EXHIBIT_F__MRS2531_Fiber_Elementary_144_Strand_with_Dist_Taps_260122.pdf

PDF 246 KB Posted

Attached to
SPECIFICATIONS TO PROCURE AND CONSTRUCT ADSS FIBER OPTIC LINE
Solicitation number
FKEC BID #26-14
Issued by
Florida

About this file

This is an exhibit document for the Florida Keys Electric Cooperative Association, Inc. (FKEC) specification to procure and construct an All Dielectric Self-Supporting (ADSS) fiber optic line connecting Crawl Key Substation to Marathon Substation in the Florida Keys. The project involves installing a 144-strand fiber optic cable with distribution taps and includes detailed specifications for splice locations, equipment placement, and termination points. The fiber line route encompasses multiple stations with specified coordinates, including capacity bank installations, reclosers, and hub patch panels at designated locations. Key infrastructure points include Marathon Substation at coordinates 24.732650, -81.019900, with various splice points and terminations distributed throughout the network from Tavernier to Marathon.

The exhibit provides a technical schematic and routing plan identifying nine major stations along the fiber route, with straight splice configurations through multiple designated points (Q-series and N-series designations) and specified hub port assignments (ports 133-144). The document indicates northern and southern termination requirements at multiple nodes and specifies patch panel configurations at various locations. This is a turn-key construction project requiring complete fiber optic line installation with associated equipment placement and connection infrastructure as outlined in the comprehensive bid package specifications.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTE: PLOT IN COLOR

SPLICES ARE STRAIGHT

SPLICE THROUGH

Q-01, Q-02, Q-03, Q-04 Q-05, Q-06, Q-07, Q-08

Q-09, Q-10, Q-11, Q-11A, Q-11B Q-11C,Q-11D, Q-11E, Q-12

CRAWL KEY

SUB STATION

SPLICES ARE STRAIGHT

SPLICE THROUGH

Q-20, Q-21, Q-22, Q-24, Q-35

SPLICE LOCATION N-130

SPLICE IS STRAIGHT

SPLICE THROUGH

N-115

SPLICE IS STRAIGHT

SPLICE THROUGH

N-60, N-47, N-37, N-7

MARATHON

SUB STATION

24.732650 -81.019900

Q-13 RECLOSER

SHEET 1 STATION 191+51

24.729302 -81.037581

N-131 RECLOSER

SHEET 1 STATION 257+77

24.72992 -81.037100

N-130B CAP BANK

PORTS 133-144 AT HUBS

SHEET 1 STATION 261+37

24.748066 -80.97976

C5-1239 CAP BANK

SHEET 1 STATION 13+86

24.730912 -81.043070

N-110 CAP BANK

SHEET 1 STATION 291+15

SPLICE IS STRAIGHT

SPLICE THROUGH

N-93, N-82

24.724723 -81.059228

N-74 CAP BANK

SHEET 1 STATION 349+31

24.724042 -81.061043

N-71 RECLOSER

SHEET 1 STATION 355+40

24.714975 -81.081041

N-22 RECLOSER

SHEET 1 STATION 445+72

4 north & 4 south terminations

24.713188 -81.087890

N-08 CAP BANK

SHEET 1 STATION 469+73

SPLICE IS STRAIGHT

SPLICE THROUGH

N-01, C5-138

4 north & 4 south terminations

4 north & 4 south terminations

4 north & 4 south terminations

4 north & 4 south terminations 4 north & 4 south terminations 4 north & 4 south terminations

4 north & 4 south terminations

4 south terminations

PORTS 133-144 AT HUBS PORTS 133-144 AT HUBS PORTS 133-144 AT HUBS PORTS 133-144 AT HUBS

PORTS 133-144 AT HUBS

PORTS 133-144 AT HUBS PORTS 133-144 AT HUBS

PORTS 133-144 AT HUBS

CRAWL KEY

SUB STATION

PATCH PANEL

PATCH PANEL

PATCH PANEL

TAVERNIER, FLORIDA

ASSOCIATION, INC.

ELECTRIC COOPERATIVE

FLORIDA KEYS

EXHIBIT F