Attachment 0010_MEO_B3182.pdf

PDF 131 KB Posted

Attached to
Solicitation for the Overhaul of the Rotor, Turbine Aircraft
Solicitation number
W58RGZ-20-R-0074
Issued by

About this file

This document contains a Maintenance Engineering Order (MEO) and a related federal contract solicitation. The MEO provides interim guidance to clarify that heating and cooling instructions for parts installations should specify the use of an arbor press to avoid applying excessive force. The related solicitation seeks the overhaul of rotor, turbine aircraft. The contractor shall furnish all labor, facilities, parts, materials, equipment, tools and data necessary to overhaul a minimum of 5 to a maximum of 414 rotor, turbine aircraft assets per year over 5 years. The rotor, turbine aircraft is a critical safety item requiring overhaul by an approved source in accordance with DFARS 209.270-3. Currently the only known approved source is GE Engine Services, LLC doing business as GE. Proposals are due by the estimated closing date of August 15, 2020 and award will be withheld pending receipt of sufficient funds.

View the file

Other files

File Type Posted
Attachment 0011_MEO_B3301.pdf PDF
Exhibit F_CDRL A006_Technical Report - Study and Services-Process Plan_2016CT315_02Dec19.pdf PDF
Attachment 0019_MEO_P7029.pdf PDF
Attachment 0014_MEO_B3413.pdf PDF
Attachment 0007_DD Form 1348-1A Template.pdf PDF
Exhibit E_CDRL A005_CDM Production Report_2016CT315_02Dec19.pdf PDF
Exhibit B_CDRL A002_Report of Shipping and Packaging Discrepancy_2016CT315_02Dec19.pdf PDF
Attachment 0013_MEO_B3390A.pdf PDF
Exhibit A_CDRL A001_TAMMS-A_2016CT315_02Dec19.pdf PDF
Attachment 0005_M and O Plan Guidance.pdf PDF
Attachment 0002_Document Summary List_2016CT315_02Dec19.pdf PDF
Attachment 0012_MEO_B3315.pdf PDF
Attachment 0016_MEO_P7003.pdf PDF
Attachment 0018_MEO_P7028.pdf PDF
Attachment 0017_MEO_P7009.pdf PDF
W58RGZ20R0074_15Jul20.pdf PDF
Attachment 0008_HQAMC-Level Protest Procedures.pdf PDF
Attachment 0009_M and O Critical Characteristics.pdf PDF
Exhibit D_CDRL A004_Technical Report - Study and Services-DD Form 1348-1_2016CT315_02Dec19.pdf PDF
Exhibit C_CDRL A003_Quality Deficiency Report_2016CT315_02Dec19.pdf PDF
Attachment 0021_ROD Guidance.pdf PDF
Attachment 0004_Depot Maintenance Production Report Template.xlsx XLSX spreadsheet
Attachment 0001_M and O Packaging Requirements_2016CT315_02Dec19.pdf PDF
Attachment 0020_MEO_P7081.pdf PDF
Attachment 0003_SF 364 (ROD Template).pdf PDF
Attachment 0006 - Form 1379.pdf PDF
Attachment 0015_MEO_B3414.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTENANCE ENGINEERING ORDER

(AMCOM Reg. 750-2)

MEO NO.

DATE PAGE 1 of

TITLE Tolerances Unless otherwise noted, dimensions are in inches and tolerances are:

Fractional ………………… ± 1/32 Decimal ………………... ± 0.010 Angular ………………… ± ½°

APPLICABILITY CSI Critical Characteristic Affected?

Impact Statement Attached?

REFERENCES FOR RDECOM USE ONLY

DOCUMENT(S) AFFECTED

PURPOSE OR PROBLEM

PROJECT ENGINEER ENGINEERING REVIEW ENGINEERING RELEASE

MED FORM 5-DEC-09 1401-R-E

AR 70-62 •11 May 2016 B 3182

Apr 27, 2018 1

Heating and Cooling General Practices for Parts Installations (T700, T401, T401C, T701C, T701D)

Technical

INTERIM USE OF THIS MEO IS AUTHORIZED

UNTIL AFFECTED DOCUMENT IS UPDATED.

MEO CHANGE TYPE

4) Normal - Can be implemented with normal priorityPRIORITY IMPLEMENTATION CATEGORY

T700 DAX

DMWR 1-2840-248-1 Dated 30 Sept 2014 TTS 184158, MEC-B336926

DOCUMENT CHANGE IS REQUIRED Verification: Hands-On Table-Top None

Clarify general heating and cooling guidance. Heating and cooling instructions are mandatory when there is specified the use of an arbor press. There is a concern that unmeasured force applied by arbor press could be excessive and cause damage to parts.

BONHAM.ROBI

N.L.1229254100

Digitally signed by

BONHAM.ROBIN.L.12292541

Date: 2018.04.10 11:30:44 -05'00'

MCCORD.MATT

HEW.KIRKLAND.

1275198800

Digitally signed by

MCCORD.MATTHEW.KIRKLA

ND.1275198800

Date: 2018.04.10 11:57:40 -05'00'

Matthew McCord

HORN.REINHOL

D.J.1087783495

Digitally signed by

HORN.REINHOLD.J.1087783

Date: 2018.04.11 14:05:22 -05'00'

Robin L Bonham Reinhold Horn PUBLICATION CHANGE REQUEST: REQUEST THAT THE FOLLOWING DATA BE INCLUDED IN THE NEXT

CHANGE OR REVISION TO THE PUBLICATION IDENTIFIED ABOVE.

WP NO. PAGE

NO.

PARA-

GRAPH

FIGURE/

TABLE

NO.

CHANGES

(EXACT WORDING OF CHANGES MUST BE GIVEN)

3-411

3-21.ad.

(2)

REVISE step as follows:

"(2) Repair part is able to be installed easily (without excessive force or the use of an arbor press)."

Distribution Statement D:- Distribution authorized to Department of Defense and U.S. DoD contractors only to protect critical technology effective as of 26 June 2014. Other requests for this document must be referred to U.S. Army Aviation and Missile Research, Development and Engineering Center, ATTN: RDMR -AEM , Corpus Christi, TX 78419-5211

MED FORM 13 JAN 2017

File details come from the government source that posted it. Updated .