Exhibit F_CDRL A006_Technical Report - Study and Services-Process Plan_2016CT315_02Dec19.pdf

PDF 5 KB Posted

Attached to
Solicitation for the Overhaul of the Rotor, Turbine Aircraft
Solicitation number
W58RGZ-20-R-0074
Issued by

About this file

This solicitation requests offers for the overhaul of the Rotor, Turbine Aircraft. The contractor shall provide all labor, facilities, parts, materials and equipment to overhaul a minimum of 5 and maximum of 414 rotor turbine aircraft assets per year over the five year IDIQ contract period. The required delivery term is FOB origin. The rotor turbine aircraft is designated a critical safety item, so overhaul can only be performed by an approved source in accordance with DFARS 209.270-3. Currently the only approved source is GE Engine Services. Offers must be submitted in accordance with FAR 52.215-1 by the closing date of the solicitation, which is an estimated date that may be adjusted depending on the solicitation release date. Award will be withheld pending receipt of sufficient funds.

The related Contract Data Requirements List requires the contractor to submit a technical report on its study and services process plan for overhauling the rotor turbine aircraft. Revisions to the process plan must be submitted within 30 days when a critical characteristic is affected. Distribution of the technical report is limited to U.S. government agencies, and documentation shall be provided electronically in PDF format on CD-ROM.

View the file

Other files

File Type Posted
Attachment 0011_MEO_B3301.pdf PDF
Attachment 0019_MEO_P7029.pdf PDF
Attachment 0014_MEO_B3413.pdf PDF
Attachment 0007_DD Form 1348-1A Template.pdf PDF
Exhibit E_CDRL A005_CDM Production Report_2016CT315_02Dec19.pdf PDF
Exhibit B_CDRL A002_Report of Shipping and Packaging Discrepancy_2016CT315_02Dec19.pdf PDF
Attachment 0013_MEO_B3390A.pdf PDF
Exhibit A_CDRL A001_TAMMS-A_2016CT315_02Dec19.pdf PDF
Attachment 0005_M and O Plan Guidance.pdf PDF
Attachment 0002_Document Summary List_2016CT315_02Dec19.pdf PDF
Attachment 0012_MEO_B3315.pdf PDF
Attachment 0016_MEO_P7003.pdf PDF
Attachment 0018_MEO_P7028.pdf PDF
Attachment 0017_MEO_P7009.pdf PDF
W58RGZ20R0074_15Jul20.pdf PDF
Attachment 0008_HQAMC-Level Protest Procedures.pdf PDF
Attachment 0009_M and O Critical Characteristics.pdf PDF
Attachment 0010_MEO_B3182.pdf PDF
Exhibit D_CDRL A004_Technical Report - Study and Services-DD Form 1348-1_2016CT315_02Dec19.pdf PDF
Exhibit C_CDRL A003_Quality Deficiency Report_2016CT315_02Dec19.pdf PDF
Attachment 0021_ROD Guidance.pdf PDF
Attachment 0004_Depot Maintenance Production Report Template.xlsx XLSX spreadsheet
Attachment 0001_M and O Packaging Requirements_2016CT315_02Dec19.pdf PDF
Attachment 0020_MEO_P7081.pdf PDF
Attachment 0003_SF 364 (ROD Template).pdf PDF
Attachment 0006 - Form 1379.pdf PDF
Attachment 0015_MEO_B3414.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

12/02/2019Page 1 of 2

2840-01-5153538

ROTOR, TURBINE, AIRCRAFT

D. SYSTEM / ITEM

A006

1. DATA ITEM NO.

WESSON, JEREMIAH

G. PREPARED BY

11/15/2016

H. DATE

WESSON, JEREMIAH

I. APPROVED BY

11/15/2016

J. DATE

MAYHALL, CONNIE

LOG #

CONCUR:

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

DATE: 12/07/2016

4. AUTHORITY (DATA ACQUISITION DOC NO) 5. CONTRACT REFERENCE

2. TITLE OF DATA ITEM

6. REQUIRING OFFICE

3. SUBTITLE

F. CONTRACTORE. CONTRACTOR / PR NO.

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

8. APP CODE

b. COPIES

DRAFT FINAL

REG REPRO

a. ADDRESSEE 11. AS OF DATE 13. DATE OF SUBEQUENT

SUBMISSION

15. TOTAL

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

RDMR-SEU

NSN:

PRID: PART NUMBER:2016CT315 3048T90G01 STATUS: R

AMSRD-AMR-SE-TD-ST/DM

Technical Report - Study/Services Process Plan

DI-MISC-80508B SOW, PARA T RDMR-SEU

LT

A

B SEE BLK 16

N/A

30DAC

SEE BLK 16

0 1 0

0 1 0

16. REMARKS:

BLOCKS 8, 10 & 13: When the contractor makes a change to the plan (as frozen at the time the PVA is approved by the Government or, when a PVA is not required, prior to induction of the first overhaul, repair, upgrade, modification or recapitalization asset) that affects a critical characteristic, submit copy of the revised plan to the Government, for review and comments, within 30 days after the date of the change. As required, revise the plan based on the Government's review and comments and resubmit to the government within 30 days of Government's comments.

BLOCK 9: Distribution Statement B: Distribution authorized to U.S. Government agencies only;

test and evaluation; date of determination: 7 July, 2005. Other requests for this documentation shall be referred to Department of the Army Combat Capabilities Development Command, Aviation and Missle Center, ATTN: FCDD-AME-U, Bldg. 5400, Fowler Rd, Redstone Arsenal, AL 35898-5000.

Export Control Act Warning - Not required

BLOCK 12: The first submission of the overhaul, repair, upgrade, modification, or recapitalization plan will be used by the Government for informational purposes only.

BLOCK 14: Documentation shall be provided electronically in adobe acrobat .pdf or compatible format on compact disk read only memory device (cd-rom).

DISTRIBUTION

a. Complete packages sent to: Department of the Army Combat Capabilities Development Command, Aviation and Missile Center, ATTN: FCDD-AME-U, Bldg. 5400 Fowler Rd, Redstone Arsenal, AL 35898-5000.

b. Letter of transmittal only sent to procurement Contracting Officer as specified in contract.

POC: PHONE:

12/02/2019Page 2 of 2