This document outlines requirements for a federal construction contract opportunity with the Department of Veterans Affairs. The solicitation is for project number 667-18-101 to correct tunnel discrepancies at the Overton Brooks VA Medical Center in Shreveport, Louisiana. The procurement will be issued as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. Offerors must be verified in the Vendor Information Pages database and registered in the System for Award Management. The construction cost range is between $500,000 and $1,000,000. The performance period is 200 calendar days from notice to proceed. The solicitation number is 36C25621R0158 and will be posted on the SAM website, where any amendments will also be issued. Proposals are due on or around August 15, 2021.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Overton Brooks VAMC Infection Control Precautions for Class II Projects
Based on the Infection Control Risk Assessment of this construction/remodel project, the following activities are required.
PROJECT: __Correct Tunnel Discrepancies 667-18-101 ______________
| During Construction Project | Upon Completion of Project | |
| Class II | ||
| 1. Provide active means to reduce airborne dust from dispersing into atmosphere. |
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents if the HVAC system is removed or isolated.
5. Place dust mat at entrance and exit of work area
6. Remove or isolate HVAC system in areas where work is being performed if required to prevent contamination of adjacent areas.
1. Wipe work surfaces with cleaner/disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
4. Upon completion, restore HVAC system where work was performed.
Maintain control measures until ALL Work is completed. Exceptions must be approved by Infection Prevention on a case by case basis.