Attachment 0001_M and O Packaging Requirements_2016CT315_02Dec19.pdf

PDF 3 KB Posted

Attached to
Solicitation for the Overhaul of the Rotor, Turbine Aircraft
Solicitation number
W58RGZ-20-R-0074
Issued by

About this file

This solicitation requests proposals for the overhaul of rotor, turbine aircraft. The contractor shall provide all labor, facilities, parts, materials, equipment, tools and data to overhaul a minimum of 5 and maximum of 414 rotor, turbine aircraft assets per year over a five year IDIQ contract period. The items are commercial and subject to FAR Part 12. Delivery is FOB origin. The rotor, turbine aircraft is a critical safety item and overhaul can only be performed by an approved source in accordance with DFARS 209.270-3, which is currently only GE Engine Services, LLC. Proposals are due by email to the specified government points of contact. The requirement is currently unfunded and any award will be withheld pending receipt of sufficient funds.

View the file

Other files

File Type Posted
Attachment 0011_MEO_B3301.pdf PDF
Exhibit F_CDRL A006_Technical Report - Study and Services-Process Plan_2016CT315_02Dec19.pdf PDF
Attachment 0019_MEO_P7029.pdf PDF
Attachment 0014_MEO_B3413.pdf PDF
Attachment 0007_DD Form 1348-1A Template.pdf PDF
Exhibit E_CDRL A005_CDM Production Report_2016CT315_02Dec19.pdf PDF
Exhibit B_CDRL A002_Report of Shipping and Packaging Discrepancy_2016CT315_02Dec19.pdf PDF
Attachment 0013_MEO_B3390A.pdf PDF
Exhibit A_CDRL A001_TAMMS-A_2016CT315_02Dec19.pdf PDF
Attachment 0005_M and O Plan Guidance.pdf PDF
Attachment 0002_Document Summary List_2016CT315_02Dec19.pdf PDF
Attachment 0012_MEO_B3315.pdf PDF
Attachment 0016_MEO_P7003.pdf PDF
Attachment 0018_MEO_P7028.pdf PDF
Attachment 0017_MEO_P7009.pdf PDF
W58RGZ20R0074_15Jul20.pdf PDF
Attachment 0008_HQAMC-Level Protest Procedures.pdf PDF
Attachment 0009_M and O Critical Characteristics.pdf PDF
Attachment 0010_MEO_B3182.pdf PDF
Exhibit D_CDRL A004_Technical Report - Study and Services-DD Form 1348-1_2016CT315_02Dec19.pdf PDF
Exhibit C_CDRL A003_Quality Deficiency Report_2016CT315_02Dec19.pdf PDF
Attachment 0021_ROD Guidance.pdf PDF
Attachment 0004_Depot Maintenance Production Report Template.xlsx XLSX spreadsheet
Attachment 0020_MEO_P7081.pdf PDF
Attachment 0003_SF 364 (ROD Template).pdf PDF
Attachment 0006 - Form 1379.pdf PDF
Attachment 0015_MEO_B3414.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M&O Packaging Requirements

12/02/2019

3048T90G01 ROTOR, TURBINE, AIRCRAFT

123.0 37.0 27.0 19.0

001 000X

X

X

RILEY, MARY ANN 09/30/2016

Part Number: Noun:

Packaging Specialist: Phone: Date:

Estimated Maximum Unit Package Weight (Pounds) and Size (inches)

Weight: Length: Width: Depth:

Intermediate Container Quantity:

4. MIL-STD-2073-1 Codes, Appendix, J:

44 1 00 GB

NA Z NZ 00

F 17 M

JI/A/MP

JV/CD

JIX/A/PK

JII/CD

JVI/CT

JX/SM

JIII/PM

JVII/UC

JVIIIA/OPI

JIV/WM

JVII/IC

X

Z=AS REQUIRED FOR SNUG FIT; NZ=8145-00-514-2798, 13414-102.

5. Supplemental Information

6. Reusable Container will be Government Furnished Material.

7. Reusable Container will be Contractor Furnished Material.

(256)876-0322

All Wood Packaging Material (WPM) must be ISPM-15 Compliant

Quantity Per Unit Pack:

MIL-STD-129 Markings Shall Apply.

Level of Preservation - Commercial / Level of Pack - Commercial in Accordance With ASTM-D-3951

Level of Preservation - Military / Level of Pack A in Accordance With:

2. Preservation Requirements and Packing Requirements Contained in MIL-STD-2073-1.

1. Preservation Requirements and Packing Requirements contained in Special Packaging Instructions (SPI) Number: Part Number:

3. Preservation Requirements and Packing Requirements Contained in

X

X

2840-01-515-3538 BNA Status: RWeapon System:PRID: 2016CT315NSN: -

File details come from the government source that posted it. Updated .