Attachment 0005_M and O Plan Guidance.pdf

PDF 1 MB Posted

Attached to
Solicitation for the Overhaul of the Rotor, Turbine Aircraft
Solicitation number
W58RGZ-20-R-0074
Issued by

About this file

This solicitation requests proposals for the overhaul of Rotor, Turbine Aircraft. The Army Materiel Command Contracting Command is seeking a contractor to furnish all labor, facilities, parts, materials, equipment, tools and data necessary to overhaul a minimum of 5 to a maximum of 414 Rotor, Turbine Aircraft per year over 5 years. The Rotor, Turbine Aircraft is a Critical Safety Item and overhaul can only be performed by an approved source in accordance with DFARS 209.270-3, which requires aviation critical item contracts be awarded only to a design control activity approved source. Currently, the only known approved source is GE Engine Services, LLC doing business as GE. Proposals are requested and must be submitted electronically by the estimated closing date. Award is contingent upon receipt of sufficient funding.

View the file

Other files

File Type Posted
Attachment 0011_MEO_B3301.pdf PDF
Exhibit F_CDRL A006_Technical Report - Study and Services-Process Plan_2016CT315_02Dec19.pdf PDF
Attachment 0019_MEO_P7029.pdf PDF
Attachment 0014_MEO_B3413.pdf PDF
Attachment 0007_DD Form 1348-1A Template.pdf PDF
Exhibit E_CDRL A005_CDM Production Report_2016CT315_02Dec19.pdf PDF
Exhibit B_CDRL A002_Report of Shipping and Packaging Discrepancy_2016CT315_02Dec19.pdf PDF
Attachment 0013_MEO_B3390A.pdf PDF
Exhibit A_CDRL A001_TAMMS-A_2016CT315_02Dec19.pdf PDF
Attachment 0002_Document Summary List_2016CT315_02Dec19.pdf PDF
Attachment 0012_MEO_B3315.pdf PDF
Attachment 0016_MEO_P7003.pdf PDF
Attachment 0018_MEO_P7028.pdf PDF
Attachment 0017_MEO_P7009.pdf PDF
W58RGZ20R0074_15Jul20.pdf PDF
Attachment 0008_HQAMC-Level Protest Procedures.pdf PDF
Attachment 0009_M and O Critical Characteristics.pdf PDF
Attachment 0010_MEO_B3182.pdf PDF
Exhibit D_CDRL A004_Technical Report - Study and Services-DD Form 1348-1_2016CT315_02Dec19.pdf PDF
Exhibit C_CDRL A003_Quality Deficiency Report_2016CT315_02Dec19.pdf PDF
Attachment 0021_ROD Guidance.pdf PDF
Attachment 0004_Depot Maintenance Production Report Template.xlsx XLSX spreadsheet
Attachment 0001_M and O Packaging Requirements_2016CT315_02Dec19.pdf PDF
Attachment 0020_MEO_P7081.pdf PDF
Attachment 0003_SF 364 (ROD Template).pdf PDF
Attachment 0006 - Form 1379.pdf PDF
Attachment 0015_MEO_B3414.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M&O PLAN DESCRIPTION AND GUIDANCE

During the review of a vendor’s M&O Plan, corrections and updates to deficient documentation will be requested as required. Any missing documentation will also be identified and requested. The vendor is responsible for providing all requested documentation in a timely manner.

The following data comprises an M&O Plan package and must be submitted for consideration:

A. Cover Letter: A cover letter stating that you wish to have your M and O plan approved for a particular Contract Number, part number, and NSN.

1) The Part Number (and dash number, if applicable), NSN, and nomenclature

2) Your firm's name, address, CAGE Code, telephone number, and FAX number

3) A identification of your quality program (i.e., MIL-I-45208, MIL-Q-9858, ISO-9000, etc.) to include copies of the quality program certifications (if applicable)

4) Quality Manual: A current copy of the company’s quality control manual must be submitted initially; subsequently, if any major changes occur, a current quality control manual should be resubmitted

5) List all applicable technical guidance utilized throughout the plan. Technical guidance includes:

Depot Maintenance Work Requirement (DMWR) and Maintenance Engineering Orders (MEO) or Best Commercial Practices (BCP).

6) FAA-certification showing the specific part number or commercial equivalent, if applicable.

B. Maintenance and Overhaul Plan: The M&O plan (i.e. “work instructions”, “shop traveler”, “router”) must describe to a level of detail necessary to demonstrate the vendor’s understanding of the proper sequence of processes and the controls necessary to maintain the integrity of the part for the processes performed by both the M&O source and its process providers.

1) The following items, at a minimum, are required to be identified on the first page of the M&O plan:

a. Companies name, address, Contractor and Government Entity (CAGE) code, plan revision number, and revision date.

b. All MEOs associated with the DMWR.

c. The applicable DMWR with Changes and Date.

d. All references used in conjunction with the DMWR other than those already identified in the

DMWR.

e. **Only Applicable if CSI** The front page and subsequent pages must also include this statement, “This is a Critical Safety Item”, and “All CCs are 100 percent inspected, the part is repaired and overhauled in accordance with QE-STD-2.”

W58RGZ-17-R-0106

Attachment 0005

2) The following items, at a minimum, must be included in the body of the M&O Plan:

a) Receiving Inspection.

b) Disassembly instructions.

c) Cleaning instructions.

d) Overhaul Inspection Requirements (OIP).

e) Repair and replacement instructions.

f) Modification instructions (if applicable).

g) Reassembly instructions.

h) Testing (if applicable).

i) Final Assembly instructions.

j) Packaging instructions

3) The following additional guidance is provided for manufacturing plan(s) submitted to obtain approval:

a) When outside process providers are used (i.e. Shotpeen, Magnetic Particle Inspection, cadmium plating, etc.), the process provider’s name, address, and CAGE code must be listed at each specific point in the M&O plan. The process provider’s detailed plan must be provided and incorporated into the primary source’s M&O plan. A receiving operation must also be incorporated to ensure the parts have been properly repaired/processed and all Certificates of Conformances (CoC) are complete. All CSI critical characteristics affecting an operation performed by an outside provider must be flowed down to the respective provider IAW AMCOM QE-STD-1/2.

b) When source controlled (includes CSIs) replacement parts are procured, those parts must be procured from sources that have been approved by the ARMY. For CSIs this ensures that AMCOM QE-STD-1 is being adhered to.

c) The M&O plan must describe the exact sequence in which the processes are performed.

d) **Only Applicable if CSI** Clear identification within the plan of all CCs so as to draw attention to them (any method is acceptable, i.e. <<C>>, **CC**, , etc.) and a statement requiring 100% inspection of all CCs prior to moving to subsequent operations.

C. Documents and Compliances also required for a plan:

1) Subcontractor/Vendor List: a list of approved subcontractors/vendors that will be used to perform M&O processes or parts procurement.

W58RGZ-17-R-0106

2) Part Sourcing: Plans to acquire replacement parts and/or obsolete parts.

3) Master Tooling Certification: A written statement certifying possession of or access to any required special tooling and inspection equipment, and/or special test equipment. If “equivalent” tooling will be utilized instead of the tooling specified in the DMWR , MEO or BCP, a complete technical description of the tooling is required, and must be sufficient to determine equivalency.

Specify availability of in house test equipment, whether it has to be purchased, locally manufactured, or Government furnished.

a. Locally manufactured tooling/test equipment will be required to have proper documentations on file, i.e. engineering drawings and assignment of part numbers.

b. Plans to purchase special tooling/test equipment that are not currently available in-house.

c. If no special tooling of inspection equipment is required state,”No special tooling or inspection equipment is required.”

W58RGZ-17-R-0106