This is a Mechanical Compliance Certificate for the Klamath Tribal Health Center, a new construction healthcare clinic facility located in Beatty, Oregon. The project involves the design and compliance verification of mechanical, plumbing, and electrical systems for a 4,065 square foot health care clinic building in Climate Zone 5b. The facility design includes three rooftop unit (RTU) heat pump systems with varying capacities (RTU-1 at 24 kBtu/h, RTU-2 at 44 kBtu/h heating and 50 kBtu/h cooling, and RTU-3 at 34 kBtu/h heating and 37 kBtu/h cooling), an electric storage water heater with 55-gallon capacity and circulation pump, and comprehensive HVAC controls. The project has been designed to comply with ASHRAE 90.1 (2022) Standard requirements and includes performance enhancements such as occupancy sensor lighting controls, reduced lighting power loads, improved heating and cooling efficiency at 5 percent above minimum, and energy monitoring systems. The facility achieved 47.0 energy credits against a required 41.8 credits. The compliance certificate was issued on September 3, 2026, by Mechanical Engineer Ethan Mansfield.
All proposed mechanical systems exceed minimum efficiency requirements, with RTU-2 and RTU-3 demonstrating efficiency ratings above code minimums (7.20 HSPF2 and 16.20 SEER2 versus required 6.70 HSPF2 and 13.40 SEER2). The project includes comprehensive inspection checklists addressing plan review, foundation, plumbing rough-in, mechanical rough-in, electrical rough-in, and final inspection phases, with all requirements marked as compliant or exceptions appropriately noted. Commissioning requirements utilizing ASHRAE/IES Standard 202 have been incorporated into construction documents. Documentation requirements include as-built drawings and operation and maintenance manuals to be furnished within 90 days of system acceptance, along with air and hydronic system balancing reports and HVAC control system testing and calibration verification.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Report Title: Klamath Tribal Health Report Date: Sep 03, 2026, 01:44 PM (PDT) 1 of 15
Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Project No:
Performance Sim. Specs:
Project Sub Type:
All Electric:
Is Renewable:
Has Battery:
Has Charger:
Has Heat Pump
90.1 (2022) Standard Klamath Tribal Health Chiloquin, Oregon 5b New Construction 162136 EnergyPlus 24.1.0 (EPW: ) New Building/Complete false false false false false
Construction Site: Owner/Agent: Designer/Contractor:
24110 Godowa Springs Rd Beatty , Oregon 97621
Notes:
Energy Credits
Description Credit
L03 Occupancy Sensor Control Areas 1.0
L06 Reduced lighting power 18.0
H03 5% cooling efficiency improvement 16.4
H02 5% heating efficiency improvement 3.4
P01 Energy monitoring 3.0
Q02 Efficient kitchen equipment 0.0
G01 Lighting Load Management 0.0
G02 HVAC Load Management 0.0
Credits: 47.0 Required 41.8 Proposed
Renewable energy
Number of Floors:
Area of Three Largest Floors:
Proposed Capacity:
Required Capacity:
Exception:
Building effective floor area is less than 10,000 ft2.
Renewables Pass: Exception: Building effective floor area is less than 10,000 ft2.
Report Title: Klamath Tribal Health Report Date: Sep 03, 2026, 01:44 PM (PDT) 2 of 15
Building Area
Description Floor Area
1-Health Care-Clinic (Health Care-Clinic) : Nonresidential 4065
Report Title: Klamath Tribal Health Report Date: Sep 03, 2026, 01:44 PM (PDT) 3 of 15
Mechanical Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
90.1 (2022) Standard Klamath Tribal Health Chiloquin, Oregon 5b New Construction
Construction Site: Owner/Agent: Designer/Contractor:
24110 Godowa Springs Rd Beatty , Oregon 97621
Mechanical Systems List
Quantity Component Description
HVAC Systems
1 RTU-1 (Single Zone):
Single Package Heat Pump Heating Mode: Capacity = 24 kBtu/h, Proposed Efficiency = 6.70 HSPF2, Required Efficiency = 6.70 HSPF2 Cooling Mode: Capacity = 24 kBtu/h, Proposed Efficiency = 13.40 SEER2, Required Efficiency = 13.40 SEER2 Proposed Part Load Efficiency = 0.00 , Required Part Load Efficiency = 0.00 Fan System: RTU-1 FAN -- Compliance (Motor nameplate HP and fan efficiency method) : Passes
Fans:
RTU-1 FAN Supply, Constant Volume, 800 CFM, 0.5 motor nameplate hp, 72.00 fan energy index , fan exception: Single fan < 1 HP or < 0.89 kW
1 RTU-2 (Multiple- Zone):
Single Package Heat Pump Heating Mode: Capacity = 44 kBtu/h, Proposed Efficiency = 7.20 HSPF2, Required Efficiency = 6.70 HSPF2 Cooling Mode: Capacity = 50 kBtu/h, Proposed Efficiency = 16.20 SEER2, Required Efficiency = 13.40 SEER2 Proposed Part Load Efficiency = 0.00 , Required Part Load Efficiency = 0.00 Fan System: RTU-2 FAN -- Compliance (Motor nameplate HP and fan efficiency method) : Passes
Fans:
RTU-2 FAN Supply, Constant Volume, 1600 CFM, 3.0 motor nameplate hp, 72.00 fan energy index
1 RTU-3 (Single Zone):
Single Package Heat Pump Heating Mode: Capacity = 34 kBtu/h, Proposed Efficiency = 7.20 HSPF2, Required Efficiency = 6.70 HSPF2 Cooling Mode: Capacity = 37 kBtu/h, Proposed Efficiency = 16.20 SEER2, Required Efficiency = 13.40 SEER2 Proposed Part Load Efficiency = 0.00 , Required Part Load Efficiency = 0.00 Fan System: RTU-3 FAN -- Compliance (Motor nameplate HP and fan efficiency method) : Passes
Fans:
RTU-3 FAN Supply, Constant Volume, 1200 CFM, 3.0 motor nameplate hp, 72.00 fan energy index
Water Heaters
1 WH-1: Electric Storage Water Heater, Capacity: 55 gallons w/ Circulation Pump No minimum efficiency requirement applies
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 90.1 (2022) Standard requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Report Title: Klamath Tribal Health Report Date: Sep 03, 2026, 01:44 PM (PDT) 4 of 15
Name - Title Signature Date
09/03/2026Ethan MansfieldEthan Mansfield - Mechanical Engineer
Report Title: Klamath Tribal Health Report Date: Sep 03, 2026, 01:44 PM (PDT) 5 of 15
Inspection Checklist
Energy Code: 90.1 (2022) Standard
Requirements: 95% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Plan Review
Section
& Req.ID Plan Review Complies? Comments/Assumptions
4.2.2, 6.4.4.2.1, 6.7.2
[PR2]1
Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: M001, M100, M101
4.2.2, 7.7.1, 10.4.2
[PR3]1
Plans, specifications, and/or calculations provide all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed.
Hot water system sized per manufacturer's sizing guide.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: P001, P100, P200
4.2.2, 8.4.1.1, 8.4.1.2, 8.7
[PR6]2
Plans, specifications, and/or calculations provide all information with which compliance can be determined for the electrical systems and equipment and document where exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: TBD
4.2.5.2
[PR5]1
Commissioning shall be performed as stated in Sections 5.9.2, 6.9.2, 7.9.2, 8.9.2, 9.9.2, 10.9.2, 11.2(d), and G1.2.1(c). Commissioning must utilize ASHRAE/IES Standard 202 or other generally accepted engineering standards acceptable to the building official.
FPT and verification requirements for commissioning are as stated in Section
4.2.5.1. Commissioning shall document
compliance of the building systems, controls, and building envelope with required provisions of this standard. Commissioning requirements shall be incorporated into the construction documents.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: M001, M100, M101
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Report Title: Klamath Tribal Health Report Date: Sep 03, 2026, 01:44 PM (PDT) 6 of 15
Footing / Foundation Inspection
Section
& Req.ID Footing / Foundation Inspection Complies? Comments/Assumptions
6.4.3.7
[FO9]3
Freeze protection and snow/ice melting system sensors for future connection to controls.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
Report Title: Klamath Tribal Health Report Date: Sep 03, 2026, 01:44 PM (PDT) 7 of 15
Plumbing Rough-In Inspection
Section
& Req.ID Plumbing Rough-In Inspection Complies? Comments/Assumptions
7.4.4.1
[PL2]3
Temperature controls installed on service water heating systems (<=120ºF to maximum temperature for intended use).
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: P001, P100, P200
7.4.4.2
[PL3]1
Automatic time switches installed to automatically switch off the recirculating hot-water system or heat trace.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: P001, P100, P200
Report Title: Klamath Tribal Health Report Date: Sep 03, 2026, 01:44 PM (PDT) 8 of 15
Mechanical Rough-In Inspection
Section
& Req.ID Mechanical Rough-In Inspection
Plans Verified Value
Field Verified Value Complies? Comments/Assumptions
6.4.1.4, 6.4.1.5
[ME1]2
HVAC equipment efficiency verified.
Non-NAECA HVAC equipment labeled as meeting 90.1.
Efficiency: Efficiency: Complies
Does Not Comply
Not Observable
Not Applicable
See the Mechanical Systems list for values
6.4.4.1.2
[ME8]2
HVAC ducts and plenums insulated per Table 6.8.2. Where ducts or plenums are installed in or under a slab, verification may need to occur during Foundation Inspection.
R- R- Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
6.4.4.1.3
[ME9]2
HVAC piping insulation thickness.
Where piping is installed in or under a slab, verification may need to occur during Foundation Inspection.
in. in.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
6.4.4.1.4
[ME41]3
Thermally ineffective panel surfaces of sensible heating panels have insulation >= R-3.5.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
6.4.4.2.1
[ME10]2
Ducts and plenums having pressure class ratings are Seal Class A construction.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
6.8.1-15, 6.8.1-16
[ME110]2
Electrically operated DX-DOAS units meet requirements per Tables 6.8.1-15 or 6.8.1-16.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
6.4.4.2.2
[ME11]3
Ductwork operating >3 in. water column requires air leakage testing.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
6.5.2.1
[ME17]1
Zone controls can limit reheating, recooling, simultaneous heating and cooling and sequence heating and cooling to each zone.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
6.5.2.3
[ME19]3
Dehumidification controls provided to prevent reheating, recooling, mixing of hot and cold airstreams or concurrent heating and cooling of the same airstream.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
6.5.2.4.1
[ME68]3
Humidifiers with airstream mounted preheating jackets have preheat auto-shutoff value set to activate when humidification is not required.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
6.5.2.4.2
[ME69]3
Humidification system dispersion tube hot surfaces in the airstreams of ducts or air-handling units insulated >= R-0.5.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
Report Title: Klamath Tribal Health Report Date: Sep 03, 2026, 01:44 PM (PDT) 9 of 15
Section
& Req.ID Mechanical Rough-In Inspection
Plans Verified Value
Field Verified Value Complies? Comments/Assumptions
6.5.2.5
[ME70]3
Preheat coils controlled to stop heat output whenever mechanical cooling, including economizer operation, is active.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
6.5.2.6
[ME106]3
Units that provide ventilation air to multiple zones and operate in conjunction with zone heating and cooling systems are prevented from using heating or heat recovery to warm supply air above 60°F when representative building loads or outdoor air temperature indicate that most zones demand cooling.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
6.5.3.4
[ME108]2
Parallel-flow fan-powered VAV air terminals have automatic controls to a) turn off the terminal fan except when space heating is required or if required for ventilation; b) turn on the terminal fan as the first stage of heating before the heating coil is activated; and c) during heating for warmup or setback temperature control, either operate the terminal fan and heating coil without primary air or reverse the terminal damper logic and provide heating from the central air handler through primary air.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
6.5.3.8
[ME109]2
Required minimum outdoor air rate is the larger of minimum outdoor air rate or minimum exhaust air rate required by Standard 62.1, Standard 62.2, Standard 170, or applicable codes or accreditation standards. Outdoor air ventilation systems shall comply with one of the following: a) design minimum system outdoor air provided < 135% of the required minimum outdoor air rate, b) dampers, ductwork, and controls allow the system to supply <= the required minimum outdoor air rate with a single set-point adjustment., or c) system includes exhaust air energy recovery complying with Section 6.5.6.1.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
6.5.3.9
[ME110]2
Zones serving rooms required to have automatic partial OFF or automatic full OFF lighting controls per Section 9.4.1.1, where the ASHRAE Standard
62.1 occupancy category permits ventilation air to be reduced to zero when the space is in occupied-standby mode and when using the Ventilation Rate Procedure, shall meet the following within five minutes of all rooms in that zone entering occupied-standby mode.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
6.5.3.2.2
[ME23]2
VAV fans have static pressure sensors positioned so setpoint <=1.2 in. w.c.
design pressure.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
N/A
6.5.3.2.3
[ME24]2
Reset static pressure setpoint for DDC controlled VAV boxes reporting to central controller based on the zones requiring the most pressure. Controls provide: zone damper monitoring or indicator of static pressure need;
autodetection, alarm, and operator override of zones excessively triggering reset logic.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
N/A
6.5.3.2.4
[ME102]2
Return and relief fans used to meet Section 6.5.1.1.5 have relief air rate controlled to maintain building pressure through differential supply-return airflow tracking. Systems with supply fans allowed to control the relief system based on oudoor air damper position.
Fans have variable speed control or other devices for managing total return/relief fan system demand per section threshold.
Complies
Does Not Comply
Not Observable
Not Applicable
Report Title: Klamath Tribal Health Report Date: Sep 03, 2026, 01:44 PM (PDT) 10 of 15
& Req.ID Mechanical Rough-In Inspection
Plans Verified Value
Field Verified Value Complies? Comments/Assumptions
6.5.3.3
[ME42]3
Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
See the Mechanical Systems list for values
6.4.3.4.1
[ME3]3
Stair and elevator shaft vents have motorized dampers that automatically close.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
6.5.3.5
[ME43]3
Multiple zone HVAC systems have supply air temperature reset controls.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Mechanical Systems list for values Location on plans/spec:
M001, M100, M101
6.5.4.2
[ME25]3
HVAC pumping systems with >= 3 control values designed for variable fluid flow (see section details).
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
6.5.6.1, 6.5.6.1.1
[ME56]1
Nontransient dwelling units shall be provided with outdoor air energy recovery ventilation systems that meet the requirements of Section 6.5.6.1.1
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
6.5.6.1, 6.5.6.1.2
[ME110]1
Fan systems serving spaces other than nontransient dwelling units have an energy recovery system meet the requirements in Tables 6.5.6.1.2-1 and 6.5.6.1.2-2
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
6.5.7.1
[ME100]2
Conditioned supply air to space with mechanical exhaust <= the greater of criteria of supply flow, required ventilation rate, exhaust flow minu the available transffer air (see section details).
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
6.5.7.2.1
[ME32]2
Kitchen hoods >5,000 cfm have make up air >=50% of exhaust air volume.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
6.4.3.4.2, 6.4.3.4.3
[ME4]3
Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
6.5.7.2.4
[ME49]3
Approved field test used to evaluate design air flow rates and demonstrate proper capture and containment of kitchen exhaust systems.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
6.5.8.1
[ME34]2
Unenclosed spaces that are heated use only radiant heat.
Complies
Does Not Comply
Not Observable
Not Applicable
Report Title: Klamath Tribal Health Report Date: Sep 03, 2026, 01:44 PM (PDT) 11 of 15
& Req.ID Mechanical Rough-In Inspection
Plans Verified Value
Field Verified Value Complies? Comments/Assumptions
7.4.2
[ME36]2
Service water heating equipment meets efficiency requirements.
Complies
Does Not Comply
Not Observable
Not Applicable
6.4.3.9
[ME63]2
Heating for vestibules and air curtains with integral heating include automatic controls that shut off the heating system when outdoor air temperatures > 45F.
Vestibule heating and cooling systems controlled by a thermostat in the vestibule with heating setpoint <= 60F and cooling setpoint >= 85F.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
6.5.10
[ME73]3
Doors separating conditioned space from the outdoors have controls that disable/reset heating and cooling system when open.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Building entrances have automatic closing devices.
6.4.3.4.5
[ME39]3
Parking garage ventilation shall meet the following: 1) Separate ventilation systems and control systems for each section, 2) Control systems shall automatically detect and control contaminant levels and capable to reduce airflow to 20% or less of design capacity and 3) The ventilation system for each section shall have controls that result in fan motor demand <= 30% of design wattage at 50% of the design airflow.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
6.4.3.4.4
[ME5]3
Ventilation fans >0.75 hp have automatic controls to shut off fan when not required.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: HVAC systems intended to operate continuously.
6.4.3.8
[ME6]1
Demand control ventilation provided for spaces larger than the floor area of Table 6.4.3.8 based on occupant outside airflow in cfm per 1000 sq ft and served by an air economizer, automatic damper or with design airflow > 3000 cfm
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
6.5.3.2.1
[ME40]2
DX cooling systems >= 75 kBtu/h (>= 65 kBtu/h effective 1/2016) and chilled-water and evaporative cooling fan motor hp >= ¼ designed to vary supply fan airflow as a function of load and comply with operational requirements.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
See the Mechanical Systems list for values
6.4.4.1.1
[ME7]3
Insulation exposed to weather protected from damage. Insulation outside of the conditioned space and associated with cooling systems is vapor retardant.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
Report Title: Klamath Tribal Health Report Date: Sep 03, 2026, 01:44 PM (PDT) 12 of 15
Rough-In Electrical Inspection
Section
& Req.ID Rough-In Electrical Inspection Complies? Comments/Assumptions
8.4.2
[EL10]2
At least 50% of all 125 volt 15- and 20-Amp receptacles are controlled by an automatic control device.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: TBD
8.4.3
[EL11]2
New buildings have electrical energy use measurement devices installed. Where tenant spaces exist, each tenant is monitored separately. In buildings with a digital control system the energy use is transmitted to to control system and displayed graphically.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: TBD
10.4.1
[EL9]2
Electric motors meet requirements where applicable.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: M001, M100, M101
Report Title: Klamath Tribal Health Report Date: Sep 03, 2026, 01:44 PM (PDT) 13 of 15
Final Inspection
Section
& Req.ID Final Inspection
Plans Verified Value
Field Verified Value Complies? Comments/Assumptions
6.4.3.6
[FI6]3
When humidification and dehumidification are provided to a zone, simultaneous operation is prohibited.
Humidity control prohibits the use of fossil fuel or electricity to produce RH > 30% in the warmest zone humidified and RH < 60% in the coldest zone dehumidified.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
N/A
6.7.3.1
[FI7]3
Furnished HVAC as-built drawings submitted within 90 days of system acceptance.
Complies
Does Not Comply
Not Observable
Not Applicable
6.7.3.2
[FI8]3
Furnished O&M manuals for HVAC systems within 90 days of system acceptance.
Complies
Does Not Comply
Not Observable
Not Applicable
6.7.3.3
[FI9]1
An air and/or hydronic system balancing report is provided for HVAC systems serving zones >5,000 ft2 of conditioned area.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
6.7.3.2
[FI10]1
HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
7.4.4.3
[FI11]3
Public lavatory faucet water temperature <=110°F.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
P001, P10, P200
7.4.4.4
[FI12]3
Controls are installed that limit the operation of a recirculation pump installed to maintain temperature of a storage tank.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
P001, P100, P200
6.4.3.1.1
[FI2]2
Heating and cooling to each zone is controlled by a thermostat control.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
10.4.3
[FI24]2
Elevators are designed with the proper lighting, ventilation power, and standby mode.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
10.5.1
[FI25]1
The building site contains on-site renewable energy with a rated capacity of not less than 0.50 W/ft2 or 1.7 Btu/ft2 of the three largest floors.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
10.4.5
[FI26]2
Air curtain unit performance tested in accordance with ANSI/AMCA 220 or ISO 27327-1 . Automatic controls comply with Section 6.4.3.9.
Complies
Does Not Comply
Not Observable
Not Applicable
Report Title: Klamath Tribal Health Report Date: Sep 03, 2026, 01:44 PM (PDT) 14 of 15
& Req.ID Final Inspection
Plans Verified Value
Field Verified Value Complies? Comments/Assumptions
10.4.7
[FI27]2
Whole-Building Energy Monitoring devices shall be installed and complies with Section 10.4.7.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
6.4.3.1.2
[FI3]3
Thermostatic controls have a 5 °F deadband.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
6.4.3.2
[FI20]3
Temperature controls have setpoint overlap restrictions.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
11.5.2.4
[FI60]2
P01: Energy Monitoring energy credit measure requires projects that are not required to have electrical energy monitoring systems installed shall be equipped to measure, monitor, record, and report energy consumption data in compliance with Section 8.4.3.
Complies
Does Not Comply
Not Observable
Not Applicable
11.5.2.5.3
[FI62]2
L03: Occupancy Sensors Control Areas energy credit measure requires buildings use “Simplified Building Method Compliance Path,” or in spaces where automatic partial OFF or automatic full OFF is not required, it shall be installed in accordance with Section 11.5.2.5.3.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Interior Lighting fixture schedule for values Location on plans/spec:
TBD
11.5.2.7.2
[FI67]2
Q02: Efficient Kitchen Equipment energy credit measure requires buildings with a commercial kitchen with at least one gas or electric fryer and all other cooking appliances comply with Section 11.5.2.7.2.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
TBD
11.5.2.8.1
[FI69]2
G01: Lighting Load Management energy credit measure requires luminaires have dimming capability and load management controls reduce general lighting power with continuous dimming in 75% of the project area during peakprice periods coincident with high building load.
Complies
Does Not Comply
Not Observable
Not Applicable
Energy credit params:
Percentage lighting load management (in %): 0.0
6.4.3.3.1
[FI21]3
HVAC systems equipped with at least one automatic shutdown control.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Systems designed for continuous operation.
11.5.2.8.2
[FI70]2
G02: HVAC Load Management energy credit measure requires load management shall a) increase cooling set point > 3F or reduce cooling capacity to 60% of installed capacity; b) for electric heating, reduce heating set point > 3F or reduce heating capacity to 60% of installed capacity; and c) provide excess outdoor air and reduce outdoor air in accordance with ASHRAE Standard 62.1, Section 6.2.5.2.
Complies
Does Not Comply
Not Observable
Not Applicable
6.4.3.3.2
[FI22]3
Setback controls allow automatic restart and temporary operation as required for maintenance.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
6.4.3.3.4
[FI23]3
Zone isolation devices and controls. Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
Report Title: Klamath Tribal Health Report Date: Sep 03, 2026, 01:44 PM (PDT) 15 of 15
& Req.ID Final Inspection
Plans Verified Value
Field Verified Value Complies? Comments/Assumptions
6.4.3.5
[FI5]3
Heat pump controls prevent supplemental electric resistance heat from coming on when not needed.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec:
M001, M100, M101
File details come from the government source that posted it. Updated .