This is a Florida Department of Transportation (FDOT) Utility Permit for work within the right-of-way on State Road 5 in Monroe County, issued to Florida Keys Electric Cooperative (FKEC). The permit authorizes FKEC to install electrical infrastructure including eighteen 90x60x60 pullboxes, 16,003 feet of 1000 MCM underground cable in 4x4" conduit via directional bore with a 9" bore diameter, 84 feet of 1/0 aluminum cable in 3x3" conduit via directional bore with a 7" bore diameter, 84 feet of 1/0 aluminum cable in 2x3" conduit via directional bore with a 7" bore diameter, three 45/H1 ductile iron poles, and 590 feet of overhead 144-strand ADSS fiber optic cable. The project runs approximately 5 miles along Overseas Highway from milepost 8.689 to milepost 3.659, with a primary voltage of 12.47/7.2KV. The permit was approved on July 8, 2026, with an anticipated start date of January 11, 2027, and work must commence within 60 calendar days of approval. Traffic control will comply with FDOT 600-series indices (600, 601, 660, and 613/615), and working hours are restricted to 9:00 AM to 4:00 PM within the state right-of-way.

The permit identifies multiple utility facility owners that were notified of the work on December 30, 2024, including AT&T Distribution, City of Key Colony Beach, City of Marathon, Comcast Cable, FDOT District 6, Florida Keys Aqueduct Authority, and Hotwire Communications. All work must conform to current FDOT standards and specifications, with right-of-way restoration required to as good or better condition than original. The contractor must coordinate with municipality inspectors regarding underground facility depths prior to bore installation, maintain traffic-rated pullbox lids, ensure uninterrupted access to driveways and sidewalks, and implement appropriate erosion control devices throughout construction. An FDOT representative is required on site prior to commencement of work, and a pre-construction meeting must be coordinated with the FDOT field inspector. Permit approval does not constitute approval of lane closures, which require separate requests through the specified online system.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rule 14-46.001 F.A.C.

FLORIDA DEPARTMENT OF TRANSPORTATION December 14, 2016

UTILITY PERMIT

PERMIT NO:__________________________________

STATE ROAD INFORMATION

County: Section: State Road No: Beginning Mile Post: Ending Mile Post:

APPLICANT INFORMATION

The Utility Agency Owner (UAO) shall be identified in this Applicant Information Box. When the UAO is a City or County and desires to have the Utility Builder make a joint permit applicant, as prescribed in Section 2.1(4) of the 2017 Utility Accommodation Manual (UAM), the Utility Builder shall also be identified in this Applicant Information Box. A Utility Builder alone cannot apply for a utility permit without the City or County adding them as a joint applicant.

Utility Agency/Owner (UAO) Utility Builder (only applicable when the UAO is a City or County) Name: _____________________________________ Name: ______________________________________

Contact Person: _____________________________________ Contact Person: ______________________________________ Address: _____________________________________ Address: ______________________________________

City: _____________________________________ City: ______________________________________ State: _____ State: _____ Zip: _________ Zip: _________

Telephone: _____________________________________ Telephone: ______________________________________ Email: ____________________________________ Email: ______________________________________

WORK DESCRIPTION

The Applicant(s) requests permission from the Florida Department of Transportation (FDOT) to construct, operate, and maintain the utilities as described below and as depicted in the incorporated documentation.

Utility Work No: ___________________________

Additional sheets are attached and are incorporated into this permit Yes No For FDEP certification, the FDOT agency report is attached in accordance with UAM Section 2.4.1 (13) Yes No

TRAFFIC CONTROL (TCP)

The TCP will comply with the following 600 series index(es) ________________________________________________________________________ A TCP has been attached and incorporated into this permit application in compliance with UAM Section 2.4.2.

MOT Technician’s contact information (may be supplied at the two (2) business day notification to FDOT):

Name: ________________________________ Telephone ________________________ Email: _______________________________

COMMENCEMENT OF WORK

The UAO and/or Utility Builder shall commence actual construction in good faith within sixty (60) calendar days after approval of the permit application. If the beginning date is more than sixty (60) calendar days from the date of approval, the UAO and/or Utility Builder must review the permit with the FDOT Approving Engineer listed to make sure no changes have occurred to the transportation facility that would affect the permit’s continued approval. The UAO and/or Utility Builder shall make good faith efforts to expedite the work and complete the work within the calendar days indicated.

Anticipated Start Date: ___________________ Calendar days needed to completed: ________

Monroe

(305) 852-2431 ext. 311___

Florida

SR 5

Florida Keys Electric Cooperative

1/11/2027

2.048

91630 Overseas Highway

602, 601, 660, 600

33070

INSTALL (18) 90x60x60 PULLBOX INSTALL 16,003 FT OF 1000 MCM UG IN 4x4" CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

INSTALL 84 FT OF 1/0 AL UG IN 3x3" CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 7"

INSTALL 84 FT OF 1/0 AL UG IN 2x3" CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 7"

INSTALL (3) 45/H1 DUCTILE IRON POLES

2026-H-692-00009

90040000

Florida Keys Electric Cooperative

Tavernier

JOSH.ELLSWORTH@FKEC.COM

9.445

Approved 2026-H-692-00009

Elizabeth Jett 7/8/2026

EXHIBIT C

Florida Department of Transportation

UTILITY PERMIT

December 14, 2016

PERMIT NO:_________________________________

APPLICANT SIGNATURE

By the below signature(s) the UAO and/or Utility Builder agree(s) to construct, operate, and maintain the work as noted in the above Work Description, shown in plans and incorporated documents, in compliance with the UAM, all instructions noted in the FDOT Special Instructions Box, and special instructions incorporated into this permit. The UAO and/or Utility Builder declares, the location of all existing utilities that it owns or has an interest in, both aerial and underground, are accurately shown on the plans of the work areas. In accordance with UAM Section 2.8, the UAO and/or Utility Builder further declares that a letter of notification was delivered to the owners of other facilities within the work areas and that those listed below are the only facility owners known to be involved or potentially impacted by the proposed work.

Date Notified: Name of other facility owners (attach additional sheets if necessary).

Utility Agency/Owner Utility Builder (when applicable)

Signature: ____________________________ Date: ________________ Signature:___________________________ Date: _______________ Name (printed): _____________________________________________ Name (printed): __________________________________________ Title: ______________________________________________________ Title: ___________________________________________________

FDOT PROJECT INFORMATION

Pursuant to UAM Section 2.1(10), the utility work is within FDOT projects listed below and must have a Utility Work Schedule for each project approved prior to commencement of work within the FDOT project limits:

FDOT SPECIAL INSTRUCTIONS

In accordance with UAM Section 2.7, FDOT incorporates the below and attached special instructions into this permit.

Additional FDOT Special Instructions are attached and incorporated into this permit. Yes No

PERMIT APPROVAL

By signature below, FDOT gives permission to the UAO and /or Utility Builder to construct, operate, and maintain the utilities indicated in this Utility Permit in compliance with the UAM, all incorporated documents, and special instructions. Any changes to the approved work must be approved by the FDOT’s Approving Engineer and attached and incorporated into this permit in accordance with UAM Section 2.11.

Approving Engineer: _____________________________________________ Date: _______________ Name: _____________________________________________

Title:______________________________________________

Notification of Utility Work to be provided to: Telephone _____________________ or Email: _____________________________

An FDOT Representative is required to be present on the worksite prior to commencement of work. Yes No Rep. Name: _____________________________ Telephone _____________________ Email: _____________________________

7/8/2026

.-WORK WITHIN THE F.D.O.T. RIGHT OF WAY SHALL CONFORM TO CURRENT F.D.O.T.

STANDARDS AND SPECIFICATIONS.

- Permit APPROVAL IN NO WAY CONSTITUTES THAT THE PERMITTED HAS AN APPROVED LANE

CLOSURE.

-PLEASE COORDINATE A PRE-CONSTRUCTION MEETING WITH FDOT FIELD INSPECTOR.

-LANE CLOSURE REQUEST REQUIRED at https://lcisv2.com.

-WORKING HOURS WITHIN THE STATE RIGHT-OF-WAY SHALL BE FROM 9:00AM TO 4:00PM OR AS DIRECTED BY ... (see special instructions cont. page)

2/26/2026

(305) 619-1635 ext. ______ juan.chinea@wwebber.com

Elizabeth Jett

Elizabeth Jett (digital signature) juan.chinea@ferrovialservices.com

JOSHUA ELLSWORTH (digital signature)

AT&T DISTRIBUTION12/30/2024

CITY OF KEY COLONY BEACH - SEWER12/30/2024

CITY OF MARATHON - RECLAIMED WATER, STORM WATER, SEWER12/30/2024

COMCAST CABLE12/30/2024

FDOT D612/30/2024

JOSHUA ELLSWORTH

3056191635Juan Chinea

DISTRICT PERMIT ENGINEER

2026-H-692-00009

FDOT construction is proposed or underway. Refer to Financial Project Id: 447757- This work is NOT related to an approved Utility Work Schedule.

Approved 2026-H-692-00009

Elizabeth Jett

Florida Department of Transportation

UTILITY PERMIT

December 14, 2016

PERMIT NO:_________________________________

CERTIFICATION

I, the undersigned UAO and/or Utility Builder, hereby CERTIFY that the utilities were constructed and inspected in compliance with the UAM all incorporated documents, and special instructions. Pursuant to UAM Section 2.11, all changes have been approved by the FDOT’s Approving Engineer and incorporated into this permit along with all other material certifications, test results, bore logs, approved plans changes, as-built plans or other required documentation.

I also CERTIFY that work began on ________________ and was completed on ________________ and that the area was left in as good or better condition than when the work began.

Utility Agency/Owner Utility Builder (when applicable)

Signature: ____________________________ Date _________________ Signature:___________________________ Date ________________ Name (printed): _____________________________________________ Name (printed): ____________________________________________ Title: ______________________________________________________ Title: ____________________________________________________

FINAL INSPECTION OF WORK

The work was inspected and found to be in non-compliance as noted below:

All issues of non-compliance listed above have been brought into compliance and/or FDOT has no outstanding issues that need to be addressed by the UAO and/or Utility Builder. However, this final inspection does not release the UAO and/or Utility Builder of their continuing responsibilities pursuant to Rule 14-46.001, the UAM, all incorporated documents, and special instructions.

FDOT Inspector: _____________________________________________ Date: _______________ Name: _____________________________________________

Title: ______________________________________________

2026-H-692-00009

Approved 2026-H-692-00009 continuation page

PERMIT NO.:

STATE ROAD INFORMATION:

NAME OF OTHER FACILITY OWNERS / DATE NOTIFIED:

FDOT PROJECT INFORMATION:

THE WORK WAS INSPECTED AND FOUND TO BE IN NON-COMPLIANCE AS NOTED BELOW:

Facility Name: FLORIDA KEYS AQUEDUCT AUTHORITY AREA 3 - WATER, Date Notified: 12/30/2024, Facility Name:

FLORIDA KEYS AQUEDUCT AUTHORITY LOWER KEYS TRAN - WATER, Date Notified: 12/30/2024, Facility Name:

FLORIDA KEYS AQUEDUCT AUTHORITY TECHNICAL SERVICE - ELECTRIC, Date Notified: 12/30/2024, Facility Name:

FLORIDA KEYS ELECTRIC COOPERATIVE ASSOC - ELECTRIC, Date Notified: 12/30/2024, Facility Name: HOTWIRE COMMUNICATIONS - CATV, FIBER, TELEPHONE, Date Notified: 12/30/2024

Monroe SR 5, Begin MP: 2.048, End MP: 9.445, Monroe SR 5, Section: 90040000, Begin MP: 11.745, End MP: 11.713

FDOT construction is proposed or underway. Refer to Financial Project Id: 447757-1 This work is NOT related to an approved Utility Work Schedule.

2026-H-692-00009

Approved 2026-H-692-00009

PERMIT NO.:

The complete special instructions could not fit in the space allotted on Page 2 of the Utility Permit so they are displayed below.

Special FDOT Instructions special instructions continuation page

.-WORK WITHIN THE F.D.O.T. RIGHT OF WAY SHALL CONFORM TO CURRENT F.D.O.T. STANDARDS AND

SPECIFICATIONS.

- Permit APPROVAL IN NO WAY CONSTITUTES THAT THE PERMITTED HAS AN APPROVED LANE CLOSURE.

-PLEASE COORDINATE A PRE-CONSTRUCTION MEETING WITH FDOT FIELD INSPECTOR.

-LANE CLOSURE REQUEST REQUIRED at https://lcisv2.com.

-WORKING HOURS WITHIN THE STATE RIGHT-OF-WAY SHALL BE FROM 9:00AM TO 4:00PM OR AS DIRECTED BY

THE DEPARTMENT REPRESENTATIVE PRIOR TO COMMENCEMENT OF WORK.

2026-H-692-00009

Approved 2026-H-692-00009

04/07/2026

Approved 2026-H-692-00009

2026-H-692-00009

2026-H-692-00009

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

F

Q1

EXISTING PULLBOX

MILEPOST: 8.689

CROSS SECTION: 1

INSTALLING 960' OF4X4" MCM UG

CONDUIT VIA DIRECTIONAL BORE

CROSS SECTION: XXX

US ROUTE 1

FLORIDA KEYS OVERSEAS

HERITAGE TRAIL

U1

INSTALLING 960' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

CROSS SECTION: 1 AND 2

18" UNK

30" UNK

3-4" PVC

N

PLAN VIEW

GAS

WATER

STORM DRAIN

SANITARY SEWER

RECLAIMED WATER

ELECTRIC

TELEPHONE

RIGHT OF WAY

BURIED UTILITIES

G

W

D

S

R

E

T

SCOPE OF WORK

ABBREVIATIONS

AC

CI

DIP

EOP

EOS

FM

PVC

ASBESTOS CEMENT

CAST IRON

DUCTILE IRON PIPE

EDGE OF PAVEMENT

EDGE OF SIDEWALK

FORCE MAIN

POLYVINYL CHLORIDE

RCP

TX

UG

REINFORCED CONCRETE PIPE

TRANSFORMER

UNDERGROUND

CENTER LINE

ROW

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

INSTALL EXISTING/REMOVE

LEGEND

P

P

P

F

F F

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

P

F

MOT INDEX

MILE POSTS

102-613 102-615 102-660

START: 8.689

END: 3.659

Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659

GENERAL CONSTRUCTION NOTES:

· RIGHT OF WAYS WILL BE RESTORED TO AS

GOOD AS OR BETTER THAN ORIGINAL

CONDITION.

· TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND

FACILITIES WITH THE MUNICIPALITY

INSPECTOR PRIOR TO BORES BEING

INSTALLED.

· ALL PULL BOX LIDS SHALL BE TRAFFIC

RATED WHEN INSTALLED WITHIN THE

RIGHT OF WAY.

· CONTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL

DRIVEWAYS, SIDEWALKS AND SIDE

STREETS ALWAYS, UNLESS OTHERWISE

APPROVED ON THE MOT PERMIT.

· ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE

VICINITY OF THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING.

Primary Voltage: 12.47/7.2KV

FKEC Q FEEDER

PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY

MARATHON, FL, 33050 - MONROE COUNTY

SCOPE OF WORK: SEE SCOPE OF WORK

W.O.O.: PETER AMENDOLA

PH: 305-852-2431 x240

SECTION: 26 TWP: 65 RANGE: 33

REV: N/A SCALE: N/ADATE: 11/18/2025

PRINT: 1 OF 91

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL

BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL 84' OF 1/0 AL UG IN 2X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

WHERE WORK OCCURS IN THE IN THE DRIP

LINE OF EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN 4X4"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

INSTALL 590' OF NEW OVERHEAD 144

STRAND ADSS FIBER OPTIC CABLE

PRINT: 1 OF 95

03/31/2026

ENSURE THE MINIMUM COVER BELOW

THE TOP OF THE PAVEMENT IS 36" AND

BELOW THE UNPAVED SURFACE IS 30"

GENERAL CONSTRUCTION NOTES:

RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR

BETTER THAN ORIGINAL CONDITION

TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND FACILITIES

WITH THE MUNICIPALITY INSPECTOR PRIOR TO

BORES BEING INSTALLED

ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN

INSTALLED WITHIN THE RIGHT OF WAY

CONSTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,

SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS

OTHERWISE APPROVED ON THE MOT PERMIT

ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE VICINITY OF

THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING

WHERE WORK OCCURS IN THE DRIP LINE OF

EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

PER THE FDOT UTILITY ACCOMMODATION

MANUAL, ENSURE APPROPRIATE EROSION

CONTROL DEVICES ARE IN PLACE BEFORE ANY

WORK AND/OR CONSTRUCTION BEGINS AND

ARE USED THROUGHOUT THE DURATION OF

THE WORK/CONSTRUCTION

102-600 102-601 102-660

POSTED SPEED LIMIT: 55 MPH

Approved 2026-H-692-00009

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW US ROUTE 1

FLORIDA KEYS OVERSEAS

HERITAGE TRAIL

U1

INSTALLING 960' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

CROSS SECTION: 1 AND 2

18" UNK

30" UNK

3-4" PVC

N

PLAN VIEW

GAS

WATER

STORM DRAIN

SANITARY SEWER

RECLAIMED WATER

ELECTRIC

TELEPHONE

RIGHT OF WAY

BURIED UTILITIES

G

W

D

S

R

E

T

SCOPE OF WORK

ABBREVIATIONS

AC

CI

DIP

EOP

EOS

FM

PVC

ASBESTOS CEMENT

CAST IRON

DUCTILE IRON PIPE

EDGE OF PAVEMENT

EDGE OF SIDEWALK

FORCE MAIN

POLYVINYL CHLORIDE

RCP

TX

UG

REINFORCED CONCRETE PIPE

TRANSFORMER

UNDERGROUND

CENTER LINE

ROW

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

INSTALL EXISTING/REMOVE

LEGEND

P

P

P

F

F

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

P

F

F

MOT INDEX

MILE POSTS

102-613 102-615 102-660

START: 8.689

END: 3.659

Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659

GENERAL CONSTRUCTION NOTES:

· RIGHT OF WAYS WILL BE RESTORED TO AS

GOOD AS OR BETTER THAN ORIGINAL

CONDITION.

· TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND

FACILITIES WITH THE MUNICIPALITY

INSPECTOR PRIOR TO BORES BEING

INSTALLED.

· ALL PULL BOX LIDS SHALL BE TRAFFIC

RATED WHEN INSTALLED WITHIN THE

RIGHT OF WAY.

· CONTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL

DRIVEWAYS, SIDEWALKS AND SIDE

STREETS ALWAYS, UNLESS OTHERWISE

APPROVED ON THE MOT PERMIT.

· ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE

VICINITY OF THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING.

Primary Voltage: 12.47/7.2KV

FKEC Q FEEDER

PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY

MARATHON, FL, 33050 - MONROE COUNTY

SCOPE OF WORK: SEE SCOPE OF WORK

W.O.O.: PETER AMENDOLA

PH: 305-852-2431 x240

SECTION: 26 TWP: 65 RANGE: 33

REV: N/A SCALE: N/ADATE: 11/18/2025

PRINT: 2 OF 91

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL

BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL 84' OF 1/0 AL UG IN 2X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

WHERE WORK OCCURS IN THE IN THE DRIP

LINE OF EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN 4X4"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

INSTALL 590' OF NEW OVERHEAD 144

STRAND ADSS FIBER OPTIC CABLE

PRINT: 2 OF 95

03/31/2026

ENSURE THE MINIMUM COVER BELOW

THE TOP OF THE PAVEMENT IS 36" AND

BELOW THE UNPAVED SURFACE IS 30"

GENERAL CONSTRUCTION NOTES:

RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR

BETTER THAN ORIGINAL CONDITION

TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND FACILITIES

WITH THE MUNICIPALITY INSPECTOR PRIOR TO

BORES BEING INSTALLED

ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN

INSTALLED WITHIN THE RIGHT OF WAY

CONSTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,

SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS

OTHERWISE APPROVED ON THE MOT PERMIT

ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE VICINITY OF

THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING

WHERE WORK OCCURS IN THE DRIP LINE OF

EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

PER THE FDOT UTILITY ACCOMMODATION

MANUAL, ENSURE APPROPRIATE EROSION

CONTROL DEVICES ARE IN PLACE BEFORE ANY

WORK AND/OR CONSTRUCTION BEGINS AND

ARE USED THROUGHOUT THE DURATION OF

THE WORK/CONSTRUCTION

102-600 102-601 102-660

POSTED SPEED LIMIT: 55 MPH

Approved 2026-H-692-00009

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

ROW

ROW

ROW

ROW

ROW

RO

W

ROW

ROW

ROW

RO

W

RO

W

F

Q2

INSTALL 90X60X60 VAULT

MILEPOST: 8.509

CROSS SECTION: 2

US ROUTE 1

BANANA BO

ULEVARD

FLORIDA KEYS OVERSEAS

HERITAGE TRAIL

U1

INSTALLING 960' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

CROSS SECTION: 1 AND 2U2

INSTALLING 1000' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

CROSS SECTION: 2 AND 3

18" UNK

30" UNK

3-4" PVC

N

PLAN VIEW

GAS

WATER

STORM DRAIN

SANITARY SEWER

RECLAIMED WATER

ELECTRIC

TELEPHONE

RIGHT OF WAY

BURIED UTILITIES

G

W

D

S

R

E

T

SCOPE OF WORK

ABBREVIATIONS

AC

CI

DIP

EOP

EOS

FM

PVC

ASBESTOS CEMENT

CAST IRON

DUCTILE IRON PIPE

EDGE OF PAVEMENT

EDGE OF SIDEWALK

FORCE MAIN

POLYVINYL CHLORIDE

RCP

TX

UG

REINFORCED CONCRETE PIPE

TRANSFORMER

UNDERGROUND

CENTER LINE

ROW

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

INSTALL EXISTING/REMOVE

LEGEND

P

P

P

F

F

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

P

F

F

MOT INDEX

MILE POSTS

102-613 102-615 102-660

START: 8.689

END: 3.659

Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659

GENERAL CONSTRUCTION NOTES:

· RIGHT OF WAYS WILL BE RESTORED TO AS

GOOD AS OR BETTER THAN ORIGINAL

CONDITION.

· TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND

FACILITIES WITH THE MUNICIPALITY

INSPECTOR PRIOR TO BORES BEING

INSTALLED.

· ALL PULL BOX LIDS SHALL BE TRAFFIC

RATED WHEN INSTALLED WITHIN THE

RIGHT OF WAY.

· CONTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL

DRIVEWAYS, SIDEWALKS AND SIDE

STREETS ALWAYS, UNLESS OTHERWISE

APPROVED ON THE MOT PERMIT.

· ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE

VICINITY OF THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING.

Primary Voltage: 12.47/7.2KV

FKEC Q FEEDER

PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY

MARATHON, FL, 33050 - MONROE COUNTY

SCOPE OF WORK: SEE SCOPE OF WORK

W.O.O.: PETER AMENDOLA

PH: 305-852-2431 x240

SECTION: 26 TWP: 65 RANGE: 33

REV: N/A SCALE: N/ADATE: 11/18/2025

PRINT: 3 OF 91

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL

BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL 84' OF 1/0 AL UG IN 2X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

WHERE WORK OCCURS IN THE IN THE DRIP

LINE OF EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN 4X4"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

INSTALL 590' OF NEW OVERHEAD 144

STRAND ADSS FIBER OPTIC CABLE

PRINT: 3 OF 95

03/31/2026

ENSURE THE MINIMUM COVER BELOW

THE TOP OF THE PAVEMENT IS 36" AND

BELOW THE UNPAVED SURFACE IS 30"

GENERAL CONSTRUCTION NOTES:

RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR

BETTER THAN ORIGINAL CONDITION

TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND FACILITIES

WITH THE MUNICIPALITY INSPECTOR PRIOR TO

BORES BEING INSTALLED

ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN

INSTALLED WITHIN THE RIGHT OF WAY

CONSTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,

SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS

OTHERWISE APPROVED ON THE MOT PERMIT

ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE VICINITY OF

THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING

WHERE WORK OCCURS IN THE DRIP LINE OF

EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

PER THE FDOT UTILITY ACCOMMODATION

MANUAL, ENSURE APPROPRIATE EROSION

CONTROL DEVICES ARE IN PLACE BEFORE ANY

WORK AND/OR CONSTRUCTION BEGINS AND

ARE USED THROUGHOUT THE DURATION OF

THE WORK/CONSTRUCTION

102-600 102-601 102-660

POSTED SPEED LIMIT: 55 MPH

Approved 2026-H-692-00009

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

US ROUTE 1

FLORIDA KEYS OVERSEAS

HERITAGE TRAIL

U2

INSTALLING 1000' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

CROSS SECTION: 2 AND 3

18" UNK

30" UNK

3-4" PVC

N

PLAN VIEW

GAS

WATER

STORM DRAIN

SANITARY SEWER

RECLAIMED WATER

ELECTRIC

TELEPHONE

RIGHT OF WAY

BURIED UTILITIES

G

W

D

S

R

E

T

SCOPE OF WORK

ABBREVIATIONS

AC

CI

DIP

EOP

EOS

FM

PVC

ASBESTOS CEMENT

CAST IRON

DUCTILE IRON PIPE

EDGE OF PAVEMENT

EDGE OF SIDEWALK

FORCE MAIN

POLYVINYL CHLORIDE

RCP

TX

UG

REINFORCED CONCRETE PIPE

TRANSFORMER

UNDERGROUND

CENTER LINE

ROW

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

INSTALL EXISTING/REMOVE

LEGEND

P

P

P

F

F

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

P

F

F

MOT INDEX

MILE POSTS

102-613 102-615 102-660

START: 8.689

END: 3.659

Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659

GENERAL CONSTRUCTION NOTES:

· RIGHT OF WAYS WILL BE RESTORED TO AS

GOOD AS OR BETTER THAN ORIGINAL

CONDITION.

· TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND

FACILITIES WITH THE MUNICIPALITY

INSPECTOR PRIOR TO BORES BEING

INSTALLED.

· ALL PULL BOX LIDS SHALL BE TRAFFIC

RATED WHEN INSTALLED WITHIN THE

RIGHT OF WAY.

· CONTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL

DRIVEWAYS, SIDEWALKS AND SIDE

STREETS ALWAYS, UNLESS OTHERWISE

APPROVED ON THE MOT PERMIT.

· ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE

VICINITY OF THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING.

Primary Voltage: 12.47/7.2KV

FKEC Q FEEDER

PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY

MARATHON, FL, 33050 - MONROE COUNTY

SCOPE OF WORK: SEE SCOPE OF WORK

W.O.O.: PETER AMENDOLA

PH: 305-852-2431 x240

SECTION: 26 TWP: 65 RANGE: 33

REV: N/A SCALE: N/ADATE: 11/18/2025

PRINT: 4 OF 91

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL

BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL 84' OF 1/0 AL UG IN 2X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

WHERE WORK OCCURS IN THE IN THE DRIP

LINE OF EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN 4X4"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

INSTALL 590' OF NEW OVERHEAD 144

STRAND ADSS FIBER OPTIC CABLE

PRINT: 4 OF 95

03/31/2026

ENSURE THE MINIMUM COVER BELOW

THE TOP OF THE PAVEMENT IS 36" AND

BELOW THE UNPAVED SURFACE IS 30"

GENERAL CONSTRUCTION NOTES:

RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR

BETTER THAN ORIGINAL CONDITION

TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND FACILITIES

WITH THE MUNICIPALITY INSPECTOR PRIOR TO

BORES BEING INSTALLED

ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN

INSTALLED WITHIN THE RIGHT OF WAY

CONSTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,

SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS

OTHERWISE APPROVED ON THE MOT PERMIT

ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE VICINITY OF

THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING

WHERE WORK OCCURS IN THE DRIP LINE OF

EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

PER THE FDOT UTILITY ACCOMMODATION

MANUAL, ENSURE APPROPRIATE EROSION

CONTROL DEVICES ARE IN PLACE BEFORE ANY

WORK AND/OR CONSTRUCTION BEGINS AND

ARE USED THROUGHOUT THE DURATION OF

THE WORK/CONSTRUCTION

102-600 102-601 102-660

POSTED SPEED LIMIT: 55 MPH

Approved 2026-H-692-00009

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

ROW

ROW

ROW

ROW

ROW

ROW

ROW

F

Q3

INSTALL 90X60X60 VAULT

MILEPOST: 8.319

CROSS SECTION: 3

US ROUTE 1

O

VERSEAS

HIG

HW

AY

FLORIDA KEYS OVERSEAS

HERITAGE TRAIL

U2

INSTALLING 1000' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

CROSS SECTION: 2 AND 3

U3

INSTALLING 1000' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

CROSS SECTION: 3 AND 4

18" UNK

30" UNK

3-4" PVC

N

PLAN VIEW

GAS

WATER

STORM DRAIN

SANITARY SEWER

RECLAIMED WATER

ELECTRIC

TELEPHONE

RIGHT OF WAY

BURIED UTILITIES

G

W

D

S

R

E

T

SCOPE OF WORK

ABBREVIATIONS

AC

CI

DIP

EOP

EOS

FM

PVC

ASBESTOS CEMENT

CAST IRON

DUCTILE IRON PIPE

EDGE OF PAVEMENT

EDGE OF SIDEWALK

FORCE MAIN

POLYVINYL CHLORIDE

RCP

TX

UG

REINFORCED CONCRETE PIPE

TRANSFORMER

UNDERGROUND

CENTER LINE

ROW

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

INSTALL EXISTING/REMOVE

LEGEND

P

P

P

F

F

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

P

F

F

MOT INDEX

MILE POSTS

102-613 102-615 102-660

START: 8.689

END: 3.659

Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659

GENERAL CONSTRUCTION NOTES:

· RIGHT OF WAYS WILL BE RESTORED TO AS

GOOD AS OR BETTER THAN ORIGINAL

CONDITION.

· TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND

FACILITIES WITH THE MUNICIPALITY

INSPECTOR PRIOR TO BORES BEING

INSTALLED.

· ALL PULL BOX LIDS SHALL BE TRAFFIC

RATED WHEN INSTALLED WITHIN THE

RIGHT OF WAY.

· CONTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL

DRIVEWAYS, SIDEWALKS AND SIDE

STREETS ALWAYS, UNLESS OTHERWISE

APPROVED ON THE MOT PERMIT.

· ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE

VICINITY OF THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING.

Primary Voltage: 12.47/7.2KV

FKEC Q FEEDER

PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY

MARATHON, FL, 33050 - MONROE COUNTY

SCOPE OF WORK: SEE SCOPE OF WORK

W.O.O.: PETER AMENDOLA

PH: 305-852-2431 x240

SECTION: 26 TWP: 65 RANGE: 33

REV: N/A SCALE: N/ADATE: 11/18/2025

PRINT: 5 OF 91

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL

BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL 84' OF 1/0 AL UG IN 2X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

WHERE WORK OCCURS IN THE IN THE DRIP

LINE OF EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN 4X4"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

INSTALL 590' OF NEW OVERHEAD 144

STRAND ADSS FIBER OPTIC CABLE

PRINT: 5 OF 95

03/31/2026

ENSURE THE MINIMUM COVER BELOW

THE TOP OF THE PAVEMENT IS 36" AND

BELOW THE UNPAVED SURFACE IS 30"

GENERAL CONSTRUCTION NOTES:

RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR

BETTER THAN ORIGINAL CONDITION

TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND FACILITIES

WITH THE MUNICIPALITY INSPECTOR PRIOR TO

BORES BEING INSTALLED

ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN

INSTALLED WITHIN THE RIGHT OF WAY

CONSTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,

SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS

OTHERWISE APPROVED ON THE MOT PERMIT

ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE VICINITY OF

THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING

WHERE WORK OCCURS IN THE DRIP LINE OF

EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

PER THE FDOT UTILITY ACCOMMODATION

MANUAL, ENSURE APPROPRIATE EROSION

CONTROL DEVICES ARE IN PLACE BEFORE ANY

WORK AND/OR CONSTRUCTION BEGINS AND

ARE USED THROUGHOUT THE DURATION OF

THE WORK/CONSTRUCTION

102-600 102-601 102-660

POSTED SPEED LIMIT: 55 MPH

Approved 2026-H-692-00009

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

US ROUTE 1

M M

56.1 BU

R

N

PO

IN

T

FLORIDA KEYS OVERSEAS

HERITAGE TRAIL

U3

INSTALLING 1000' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

CROSS SECTION: 3 AND 4

18" UNK

30" UNK

3-4" PVC

N

PLAN VIEW

GAS

WATER

STORM DRAIN

SANITARY SEWER

RECLAIMED WATER

ELECTRIC

TELEPHONE

RIGHT OF WAY

BURIED UTILITIES

G

W

D

S

R

E

T

SCOPE OF WORK

ABBREVIATIONS

AC

CI

DIP

EOP

EOS

FM

PVC

ASBESTOS CEMENT

CAST IRON

DUCTILE IRON PIPE

EDGE OF PAVEMENT

EDGE OF SIDEWALK

FORCE MAIN

POLYVINYL CHLORIDE

RCP

TX

UG

REINFORCED CONCRETE PIPE

TRANSFORMER

UNDERGROUND

CENTER LINE

ROW

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

INSTALL EXISTING/REMOVE

LEGEND

P

P

P

F

F

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

P

F

F

MOT INDEX

MILE POSTS

102-613 102-615 102-660

START: 8.689

END: 3.659

Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659

GENERAL CONSTRUCTION NOTES:

· RIGHT OF WAYS WILL BE RESTORED TO AS

GOOD AS OR BETTER THAN ORIGINAL

CONDITION.

· TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND

FACILITIES WITH THE MUNICIPALITY

INSPECTOR PRIOR TO BORES BEING

INSTALLED.

· ALL PULL BOX LIDS SHALL BE TRAFFIC

RATED WHEN INSTALLED WITHIN THE

RIGHT OF WAY.

· CONTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL

DRIVEWAYS, SIDEWALKS AND SIDE

STREETS ALWAYS, UNLESS OTHERWISE

APPROVED ON THE MOT PERMIT.

· ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE

VICINITY OF THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING.

Primary Voltage: 12.47/7.2KV

FKEC Q FEEDER

PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY

MARATHON, FL, 33050 - MONROE COUNTY

SCOPE OF WORK: SEE SCOPE OF WORK

W.O.O.: PETER AMENDOLA

PH: 305-852-2431 x240

SECTION: 26 TWP: 65 RANGE: 33

REV: N/A SCALE: N/ADATE: 11/18/2025

PRINT: 6 OF 91

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL

BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL 84' OF 1/0 AL UG IN 2X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

WHERE WORK OCCURS IN THE IN THE DRIP

LINE OF EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN 4X4"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

INSTALL 590' OF NEW OVERHEAD 144

STRAND ADSS FIBER OPTIC CABLE

PRINT: 6 OF 95

03/31/2026

ENSURE THE MINIMUM COVER BELOW

THE TOP OF THE PAVEMENT IS 36" AND

BELOW THE UNPAVED SURFACE IS 30"

GENERAL CONSTRUCTION NOTES:

RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR

BETTER THAN ORIGINAL CONDITION

TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND FACILITIES

WITH THE MUNICIPALITY INSPECTOR PRIOR TO

BORES BEING INSTALLED

ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN

INSTALLED WITHIN THE RIGHT OF WAY

CONSTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,

SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS

OTHERWISE APPROVED ON THE MOT PERMIT

ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE VICINITY OF

THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING

WHERE WORK OCCURS IN THE DRIP LINE OF

EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

PER THE FDOT UTILITY ACCOMMODATION

MANUAL, ENSURE APPROPRIATE EROSION

CONTROL DEVICES ARE IN PLACE BEFORE ANY

WORK AND/OR CONSTRUCTION BEGINS AND

ARE USED THROUGHOUT THE DURATION OF

THE WORK/CONSTRUCTION

102-600 102-601 102-660

POSTED SPEED LIMIT: 55 MPH

Approved 2026-H-692-00009

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

F

Q4

INSTALL 90X60X60 VAULT

MILEPOST: 8.130

CROSS SECTION: 4

US ROUTE 1

FLORIDA KEYS OVERSEAS

HERITAGE TRAIL

U3

INSTALLING 1000' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

CROSS SECTION: 3 AND 4

U4

INSTALLING 1000' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

CROSS SECTION: 4 AND 5

18" UNK

30" UNK

3-4" PVC

UNK" UNK

N

PLAN VIEW

GAS

WATER

STORM DRAIN

SANITARY SEWER

RECLAIMED WATER

ELECTRIC

TELEPHONE

RIGHT OF WAY

BURIED UTILITIES

G

W

D

S

R

E

T

SCOPE OF WORK

ABBREVIATIONS

AC

CI

DIP

EOP

EOS

FM

PVC

ASBESTOS CEMENT

CAST IRON

DUCTILE IRON PIPE

EDGE OF PAVEMENT

EDGE OF SIDEWALK

FORCE MAIN

POLYVINYL CHLORIDE

RCP

TX

UG

REINFORCED CONCRETE PIPE

TRANSFORMER

UNDERGROUND

CENTER LINE

ROW

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

INSTALL EXISTING/REMOVE

LEGEND

P

P

P

F

F

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

P

F

F

MOT INDEX

MILE POSTS

102-613 102-615 102-660

START: 8.689

END: 3.659

Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659

GENERAL CONSTRUCTION NOTES:

· RIGHT OF WAYS WILL BE RESTORED TO AS

GOOD AS OR BETTER THAN ORIGINAL

CONDITION.

· TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND

FACILITIES WITH THE MUNICIPALITY

INSPECTOR PRIOR TO BORES BEING

INSTALLED.

· ALL PULL BOX LIDS SHALL BE TRAFFIC

RATED WHEN INSTALLED WITHIN THE

RIGHT OF WAY.

· CONTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL

DRIVEWAYS, SIDEWALKS AND SIDE

STREETS ALWAYS, UNLESS OTHERWISE

APPROVED ON THE MOT PERMIT.

· ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE

VICINITY OF THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING.

Primary Voltage: 12.47/7.2KV

FKEC Q FEEDER

PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY

MARATHON, FL, 33050 - MONROE COUNTY

SCOPE OF WORK: SEE SCOPE OF WORK

W.O.O.: PETER AMENDOLA

PH: 305-852-2431 x240

SECTION: 26 TWP: 65 RANGE: 33

REV: N/A SCALE: N/ADATE: 11/18/2025

PRINT: 7 OF 91

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL

BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL 84' OF 1/0 AL UG IN 2X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

WHERE WORK OCCURS IN THE IN THE DRIP

LINE OF EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN 4X4"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

INSTALL 590' OF NEW OVERHEAD 144

STRAND ADSS FIBER OPTIC CABLE

PRINT: 7 OF 95

03/31/2026

ENSURE THE MINIMUM COVER BELOW

THE TOP OF THE PAVEMENT IS 36" AND

BELOW THE UNPAVED SURFACE IS 30"

GENERAL CONSTRUCTION NOTES:

RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR

BETTER THAN ORIGINAL CONDITION

TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND FACILITIES

WITH THE MUNICIPALITY INSPECTOR PRIOR TO

BORES BEING INSTALLED

ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN

INSTALLED WITHIN THE RIGHT OF WAY

CONSTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,

SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS

OTHERWISE APPROVED ON THE MOT PERMIT

ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE VICINITY OF

THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING

WHERE WORK OCCURS IN THE DRIP LINE OF

EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

PER THE FDOT UTILITY ACCOMMODATION

MANUAL, ENSURE APPROPRIATE EROSION

CONTROL DEVICES ARE IN PLACE BEFORE ANY

WORK AND/OR CONSTRUCTION BEGINS AND

ARE USED THROUGHOUT THE DURATION OF

THE WORK/CONSTRUCTION

102-600 102-601 102-660

POSTED SPEED LIMIT: 55 MPH

Approved 2026-H-692-00009

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

US ROUTE 1

FLORIDA KEYS OVERSEAS

HERITAGE TRAIL

U4

INSTALLING 1000' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

CROSS SECTION: 4 AND 5

18" UNK

30" UNK

3-4" PVC

UNK" UNK

N

PLAN VIEW

GAS

WATER

STORM DRAIN

SANITARY SEWER

RECLAIMED WATER

ELECTRIC

TELEPHONE

RIGHT OF WAY

BURIED UTILITIES

G

W

D

S

R

E

T

SCOPE OF WORK

ABBREVIATIONS

AC

CI

DIP

EOP

EOS

FM

PVC

ASBESTOS CEMENT

CAST IRON

DUCTILE IRON PIPE

EDGE OF PAVEMENT

EDGE OF SIDEWALK

FORCE MAIN

POLYVINYL CHLORIDE

RCP

TX

UG

REINFORCED CONCRETE PIPE

TRANSFORMER

UNDERGROUND

CENTER LINE

ROW

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

INSTALL EXISTING/REMOVE

LEGEND

P

P

P

F

F

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

P

F

F

MOT INDEX

MILE POSTS

102-613 102-615 102-660

START: 8.689

END: 3.659

Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659

GENERAL CONSTRUCTION NOTES:

· RIGHT OF WAYS WILL BE RESTORED TO AS

GOOD AS OR BETTER THAN ORIGINAL

CONDITION.

· TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND

FACILITIES WITH THE MUNICIPALITY

INSPECTOR PRIOR TO BORES BEING

INSTALLED.

· ALL PULL BOX LIDS SHALL BE TRAFFIC

RATED WHEN INSTALLED WITHIN THE

RIGHT OF WAY.

· CONTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL

DRIVEWAYS, SIDEWALKS AND SIDE

STREETS ALWAYS, UNLESS OTHERWISE

APPROVED ON THE MOT PERMIT.

· ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE

VICINITY OF THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING.

Primary Voltage: 12.47/7.2KV

FKEC Q FEEDER

PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY

MARATHON, FL, 33050 - MONROE COUNTY

SCOPE OF WORK: SEE SCOPE OF WORK

W.O.O.: PETER AMENDOLA

PH: 305-852-2431 x240

SECTION: 26 TWP: 65 RANGE: 33

REV: N/A SCALE: N/ADATE: 11/18/2025

PRINT: 8 OF 91

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL

BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL 84' OF 1/0 AL UG IN 2X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

WHERE WORK OCCURS IN THE IN THE DRIP

LINE OF EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN 4X4"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

INSTALL 590' OF NEW OVERHEAD 144

STRAND ADSS FIBER OPTIC CABLE

PRINT: 8 OF 95

03/31/2026

ENSURE THE MINIMUM COVER BELOW

THE TOP OF THE PAVEMENT IS 36" AND

BELOW THE UNPAVED SURFACE IS 30"

GENERAL CONSTRUCTION NOTES:

RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR

BETTER THAN ORIGINAL CONDITION

TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND FACILITIES

WITH THE MUNICIPALITY INSPECTOR PRIOR TO

BORES BEING INSTALLED

ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN

INSTALLED WITHIN THE RIGHT OF WAY

CONSTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,

SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS

OTHERWISE APPROVED ON THE MOT PERMIT

ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE VICINITY OF

THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING

WHERE WORK OCCURS IN THE DRIP LINE OF

EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

PER THE FDOT UTILITY ACCOMMODATION

MANUAL, ENSURE APPROPRIATE EROSION

CONTROL DEVICES ARE IN PLACE BEFORE ANY

WORK AND/OR CONSTRUCTION BEGINS AND

ARE USED THROUGHOUT THE DURATION OF

THE WORK/CONSTRUCTION

102-600 102-601 102-660

POSTED SPEED LIMIT: 55 MPH

Approved 2026-H-692-00009

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

F

Q5

INSTALL 90X60X60 VAULT

MILEPOST: 7.941

CROSS SECTION: 5

US ROUTE 1

FLORIDA KEYS OVERSEAS

HERITAGE TRAIL

U4

INSTALLING 1000' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

CROSS SECTION: 4 AND 5

U5

INSTALLING 1000' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

CROSS SECTION: 5 AND 6

18" UNK

30" UNK

3-4" PVC

UNK" UNK

N

PLAN VIEW

GAS

WATER

STORM DRAIN

SANITARY SEWER

RECLAIMED WATER

ELECTRIC

TELEPHONE

RIGHT OF WAY

BURIED UTILITIES

G

W

D

S

R

E

T

SCOPE OF WORK

ABBREVIATIONS

AC

CI

DIP

EOP

EOS

FM

PVC

ASBESTOS CEMENT

CAST IRON

DUCTILE IRON PIPE

EDGE OF PAVEMENT

EDGE OF SIDEWALK

FORCE MAIN

POLYVINYL CHLORIDE

RCP

TX

UG

REINFORCED CONCRETE PIPE

TRANSFORMER

UNDERGROUND

CENTER LINE

ROW

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

INSTALL EXISTING/REMOVE

LEGEND

P

P

P

F

F

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

P

F

F

MOT INDEX

MILE POSTS

102-613 102-615 102-660

START: 8.689

END: 3.659

Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659

GENERAL CONSTRUCTION NOTES:

· RIGHT OF WAYS WILL BE RESTORED TO AS

GOOD AS OR BETTER THAN ORIGINAL

CONDITION.

· TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND

FACILITIES WITH THE MUNICIPALITY

INSPECTOR PRIOR TO BORES BEING

INSTALLED.

· ALL PULL BOX LIDS SHALL BE TRAFFIC

RATED WHEN INSTALLED WITHIN THE

RIGHT OF WAY.

· CONTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL

DRIVEWAYS, SIDEWALKS AND SIDE

STREETS ALWAYS, UNLESS OTHERWISE

APPROVED ON THE MOT PERMIT.

· ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE

VICINITY OF THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING.

Primary Voltage: 12.47/7.2KV

FKEC Q FEEDER

PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY

MARATHON, FL, 33050 - MONROE COUNTY

SCOPE OF WORK: SEE SCOPE OF WORK

W.O.O.: PETER AMENDOLA

PH: 305-852-2431 x240

SECTION: 26 TWP: 65 RANGE: 33

REV: N/A SCALE: N/ADATE: 11/18/2025

PRINT: 9 OF 91

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL

BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL 84' OF 1/0 AL UG IN 2X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

WHERE WORK OCCURS IN THE IN THE DRIP

LINE OF EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

INSTALL (18) 90X60X60 PULLBOX

INSTALL 16003' OF 1000 MCM UG IN 4X4"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

INSTALL 84' OF 1/0 AL UG IN 3X3"

CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER 7"

INSTALL (3) 45/H1 DUCTILE IRON POLE

INSTALL 590' OF NEW OVERHEAD 144

STRAND ADSS FIBER OPTIC CABLE

PRINT: 9 OF 95

03/31/2026

ENSURE THE MINIMUM COVER BELOW

THE TOP OF THE PAVEMENT IS 36" AND

BELOW THE UNPAVED SURFACE IS 30"

GENERAL CONSTRUCTION NOTES:

RIGHT OF WAYS WILL BE RESTORED TO AS GOOD OR

BETTER THAN ORIGINAL CONDITION

TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND FACILITIES

WITH THE MUNICIPALITY INSPECTOR PRIOR TO

BORES BEING INSTALLED

ALL PULL BOX LIDS SHALL BE TRAFFIC RATED WHEN

INSTALLED WITHIN THE RIGHT OF WAY

CONSTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL DRIVEWAYS,

SIDEWALKS AND SIDE STREETS ALWAYS, UNLESS

OTHERWISE APPROVED ON THE MOT PERMIT

ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE VICINITY OF

THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING

WHERE WORK OCCURS IN THE DRIP LINE OF

EXISTING TREES, WORK SHALL BE

PERFORMED PER FDOT STANDARD PLANS

INDEX 110-100

PER THE FDOT UTILITY ACCOMMODATION

MANUAL, ENSURE APPROPRIATE EROSION

CONTROL DEVICES ARE IN PLACE BEFORE ANY

WORK AND/OR CONSTRUCTION BEGINS AND

ARE USED THROUGHOUT THE DURATION OF

THE WORK/CONSTRUCTION

102-600 102-601 102-660

POSTED SPEED LIMIT: 55 MPH

Approved 2026-H-692-00009

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

ROW

US ROUTE 1

FLORIDA KEYS OVERSEAS

HERITAGE TRAIL

U5

INSTALLING 1000' OF 1000 MCM UG IN

4X4" CONDUIT VIA DIRECTIONAL BORE

BORE DIAMETER: 9"

CROSS SECTION: 5 AND 6

18" UNK

30" UNK

3-4" PVC

UNK" UNK

N

PLAN VIEW

GAS

WATER

STORM DRAIN

SANITARY SEWER

RECLAIMED WATER

ELECTRIC

TELEPHONE

RIGHT OF WAY

BURIED UTILITIES

G

W

D

S

R

E

T

SCOPE OF WORK

ABBREVIATIONS

AC

CI

DIP

EOP

EOS

FM

PVC

ASBESTOS CEMENT

CAST IRON

DUCTILE IRON PIPE

EDGE OF PAVEMENT

EDGE OF SIDEWALK

FORCE MAIN

POLYVINYL CHLORIDE

RCP

TX

UG

REINFORCED CONCRETE PIPE

TRANSFORMER

UNDERGROUND

CENTER LINE

ROW

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

INSTALL EXISTING/REMOVE

LEGEND

P

P

P

F

F

POLE

TRANSFORMER

PEDESTAL

PULLBOX

TRANSFORMER IN PROPERTY

PEDESTAL IN PROPERTY

PULLBOX IN PROPERTY

UNDERGROUND CABLE

AERIAL CABLE

P

F

F

MOT INDEX

MILE POSTS

102-613 102-615 102-660

START: 8.689

END: 3.659

Q1: 8.689 Q2: 8.509 Q3: 8.319 Q4: 8.130 Q5: 7.941 Q6: 7.751 Q7: 7.562 Q8: 7.372 Q9: 7.190 Q10: 7.000 Q11: 6.811 Q11A: 6.62 Q11B: 6.432 Q11C: 6.231 Q11D: 6.076 Q11E: 5.917 Q12: 5.773 Q16: 5.648 Q17: 5.615 Q18: 5.584 Q22: 5.344 Q24: 5.291 C5-1316: 4.148 Q53B: 4.147 C5-1327: 3.661 B14C: 3.659

GENERAL CONSTRUCTION NOTES:

· RIGHT OF WAYS WILL BE RESTORED TO AS

GOOD AS OR BETTER THAN ORIGINAL

CONDITION.

· TO AVOID CONFLICTS, CONTRACTOR WILL

COORDINATE DEPTH OF UNDERGROUND

FACILITIES WITH THE MUNICIPALITY

INSPECTOR PRIOR TO BORES BEING

INSTALLED.

· ALL PULL BOX LIDS SHALL BE TRAFFIC

RATED WHEN INSTALLED WITHIN THE

RIGHT OF WAY.

· CONTRACTOR SHALL MAINTAIN AN

UNINTERRUPTED ACCESS TO ALL

DRIVEWAYS, SIDEWALKS AND SIDE

STREETS ALWAYS, UNLESS OTHERWISE

APPROVED ON THE MOT PERMIT.

· ALL OTHER RIGHT OF WAY USERS AND

MUNICIPALITIES IN THE IMMEDIATE

VICINITY OF THE PROPOSED

CONSTRUCTION/INSTALLATION HAVE BEEN

NOTIFIED IN WRITING.

Primary Voltage: 12.47/7.2KV

FKEC Q FEEDER

PROJECT SITE ADDRESS: 56639 OVERSEAS HIGHWAY

MARATHON, FL, 33050 - MONROE COUNTY

SCOPE OF WORK: SEE SCOPE OF WORK

W.O.O.: PETER AMENDOLA

PH: 305-852-2431 x240

SECTION: 26 TWP: 65 RANGE: 33

REV: N/A SCALE: N/ADATE: 11/18/2025

PRINT: 10 OF 91

INSTALL (18)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .