15 - Class II Precautions - Correct Tunnel Discrepancies - Preliminary.docx

DOCX document 20 KB Posted

Attached to
Z2NB-- Project 667-18-101 Correct Tunnel Discrepancies Federal contract opportunity
Solicitation number
36C25621R0158
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document outlines requirements for a federal construction contract opportunity with the Department of Veterans Affairs. The solicitation is for project number 667-18-101 to correct tunnel discrepancies at the Overton Brooks VA Medical Center in Shreveport, Louisiana. The procurement will be issued as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. Offerors must be verified in the Vendor Information Pages database and registered in the System for Award Management. The construction cost range is between $500,000 and $1,000,000. The performance period is 200 calendar days from notice to proceed. The solicitation number is 36C25621R0158 and will be posted on the SAM website, where any amendments will also be issued. Proposals are due on or around August 15, 2021.

View the file

Other files for this federal contract opportunity

Other files attached to Z2NB-- Project 667-18-101 Correct Tunnel Discrepancies, newest first.
File Type Posted
AD103 ADD 1.pdf PDF
Correct Tunnel Discrepancies - RFI 02.docx DOCX document
36C25621R0158 0005.docx DOCX document
36C25621R0158 0004.docx DOCX document
36C25621R0158 0003.docx DOCX document
Correct Tunnel Discrepancies RFIs.docx DOCX document
667-18-101 - Tunnel Project - Sign In Sheet 08.10.2021.pdf PDF
36C25621R0158 0002.docx DOCX document
02 82 13_13 GLOVEBAG ASBESTOS ABATEMENT - Revised 08-11-2021.pdf PDF
02 82 11 TRADITIONAL ASBESTOS ABATEMENT - Revised 08-09-2021.pdf PDF
36C25621R0158 0001.docx DOCX document
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY SURVEY (1).docx DOCX document
Exhibit B Past and Present Performance Questionnaire.docx DOCX document
07 - SOW Correct Tunnel Discrepancies - Rev 5-13-21.pdf PDF
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY v2.docx DOCX document
Revised 7-22-21_667-18-101_Construction Documents_Specs.pdf PDF
21_M201R - REVISED 07.20.21.pdf PDF
EXHIBIT E SURETY FORM.docx DOCX document
General Decision Number LA20210031 Mod 2 dated June 18 2021.docx DOCX document
15 - ACM Survey - Correct Tunnel Discrepancies.pdf PDF
14 - ICRA - Correct Tunnel Discrepancies - Preliminary.docx DOCX document
12 - DRWGS - Correct Tunnel Discrepancies.pdf PDF
36C25621R0158_1.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Overton Brooks VAMC Infection Control Precautions for Class II Projects

Based on the Infection Control Risk Assessment of this construction/remodel project, the following activities are required.

PROJECT: __Correct Tunnel Discrepancies 667-18-101 ______________

During Construction ProjectUpon Completion of Project
Class II
1. Provide active means to reduce airborne dust from dispersing into atmosphere.

2. Water mist work surfaces to control dust while cutting.

3. Seal unused doors with duct tape.

4. Block off and seal air vents if the HVAC system is removed or isolated.

5. Place dust mat at entrance and exit of work area

6. Remove or isolate HVAC system in areas where work is being performed if required to prevent contamination of adjacent areas.

1. Wipe work surfaces with cleaner/disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.

4. Upon completion, restore HVAC system where work was performed.

Maintain control measures until ALL Work is completed. Exceptions must be approved by Infection Prevention on a case by case basis.

File details come from the government source that posted it. Updated .