This Addendum #2 document is issued by Klamath Tribal Health & Family Services (KTHFS) and modifies the original bidding documents for RFP-KTHFS-2026-002, the Beatty Health Center Project, a new 4,064-square-foot health center facility in Beatty, Oregon. The addendum clarifies specifications and updates contract documents through the second revision, containing modifications to Section 01 10 00 (Summary) and Section 10 28 00 (Toilet, Bath and Custodial Accessories). The final date for RFP questions is Thursday, October 1, 2026, at 12:00 p.m., with a submission deadline of Wednesday, October 7, 2026. Key clarifications include confirmation that only two wheel stops are required per civil plans. The addendum provides updated architectural drawings, specifically E101 (Level 1 Lighting Plan Sheet) adding an exterior exit sign and wall pack at the exterior door, and E201 (Level 1 Power Plan Sheet) adding a receptacle at the exterior door.
The Toilet, Bath, and Custodial Accessories specification section details contractor-provided and contractor-installed items including grab bars, mirrors, towel bars, shower curtain bars, baby changers, hooks, recessed wastebaskets, and waste receptacles, with basis-of-design products from Bobrick and other manufacturers including ASI (American Specialties, Inc.) and Bradley Corporation. KTHFS will provide soap dispensers, towel dispensers, toilet paper dispensers, toilet seat cover dispensers, and feminine hygiene dispensers for the contractor to install with backing and support framing. Installation requirements mandate compliance with 2010 ADA Standards for Accessible Design, ASTM material specifications for stainless steel tubing and sheet, galvanized steel, tempered glass, and electrodeposited coatings. All accessories must be shop-assembled, free of defects, and delivered complete with anchors, fittings, and fasteners; the contractor must provide three keys for each master key lockable accessory to the owner and ensure proper coordination with internal wall reinforcement and toilet partition anchoring.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP-KTHFS-2026-002 – ADDENDUM #2 – Beatty Health Center Project Page 1
KLAMATH TRIBAL HEALTH & FAMILY SERVICES
3949 S. 6th St.
Klamath Falls, OR 97603
Addendum #2
Project: RFP-KTHFS-2026-002
BEATTY HEALTH CENTER PROJECT
FINAL DATE FOR RFP QUESTIONS:
Thursday, October 1, 2026 @ 12:00 p.m.
SUBMISSION DEADLINE: Wednesday, October 7, 2026
RFP-KTHFS-2026-002 – ADDENDUM #2 – Beatty Health Center Project Page 2
Table of Contents
Summary 3
Addendum 2 Updates 4
Toilet, Bath, and Custodial Accessories 5
E101 – Level 1 Lighting Plan Sheet 9
E201 – Level 1 Power Plan Sheet 10
RFP-KTHFS-2026-002 – ADDENDUM #2 – Beatty Health Center Project Page 3
SUMMARY
1. PROJECT
1.1 Project Name: RFP-KTHFS-2026-002 – Beatty Health Center Project
1.2 The project consists of the construction of a new 4,064 SF health center in Beatty, Oregon.
The project consists of a community room, a workout room, medical office, dental office, behavioral health office, lab room, equipment sterilization room, restrooms, showers, and a breakroom.
2. WORK BY KTHFS
2.1 KTHFS will supply the following for installation by the supplier of the equipment
2.1.1 All furnishings, furniture, and moveable equipment
2.1.2 Exercise equipment
2.1.3 Restroom accessories, dispensers (i.e., soap dispensers, towel dispensers, seat protection dispensers, feminine hygiene dispensers, toilet paper dispensers
2.1.4 Medical and dental equipment
2.1.5 Artwork or wall-mounted equipment
2.1.6 Health assessment equipment
2.1.7 If an item is not attached to the structure, KTHFS is providing unless noted otherwise.
3. CONTRACTOR USE OF SITE AND PREMISES
3.1 Construction operations: Limited to areas noted on drawings.
3.1.1 Locate and conduct construction activities in ways that limit disturbance to site.
3.2 Arrange use of site and premises to allow:
3.2.1 Work by others
3.2.2 Work by KTHFS
3.3 Provide access to and from site as required by law and/or by KTHFS:
3.3.1 Do not obstruct roadways, sidewalks, or other public ways.
3.4 Utility outages and shutdown:
3.4.1 Prevent accidental disruption of utility services or other facilities.
4. WORK SEQUENCE
4.1 Coordinate construction schedule and operations with KTHFS Facilities/Security Director and KTHFS Health Project Manager.
RFP-KTHFS-2026-002 – ADDENDUM #2 – Beatty Health Center Project Page 4
ADDENDUM NO. 002
TO ALL PLAN HOLDERS:
This Addendum forms a part of the Contract Documents and modifies the original bidding documents released for bid preparation. Please notify everyone concerned as your sub-contractors and suppliers of the issuance and contents of this addendum prior to date of bid opening.
THE FINAL DATE RFP QUESTIONS WILL BE ACCEPTED IS THURSDAY, OCTOBER 1, 2026, AT 12:00 P.M.
QUESTIONS AND CLARIFICATIONS:
Q1: Clarification on quantity of wheel stops.
A1: There will only be 2 wheel stops required per the civil plans.
SPECIFICATIONS:
Reference: Description:
Section 01 10 00 Summary Addendum #2 (REPLACED) Section 10 28 00 Toilet, Bath and Custodial Accessories Addendum #2 (REPLACED)
DRAWINGS:
E101 Lighting Plan Added exit sign to exterior door Added exterior wall pack at exterior door
E201 Power Plan Added receptacle at exterior door
RFP-KTHFS-2026-002 – ADDENDUM #2 – Beatty Health Center Project Page 5
TOILET, BATH, AND CUSTODIAL ACCESSORIES
1. PART 1 – GENERAL
1.1. Section includes:
1.1.1. Commercial toilet accessories
1.1.1.1. Contractor provided, contractor installed
1.1.1.2. KTHFS provided, supplier installed
1.1.1.2.1. Contractor – Provide backing in walls and required to install accessories
1.1.2. Under-lavatory pipe supply covers
1.1.3. Accessories for toilet rooms, showers, and utility rooms
1.1.4. Diaper changing stations
1.1.5. Utility room accessories
1.2. Related requirements
1.2.1. Section 06 1000 - Rough Carpentry: Concealed supports for accessories, including in-wall framing and plates.
1.2.2. Section 102113.19 - Plastic Toilet Compartments.
1.2.3. Section 224000 - Plumbing Fixtures: Under-lavatory pipe and supply covers.
1.3. Reference standards
1.3.1. ADA Standards - 2010 ADA Standards for Accessible Design; 2010.
1.3.2. ASTM A269/A269M - Standard Specification for Seamless and Welded Austenitic
Stainless-Steel Tubing for General Service; 2025.
1.3.3. ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or
Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process; 2025a.
1.3.4. ASTM A666/A666M - Standard Specification for Annealed or Cold-Worked Austenitic
Stainless-Steel Sheet, Strip, Plate, and Flat Bar; 2024.
1.3.5. ASTM B456 - Standard Specification for Electrodeposited Coatings of Copper Plus Nickel
Plus Chromium and Nickel Plus Chromium; 2017 (Reapproved 2022).
1.3.6. ASTM C1036 - Standard Specification for Flat Glass; 2025.
1.3.7. ASTM C1048 - Standard Specification for Heat-Strengthened and Fully Tempered Flat
Glass; 2025.
1.3.8. ASTM C1503 - Standard Specification for Silvered Flat Glass Mirror; 2024.
1.3.9. ASTM F2285 - Standard Consumer Safety Performance Specification for Diaper Changing
Tables for Commercial Use; 2022.
1.4. Administrative requirements
1.4.1. Coordinate the work with the placement of internal wall reinforcement, concealed ceiling supports, and reinforcement of toilet partitions to receive anchor attachments.
1.5. Submittals
1.5.1. See RFP-KTHFS-2026-002—Beatty Health Center RFP Packet, for submittal procedures
1.5.2. Product Data: Submit data on accessories describing size, finish, details of function, and attachment methods.
1.5.3. Samples: Submit one sample of each accessory, illustrating color and finish.
1.5.4. Manufacturers’ Installation Instructions: Indicate special procedures and conditions requiring special attention.
2. PART 2 – PRODUCTS
2.1. Manufacturers
2.1.1. Basis of Design: Bobrick.
2.1.2. Basis of Design: Kimberly Clark- Owner supplier provided accessories.
2.1.3. Commercial Toilet, Shower, and Bath Accessories:
2.1.3.1. ASI - American Specialties, Inc: www.americanspecialties.com.
RFP-KTHFS-2026-002 – ADDENDUM #2 – Beatty Health Center Project Page 6
2.1.3.2. Bradley Corporation: www.bradleycorp.com.
2.1.4. Contractor Furnished / Contractor Installed Accessories:
2.1.4.1. Grab Bars
2.1.4.2. Mirrors
2.1.4.3. Towel Bars
2.1.4.4. Shower curtain Bar
2.1.4.5. Baby Changers
2.1.4.6. Hooks
2.1.4.7. Recessed Wastebasket
2.1.4.8. Provide products of each category type by single manufacturer.
2.1.5. KTHFS Furnished; Supplier Installed Accessories:
2.1.5.1. Toilet paper dispensers
2.1.5.2. Paper Towel Dispenser
2.1.5.3. Soap Dispensers
2.1.5.4. Toilet Seat Cover Dispensers
2.1.5.5. Feminine Hygiene Dispenser
2.2. Materials
2.2.1. Accessories – General: Shop assembled, free of dents and scratches and packaged complete with anchors and fittings, steel anchor plates, adapters, and anchor components for installation.
2.2.2. Keys: Provide three (3) keys for each accessory to Owner; master key lockable accessories.
2.2.3. Stainless Steel Sheet: ASTM A666/A666M, Type 304.
2.2.4. Stainless Steel Tubing: ASTM A269/A269M, Grade TP304 or TP316.
2.2.5. Galvanized Sheet Steel: Hot-dipped galvanized steel sheet, ASTM A653/A653M, with
G90/Z275 coating.
2.2.6. Mirror Glass: Tempered safety glass, ASTM C1048; and ASTM C1036 Type I, Class 1, Quality Q2, with silvering as required.
2.2.7. Adhesive: Contact type, waterproof.
2.2.8. Fasteners, Screws, and Bolts: Hot dip galvanized; tamper-proof; security type.
2.3. Finishes
2.3.1. Stainless Steel: Satin finish, unless otherwise noted.
2.3.2. Chrome/Nickel Plating: ASTM B456, SC 2, polished finish, unless otherwise noted.
2.3.3. Shop Primed Ferrous Metals: Pretreat and clean, spray apply one coat primer and bake.
2.3.4. Back paint components where contact is made with building finishes to prevent electrolysis.
2.4. Commercial Toilet Accessories
2.4.1. Waste Receptacle: Recessed, stainless steel, seamless lower door for access to container, with tumbler lock, reinforced panel full height of door, continuously welded bottom pan and seamless exposed flanges.
2.4.1.1. Liner: Removable seamless stainless-steel receptacle.
2.4.1.2. Minimum capacity: 12 gallons (45 liters).
2.4.1.3. Contractor provided, contractor installed.
2.4.1.4. Products:
2.4.1.4.1. Bobrink #B-3644
2.4.2. Mirrors: Stainless steel framed, 1/4 inch (6 mm) thick annealed float glass; ASTM C1036.
2.4.2.1. Tempered safety glass: Silvering, protective and physical characteristics in compliance with ASTM C1503.
2.4.2.2. Size: As indicated on drawings.
RFP-KTHFS-2026-002 – ADDENDUM #2 – Beatty Health Center Project Page 7
2.4.2.3. Frame: 0.05-inch (1.3 mm) channel shapes, with mitered and welded and ground corners, and tamperproof hanging system; No. 4 finish.
2.4.2.4. Backing: Full mirror sized, minimum 0.03 inch (0.8 mm) galvanized steel sheet and nonabsorptive filler material.
2.4.2.5. Shelf: Stainless steel gauge and finish to match mirror frame, turned down edges, welded to frame; 5 inches (125 mm) deep, full width of mirror.
2.4.2.6. Product: B-165 manufactured by Bobrick.
2.4.2.7. Contractor provided, contractor installed.
2.4.3. Grab Bars: Stainless steel, smooth surface.
2.4.3.1. Standard Duty Grab Bars
2.4.3.1.1. Push and Pull Point Load Minimum 250 lb. (1112N).
2.4.3.1.2. Dimensions: 1-1/2 inch (38 mm) outside diameter, minimum 18-gauge,
0.05 inch (1.02 mm) steel thickness, exposed flange mounting, 1-1/2 inch (38 mm) clearance between wall and inside of grab bar.
2.4.3.1.3. Finish: Satin
2.4.3.1.4. Length and Configuration: As indicated on drawings.
2.4.3.1.5. Contractor provided, contractor installed.
2.4.3.1.6. Products: B-5806 Series Grab Bar by Bobrick.
2.4.4. Sanitary Napkin Disposal Unit: Stainless steel surface-mounted, self-closing door, locking bottom panel with full length stainless steel piano-type hinge, removable receptacle.
2.4.4.1. Product: B-254 manufactured by Bobrick.
2.4.4.2. Provide one in each restroom stall.
2.4.4.3. Contractor provided, contractor installed.
2.5. Shower Accessories
2.5.1. Shower Curtain Rod: Stainless steel tube, 1 inch (25 mm) outside diameter, 0.04 inch
(1.0 mm) wall thickness, satin finished, with 3 inch (75 mm) outside diameter, minimum
0.04 inch (1.0 mm) thick satin-finished stainless steel flanges, for installation with exposed fasteners.
2.5.1.1. Product: B-6107 x 36 manufactured by Bobrick.
2.5.1.2. Contractor provided, contractor installed.
2.5.2. Shower Curtain: Material – Manufacturer standard, machine washable, stain and mildew-resistant, with mesh band at ceiling, NFPA 701 Compliant.
2.5.2.1. Size: No less than 10% wider than track length.
2.5.2.1.1. Finish bottom hem no less than 10 inches above the floor length.
2.5.2.2. Grommets: Stainless steel; pierced through top hem on 6 inch (150 mm) centers.
2.5.2.3. Color: As selected from manufacturer’s standard colors.
2.5.2.4. Shower Curtain Hoods: Chrome-plated or stainless steel spring wire designed for snap closure.
2.5.2.5. Contractor provided, contractor installed.
2.5.3. Folding Shower Seat: Wall-mounted surface; welded tubular seat frame, structural support members, swing-down legs, hinges, and mechanical fasteners of Type 304 stainless steel, L-shaped right-hand seat.
2.5.3.1. Seat: Phenolic or polymeric composite one-piece seat or seat slats, of white color.
2.5.3.2. Size: ADA Standards compliant.
2.5.3.3. Basis of Desing Product: B-918116 manufactured by Bobrick.
2.5.3.4. Contractor provided, contractor installed.
2.5.4. Towel Bar: Stainless steel, 1 inch (2.5 mm) round tubular bar; brackets, concealed attachment, satin finish.
RFP-KTHFS-2026-002 – ADDENDUM #2 – Beatty Health Center Project Page 8
2.5.4.1. Length: 24 inches (610 mm).
2.5.4.2. Provide one per shower room
2.5.4.3. Products: B-530 Series by Bobrick
2.5.4.4. Contractor provided, contractor installed.
2.5.5. Robe Hook: Heavy-duty stainless steel, single-prong, rectangular-shaped bracket and backplate for concealed attachment, satin finish.
2.5.5.1. Product: B-671 manufactured by Bobrick.
2.5.5.2. Provide two (2) per shower room.
2.5.5.3. Contractor provided, contractor installed.
2.6. Under-Lavatory Pipe and Supply Covers
2.6.1. Specified in 224000 - Plumbing Fixtures.
2.7. Diaper Changing Stations
2.7.1. Diaper Changing Station: Wall-mounted folding diaper changing station for use in commercial toilet facilities, meeting or exceeding ASTM F2285.
2.7.1.1. Material: Stainless steel.
2.7.1.2. Mounting: Recessed.
2.7.1.3. Interior Color: Gray.
2.7.1.4. Minimum Rated Load: 50 pounds (22.6 kg).
2.7.1.5. Products: Bobrick, Koala Kare: KB310-SSWM
2.7.1.6. Contractor provided, contractor installed.
2.8. Utility Room Accessories
2.8.1. Mop and Broom Holder: 0.05 inch (1.3 mm) thick stainless steel, Type 304, hat-shaped channel.
2.8.1.1. Holders: Three spring-loaded rubber cam holders.
2.8.1.2. Length: 24 inches (609.6 mm) .
2.8.1.3. Product: B-233 x 24 manufactured by Bobrick.
2.8.1.4. Contractor provided, contractor installed.
3. PART 3 – EXECUTION
3.1. Examination
3.1.1. Verify existing conditions before starting work.
3.1.2. Verify exact location of accessories for installation.
3.1.3. Verify that field measurements are as indicated on drawings.
3.2. Preparation
3.2.1. Deliver inserts and rough-in frames to site for timely installation.
3.2.2. Provide templates and rough-in measurements as required.
3.3. Installation
3.3.1. Install accessories in accordance with manufacturers' instructions in locations indicated on drawings.
3.3.2. Install plumb and level, securely and rigidly anchored to substrate.
3.3.3. Mounting Heights: As required by accessibility regulations, unless otherwise indicated.
3.4. Protection
3.4.1. Protect installed accessories from damage due to subsequent construction operations.
V
V
V
V
V
V
V
V
V
V
V
V
V V
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
V
A
A
B
B
88 SF
VESTIBULE
782 SF
FITNESS
586 SF
CONFERENCE
69 SF
STORAGE
139 SF
MEDICAL
163 SF
DENTAL
110 SF
BEHAVIORAL
HEALTH OFFICE
105 SF
FLEX OFFICE
71 SF
STORAGE
68 SF
RESTROOM
67 SF
RESTROOM
97 SF
MECH / I.T.
42 SF
JANITOR
155 SF
BREAK ROOM
188 SF
STORAGE
109 SF
AUTOCLAVE
116 78 SF
RESTROOM
22 SF
STORAGE
91 SF
SHOWER ROOM
88 SF
LAB
239 SF
HALL
194 SF
HALL
RECEPTION
/ WAITING
3D
3D
V
V
V
3D
V
V
V
V
VD
VD
VD
VD
VD
D
3D
V
'X1'
'X1'
'X1'
'X1'
'X1'
A - 1
'RT1'
A - 1
'RT1'
A - 1
'RT1'
A - 1
'RT1'
A - 1
'RT1E'
A - 1
'RT1'
A - 1
'RT1'
A - 1
'RT1E'
A - 1
'RT1'
A - 1
'RT1E'
A - 1
'RT1'A - 1
'RT1'
A - 18
'RT1E'
A - 18
'RT1'
A - 18
'RT1'
A - 18
'RD4E'
A - 20
'RT1'
A - 20
'RT1'
A - 18
'RT1'
A - 18
'RT1'
A - 18
'RT1E'
A - 18
'RT1E'
A - 20
'RT1'
A - 20
'RT1'
A - 20
'RT1'
A - 20
'RT1'
A - 20
'RD4E'
A - 1
'RT1E'
A - 1
'RD4E'
A - 18
'RT1E'
A - 18
'RT1'
A - 18
'RT1E'
A - 1
'RD4E'
A - 1
'RD4E'
A - 1 'S1'
'X1'
A - 1
'RT1E'
A - 1
'RT1'
A - 1
'RT1'
A - 1
'RT1'
A - 1
'RT1'
A - 1
'RT1'
A - 1
'RT1'
A - 1
'RT1'
A - 1
'RT1E'
A - 1
'RT1'
A - 1
'RT1E'
A - 20
'RT1'
A - 20
'RT1'
A - 20
'RT1'
A - 20
'RT1'
A - 20
'RT1'
A - 20
'RT1'
A - 20
'RT1'
A - 20
'RT1'
A - 20
'RT1'
A - 20
'RT1'
A - 1
'RD4'
A - 1 'S1'
A - 18
'RT1'
A - 34
'WP1E'
A - 36
'WP1E'
A - 38
'WP1E'
A - 32
'WP1E'
A - 36
'WP1'
A - 36
'WP1'
A - 36
'WP1'
V
'X1'
A - 32
'WP1E' 1 1
1345 NW WALL, SUITE 101
BEND, OREGON 97701
(541) 318-0404 cea@cea-engineering.com
COPYRIGHT 2026
STEELE ASSOCIATES
ARCHITECTS
All rights reserved. Reproduction or use in any form or by any means- graphic, electronic, mechanical, etc.- without written permission of STEELE ASSOCIATES ARCHITECTS is unlawful and subject to criminal prosecution.
S T
E E
L E
A S
S O
C
IA
T E
S A
R C
H
IT
E C
T S
L L
C
N
W P
O T
T S
C T
S
U
IT
E
B E
N D
O
R
JOB NO.
DATE
DRAWN BY CHECKED BY
SHEET NO.
5 4 3 2 1
5 4 3 2 1
A
B
C
D
A
B
C
D
/2
/2
:5
:0
A
M
E101
CEACEA
26109.01
P E
R M
IT
S
E T
L E
V E
L
L
IG
H T
IN
G
P L A
N
LEVEL 1 LIGHTING PLAN
09/04/2026
K L A
M A
T H
T R
IB
A
L H
E A
L T
H
B E
A T
T Y
1/4" = 1'-0"
1 LEVEL 1 - LIGHTING PLAN
SCALE : 1/4" = 1'-0"
0' 2' 4' 8' 12'1'
LIGHTING GENERAL NOTES:
A. UNLESS OTHERWISE NOTED, 120V, 20A/1P BREAKERS SHALL
UTILIZE #12 AWG CONDUCTORS. EXCEPTION: WHERE
BRANCH CIRCUIT IS IN EXCESS OF 125 LINEAR FEET,
CONDUCTORS SHALL BE #10 AWG. EQUIPMENT GROUNDING
CONDUCTOR SHALL MATCH PHASE CONDUCTOR FOR
20A/1P CIRCUITS.
B. COORDINATE EXACT LOCATIONS OF LIGHTING FIXTURES IN
MECHANICAL ROOMS WITH MECHANICAL DUCTWORK AND
EQUIPMENT PRIOR TO ROUGH-IN.
C. MAINTAIN A MINIMUM SEPARATION OF 24" BETWEEN
CENTERLINE OF ALL LIGHT SWITCHES SET INTO OPPOSITE
SIDES OF ALL SOUND ISOLATION WALLS. WHERE ABOVE
NOTED CONDITION OCCURS AND REQUIRES A CONDUIT
CONNECTION BETWEEN BOXES, UTILIZE FLEXIBLE TYPE
CONDUIT.
D. MULTIWIRE BRANCH CIRCUITS SHALL BE INSTALLED PER
ARTICLE 210.4 OF THE NEC. EACH MULTIWIRE CIRCUIT
SHALL BE PROVIDED WITH A MEANS THAT WILL
SIMULTANEOUSLY DISCONNECT ALL UNGROUNDED
CONDUCTORS AT THE POINT WHERE THE BRANCH CIRCUIT
ORIGINATES.
E. REFER TO ARCHITECTURAL INTERIOR ELEVATIONS
DRAWINGS FOR EXACT LOCATION AND ORIENTATION OF
SWITCHES.
F. CIRCUIT ALL EXIT SIGNS AND EMERGENCY BALLAST AHEAD
OF SWITCHING.
KEYED NOTES:
1. ROUTE EXTERIOR LIGHTING CIRCUIT THRU 30A LIGHTING
CONTACTOR LC1 WITH PHOTOCELL AND TIMECLOCK.
PHOTOCELL ON/TIMECLOCK OFF.
REV. DATE DESCRIPTION
1 09/25/2026 Bidding Addendum #2
RFP-KTHFS-2026-002 – ADDENDUM #2 – Beatty Health Center Project Page 9
J
J
J
J
J
J
J
J
J
S M
C
J
S M
C
A
A
B
B
88 SF
VESTIBULE
782 SF
FITNESS
586 SF
CONFERENCE
69 SF
STORAGE
139 SF
MEDICAL
163 SF
DENTAL
110 SF
BEHAVIORAL
HEALTH OFFICE
105 SF
FLEX OFFICE
71 SF
STORAGE
68 SF
RESTROOM
67 SF
RESTROOM
97 SF
MECH / I.T.
42 SF
JANITOR
155 SF
BREAK ROOM
188 SF
STORAGE
109 SF
AUTOCLAVE
116 78 SF
RESTROOM
22 SF
STORAGE
91 SF
SHOWER ROOM
88 SF
LAB
239 SF
HALL
194 SF
HALL
RECEPTION
/ WAITING
GFI/WP
A - 3
GFI/WP
A - 3
GFI
A - 6
GFI
A - 6
GFI
A - 12
GFI
A - 10
DW
A - 17
GFI
A - 14
REF
A - 15
GFI/WP
A - 3
GFI/WP
A - 3
A - 6
A - 6
GFI
A - 6
A - 7
A - 7
A - 7
A - 7
A - 5
A - 5
A - 5
A - 5
A - 5 A - 5
A - 2
A - 6
A - 2
A - 2
A - 2
A - 2
A - 2
A - 12
A - 12
A - 9
A - 9
A - 9
A - 9
A - 9
A
GFI
A - 8
A - 8 A - 8
A - 8 A - 10
A - 10 A - 10
A - 10
A - 23
A - 23
A
A
A
A
A
ATS
C.T. CABINET AND METER
A - 37,39
EWH-1
30A/3P A - 52,54,56
WH-1
CP-1
A - 41
EWC/GFI
A - 44
FITNESS
EQUIPMENT
A - 40
FITNESS
EQUIPMENT
A - 42
30A/2P A - 43,45
30A/2P A - 47,49
A - 7
A - 8
GFI
A - 23
A - 23 A - 23
A - 23
FREEZER
A - 11
REF
A - 19
GFI
A - 4
DISPOSAL
A - 13
GFI
A - 12
GFI
A - 12
A - 12
A - 51,53
A - 48
A - 50
A - 55
LC1
A - 21
A - 21
A - 61,63
#1
#2
GENERATOR
GENERATOR CONTROL PANEL
A - 74,76
GFI/WP
A - 3
1345 NW WALL, SUITE 101
BEND, OREGON 97701
(541) 318-0404 cea@cea-engineering.com
COPYRIGHT 2026
STEELE ASSOCIATES
ARCHITECTS
All rights reserved. Reproduction or use in any form or by any means- graphic, electronic, mechanical, etc.- without written permission of STEELE ASSOCIATES ARCHITECTS is unlawful and subject to criminal prosecution.
S T
E E
L E
A S
S O
C
IA
T E
S A
R C
H
IT
E C
T S
L L
C
N
W P
O T
T S
C T
S
U
IT
E
B E
N D
O
R
JOB NO.
DATE
DRAWN BY CHECKED BY
SHEET NO.
5 4 3 2 1
5 4 3 2 1
A
B
C
D
A
B
C
D
/2
/2
:5
:0
A
M
E201
CEACEA
26109.01
P E
R M
IT
S
E T
L E
V E
L
P O
W E
R P
L A
N
LEVEL 1 POWER PLAN
09/04/2026
K L A
M A
T H
T R
IB
A
L H
E A
L T
H
B E
A T
T Y
SCALE : 1/4" = 1'-0"
0' 2' 4' 8' 12'1'
1/4" = 1'-0"
1 LEVEL 1 - POWER PLAN
POWER GENERAL NOTES:
A. UNLESS OTHERWISE NOTED, 120V, 20A/1P BREAKERS SHALL UTILIZE #12
AWG CONDUCTORS. EXCEPTION: WHERE BRANCH CIRCUIT IS IN EXCESS
OF 125 LINEAR FEET, CONDUCTORS SHALL BE #10 AWG. EQUIPMENT
GROUNDING CONDUCTOR SHALL MATCH PHASE CONDUCTOR FOR
20A/1P CIRCUITS.
B. BRANCH CIRCUIT CONDUCTORS SIZED TO PREVENT VOLTAGE DROP
MAY BE REDUCED IN SIZE AS LOAD SUPPLIED BY REMAINING CIRCUIT
DECREASES. VOLTAGE DROP SHALL NOT EXCEED THREE PERCENT AT
THE FARTHEST BRANCH CIRCUITS.
C. MULTIWIRE BRANCH CIRCUITS SHALL BE INSTALLED PER ARTICLE 210.4
OF THE NEC. EACH MULTIWIRE CIRCUIT SHALL BE PROVIDED WITH A
MEANS THAT WILL SIMULTANEOUSLY DISCONNECT ALL UNGROUNDED
CONDUCTORS AT THE POINT WHERE THE BRANCH CIRCUIT ORIGINATES.
I.E. BREAKER HANDLE-TIE.
D. MAINTAIN A MINIMUM SEPARATION OF 12" BETWEEN CENTERLINE OF ALL
RECEPTACLES SET INTO OPPOSITE SIDES OF ALL SOUND ISOLATION
WALLS. WHERE ABOVE NOTED CONDITION OCCURS AND REQUIRES A
CONDUIT CONNECTION BETWEEN BOXES, UTILIZE FLEXIBLE TYPE
CONDUIT.
E. DEVICES INDICATED ON THIS DRAWINGS ARE DIAGRAMMATICAL ONLY.
CONTRACTOR SHALL REFER TO ARCHITECTURAL ELEVATIONS FOR
LOCATIONS OF OUTLETS, DEVICES, ETC. PRIOR TO ROUGH-IN.
F. REFERENCE MECHANICAL DRAWINGS FOR EXACT LOCATIONS AND
QUANTITIES OF DUCT SMOKE DETECTORS, FIRE/SMOKE DAMPERS AND
SMOKE CONTROL DAMPERS.
KEYED NOTES:
1. TIE EXHAUST FAN INTO LIGHTING CIRCUIT. FAN SHALL BE SWITCHED WITH
LIGHT FIXTURES.
2. PROVIDE ELECTRICAL CONNECTION TO DENTAL CHAIR AND LIGHT IN
ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS.
COORDINATE EXACT LOCATION AND REQUIREMENTS PRIOR TO ROUGH-
IN.
3. LOCATE RECEPTACLE TO BEST SERVE MONITOR.
4. PROVIDE POWER TO SECURITY SYSTEM MAIN CONTROL PANEL IN
ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS.
COORDINATE LOCATION PRIOR TO ROUGH-IN.
5. PROVIDE ELECTRICAL CONNECTION TO PROJECTOR AND PROJECTOR
SCREEN IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION
INSTRUCTIONS. COORDINATE EXACT LOCATION AND REQUIREMENTS
PRIOR TO ROUGH-IN.
6. SPACE FOR FUTURE PV SOLAR EQUIPMENT.
REV. DATE DESCRIPTION
1 09/25/2026 Bidding Addendum #2
RFP-KTHFS-2026-002 – ADDENDUM #2 – Beatty Health Center Project Page 10