EXHIBIT_D__FKEC_QFeeder__Fiber_PDF__8.28.2025_1.pdf

PDF 78 MB Posted

Attached to
SPECIFICATIONS TO PROCURE AND CONSTRUCT ADSS FIBER OPTIC LINE
Solicitation number
FKEC BID #26-14
Issued by
Florida

About this file

This is an Exhibit D document prepared by Florida Keys Electric Cooperative Association, Inc. (FKEC) detailing specifications for a turn-key project to procure and construct an All Dielectric Self-Supporting (ADSS) fiber optic line. The project involves installing approximately 42 miles of ADSS fiber cable to connect Crawl Key Substation to Marathon Substation in the Florida Keys. The cable installation will utilize existing utility poles owned by FKEC and Florida Power & Light Company. The scope of work includes fiber cable supply, pole attachment hardware, splicing and termination equipment, installation labor, testing, and commissioning of the fiber line. The project requires completion of a comprehensive fiber optic system capable of supporting FKEC's operational and communication needs. Bidders are expected to provide detailed technical specifications, installation methodology, project schedules, and quality assurance plans. The document establishes performance standards for cable installation, fiber optic splice quality, system testing requirements, and acceptance criteria.

The specifications outline technical requirements including ADSS cable specifications meeting industry standards, proper grounding and bonding procedures, and compliance with National Electrical Safety Code (NESC) standards. The document details pole attachment requirements, clearance specifications, and coordination procedures with existing utility infrastructure. Installation quality standards include maximum bend radius specifications, splice loss limits, and light path continuity verification. The project requires comprehensive testing documentation, including attenuation measurements, reflectance testing, and end-to-end system verification. Bidders must demonstrate experience with similar large-scale fiber installation projects and provide evidence of technical competency, safety protocols, and project management capabilities. The specifications emphasize adherence to industry best practices and regulatory compliance throughout all phases of procurement and construction.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .