About this file

This document contains an exhibit for a federal solicitation requesting proposals for corrective tunnel work. The solicitation will be issued as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses to correct tunnel discrepancies at the Overton Brooks VA Medical Center in Shreveport, Louisiana. The tentative proposal due date is August 15, 2021 with an anticipated award date within 30 days thereafter. The performance period is 200 calendar days from the notice to proceed. The work includes all labor, materials, equipment, and expertise to perform the scope of work, drawings, and specifications. The NAICS code is 236220 for construction of commercial and institutional buildings with a small business size standard of $39.5 million. The construction cost range is between $500,000 to $1 million.

View the file

Other files for this federal contract opportunity

Other files attached to Z2NB-- Project 667-18-101 Correct Tunnel Discrepancies, newest first.
File Type Posted
AD103 ADD 1.pdf PDF
Correct Tunnel Discrepancies - RFI 02.docx DOCX document
36C25621R0158 0005.docx DOCX document
36C25621R0158 0004.docx DOCX document
Correct Tunnel Discrepancies RFIs.docx DOCX document
36C25621R0158 0003.docx DOCX document
667-18-101 - Tunnel Project - Sign In Sheet 08.10.2021.pdf PDF
36C25621R0158 0002.docx DOCX document
02 82 13_13 GLOVEBAG ASBESTOS ABATEMENT - Revised 08-11-2021.pdf PDF
02 82 11 TRADITIONAL ASBESTOS ABATEMENT - Revised 08-09-2021.pdf PDF
36C25621R0158 0001.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY SURVEY (1).docx DOCX document
15 - Class II Precautions - Correct Tunnel Discrepancies - Preliminary.docx DOCX document
Revised 7-22-21_667-18-101_Construction Documents_Specs.pdf PDF
21_M201R - REVISED 07.20.21.pdf PDF
EXHIBIT E SURETY FORM.docx DOCX document
General Decision Number LA20210031 Mod 2 dated June 18 2021.docx DOCX document
15 - ACM Survey - Correct Tunnel Discrepancies.pdf PDF
14 - ICRA - Correct Tunnel Discrepancies - Preliminary.docx DOCX document
12 - DRWGS - Correct Tunnel Discrepancies.pdf PDF
36C25621R0158_1.docx DOCX document
Exhibit B Past and Present Performance Questionnaire.docx DOCX document
07 - SOW Correct Tunnel Discrepancies - Rev 5-13-21.pdf PDF
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY v2.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

Source Selection Sensitive Information—See FAR 2.101 & 3.104 36C25621R0158 Correct Tunnel Discrepancies

EXHIBIT C – SUBCONTRACTOR INFORMATION AND CONSENT FORM

Subcontractor and/or Teaming Partner Consent for the Release of Past Performance Information to the Prime Contractor and Reference Information

Past performance information concerning subcontractors and teaming partners cannot be disclosed to a private party without the subcontractor’s or teaming partner’s consent. Because a prime contractor is a private party, the Government will need that consent before disclosing subcontractor/teaming partner past and present performance information to the prime during exchanges. In an effort to assist the Government in assessing your past performance relevancy we request that the following consent form be completed by the major subcontractors/teaming partners identified in your proposal. The completed consent forms should be submitted to the offering contractor for submission with past performance volume.

(NAME OF FIRM)

is currently planning on participating as a subcontractor and or a teaming partner with

(PRIME CONTRACTOR OR NAME OF ENTITY PROVIDING PROPOSAL)

in responding to the Request for Proposal No. 36C25621R0158 for Project 667-18-101, Correct Tunnel Discrepancies

We understand that the Government is placing increased emphasis on past performance in order to obtain best value in source selections. In order to facilitate the performance confidence assessment process we are signing this consent form to allow you to discuss our past and present performance information with the prime contractor during the source selection process.

(Signature)(Title of Individual with authority to sign for and
Legally bind the company)

Company Name: Telephone #

Address:

City/State/Zip Code: Date:

Reference List (required):

1.Contract No. And Title:
Describe role (Prime/Sub) and work Performed:
Reference POC NamePhone:Fax:
Email address:
2.Contract No. And Title:
Describe role (Prime/Sub) and work Performed:
Reference POC NamePhone:Fax:
Email address:
3.Contract No. And Title:
Describe role (Prime/Sub) and work Performed:
Reference POC NamePhone:Fax:
Email address:

File details come from the government source that posted it. Updated .