appropriate actions.

c. Additional cultural resources assessments may be required of the permit area in the case of unanticipated discoveries as referenced in accordance with the above Special Condition and, if deemed necessary by the SHPO or Corps, in accordance with 36 CFR 800 or 33 CFR 325, Appendix C (5).

Based on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend, or revoke the permit in accordance with 33 CFR Part 325.7. Such activity shall

-4-not resume on non-federal lands without written authorization from the SHPO for finds under his or her jurisdiction, and from the Corps.

d. In the unlikely event that unmarked human remains are identified on non-federal lands; they will be treated in accordance with Section 872.05 Florida Statutes. All work and ground disturbing activities within a 100-meter diameter of the unmarked human remains shall immediately cease and the Permittee shall immediately notify the medical examiner, Corps, and State Archaeologist within the same business day (8-hours). The Corps shall then notify the appropriate SHPO. Based on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend, or revoke the permit in accordance with 33 CFR Part

325.7. Such activity shall not resume without written authorization from the SHPO and from the Corps.

6. Assurance of Navigation and Maintenance: The Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be required, upon due notice from the U.S.

Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.

7. Water Quality Certification (WQC) and Coastal Zone Management Act

(CZMA) Condition: Prior to construction, activities qualifying for a nationwide permit 57 (NWP 57) must be authorized by a written final order granting certification pursuant to the Florida Electric Transmission Line Siting Act (for electric utility line activities), or authorized by the applicable permit or exemption under Part IV of Chapter 373, F.S. (for telecommunication line activities), and by any authorization required to use or occupy sovereignty submerged lands (SSL) under Chapter 253, F.S., and as applicable, Chapter 258, F.S.

This letter of authorization does not include conditions that would prevent the ‘take’ of a state-listed fish or wildlife species. These species are protected under sec. 379.411, Florida Statutes, and listed under Rule 68A-27, Florida Administrative Code. With regard to fish and wildlife species designated as species of special concern or threatened by the State of Florida, you are responsible for coordinating directly with the Florida Fish and Wildlife Conservation Commission (FWC). You can visit the FWC license and permitting webpage (http://www.myfwc.com/license/wildlife/) for more information, including a list of those fish and wildlife species designated as species of special concern or threatened.

The Florida Natural Areas Inventory (http://www.fnai.org/) also maintains updated lists, by county, of documented occurrences of those species.

http://www.myfwc.com/license/wildlife/ http://www.fnai.org/

-5-

This letter of authorization does not give absolute Federal authority to perform the work as specified on your application. The proposed work may be subject to local building restrictions mandated by the National Flood Insurance Program. You should contact your local office that issues building permits to determine if your site is located in a flood-prone area, and if you must comply with the local building requirements mandated by the National Flood Insurance Program.

This letter of authorization does not preclude the necessity to obtain any other Federal, State, or local permits which may be required. Activities located within the boundaries of the Florida Keys National Marine Sanctuary (FKNMS) may require separate approval from the FKNMS prior to construction. It is the permittee’s responsibility to obtain any permits or authorizations which may be required by the FKNMS. You should contact the FKNMS at fknms.authorizations@noaa.gov.

Thank you for your cooperation with our permit program. The Corps’ Jacksonville

District Regulatory Division is committed to improving service to our customers. We strive to perform our duty in a friendly and timely manner while working to preserve our environment. We invite you to complete our automated Customer Service Survey at https://regulatory.ops.usace.army.mil/customer-service-survey/. Please be aware this Internet address is case sensitive and you will need to enter it exactly as it appears above.

Your input is appreciated – favorable or otherwise.

Should you have any questions related to this NWP verification or have issues accessing the documents referenced in this letter, please contact Ingrid Fuquene at the Florida Keys Permits Section at 9900 SW 107th Avenue, Suite 203 Miami, FL 33176, by telephone at 305-878-8257, or by email at Ingrid.C.Fuquene@usace.army.mil.

Sincerely, Ingrid Fuquene Project Manager

Enclosures

Cc: austin.arnold@kci.com Austin Arnold fknms.authorizations@noaa.gov mailto:fknms.authorizations@noaa.gov https://regulatory.ops.usace.army.mil/customer-service-survey/ mailto:austin.arnold@kci.com mailto:fknms.authorizations@noaa.gov

DEPARTMENT OF THE ARMY PERMIT TRANSFER REQUEST

DA PERMIT NUMBER: SAJ-2026-00706 (NWP-ICF)

When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. Although the construction period for works authorized by Department of the Army permits is finite, the permit itself, with its limitations, does not expire.

To validate the transfer of this permit and the associated responsibilities associated with compliance with its terms and conditions, have the transferee sign and date below and mail to the U.S. Army Corps of Engineers, Enforcement Section, Post Office Box 4970, Jacksonville, FL 32232-0019 or submit via electronic mail to:

SAJ-RD-Enforcement@usace.army.mil (not to exceed 15 MB).

(TRANSFEREE-SIGNATURE) (SUBDIVISION)

(DATE) (LOT) (BLOCK)

___________________________________ (STREET ADDRESS)

(NAME-PRINTED)

(MAILING ADDRESS)

(CITY, STATE, ZIP CODE)

mailto:SAJ-RD-Enforcement@usace.army.mil

ROW

ROW

ROW

ROW

ROW

RO

W

ROW

ROW

C5-1297

EXISTING POLE

MILEPOST: 5.077

CROSS SECTION 2

C5-1296

EXISTING POLE

MILEPOST: 5.180

CROSS SECTION 1

INSTALL 590' OF 144 STRAND

ADSS FIBER OPTIC CABLE

US ROUTE 1

US ROUTE 1

VACA CUT BRIDGE

BUILDING

#11710

N

PLAN VIEW

GAS

WATER

STORM DRAIN

SANITARY SEWER

RECLAIMED WATER

ELECTRIC

TELEPHONE

RIGHT OF WAY

BURIED UTILITIES

G

W

D

S

R

E

T

SCOPE OF WORK

ABBREVIATIONS

AC

CI

DIP

EOP

EOS

FM

PVC

ASBESTOS CEMENT

CAST IRON

DUCTILE IRON PIPE

EDGE OF PAVEMENT

EDGE OF SIDEWALK

FORCE MAIN

POLYVINYL CHLORIDE

RCP

TX

UG

REINFORCED CONCRETE PIPE

TRANSFORMER

UNDERGROUND

CENTER LINE

ROW

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

INSTALL EXISTING/REMOVE

LEGEND

P

P

P

F

F F

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

P

F

GENERAL CONSTRUCTION NOTES:

· RIGHT OF WAYS WILL BE RESTORED TO AS

GOOD AS OR BETTER THAN ORIGINAL

CONDITION.

· TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND

FACILITIES WITH THE MUNICIPALITY

INSPECTOR PRIOR TO BORES BEING

INSTALLED.

· ALL PULL BOX LIDS SHALL BE TRAFFIC

RATED WHEN INSTALLED WITHIN THE

RIGHT OF WAY.

· CONTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL

DRIVEWAYS, SIDEWALKS AND SIDE

STREETS ALWAYS, UNLESS OTHERWISE

APPROVED ON THE MOT PERMIT.

· ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE

VICINITY OF THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING.

Circuit ID: XXX Primary Voltage: 12.47/7.2KV

VACA BRIDGE CROSSING

PROJECT SITE ADDRESS: 11710 OVERSEAS HIGHWAY

MARATHON, FL, 33050 - MONROE COUNTY

SCOPE OF WORK: INSTALL 590' OF OVERHEAD WIRE

W.O.O.: PETER AMENDOLA

PH: 305-852-2431 x240

SECTION: 05 TWP: 66 RANGE: 33

REV: N/A SCALE: N/ADATE: 10/16/2025

PRINT: 1 OF 7

INSTALL 590' OF OVERHEAD WIRE

MOT INDEX

MILE POSTS

102-602

START: 5.077

END: 5.180

C5-1297: 5.077

C5-1296: 5.180

117TH STREET: 5.005

02/27/2026

SAFETY NOTES:

TO PREVENT FIBER FROM FALLING INTO OR

CLOSELY ABOVE VACA CUT, THE FIBER WILL BE

DISPENSED FROM A TRUCK MOUNTED REEL

WITH A FRICTION BRAKE ASSEMBLY AND

ADDITIONALLY SECURED WITH A HANDLINE TO

ENSURE FULL CONTROL THROUGHOUT THE

INSTALLATION PROCESS.

THE LINES WILL BE INSTALLED UTILIZING

INDUSTRY STANDARD SAFE WORK PRACTICES

AND NATIONAL ELECTRIC SAFETY CODE

GUIDELINES. NO CONTACT WITH THE WATER IS

EXPECTED. NO CONTACT WITH THE CHANNEL

FLOOR WILL OCCUR.

GPS COORDINATES:

C5-1296: 24.730814, -81.028699 C5-1297: 24.730464, -81.030434

INSTALL 590' OF NEW OVERHEAD

WIRE ABOVE THE LOWEST EXISTING

LINE

SAJ-2026-00706 Hamilton, Sarah (Sheet 1 of 7) 05/14/2026

US ROUTE 1

7T

H S

TR

EE

T

VICNITY MAP

GAS

WATER

STORM DRAIN

SANITARY SEWER

RECLAIMED WATER

ELECTRIC

TELEPHONE

RIGHT OF WAY

BURIED UTILITIES

G

W

D

S

R

E

T

SCOPE OF WORK

INSTALL 590' OF OVERHEAD WIRE

ABBREVIATIONS

AC

CI

DIP

EOP

EOS

FM

PVC

ASBESTOS CEMENT

CAST IRON

DUCTILE IRON PIPE

EDGE OF PAVEMENT

EDGE OF SIDEWALK

FORCE MAIN

POLYVINYL CHLORIDE

RCP

TX

UG

REINFORCED CONCRETE PIPE

TRANSFORMER

UNDERGROUND

CENTER LINE

ROW

Circuit ID: XXX Primary Voltage: 12.47/7.2KV

VACA BRIDGE CROSSING

PROJECT SITE ADDRESS: 11710 OVERSEAS HIGHWAY

MARATHON, FL, 33050 - MONROE COUNTY

SCOPE OF WORK: INSTALL 590' OF OVERHEAD WIRE

W.O.O.: PETER AMENDOLA

PH: 305-852-2431 x240

SECTION: 05 TWP: 66 RANGE: 33

REV: N/A SCALE: N/ADATE: 10/16/2025

PRINT: 2 OF 7

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

INSTALL EXISTING/REMOVE

LEGEND

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

P

F

P

F

P

F

P

F

N

MOT INDEX

MILE POSTS

102-602

START: 5.077

END: 5.180

C5-1297: 5.077

C5-1296: 5.180

117TH STREET: 5.005

GENERAL CONSTRUCTION NOTES:

· RIGHT OF WAYS WILL BE RESTORED TO AS

GOOD AS OR BETTER THAN ORIGINAL

CONDITION.

· TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND

FACILITIES WITH THE MUNICIPALITY

INSPECTOR PRIOR TO BORES BEING

INSTALLED.

· ALL PULL BOX LIDS SHALL BE TRAFFIC

RATED WHEN INSTALLED WITHIN THE

RIGHT OF WAY.

· CONTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL

DRIVEWAYS, SIDEWALKS AND SIDE

STREETS ALWAYS, UNLESS OTHERWISE

APPROVED ON THE MOT PERMIT.

· ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE

VICINITY OF THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING.

02/27/2026

SAFETY NOTES:

TO PREVENT FIBER FROM FALLING INTO OR

CLOSELY ABOVE VACA CUT, THE FIBER WILL BE

DISPENSED FROM A TRUCK MOUNTED REEL

WITH A FRICTION BRAKE ASSEMBLY AND

ADDITIONALLY SECURED WITH A HANDLINE TO

ENSURE FULL CONTROL THROUGHOUT THE

INSTALLATION PROCESS.

THE LINES WILL BE INSTALLED UTILIZING

INDUSTRY STANDARD SAFE WORK PRACTICES

AND NATIONAL ELECTRIC SAFETY CODE

GUIDELINES. NO CONTACT WITH THE WATER IS

EXPECTED. NO CONTACT WITH THE CHANNEL

FLOOR WILL OCCUR.

INSTALL 590' OF NEW OVERHEAD

WIRE ABOVE THE LOWEST EXISTING

LINE

SAJ-2026-00706 Hamilton, Sarah (Sheet 2 of 7) 05/14/2026

CROSS SECTION #1

LOOKING SOUTHWEST

0" 12" 24" 36" 48" 60" 72" 84" 96"

108"

0" 12" 24" 36" 48" 60" 72" 84" 96" 108"

R/W

Hor. Scale : 1" = 20' Vert. Scale: 1" = 5'

US ROUTE 1

EOP

C/L

R/WEOP

NOTE:

· CONTRACTOR SHALL CALL SUNSHINE STATE

"ONE CALL" FOR LOCATES OF THE EXISTING

UTILITIES PRIOR TO CONSTRUCTION.

· ALL WORK SHALL COMPLY WITH ALL CITY,

STATE, AND FEDERAL REGULATIONS &

GUIDELINES.

· THE UAO SHALL COMPLY WITH THE UAM 2017.

GENERAL CONSTRUCTION NOTES:

· RIGHT OF WAYS WILL BE RESTORED TO AS

GOOD AS OR BETTER THAN ORIGINAL

CONDITION.

· TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND

FACILITIES WITH THE MUNICIPALITY

INSPECTOR PRIOR TO BORES BEING

INSTALLED.

· ALL PULL BOX LIDS SHALL BE TRAFFIC

RATED WHEN INSTALLED WITHIN THE

RIGHT OF WAY.

· CONTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL

DRIVEWAYS, SIDEWALKS AND SIDE

STREETS ALWAYS, UNLESS OTHERWISE

APPROVED ON THE MOT PERMIT.

· ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE

VICINITY OF THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING.

Circuit ID: XXX Primary Voltage: 12.47/7.2KV

VACA BRIDGE CROSSING

PROJECT SITE ADDRESS: 11710 OVERSEAS HIGHWAY

MARATHON, FL, 33050 - MONROE COUNTY

SCOPE OF WORK: INSTALL 590' OF OVERHEAD WIRE

W.O.O.: PETER AMENDOLA

PH: 305-852-2431 x240

SECTION: 05 TWP: 66 RANGE: 33

REV: N/A SCALE: N/ADATE: 10/16/2025

PRINT: 3 OF 7

37'

C5-1296

EXISTING POLE

02/27/2026

SAFETY NOTES:

TO PREVENT FIBER FROM FALLING INTO OR

CLOSELY ABOVE VACA CUT, THE FIBER WILL BE

DISPENSED FROM A TRUCK MOUNTED REEL

WITH A FRICTION BRAKE ASSEMBLY AND

ADDITIONALLY SECURED WITH A HANDLINE TO

ENSURE FULL CONTROL THROUGHOUT THE

INSTALLATION PROCESS.

THE LINES WILL BE INSTALLED UTILIZING

INDUSTRY STANDARD SAFE WORK PRACTICES

AND NATIONAL ELECTRIC SAFETY CODE

GUIDELINES. NO CONTACT WITH THE WATER IS

EXPECTED. NO CONTACT WITH THE CHANNEL

FLOOR WILL OCCUR.

SAJ-2026-00706 Hamilton, Sarah (Sheet 3 of 7) 05/14/2026

CROSS SECTION #2

LOOKING SOUTHWEST

0" 12" 24" 36" 48" 60" 72" 84" 96"

108"

0" 12" 24" 36" 48" 60" 72" 84" 96" 108"

R/W

Hor. Scale : 1" = 20' Vert. Scale: 1" = 5'

US ROUTE 1

EOP

C/L

R/WEOP

NOTE:

· CONTRACTOR SHALL CALL SUNSHINE STATE

"ONE CALL" FOR LOCATES OF THE EXISTING

UTILITIES PRIOR TO CONSTRUCTION.

· ALL WORK SHALL COMPLY WITH ALL CITY,

STATE, AND FEDERAL REGULATIONS &

GUIDELINES.

· THE UAO SHALL COMPLY WITH THE UAM 2017.

GENERAL CONSTRUCTION NOTES:

· RIGHT OF WAYS WILL BE RESTORED TO AS

GOOD AS OR BETTER THAN ORIGINAL

CONDITION.

· TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND

FACILITIES WITH THE MUNICIPALITY

INSPECTOR PRIOR TO BORES BEING

INSTALLED.

· ALL PULL BOX LIDS SHALL BE TRAFFIC

RATED WHEN INSTALLED WITHIN THE

RIGHT OF WAY.

· CONTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL

DRIVEWAYS, SIDEWALKS AND SIDE

STREETS ALWAYS, UNLESS OTHERWISE

APPROVED ON THE MOT PERMIT.

· ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE

VICINITY OF THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING.

Circuit ID: XXX Primary Voltage: 12.47/7.2KV

VACA BRIDGE CROSSING

PROJECT SITE ADDRESS: 11710 OVERSEAS HIGHWAY

MARATHON, FL, 33050 - MONROE COUNTY

SCOPE OF WORK: INSTALL 590' OF OVERHEAD WIRE

W.O.O.: PETER AMENDOLA

PH: 305-852-2431 x240

SECTION: 05 TWP: 66 RANGE: 33

REV: N/A SCALE: N/ADATE: 10/16/2025

PRINT: 4 OF 7

35'

C5-1297

EXISTING POLE

02/27/2026

SAFETY NOTES:

TO PREVENT FIBER FROM FALLING INTO OR

CLOSELY ABOVE VACA CUT, THE FIBER WILL BE

DISPENSED FROM A TRUCK MOUNTED REEL

WITH A FRICTION BRAKE ASSEMBLY AND

ADDITIONALLY SECURED WITH A HANDLINE TO

ENSURE FULL CONTROL THROUGHOUT THE

INSTALLATION PROCESS.

THE LINES WILL BE INSTALLED UTILIZING

INDUSTRY STANDARD SAFE WORK PRACTICES

AND NATIONAL ELECTRIC SAFETY CODE

GUIDELINES. NO CONTACT WITH THE WATER IS

EXPECTED. NO CONTACT WITH THE CHANNEL

FLOOR WILL OCCUR.

SAJ-2026-00706 Hamilton, Sarah (Sheet 4 of 7) 05/14/2026

PROFILE VIEW #1

156" 144" 132" 120" 108" 96" 84" 72" 60" 48" 36" 24" 12"

0"

156" 144" 132" 120" 108" 96" 84" 72" 60" 48" 36" 24" 12" 0"

Hor. Scale : 1" = 40' Vert. Scale: 1" = 5'

NOTE:

· CONTRACTOR SHALL CALL SUNSHINE STATE

"ONE CALL" FOR LOCATES OF THE EXISTING

UTILITIES PRIOR TO CONSTRUCTION.

· ALL WORK SHALL COMPLY WITH ALL CITY,

STATE, AND FEDERAL REGULATIONS &

GUIDELINES.

· THE UAO SHALL COMPLY WITH THE UAM 2017.

GENERAL CONSTRUCTION NOTES:

· RIGHT OF WAYS WILL BE RESTORED TO AS

GOOD AS OR BETTER THAN ORIGINAL

CONDITION.

· TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND

FACILITIES WITH THE MUNICIPALITY

INSPECTOR PRIOR TO BORES BEING

INSTALLED.

· ALL PULL BOX LIDS SHALL BE TRAFFIC

RATED WHEN INSTALLED WITHIN THE

RIGHT OF WAY.

· CONTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL

DRIVEWAYS, SIDEWALKS AND SIDE

STREETS ALWAYS, UNLESS OTHERWISE

APPROVED ON THE MOT PERMIT.

· ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE

VICINITY OF THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING.

Circuit ID: XXX Primary Voltage: 12.47/7.2KV

VACA BRIDGE CROSSING

PROJECT SITE ADDRESS: 11710 OVERSEAS HIGHWAY

MARATHON, FL, 33050 - MONROE COUNTY

SCOPE OF WORK: INSTALL 590' OF OVERHEAD WIRE

W.O.O.: PETER AMENDOLA

PH: 305-852-2431 x240

SECTION: 05 TWP: 66 RANGE: 33

REV: N/A SCALE: N/ADATE: 10/16/2025

PRINT: 5 OF 7

C5-1296

EXISTING POLE

C5-1297

EXISTING POLE

INSTALL 590' OF 144 STRAND

ADSS FIBER OPTIC CABLE

VACA CUT BRIDGE

02/27/2026

SAJ-2026-00706 Hamilton, Sarah (Sheet 5 of 7) 05/14/2026

LOOKING WEST

NOTE:

· CONTRACTOR SHALL CALL SUNSHINE STATE

"ONE CALL" FOR LOCATES OF THE EXISTING

UTILITIES PRIOR TO CONSTRUCTION.

· ALL WORK SHALL COMPLY WITH ALL CITY,

STATE, AND FEDERAL REGULATIONS &

GUIDELINES.

· THE UAO SHALL COMPLY WITH THE UAM 2017.

GENERAL CONSTRUCTION NOTES:

· RIGHT OF WAYS WILL BE RESTORED TO AS

GOOD AS OR BETTER THAN ORIGINAL

CONDITION.

· TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND

FACILITIES WITH THE MUNICIPALITY

INSPECTOR PRIOR TO BORES BEING

INSTALLED.

· ALL PULL BOX LIDS SHALL BE TRAFFIC

RATED WHEN INSTALLED WITHIN THE

RIGHT OF WAY.

· CONTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL

DRIVEWAYS, SIDEWALKS AND SIDE

STREETS ALWAYS, UNLESS OTHERWISE

APPROVED ON THE MOT PERMIT.

· ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE

VICINITY OF THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING.

Circuit ID: XXX Primary Voltage: 12.47/7.2KV

VACA BRIDGE CROSSING

PROJECT SITE ADDRESS: 11710 OVERSEAS HIGHWAY

MARATHON, FL, 33050 - MONROE COUNTY

SCOPE OF WORK: INSTALL 590' OF OVERHEAD WIRE

W.O.O.: PETER AMENDOLA

PH: 305-852-2431 x240

SECTION: 05 TWP: 66 RANGE: 33

REV: N/A SCALE: N/ADATE: 10/16/2025

PRINT: 6 OF 7

SAJ-2026-00706 Hamilton, Sarah (Sheet 6 of 7) 05/14/2026

LOOKING WEST

NOTE:

· CONTRACTOR SHALL CALL SUNSHINE STATE

"ONE CALL" FOR LOCATES OF THE EXISTING

UTILITIES PRIOR TO CONSTRUCTION.

· ALL WORK SHALL COMPLY WITH ALL CITY,

STATE, AND FEDERAL REGULATIONS &

GUIDELINES.

· THE UAO SHALL COMPLY WITH THE UAM 2017.

GENERAL CONSTRUCTION NOTES:

· RIGHT OF WAYS WILL BE RESTORED TO AS

GOOD AS OR BETTER THAN ORIGINAL

CONDITION.

· TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND

FACILITIES WITH THE MUNICIPALITY

INSPECTOR PRIOR TO BORES BEING

INSTALLED.

· ALL PULL BOX LIDS SHALL BE TRAFFIC

RATED WHEN INSTALLED WITHIN THE

RIGHT OF WAY.

· CONTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL

DRIVEWAYS, SIDEWALKS AND SIDE

STREETS ALWAYS, UNLESS OTHERWISE

APPROVED ON THE MOT PERMIT.

· ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE

VICINITY OF THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING.

Circuit ID: XXX Primary Voltage: 12.47/7.2KV

VACA BRIDGE CROSSING

PROJECT SITE ADDRESS: 11710 OVERSEAS HIGHWAY

MARATHON, FL, 33050 - MONROE COUNTY

SCOPE OF WORK: INSTALL 590' OF OVERHEAD WIRE

W.O.O.: PETER AMENDOLA

PH: 305-852-2431 x240

SECTION: 05 TWP: 66 RANGE: 33

REV: N/A SCALE: N/ADATE: 10/16/2025

PRINT: 7 OF 7

SAJ-2026-00706 Hamilton, Sarah (Sheet 7 of 7) 05/14/2026

20260514-Samped plans.pdf
Sheets and Views
BRIDGE CROSSING PERMIT-PLAN VIEW
BRIDGE CROSSING PERMIT-VICINITY MAP
BRIDGE CROSSING PERMIT-CROSS SECTION
BRIDGE CROSSING PERMIT-CROSS SECTION (2)
BRIDGE CROSSING PERMIT-PROFILE VIEW
BRIDGE CROSSING PERMIT-PHOTO SHEET
BRIDGE CROSSING PERMIT-PHOTO SHEET (2)
2026-05-20T11:41:48-0400
FUQUENE.INGRID.CAROLINA.1618819147