This is a Florida Department of Transportation (FDOT) Utility Permit for work within the right-of-way on State Road 5 in Monroe County, issued to Florida Keys Electric Cooperative (FKEC). The permit authorizes FKEC to install electrical infrastructure including eighteen 90x60x60 pullboxes, 16,003 feet of 1000 MCM underground cable in 4x4" conduit via directional bore with a 9" bore diameter, 84 feet of 1/0 aluminum cable in 3x3" conduit via directional bore with a 7" bore diameter, 84 feet of 1/0 aluminum cable in 2x3" conduit via directional bore with a 7" bore diameter, three 45/H1 ductile iron poles, and 590 feet of overhead 144-strand ADSS fiber optic cable. The project runs approximately 5 miles along Overseas Highway from milepost 8.689 to milepost 3.659, with a primary voltage of 12.47/7.2KV. The permit was approved on July 8, 2026, with an anticipated start date of January 11, 2027, and work must commence within 60 calendar days of approval. Traffic control will comply with FDOT 600-series indices (600, 601, 660, and 613/615), and working hours are restricted to 9:00 AM to 4:00 PM within the state right-of-way.
The permit identifies multiple utility facility owners that were notified of the work on December 30, 2024, including AT&T Distribution, City of Key Colony Beach, City of Marathon, Comcast Cable, FDOT District 6, Florida Keys Aqueduct Authority, and Hotwire Communications. All work must conform to current FDOT standards and specifications, with right-of-way restoration required to as good or better condition than original. The contractor must coordinate with municipality inspectors regarding underground facility depths prior to bore installation, maintain traffic-rated pullbox lids, ensure uninterrupted access to driveways and sidewalks, and implement appropriate erosion control devices throughout construction. An FDOT representative is required on site prior to commencement of work, and a pre-construction meeting must be coordinated with the FDOT field inspector. Permit approval does not constitute approval of lane closures, which require separate requests through the specified online system.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rule 14-46.001 F.A.C.
FLORIDA DEPARTMENT OF TRANSPORTATION December 14, 2016
UTILITY PERMIT
PERMIT NO:__________________________________
STATE ROAD INFORMATION
County: Section: State Road No: Beginning Mile Post: Ending Mile Post:
APPLICANT INFORMATION
The Utility Agency Owner (UAO) shall be identified in this Applicant Information Box. When the UAO is a City or County and desires to have the Utility Builder make a joint permit applicant, as prescribed in Section 2.1(4) of the 2017 Utility Accommodation Manual (UAM), the Utility Builder shall also be identified in this Applicant Information Box. A Utility Builder alone cannot apply for a utility permit without the City or County adding them as a joint applicant.
Utility Agency/Owner (UAO) Utility Builder (only applicable when the UAO is a City or County) Name: _____________________________________ Name: ______________________________________
Contact Person: _____________________________________ Contact Person: ______________________________________ Address: _____________________________________ Address: ______________________________________
City: _____________________________________ City: ______________________________________ State: _____ State: _____ Zip: _________ Zip: _________
Telephone: _____________________________________ Telephone: ______________________________________ Email: ____________________________________ Email: ______________________________________
WORK DESCRIPTION
The Applicant(s) requests permission from the Florida Department of Transportation (FDOT) to construct, operate, and maintain the utilities as described below and as depicted in the incorporated documentation.
Utility Work No: ___________________________
Additional sheets are attached and are incorporated into this permit Yes No For FDEP certification, the FDOT agency report is attached in accordance with UAM Section 2.4.1 (13) Yes No
TRAFFIC CONTROL (TCP)
The TCP will comply with the following 600 series index(es) ________________________________________________________________________ A TCP has been attached and incorporated into this permit application in compliance with UAM Section 2.4.2.
MOT Technician’s contact information (may be supplied at the two (2) business day notification to FDOT):
Name: ________________________________ Telephone ________________________ Email: _______________________________
COMMENCEMENT OF WORK
The UAO and/or Utility Builder shall commence actual construction in good faith within sixty (60) calendar days after approval of the permit application. If the beginning date is more than sixty (60) calendar days from the date of approval, the UAO and/or Utility Builder must review the permit with the FDOT Approving Engineer listed to make sure no changes have occurred to the transportation facility that would affect the permit’s continued approval. The UAO and/or Utility Builder shall make good faith efforts to expedite the work and complete the work within the calendar days indicated.
Anticipated Start Date: ___________________ Calendar days needed to completed: ________
Monroe
(305) 852-2431 ext. 311___
Florida
SR 5
Florida Keys Electric Cooperative
1/11/2027
2.048
91630 Overseas Highway
602, 601, 660, 600
33070
INSTALL (18) 90x60x60 PULLBOX INSTALL 16,003 FT OF 1000 MCM UG IN 4x4" CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
INSTALL 84 FT OF 1/0 AL UG IN 3x3" CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 7"
INSTALL 84 FT OF 1/0 AL UG IN 2x3" CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 7"
INSTALL (3) 45/H1 DUCTILE IRON POLES
2026-H-692-00009
90040000
Florida Keys Electric Cooperative
Tavernier
JOSH.ELLSWORTH@FKEC.COM
9.445
Approved 2026-H-692-00009
Elizabeth Jett 7/8/2026
EXHIBIT C
Florida Department of Transportation
UTILITY PERMIT
December 14, 2016
PERMIT NO:_________________________________
APPLICANT SIGNATURE
By the below signature(s) the UAO and/or Utility Builder agree(s) to construct, operate, and maintain the work as noted in the above Work Description, shown in plans and incorporated documents, in compliance with the UAM, all instructions noted in the FDOT Special Instructions Box, and special instructions incorporated into this permit. The UAO and/or Utility Builder declares, the location of all existing utilities that it owns or has an interest in, both aerial and underground, are accurately shown on the plans of the work areas. In accordance with UAM Section 2.8, the UAO and/or Utility Builder further declares that a letter of notification was delivered to the owners of other facilities within the work areas and that those listed below are the only facility owners known to be involved or potentially impacted by the proposed work.
Date Notified: Name of other facility owners (attach additional sheets if necessary).
Utility Agency/Owner Utility Builder (when applicable)
Signature: ____________________________ Date: ________________ Signature:___________________________ Date: _______________ Name (printed): _____________________________________________ Name (printed): __________________________________________ Title: ______________________________________________________ Title: ___________________________________________________
FDOT PROJECT INFORMATION
Pursuant to UAM Section 2.1(10), the utility work is within FDOT projects listed below and must have a Utility Work Schedule for each project approved prior to commencement of work within the FDOT project limits:
FDOT SPECIAL INSTRUCTIONS
In accordance with UAM Section 2.7, FDOT incorporates the below and attached special instructions into this permit.
Additional FDOT Special Instructions are attached and incorporated into this permit. Yes No
PERMIT APPROVAL
By signature below, FDOT gives permission to the UAO and /or Utility Builder to construct, operate, and maintain the utilities indicated in this Utility Permit in compliance with the UAM, all incorporated documents, and special instructions. Any changes to the approved work must be approved by the FDOT’s Approving Engineer and attached and incorporated into this permit in accordance with UAM Section 2.11.
Approving Engineer: _____________________________________________ Date: _______________ Name: _____________________________________________
Title:______________________________________________
Notification of Utility Work to be provided to: Telephone _____________________ or Email: _____________________________
An FDOT Representative is required to be present on the worksite prior to commencement of work. Yes No Rep. Name: _____________________________ Telephone _____________________ Email: _____________________________
7/8/2026
.-WORK WITHIN THE F.D.O.T. RIGHT OF WAY SHALL CONFORM TO CURRENT F.D.O.T.
STANDARDS AND SPECIFICATIONS.
- Permit APPROVAL IN NO WAY CONSTITUTES THAT THE PERMITTED HAS AN APPROVED LANE
CLOSURE.
-PLEASE COORDINATE A PRE-CONSTRUCTION MEETING WITH FDOT FIELD INSPECTOR.
-LANE CLOSURE REQUEST REQUIRED at https://lcisv2.com.
-WORKING HOURS WITHIN THE STATE RIGHT-OF-WAY SHALL BE FROM 9:00AM TO 4:00PM OR AS DIRECTED BY ... (see special instructions cont. page)
2/26/2026
(305) 619-1635 ext. ______ juan.chinea@wwebber.com
Elizabeth Jett
Elizabeth Jett (digital signature) juan.chinea@ferrovialservices.com
JOSHUA ELLSWORTH (digital signature)
AT&T DISTRIBUTION12/30/2024
CITY OF KEY COLONY BEACH - SEWER12/30/2024
CITY OF MARATHON - RECLAIMED WATER, STORM WATER, SEWER12/30/2024
COMCAST CABLE12/30/2024
FDOT D612/30/2024
JOSHUA ELLSWORTH
3056191635Juan Chinea
DISTRICT PERMIT ENGINEER
2026-H-692-00009
FDOT construction is proposed or underway. Refer to Financial Project Id: 447757- This work is NOT related to an approved Utility Work Schedule.
Approved 2026-H-692-00009
Elizabeth Jett
Florida Department of Transportation
UTILITY PERMIT
December 14, 2016
PERMIT NO:_________________________________
CERTIFICATION
I, the undersigned UAO and/or Utility Builder, hereby CERTIFY that the utilities were constructed and inspected in compliance with the UAM all incorporated documents, and special instructions. Pursuant to UAM Section 2.11, all changes have been approved by the FDOT’s Approving Engineer and incorporated into this permit along with all other material certifications, test results, bore logs, approved plans changes, as-built plans or other required documentation.
I also CERTIFY that work began on ________________ and was completed on ________________ and that the area was left in as good or better condition than when the work began.
Utility Agency/Owner Utility Builder (when applicable)
Signature: ____________________________ Date _________________ Signature:___________________________ Date ________________ Name (printed): _____________________________________________ Name (printed): ____________________________________________ Title: ______________________________________________________ Title: ____________________________________________________
FINAL INSPECTION OF WORK
The work was inspected and found to be in non-compliance as noted below:
All issues of non-compliance listed above have been brought into compliance and/or FDOT has no outstanding issues that need to be addressed by the UAO and/or Utility Builder. However, this final inspection does not release the UAO and/or Utility Builder of their continuing responsibilities pursuant to Rule 14-46.001, the UAM, all incorporated documents, and special instructions.
FDOT Inspector: _____________________________________________ Date: _______________ Name: _____________________________________________
Title: ______________________________________________
2026-H-692-00009
Approved 2026-H-692-00009 continuation page
PERMIT NO.:
STATE ROAD INFORMATION:
NAME OF OTHER FACILITY OWNERS / DATE NOTIFIED:
FDOT PROJECT INFORMATION:
THE WORK WAS INSPECTED AND FOUND TO BE IN NON-COMPLIANCE AS NOTED BELOW:
Facility Name: FLORIDA KEYS AQUEDUCT AUTHORITY AREA 3 - WATER, Date Notified: 12/30/2024, Facility Name:
FLORIDA KEYS AQUEDUCT AUTHORITY LOWER KEYS TRAN - WATER, Date Notified: 12/30/2024, Facility Name:
FLORIDA KEYS AQUEDUCT AUTHORITY TECHNICAL SERVICE - ELECTRIC, Date Notified: 12/30/2024, Facility Name:
FLORIDA KEYS ELECTRIC COOPERATIVE ASSOC - ELECTRIC, Date Notified: 12/30/2024, Facility Name: HOTWIRE COMMUNICATIONS - CATV, FIBER, TELEPHONE, Date Notified: 12/30/2024
Monroe SR 5, Begin MP: 2.048, End MP: 9.445, Monroe SR 5, Section: 90040000, Begin MP: 11.745, End MP: 11.713
FDOT construction is proposed or underway. Refer to Financial Project Id: 447757-1 This work is NOT related to an approved Utility Work Schedule.
2026-H-692-00009
Approved 2026-H-692-00009
PERMIT NO.:
The complete special instructions could not fit in the space allotted on Page 2 of the Utility Permit so they are displayed below.
Special FDOT Instructions special instructions continuation page
.-WORK WITHIN THE F.D.O.T. RIGHT OF WAY SHALL CONFORM TO CURRENT F.D.O.T. STANDARDS AND
SPECIFICATIONS.
- Permit APPROVAL IN NO WAY CONSTITUTES THAT THE PERMITTED HAS AN APPROVED LANE CLOSURE.
-PLEASE COORDINATE A PRE-CONSTRUCTION MEETING WITH FDOT FIELD INSPECTOR.
-LANE CLOSURE REQUEST REQUIRED at https://lcisv2.com.
-WORKING HOURS WITHIN THE STATE RIGHT-OF-WAY SHALL BE FROM 9:00AM TO 4:00PM OR AS DIRECTED BY
THE DEPARTMENT REPRESENTATIVE PRIOR TO COMMENCEMENT OF WORK.
2026-H-692-00009
Approved 2026-H-692-00009
04/07/2026
Approved 2026-H-692-00009
2026-H-692-00009
2026-H-692-00009
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
F
Q1
EXISTING PULLBOX
MILEPOST: 8.689
CROSS SECTION: 1
INSTALLING 960' OF4X4" MCM UG
CONDUIT VIA DIRECTIONAL BORE
CROSS SECTION: XXX
US ROUTE 1
FLORIDA KEYS OVERSEAS
HERITAGE TRAIL
U1
INSTALLING 960' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
CROSS SECTION: 1 AND 2
18" UNK
30" UNK
3-4" PVC
N
PLAN VIEW
GAS
WATER
STORM DRAIN
SANITARY SEWER
RECLAIMED WATER
ELECTRIC
TELEPHONE
RIGHT OF WAY
BURIED UTILITIES
G
W
D
S
R
E
T
SCOPE OF WORK
ABBREVIATIONS
AC
CI
DIP
EOP
EOS
FM
PVC
ASBESTOS CEMENT
CAST IRON
DUCTILE IRON PIPE
EDGE OF PAVEMENT
EDGE OF SIDEWALK
FORCE MAIN
POLYVINYL CHLORIDE
RCP
TX
UG
REINFORCED CONCRETE PIPE
TRANSFORMER
UNDERGROUND
CENTER LINE
ROW
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
INSTALL EXISTING/REMOVE
LEGEND
P
P
P
F
F F
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
P
F
MOT INDEX
MILE POSTS
102-613 102-615 102-660
START: 8.689
END: 3.659
Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659
GENERAL CONSTRUCTION NOTES:
· RIGHT OF WAYS WILL BE RESTORED TO AS
GOOD AS OR BETTER THAN ORIGINAL
CONDITION.
· TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND
FACILITIES WITH THE MUNICIPALITY
INSPECTOR PRIOR TO BORES BEING
INSTALLED.
· ALL PULL BOX LIDS SHALL BE TRAFFIC
RATED WHEN INSTALLED WITHIN THE
RIGHT OF WAY.
· CONTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL
DRIVEWAYS, SIDEWALKS AND SIDE
STREETS ALWAYS, UNLESS OTHERWISE
APPROVED ON THE MOT PERMIT.
· ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE
VICINITY OF THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING.
Primary Voltage: 12.47/7.2KV
FKEC Q FEEDER
PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY
MARATHON, FL, 33050 - MONROE COUNTY
SCOPE OF WORK: SEE SCOPE OF WORK
W.O.O.: PETER AMENDOLA
PH: 305-852-2431 x240
SECTION: 26 TWP: 65 RANGE: 33
REV: N/A SCALE: N/ADATE: 11/18/2025
PRINT: 1 OF 91
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL
BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL 84' OF 1/0 AL UG IN 2X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
WHERE WORK OCCURS IN THE IN THE DRIP
LINE OF EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN 4X4"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
INSTALL 590' OF NEW OVERHEAD 144
STRAND ADSS FIBER OPTIC CABLE
PRINT: 1 OF 95
03/31/2026
ENSURE THE MINIMUM COVER BELOW
THE TOP OF THE PAVEMENT IS 36" AND
BELOW THE UNPAVED SURFACE IS 30"
GENERAL CONSTRUCTION NOTES:
RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR
BETTER THAN ORIGINAL CONDITION
TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND FACILITIES
WITH THE MUNICIPALITY INSPECTOR PRIOR TO
BORES BEING INSTALLED
ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN
INSTALLED WITHIN THE RIGHT OF WAY
CONSTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,
SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS
OTHERWISE APPROVED ON THE MOT PERMIT
ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE VICINITY OF
THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING
WHERE WORK OCCURS IN THE DRIP LINE OF
EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
PER THE FDOT UTILITY ACCOMMODATION
MANUAL, ENSURE APPROPRIATE EROSION
CONTROL DEVICES ARE IN PLACE BEFORE ANY
WORK AND/OR CONSTRUCTION BEGINS AND
ARE USED THROUGHOUT THE DURATION OF
THE WORK/CONSTRUCTION
102-600 102-601 102-660
POSTED SPEED LIMIT: 55 MPH
Approved 2026-H-692-00009
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW US ROUTE 1
FLORIDA KEYS OVERSEAS
HERITAGE TRAIL
U1
INSTALLING 960' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
CROSS SECTION: 1 AND 2
18" UNK
30" UNK
3-4" PVC
N
PLAN VIEW
GAS
WATER
STORM DRAIN
SANITARY SEWER
RECLAIMED WATER
ELECTRIC
TELEPHONE
RIGHT OF WAY
BURIED UTILITIES
G
W
D
S
R
E
T
SCOPE OF WORK
ABBREVIATIONS
AC
CI
DIP
EOP
EOS
FM
PVC
ASBESTOS CEMENT
CAST IRON
DUCTILE IRON PIPE
EDGE OF PAVEMENT
EDGE OF SIDEWALK
FORCE MAIN
POLYVINYL CHLORIDE
RCP
TX
UG
REINFORCED CONCRETE PIPE
TRANSFORMER
UNDERGROUND
CENTER LINE
ROW
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
INSTALL EXISTING/REMOVE
LEGEND
P
P
P
F
F
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
P
F
F
MOT INDEX
MILE POSTS
102-613 102-615 102-660
START: 8.689
END: 3.659
Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659
GENERAL CONSTRUCTION NOTES:
· RIGHT OF WAYS WILL BE RESTORED TO AS
GOOD AS OR BETTER THAN ORIGINAL
CONDITION.
· TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND
FACILITIES WITH THE MUNICIPALITY
INSPECTOR PRIOR TO BORES BEING
INSTALLED.
· ALL PULL BOX LIDS SHALL BE TRAFFIC
RATED WHEN INSTALLED WITHIN THE
RIGHT OF WAY.
· CONTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL
DRIVEWAYS, SIDEWALKS AND SIDE
STREETS ALWAYS, UNLESS OTHERWISE
APPROVED ON THE MOT PERMIT.
· ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE
VICINITY OF THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING.
Primary Voltage: 12.47/7.2KV
FKEC Q FEEDER
PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY
MARATHON, FL, 33050 - MONROE COUNTY
SCOPE OF WORK: SEE SCOPE OF WORK
W.O.O.: PETER AMENDOLA
PH: 305-852-2431 x240
SECTION: 26 TWP: 65 RANGE: 33
REV: N/A SCALE: N/ADATE: 11/18/2025
PRINT: 2 OF 91
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL
BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL 84' OF 1/0 AL UG IN 2X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
WHERE WORK OCCURS IN THE IN THE DRIP
LINE OF EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN 4X4"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
INSTALL 590' OF NEW OVERHEAD 144
STRAND ADSS FIBER OPTIC CABLE
PRINT: 2 OF 95
03/31/2026
ENSURE THE MINIMUM COVER BELOW
THE TOP OF THE PAVEMENT IS 36" AND
BELOW THE UNPAVED SURFACE IS 30"
GENERAL CONSTRUCTION NOTES:
RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR
BETTER THAN ORIGINAL CONDITION
TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND FACILITIES
WITH THE MUNICIPALITY INSPECTOR PRIOR TO
BORES BEING INSTALLED
ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN
INSTALLED WITHIN THE RIGHT OF WAY
CONSTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,
SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS
OTHERWISE APPROVED ON THE MOT PERMIT
ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE VICINITY OF
THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING
WHERE WORK OCCURS IN THE DRIP LINE OF
EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
PER THE FDOT UTILITY ACCOMMODATION
MANUAL, ENSURE APPROPRIATE EROSION
CONTROL DEVICES ARE IN PLACE BEFORE ANY
WORK AND/OR CONSTRUCTION BEGINS AND
ARE USED THROUGHOUT THE DURATION OF
THE WORK/CONSTRUCTION
102-600 102-601 102-660
POSTED SPEED LIMIT: 55 MPH
Approved 2026-H-692-00009
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
ROW
ROW
ROW
ROW
ROW
RO
W
ROW
ROW
ROW
RO
W
RO
W
F
Q2
INSTALL 90X60X60 VAULT
MILEPOST: 8.509
CROSS SECTION: 2
US ROUTE 1
BANANA BO
ULEVARD
FLORIDA KEYS OVERSEAS
HERITAGE TRAIL
U1
INSTALLING 960' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
CROSS SECTION: 1 AND 2U2
INSTALLING 1000' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
CROSS SECTION: 2 AND 3
18" UNK
30" UNK
3-4" PVC
N
PLAN VIEW
GAS
WATER
STORM DRAIN
SANITARY SEWER
RECLAIMED WATER
ELECTRIC
TELEPHONE
RIGHT OF WAY
BURIED UTILITIES
G
W
D
S
R
E
T
SCOPE OF WORK
ABBREVIATIONS
AC
CI
DIP
EOP
EOS
FM
PVC
ASBESTOS CEMENT
CAST IRON
DUCTILE IRON PIPE
EDGE OF PAVEMENT
EDGE OF SIDEWALK
FORCE MAIN
POLYVINYL CHLORIDE
RCP
TX
UG
REINFORCED CONCRETE PIPE
TRANSFORMER
UNDERGROUND
CENTER LINE
ROW
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
INSTALL EXISTING/REMOVE
LEGEND
P
P
P
F
F
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
P
F
F
MOT INDEX
MILE POSTS
102-613 102-615 102-660
START: 8.689
END: 3.659
Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659
GENERAL CONSTRUCTION NOTES:
· RIGHT OF WAYS WILL BE RESTORED TO AS
GOOD AS OR BETTER THAN ORIGINAL
CONDITION.
· TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND
FACILITIES WITH THE MUNICIPALITY
INSPECTOR PRIOR TO BORES BEING
INSTALLED.
· ALL PULL BOX LIDS SHALL BE TRAFFIC
RATED WHEN INSTALLED WITHIN THE
RIGHT OF WAY.
· CONTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL
DRIVEWAYS, SIDEWALKS AND SIDE
STREETS ALWAYS, UNLESS OTHERWISE
APPROVED ON THE MOT PERMIT.
· ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE
VICINITY OF THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING.
Primary Voltage: 12.47/7.2KV
FKEC Q FEEDER
PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY
MARATHON, FL, 33050 - MONROE COUNTY
SCOPE OF WORK: SEE SCOPE OF WORK
W.O.O.: PETER AMENDOLA
PH: 305-852-2431 x240
SECTION: 26 TWP: 65 RANGE: 33
REV: N/A SCALE: N/ADATE: 11/18/2025
PRINT: 3 OF 91
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL
BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL 84' OF 1/0 AL UG IN 2X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
WHERE WORK OCCURS IN THE IN THE DRIP
LINE OF EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN 4X4"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
INSTALL 590' OF NEW OVERHEAD 144
STRAND ADSS FIBER OPTIC CABLE
PRINT: 3 OF 95
03/31/2026
ENSURE THE MINIMUM COVER BELOW
THE TOP OF THE PAVEMENT IS 36" AND
BELOW THE UNPAVED SURFACE IS 30"
GENERAL CONSTRUCTION NOTES:
RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR
BETTER THAN ORIGINAL CONDITION
TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND FACILITIES
WITH THE MUNICIPALITY INSPECTOR PRIOR TO
BORES BEING INSTALLED
ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN
INSTALLED WITHIN THE RIGHT OF WAY
CONSTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,
SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS
OTHERWISE APPROVED ON THE MOT PERMIT
ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE VICINITY OF
THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING
WHERE WORK OCCURS IN THE DRIP LINE OF
EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
PER THE FDOT UTILITY ACCOMMODATION
MANUAL, ENSURE APPROPRIATE EROSION
CONTROL DEVICES ARE IN PLACE BEFORE ANY
WORK AND/OR CONSTRUCTION BEGINS AND
ARE USED THROUGHOUT THE DURATION OF
THE WORK/CONSTRUCTION
102-600 102-601 102-660
POSTED SPEED LIMIT: 55 MPH
Approved 2026-H-692-00009
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
US ROUTE 1
FLORIDA KEYS OVERSEAS
HERITAGE TRAIL
U2
INSTALLING 1000' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
CROSS SECTION: 2 AND 3
18" UNK
30" UNK
3-4" PVC
N
PLAN VIEW
GAS
WATER
STORM DRAIN
SANITARY SEWER
RECLAIMED WATER
ELECTRIC
TELEPHONE
RIGHT OF WAY
BURIED UTILITIES
G
W
D
S
R
E
T
SCOPE OF WORK
ABBREVIATIONS
AC
CI
DIP
EOP
EOS
FM
PVC
ASBESTOS CEMENT
CAST IRON
DUCTILE IRON PIPE
EDGE OF PAVEMENT
EDGE OF SIDEWALK
FORCE MAIN
POLYVINYL CHLORIDE
RCP
TX
UG
REINFORCED CONCRETE PIPE
TRANSFORMER
UNDERGROUND
CENTER LINE
ROW
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
INSTALL EXISTING/REMOVE
LEGEND
P
P
P
F
F
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
P
F
F
MOT INDEX
MILE POSTS
102-613 102-615 102-660
START: 8.689
END: 3.659
Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659
GENERAL CONSTRUCTION NOTES:
· RIGHT OF WAYS WILL BE RESTORED TO AS
GOOD AS OR BETTER THAN ORIGINAL
CONDITION.
· TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND
FACILITIES WITH THE MUNICIPALITY
INSPECTOR PRIOR TO BORES BEING
INSTALLED.
· ALL PULL BOX LIDS SHALL BE TRAFFIC
RATED WHEN INSTALLED WITHIN THE
RIGHT OF WAY.
· CONTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL
DRIVEWAYS, SIDEWALKS AND SIDE
STREETS ALWAYS, UNLESS OTHERWISE
APPROVED ON THE MOT PERMIT.
· ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE
VICINITY OF THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING.
Primary Voltage: 12.47/7.2KV
FKEC Q FEEDER
PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY
MARATHON, FL, 33050 - MONROE COUNTY
SCOPE OF WORK: SEE SCOPE OF WORK
W.O.O.: PETER AMENDOLA
PH: 305-852-2431 x240
SECTION: 26 TWP: 65 RANGE: 33
REV: N/A SCALE: N/ADATE: 11/18/2025
PRINT: 4 OF 91
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL
BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL 84' OF 1/0 AL UG IN 2X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
WHERE WORK OCCURS IN THE IN THE DRIP
LINE OF EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN 4X4"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
INSTALL 590' OF NEW OVERHEAD 144
STRAND ADSS FIBER OPTIC CABLE
PRINT: 4 OF 95
03/31/2026
ENSURE THE MINIMUM COVER BELOW
THE TOP OF THE PAVEMENT IS 36" AND
BELOW THE UNPAVED SURFACE IS 30"
GENERAL CONSTRUCTION NOTES:
RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR
BETTER THAN ORIGINAL CONDITION
TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND FACILITIES
WITH THE MUNICIPALITY INSPECTOR PRIOR TO
BORES BEING INSTALLED
ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN
INSTALLED WITHIN THE RIGHT OF WAY
CONSTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,
SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS
OTHERWISE APPROVED ON THE MOT PERMIT
ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE VICINITY OF
THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING
WHERE WORK OCCURS IN THE DRIP LINE OF
EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
PER THE FDOT UTILITY ACCOMMODATION
MANUAL, ENSURE APPROPRIATE EROSION
CONTROL DEVICES ARE IN PLACE BEFORE ANY
WORK AND/OR CONSTRUCTION BEGINS AND
ARE USED THROUGHOUT THE DURATION OF
THE WORK/CONSTRUCTION
102-600 102-601 102-660
POSTED SPEED LIMIT: 55 MPH
Approved 2026-H-692-00009
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
ROW
ROW
ROW
ROW
ROW
ROW
ROW
F
Q3
INSTALL 90X60X60 VAULT
MILEPOST: 8.319
CROSS SECTION: 3
US ROUTE 1
O
VERSEAS
HIG
HW
AY
FLORIDA KEYS OVERSEAS
HERITAGE TRAIL
U2
INSTALLING 1000' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
CROSS SECTION: 2 AND 3
U3
INSTALLING 1000' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
CROSS SECTION: 3 AND 4
18" UNK
30" UNK
3-4" PVC
N
PLAN VIEW
GAS
WATER
STORM DRAIN
SANITARY SEWER
RECLAIMED WATER
ELECTRIC
TELEPHONE
RIGHT OF WAY
BURIED UTILITIES
G
W
D
S
R
E
T
SCOPE OF WORK
ABBREVIATIONS
AC
CI
DIP
EOP
EOS
FM
PVC
ASBESTOS CEMENT
CAST IRON
DUCTILE IRON PIPE
EDGE OF PAVEMENT
EDGE OF SIDEWALK
FORCE MAIN
POLYVINYL CHLORIDE
RCP
TX
UG
REINFORCED CONCRETE PIPE
TRANSFORMER
UNDERGROUND
CENTER LINE
ROW
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
INSTALL EXISTING/REMOVE
LEGEND
P
P
P
F
F
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
P
F
F
MOT INDEX
MILE POSTS
102-613 102-615 102-660
START: 8.689
END: 3.659
Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659
GENERAL CONSTRUCTION NOTES:
· RIGHT OF WAYS WILL BE RESTORED TO AS
GOOD AS OR BETTER THAN ORIGINAL
CONDITION.
· TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND
FACILITIES WITH THE MUNICIPALITY
INSPECTOR PRIOR TO BORES BEING
INSTALLED.
· ALL PULL BOX LIDS SHALL BE TRAFFIC
RATED WHEN INSTALLED WITHIN THE
RIGHT OF WAY.
· CONTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL
DRIVEWAYS, SIDEWALKS AND SIDE
STREETS ALWAYS, UNLESS OTHERWISE
APPROVED ON THE MOT PERMIT.
· ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE
VICINITY OF THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING.
Primary Voltage: 12.47/7.2KV
FKEC Q FEEDER
PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY
MARATHON, FL, 33050 - MONROE COUNTY
SCOPE OF WORK: SEE SCOPE OF WORK
W.O.O.: PETER AMENDOLA
PH: 305-852-2431 x240
SECTION: 26 TWP: 65 RANGE: 33
REV: N/A SCALE: N/ADATE: 11/18/2025
PRINT: 5 OF 91
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL
BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL 84' OF 1/0 AL UG IN 2X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
WHERE WORK OCCURS IN THE IN THE DRIP
LINE OF EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN 4X4"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
INSTALL 590' OF NEW OVERHEAD 144
STRAND ADSS FIBER OPTIC CABLE
PRINT: 5 OF 95
03/31/2026
ENSURE THE MINIMUM COVER BELOW
THE TOP OF THE PAVEMENT IS 36" AND
BELOW THE UNPAVED SURFACE IS 30"
GENERAL CONSTRUCTION NOTES:
RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR
BETTER THAN ORIGINAL CONDITION
TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND FACILITIES
WITH THE MUNICIPALITY INSPECTOR PRIOR TO
BORES BEING INSTALLED
ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN
INSTALLED WITHIN THE RIGHT OF WAY
CONSTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,
SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS
OTHERWISE APPROVED ON THE MOT PERMIT
ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE VICINITY OF
THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING
WHERE WORK OCCURS IN THE DRIP LINE OF
EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
PER THE FDOT UTILITY ACCOMMODATION
MANUAL, ENSURE APPROPRIATE EROSION
CONTROL DEVICES ARE IN PLACE BEFORE ANY
WORK AND/OR CONSTRUCTION BEGINS AND
ARE USED THROUGHOUT THE DURATION OF
THE WORK/CONSTRUCTION
102-600 102-601 102-660
POSTED SPEED LIMIT: 55 MPH
Approved 2026-H-692-00009
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
US ROUTE 1
M M
56.1 BU
R
N
PO
IN
T
FLORIDA KEYS OVERSEAS
HERITAGE TRAIL
U3
INSTALLING 1000' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
CROSS SECTION: 3 AND 4
18" UNK
30" UNK
3-4" PVC
N
PLAN VIEW
GAS
WATER
STORM DRAIN
SANITARY SEWER
RECLAIMED WATER
ELECTRIC
TELEPHONE
RIGHT OF WAY
BURIED UTILITIES
G
W
D
S
R
E
T
SCOPE OF WORK
ABBREVIATIONS
AC
CI
DIP
EOP
EOS
FM
PVC
ASBESTOS CEMENT
CAST IRON
DUCTILE IRON PIPE
EDGE OF PAVEMENT
EDGE OF SIDEWALK
FORCE MAIN
POLYVINYL CHLORIDE
RCP
TX
UG
REINFORCED CONCRETE PIPE
TRANSFORMER
UNDERGROUND
CENTER LINE
ROW
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
INSTALL EXISTING/REMOVE
LEGEND
P
P
P
F
F
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
P
F
F
MOT INDEX
MILE POSTS
102-613 102-615 102-660
START: 8.689
END: 3.659
Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659
GENERAL CONSTRUCTION NOTES:
· RIGHT OF WAYS WILL BE RESTORED TO AS
GOOD AS OR BETTER THAN ORIGINAL
CONDITION.
· TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND
FACILITIES WITH THE MUNICIPALITY
INSPECTOR PRIOR TO BORES BEING
INSTALLED.
· ALL PULL BOX LIDS SHALL BE TRAFFIC
RATED WHEN INSTALLED WITHIN THE
RIGHT OF WAY.
· CONTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL
DRIVEWAYS, SIDEWALKS AND SIDE
STREETS ALWAYS, UNLESS OTHERWISE
APPROVED ON THE MOT PERMIT.
· ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE
VICINITY OF THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING.
Primary Voltage: 12.47/7.2KV
FKEC Q FEEDER
PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY
MARATHON, FL, 33050 - MONROE COUNTY
SCOPE OF WORK: SEE SCOPE OF WORK
W.O.O.: PETER AMENDOLA
PH: 305-852-2431 x240
SECTION: 26 TWP: 65 RANGE: 33
REV: N/A SCALE: N/ADATE: 11/18/2025
PRINT: 6 OF 91
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL
BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL 84' OF 1/0 AL UG IN 2X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
WHERE WORK OCCURS IN THE IN THE DRIP
LINE OF EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN 4X4"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
INSTALL 590' OF NEW OVERHEAD 144
STRAND ADSS FIBER OPTIC CABLE
PRINT: 6 OF 95
03/31/2026
ENSURE THE MINIMUM COVER BELOW
THE TOP OF THE PAVEMENT IS 36" AND
BELOW THE UNPAVED SURFACE IS 30"
GENERAL CONSTRUCTION NOTES:
RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR
BETTER THAN ORIGINAL CONDITION
TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND FACILITIES
WITH THE MUNICIPALITY INSPECTOR PRIOR TO
BORES BEING INSTALLED
ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN
INSTALLED WITHIN THE RIGHT OF WAY
CONSTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,
SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS
OTHERWISE APPROVED ON THE MOT PERMIT
ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE VICINITY OF
THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING
WHERE WORK OCCURS IN THE DRIP LINE OF
EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
PER THE FDOT UTILITY ACCOMMODATION
MANUAL, ENSURE APPROPRIATE EROSION
CONTROL DEVICES ARE IN PLACE BEFORE ANY
WORK AND/OR CONSTRUCTION BEGINS AND
ARE USED THROUGHOUT THE DURATION OF
THE WORK/CONSTRUCTION
102-600 102-601 102-660
POSTED SPEED LIMIT: 55 MPH
Approved 2026-H-692-00009
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
F
Q4
INSTALL 90X60X60 VAULT
MILEPOST: 8.130
CROSS SECTION: 4
US ROUTE 1
FLORIDA KEYS OVERSEAS
HERITAGE TRAIL
U3
INSTALLING 1000' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
CROSS SECTION: 3 AND 4
U4
INSTALLING 1000' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
CROSS SECTION: 4 AND 5
18" UNK
30" UNK
3-4" PVC
UNK" UNK
N
PLAN VIEW
GAS
WATER
STORM DRAIN
SANITARY SEWER
RECLAIMED WATER
ELECTRIC
TELEPHONE
RIGHT OF WAY
BURIED UTILITIES
G
W
D
S
R
E
T
SCOPE OF WORK
ABBREVIATIONS
AC
CI
DIP
EOP
EOS
FM
PVC
ASBESTOS CEMENT
CAST IRON
DUCTILE IRON PIPE
EDGE OF PAVEMENT
EDGE OF SIDEWALK
FORCE MAIN
POLYVINYL CHLORIDE
RCP
TX
UG
REINFORCED CONCRETE PIPE
TRANSFORMER
UNDERGROUND
CENTER LINE
ROW
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
INSTALL EXISTING/REMOVE
LEGEND
P
P
P
F
F
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
P
F
F
MOT INDEX
MILE POSTS
102-613 102-615 102-660
START: 8.689
END: 3.659
Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659
GENERAL CONSTRUCTION NOTES:
· RIGHT OF WAYS WILL BE RESTORED TO AS
GOOD AS OR BETTER THAN ORIGINAL
CONDITION.
· TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND
FACILITIES WITH THE MUNICIPALITY
INSPECTOR PRIOR TO BORES BEING
INSTALLED.
· ALL PULL BOX LIDS SHALL BE TRAFFIC
RATED WHEN INSTALLED WITHIN THE
RIGHT OF WAY.
· CONTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL
DRIVEWAYS, SIDEWALKS AND SIDE
STREETS ALWAYS, UNLESS OTHERWISE
APPROVED ON THE MOT PERMIT.
· ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE
VICINITY OF THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING.
Primary Voltage: 12.47/7.2KV
FKEC Q FEEDER
PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY
MARATHON, FL, 33050 - MONROE COUNTY
SCOPE OF WORK: SEE SCOPE OF WORK
W.O.O.: PETER AMENDOLA
PH: 305-852-2431 x240
SECTION: 26 TWP: 65 RANGE: 33
REV: N/A SCALE: N/ADATE: 11/18/2025
PRINT: 7 OF 91
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL
BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL 84' OF 1/0 AL UG IN 2X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
WHERE WORK OCCURS IN THE IN THE DRIP
LINE OF EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN 4X4"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
INSTALL 590' OF NEW OVERHEAD 144
STRAND ADSS FIBER OPTIC CABLE
PRINT: 7 OF 95
03/31/2026
ENSURE THE MINIMUM COVER BELOW
THE TOP OF THE PAVEMENT IS 36" AND
BELOW THE UNPAVED SURFACE IS 30"
GENERAL CONSTRUCTION NOTES:
RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR
BETTER THAN ORIGINAL CONDITION
TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND FACILITIES
WITH THE MUNICIPALITY INSPECTOR PRIOR TO
BORES BEING INSTALLED
ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN
INSTALLED WITHIN THE RIGHT OF WAY
CONSTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,
SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS
OTHERWISE APPROVED ON THE MOT PERMIT
ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE VICINITY OF
THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING
WHERE WORK OCCURS IN THE DRIP LINE OF
EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
PER THE FDOT UTILITY ACCOMMODATION
MANUAL, ENSURE APPROPRIATE EROSION
CONTROL DEVICES ARE IN PLACE BEFORE ANY
WORK AND/OR CONSTRUCTION BEGINS AND
ARE USED THROUGHOUT THE DURATION OF
THE WORK/CONSTRUCTION
102-600 102-601 102-660
POSTED SPEED LIMIT: 55 MPH
Approved 2026-H-692-00009
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
US ROUTE 1
FLORIDA KEYS OVERSEAS
HERITAGE TRAIL
U4
INSTALLING 1000' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
CROSS SECTION: 4 AND 5
18" UNK
30" UNK
3-4" PVC
UNK" UNK
N
PLAN VIEW
GAS
WATER
STORM DRAIN
SANITARY SEWER
RECLAIMED WATER
ELECTRIC
TELEPHONE
RIGHT OF WAY
BURIED UTILITIES
G
W
D
S
R
E
T
SCOPE OF WORK
ABBREVIATIONS
AC
CI
DIP
EOP
EOS
FM
PVC
ASBESTOS CEMENT
CAST IRON
DUCTILE IRON PIPE
EDGE OF PAVEMENT
EDGE OF SIDEWALK
FORCE MAIN
POLYVINYL CHLORIDE
RCP
TX
UG
REINFORCED CONCRETE PIPE
TRANSFORMER
UNDERGROUND
CENTER LINE
ROW
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
INSTALL EXISTING/REMOVE
LEGEND
P
P
P
F
F
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
P
F
F
MOT INDEX
MILE POSTS
102-613 102-615 102-660
START: 8.689
END: 3.659
Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659
GENERAL CONSTRUCTION NOTES:
· RIGHT OF WAYS WILL BE RESTORED TO AS
GOOD AS OR BETTER THAN ORIGINAL
CONDITION.
· TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND
FACILITIES WITH THE MUNICIPALITY
INSPECTOR PRIOR TO BORES BEING
INSTALLED.
· ALL PULL BOX LIDS SHALL BE TRAFFIC
RATED WHEN INSTALLED WITHIN THE
RIGHT OF WAY.
· CONTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL
DRIVEWAYS, SIDEWALKS AND SIDE
STREETS ALWAYS, UNLESS OTHERWISE
APPROVED ON THE MOT PERMIT.
· ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE
VICINITY OF THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING.
Primary Voltage: 12.47/7.2KV
FKEC Q FEEDER
PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY
MARATHON, FL, 33050 - MONROE COUNTY
SCOPE OF WORK: SEE SCOPE OF WORK
W.O.O.: PETER AMENDOLA
PH: 305-852-2431 x240
SECTION: 26 TWP: 65 RANGE: 33
REV: N/A SCALE: N/ADATE: 11/18/2025
PRINT: 8 OF 91
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL
BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL 84' OF 1/0 AL UG IN 2X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
WHERE WORK OCCURS IN THE IN THE DRIP
LINE OF EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN 4X4"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
INSTALL 590' OF NEW OVERHEAD 144
STRAND ADSS FIBER OPTIC CABLE
PRINT: 8 OF 95
03/31/2026
ENSURE THE MINIMUM COVER BELOW
THE TOP OF THE PAVEMENT IS 36" AND
BELOW THE UNPAVED SURFACE IS 30"
GENERAL CONSTRUCTION NOTES:
RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR
BETTER THAN ORIGINAL CONDITION
TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND FACILITIES
WITH THE MUNICIPALITY INSPECTOR PRIOR TO
BORES BEING INSTALLED
ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN
INSTALLED WITHIN THE RIGHT OF WAY
CONSTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,
SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS
OTHERWISE APPROVED ON THE MOT PERMIT
ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE VICINITY OF
THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING
WHERE WORK OCCURS IN THE DRIP LINE OF
EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
PER THE FDOT UTILITY ACCOMMODATION
MANUAL, ENSURE APPROPRIATE EROSION
CONTROL DEVICES ARE IN PLACE BEFORE ANY
WORK AND/OR CONSTRUCTION BEGINS AND
ARE USED THROUGHOUT THE DURATION OF
THE WORK/CONSTRUCTION
102-600 102-601 102-660
POSTED SPEED LIMIT: 55 MPH
Approved 2026-H-692-00009
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
F
Q5
INSTALL 90X60X60 VAULT
MILEPOST: 7.941
CROSS SECTION: 5
US ROUTE 1
FLORIDA KEYS OVERSEAS
HERITAGE TRAIL
U4
INSTALLING 1000' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
CROSS SECTION: 4 AND 5
U5
INSTALLING 1000' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
CROSS SECTION: 5 AND 6
18" UNK
30" UNK
3-4" PVC
UNK" UNK
N
PLAN VIEW
GAS
WATER
STORM DRAIN
SANITARY SEWER
RECLAIMED WATER
ELECTRIC
TELEPHONE
RIGHT OF WAY
BURIED UTILITIES
G
W
D
S
R
E
T
SCOPE OF WORK
ABBREVIATIONS
AC
CI
DIP
EOP
EOS
FM
PVC
ASBESTOS CEMENT
CAST IRON
DUCTILE IRON PIPE
EDGE OF PAVEMENT
EDGE OF SIDEWALK
FORCE MAIN
POLYVINYL CHLORIDE
RCP
TX
UG
REINFORCED CONCRETE PIPE
TRANSFORMER
UNDERGROUND
CENTER LINE
ROW
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
INSTALL EXISTING/REMOVE
LEGEND
P
P
P
F
F
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
P
F
F
MOT INDEX
MILE POSTS
102-613 102-615 102-660
START: 8.689
END: 3.659
Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659
GENERAL CONSTRUCTION NOTES:
· RIGHT OF WAYS WILL BE RESTORED TO AS
GOOD AS OR BETTER THAN ORIGINAL
CONDITION.
· TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND
FACILITIES WITH THE MUNICIPALITY
INSPECTOR PRIOR TO BORES BEING
INSTALLED.
· ALL PULL BOX LIDS SHALL BE TRAFFIC
RATED WHEN INSTALLED WITHIN THE
RIGHT OF WAY.
· CONTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL
DRIVEWAYS, SIDEWALKS AND SIDE
STREETS ALWAYS, UNLESS OTHERWISE
APPROVED ON THE MOT PERMIT.
· ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE
VICINITY OF THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING.
Primary Voltage: 12.47/7.2KV
FKEC Q FEEDER
PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY
MARATHON, FL, 33050 - MONROE COUNTY
SCOPE OF WORK: SEE SCOPE OF WORK
W.O.O.: PETER AMENDOLA
PH: 305-852-2431 x240
SECTION: 26 TWP: 65 RANGE: 33
REV: N/A SCALE: N/ADATE: 11/18/2025
PRINT: 9 OF 91
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL
BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL 84' OF 1/0 AL UG IN 2X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
WHERE WORK OCCURS IN THE IN THE DRIP
LINE OF EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
INSTALL (18) 90X60X60 PULLBOX
INSTALL 16003' OF 1000 MCM UG IN 4X4"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
INSTALL 84' OF 1/0 AL UG IN 3X3"
CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER 7"
INSTALL (3) 45/H1 DUCTILE IRON POLE
INSTALL 590' OF NEW OVERHEAD 144
STRAND ADSS FIBER OPTIC CABLE
PRINT: 9 OF 95
03/31/2026
ENSURE THE MINIMUM COVER BELOW
THE TOP OF THE PAVEMENT IS 36" AND
BELOW THE UNPAVED SURFACE IS 30"
GENERAL CONSTRUCTION NOTES:
RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR
BETTER THAN ORIGINAL CONDITION
TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND FACILITIES
WITH THE MUNICIPALITY INSPECTOR PRIOR TO
BORES BEING INSTALLED
ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN
INSTALLED WITHIN THE RIGHT OF WAY
CONSTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,
SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS
OTHERWISE APPROVED ON THE MOT PERMIT
ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE VICINITY OF
THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING
WHERE WORK OCCURS IN THE DRIP LINE OF
EXISTING TREES, WORK SHALL BE
PERFORMED PER FDOT STANDARD PLANS
INDEX 110-100
PER THE FDOT UTILITY ACCOMMODATION
MANUAL, ENSURE APPROPRIATE EROSION
CONTROL DEVICES ARE IN PLACE BEFORE ANY
WORK AND/OR CONSTRUCTION BEGINS AND
ARE USED THROUGHOUT THE DURATION OF
THE WORK/CONSTRUCTION
102-600 102-601 102-660
POSTED SPEED LIMIT: 55 MPH
Approved 2026-H-692-00009
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
US ROUTE 1
FLORIDA KEYS OVERSEAS
HERITAGE TRAIL
U5
INSTALLING 1000' OF 1000 MCM UG IN
4X4" CONDUIT VIA DIRECTIONAL BORE
BORE DIAMETER: 9"
CROSS SECTION: 5 AND 6
18" UNK
30" UNK
3-4" PVC
UNK" UNK
N
PLAN VIEW
GAS
WATER
STORM DRAIN
SANITARY SEWER
RECLAIMED WATER
ELECTRIC
TELEPHONE
RIGHT OF WAY
BURIED UTILITIES
G
W
D
S
R
E
T
SCOPE OF WORK
ABBREVIATIONS
AC
CI
DIP
EOP
EOS
FM
PVC
ASBESTOS CEMENT
CAST IRON
DUCTILE IRON PIPE
EDGE OF PAVEMENT
EDGE OF SIDEWALK
FORCE MAIN
POLYVINYL CHLORIDE
RCP
TX
UG
REINFORCED CONCRETE PIPE
TRANSFORMER
UNDERGROUND
CENTER LINE
ROW
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
INSTALL EXISTING/REMOVE
LEGEND
P
P
P
F
F
POLE
TRANSFORMER
PEDESTAL
PULLBOX
TRANSFORMER IN PROPERTY
PEDESTAL IN PROPERTY
PULLBOX IN PROPERTY
UNDERGROUND CABLE
AERIAL CABLE
P
F
F
MOT INDEX
MILE POSTS
102-613 102-615 102-660
START: 8.689
END: 3.659
Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659
GENERAL CONSTRUCTION NOTES:
· RIGHT OF WAYS WILL BE RESTORED TO AS
GOOD AS OR BETTER THAN ORIGINAL
CONDITION.
· TO AVOID CONFLICTS, CONTRACTOR WILL
COORDINATE DEPTH OF UNDERGROUND
FACILITIES WITH THE MUNICIPALITY
INSPECTOR PRIOR TO BORES BEING
INSTALLED.
· ALL PULL BOX LIDS SHALL BE TRAFFIC
RATED WHEN INSTALLED WITHIN THE
RIGHT OF WAY.
· CONTRACTOR SHALL MAINTAIN AN
UNINTERRUPTED ACCESS TO ALL
DRIVEWAYS, SIDEWALKS AND SIDE
STREETS ALWAYS, UNLESS OTHERWISE
APPROVED ON THE MOT PERMIT.
· ALL OTHER RIGHT OF WAY USERS AND
MUNICIPALITIES IN THE IMMEDIATE
VICINITY OF THE PROPOSED
CONSTRUCTION/INSTALLATION HAVE BEEN
NOTIFIED IN WRITING.
Primary Voltage: 12.47/7.2KV
FKEC Q FEEDER
PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY
MARATHON, FL, 33050 - MONROE COUNTY
SCOPE OF WORK: SEE SCOPE OF WORK
W.O.O.: PETER AMENDOLA
PH: 305-852-2431 x240
SECTION: 26 TWP: 65 RANGE: 33
REV: N/A SCALE: N/ADATE: 11/18/2025
PRINT: 10 OF 91
INSTALL (18)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .