EXHIBIT_G__Q_Feeder__New_Poles_Staking_Sheet_with_Attach_Heights.pdf
PDF 59 KB Posted
- Solicitation number
- FKEC BID #26-14
- Issued by
- Florida
About this file
This is a staking sheet and pole attachment specifications document for Florida Keys Electric Cooperative Association, Inc. (FKEC) related to the procurement and construction of an All Dielectric Self-Supporting (ADSS) fiber optic line connecting Crawl Key Substation to Marathon Substation in Florida. The document provides detailed technical specifications for new pole structures across the proposed fiber line route, including 42 identified structure locations designated with identifiers ranging from R00 through B14A. The specifications establish structural requirements including pole heights ranging from 38.5 to 43 feet, class ratings from 45_H1 to 50_20 kip, embedded depths from 6.5 to 10 feet, and geographic coordinates for each structure location. The document identifies attachment heights for distribution lines, communications lines, and other equipment, with lowest distribution attachment points ranging from 24.749996 to 38 feet and highest communications attachment points from 19.62 to 34.67 feet. Phasing information indicates whether each structure includes tree trimming requirements and the type of framing configuration needed for each pole location.
The document serves as a technical reference for bidders to understand the specific pole specifications, spacing, and attachment requirements across the approximately 42-pole project corridor. Critical design parameters include span distances between poles ranging from 42.789 to 285.244 feet, line angles indicating directional changes in the route, and specific pole class and height combinations tailored to each location's structural demands. All structures are designated as new installations with detailed easting and northing coordinates provided in Florida's State Plane Coordinate System, enabling precise surveying and construction layout. The document includes notations for joint use arrangements, specific utility attachment specifications, and phasing requirements that indicate either transfer or attach operations for integration with existing utility infrastructure.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Structure Number
Existing Ahead Span
(ft) Line Angle
(deg) X Easting
(ft) Y Northing
(ft) Structure Height (ft)
Class Modeled
Embedded Depth (ft)
Framing Latitude
(deg) Longitude
(deg) PHASING Joint Use Tree Trim
Lowest Distribution Attachment
(ft)
Highest Comms
Attachment (ft)
2nd Comms Attachment
(ft)
3rd Comms Attachment
(ft)
R00 New 266.201 4.061 663799.5 151408.67 38.5 45_H1 6.5 VC1-P VG2 24.749996 -80.977007 AR BM CF Transfer R01 New 42.789 24.6177 663816.8 151143.03 40 50_12.8 kip 10 VC8-P 24.749258 -80.976957 AR BM CF Transfer 35 31.67 30.67
R02 New 77.908 -1.513 663801.5 151103.06 38.5 45_H3 6.5
VC1-P
VC7-P
900A TERM
24.749154 -80.977002 AR BM CF Transfer 28.67 25.33
Q12 New 81.614 -2.9919 649667.5 145137.76 40 50_20 kip 10 VC8-P 900A TERM 24.7327 -81.0196 AR BM CF None 33.17 29.83
Q13 New 109.011 0.3124 649563.3 145105.8 38.5 45_H1 6.5
VC1-P
M3-13
24.7327 -81.0199 AR BM CF None 33.5 30.17 29.17
Q14A New 165 43 50_H1 7 VC1-P 24.732535 -81.0203 AR BM CF None 38 34.67 33.67 Q15 New 198 -1.0883 649228.4 145003.74 43 50_H1 7 VC1-P 24.7324 -81.0209 AR BM CF None 38 34.67 33.67 Q16 New 201.445 -2.0796 649034.5 144948.89 38.5 45_H1 6.5 VC1-P 24.7322 -81.0215 AR BM CF None 33.5 30.17 29.17 Q17 New 171.511 1.012 648867.9 144908.22 38.5 45_H1 6.5 VC1-P VG2 24.7321 -81.022 AR BM CF None 33.5 30.17 29.17 Q18 New 194.246 -3.4719 648680.1 144858.83 38.5 45_H1 6.5 VC1-P 24.732 -81.0226 AR BM CF None 33.5 30.17 29.17
Q19 New 202.714 3.2329 648481.3 144819.25 38.5 45_H1 6.5
VC1-P
VC7-P
M5-9 x2
24.7319 -81.0232 AR BM CF None 29.5 23.47
25.17 Q20 New 130.614 -0.6369 648354.8 144786.57 40 50_20 kip 10 VC7-P 900A TERM 24.7318 -81.0235 AR BM CF None X 33.17 29.83
Q24 New 76.931 4.1794 647183.8 144560.03 40 50_20kip 10
VC7-P
VA5-P
M5-9
900A TERM
24.7311 -81.0271 AR BM CF Attach 33.17 29.83
Q28 New 177.546 0.4441 645731.7 144240.42 43 50_12.8 kip 7
VC17-P
VC5-P
M5-10 x3
24.7303 -81.0314 BT AM CB Transfer X 29.5 24.12
23.12 Q29 New 159.193 5.5672 645641.4 144223.13 38.5 45_H3 6.5 VC19-P VG2 24.7302 -81.0317 BT AM CB Transfer 25 19.62 18.62 Q30 New 230.553 -1.2497 645417 144170.13 38.5 45_H1 6.5 VC1-P 24.7301 -81.0324 AR BM CF Transfer 32.5 29.17 28.17 27.17 Q31 New 233.158 2.5416 645189 144121.49 38.5 45_H1 6.5 VC33-1P VG2 24.7299 -81.0331 AR BM CF Transfer 33.5 30.17 29.17 28.17 Q32 New 134.102 -1.5909 645059.2 144087.72 38.5 45_H1 6.5 VC1-P VG1 24.7298 -81.0335 AR BM CF Transfer 33.5 30.17 29.17 28.17 Q33 New 205.066 -0.061 644859.4 144041.62 38.5 45_H1 6.5 VC1-P 24.7297 -81.0341 AR BM CF Transfer 33.5 30.17 29.17 28.17 Q35 New 215 3.3061 644323.3 143923.65 38.5 45_H1 6.5 VC1-P 24.7294 -81.0357 AR BM CF Transfer 33.5 30.17 29.17 28.17 Q36 New 212 -5.0589 644197.2 143889.16 38.5 45_H1 6.5 VC1-P VG3 24.7293 -81.0361 AR BM CF Transfer 33.5 30.17 29.17 28.17 Q37 New 259.373 5.3631 643942 143843.08 38.5 45_H1 6.5 VC33-1P 24.7292 -81.0368 AR BM CF Transfer 33.5 30.17 29.17 28.17 Q39 New 285.244 6.3249 643423.8 143722.94 43 50_H1 7 VC1-P VG3 24.7288 -81.0384 AR BM CF Attach 38 34.67 33.67 32.67
Q41 New 246.536 643184.4 143664.39 43 50_H1 7
VC1-P
M3-13
24.7287 -81.0391 AR BM CF Attach 38 34.67
33.67 32.67
Q43 New 172.792 -0.6009 642857.6 143590.1 43 50_H1 7 VC1-P 24.7285 -81.0401 AR BM CF Attach 38 34.67 33.67 32.67 Q45 New 130.969 -1.9082 642617.2 143537.48 40 50_20 kip 10 VC8-P 24.7283 -81.0408 AR BM CF Transfer 33.17 29.83 Q47 New 229.345 4.7888 642328.1 143476.15 38.5 45_H1 6.5 VC1-P VG3 24.7282 -81.0417 AR BM CF Transfer 33.5 30.17 29.17 28.17 Q51 New 247.054 1.0062 641576.3 143213.65 38.5 50_H1 6.5 VC1-P VG2 24.7274 -81.044 AR BM CF Transfer 33.5 30.17 29.17 28.17 Q55 New 147.211 641027.2 142984.53 40 50_20 kip 10 VC7-P VG2 24.7268 -81.0456 AR BM CF Transfer 33.17 29.83 28.83
B15 New 184.781 0.0163 639012.6 142149.08 43 50_12.8 kip 7
VC1-P
VC8-P
900A TERM
24.7245 -81.0517 AR BM CF Transfer X 32 28.67
27.67 26.67 B14A New 134.97 -0.2216 638889.1 142094.62 38.5 45_H1 6.5 VC1-P 900A TERM 24.7244 -81.0521 AR BM CF Attach 33.5 30.17 29.17 28.17
EXHIBIT G
File details come from the government source that posted it. Updated .