21_M201R - REVISED 07.20.21.pdf

PDF 520 KB Posted

Attached to
Z2NB-- Project 667-18-101 Correct Tunnel Discrepancies Federal contract opportunity
Solicitation number
36C25621R0158
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document provides details for a federal contract opportunity to correct tunnel discrepancies at the Overton Brooks VA Medical Center in Shreveport, Louisiana. The solicitation will be issued as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses through request for proposal procedures. Interested offerors must be registered and verified in the Vendor Information Pages database and System for Award Management. The contract award amount ranges from $500,000 to $1,000,000 and performance period is 200 calendar days from notice to proceed. Offerors must acknowledge all amendments and check the website regularly as the request for proposal, with a tentative issue date of July 15th and proposal due date of August 15th, will provide additional details such as pre-bid questions cutoff and scheduled site visit for the work located at 510 E Stoner Avenue.

View the file

Other files for this federal contract opportunity

Other files attached to Z2NB-- Project 667-18-101 Correct Tunnel Discrepancies, newest first.
File Type Posted
AD103 ADD 1.pdf PDF
Correct Tunnel Discrepancies - RFI 02.docx DOCX document
36C25621R0158 0005.docx DOCX document
36C25621R0158 0004.docx DOCX document
36C25621R0158 0003.docx DOCX document
Correct Tunnel Discrepancies RFIs.docx DOCX document
667-18-101 - Tunnel Project - Sign In Sheet 08.10.2021.pdf PDF
36C25621R0158 0002.docx DOCX document
02 82 13_13 GLOVEBAG ASBESTOS ABATEMENT - Revised 08-11-2021.pdf PDF
02 82 11 TRADITIONAL ASBESTOS ABATEMENT - Revised 08-09-2021.pdf PDF
36C25621R0158 0001.docx DOCX document
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY SURVEY (1).docx DOCX document
Exhibit B Past and Present Performance Questionnaire.docx DOCX document
07 - SOW Correct Tunnel Discrepancies - Rev 5-13-21.pdf PDF
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY v2.docx DOCX document
15 - Class II Precautions - Correct Tunnel Discrepancies - Preliminary.docx DOCX document
Revised 7-22-21_667-18-101_Construction Documents_Specs.pdf PDF
EXHIBIT E SURETY FORM.docx DOCX document
General Decision Number LA20210031 Mod 2 dated June 18 2021.docx DOCX document
15 - ACM Survey - Correct Tunnel Discrepancies.pdf PDF
14 - ICRA - Correct Tunnel Discrepancies - Preliminary.docx DOCX document
12 - DRWGS - Correct Tunnel Discrepancies.pdf PDF
36C25621R0158_1.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2.1 3.1 4.1 5.1 6.1 7.11.1

1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0

8.1

F3

M601

C3

M600

F1

M600

D6

M601

C7

M603

2" XPCR

6" XHPS

UP TO

PLANT

UP TO

PLANT

UP TO PLANT

UP TO PLANT

2" XHPS10" XHPS

8" XPCR

12" XHPS

8" XDCW

8" XPCR

18" XCHS

4" XPCR

EXISTING SLIP EXPANSION JOINTS

ON CONDENSATE RETURN PIPING

R A

C K

R A

C K

R A

C K

R A

C K

R A

C K

R A

C K

R A

C K

R A

C K

R A

C K

9 R A

C K

R A

C K

R A

C K

R A

C K

R A

C K

R A

C K

R A

C K

EXISTING SLIP

EXPANSION JOINTS

ON STEAM PIPING

4" XPCR

/M

4 4

4 4 4

4 4 4

5 (TYP FOR ALL)

5 (TYP FOR ALL)

9 (TYP. 2)

(TYP. 2)

(TYP. 2)

(TYP. 2)

(TYP. 2) (TYP. 2) (TYP. 2)

(TYP. 2)

(TYP. 2)

(TYP. 2)

(TYP. 2)

(TYP. 2)

(TYP. 2)

8" XDCW

12" XHPS

5 (TYP FOR ALL)

18" XCHR

1 2 3 4 5 6 7 98 10

E

D

C

B

A

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

GULF COAST

VETERANS HEALTH

CARE SYSTEM

OVERTON BROOKS

VAMC

U.S. Department of Veterans Affairs

ARCHITECT OF RECORD:

A/E:

STAMP

MISSION CRITICAL

CONSTRUCTION DOCUMENTS

C U s e rs \K

T O

N -T

H A

T \D o c u m e n ts \R e v it

L o c a l C o p y \6

-1

-1

M E

P

M O

D E

L R

E V

IT

k to n -t h a t.

rv t

/2

/2

:1

:5

A

M

M201

MECHANICAL RENOVATION PLAN

JohnsonDanforth & Associates

2200 N. Rodney Parham Rd, Suite 210

Little Rock, AR 72212

501.404.4811

CORRECT TUNNEL

DISCREPANCIES

510 E. STONER AVENUE SHREVEPORT, LA 71101

667-18-101

B1 & B3

2019.02.22 BB MAB

1/8" = 1'-0"2

MECHANICAL TUNNEL FLOOR PLAN @ GARAGE - RENOVATION

GENERAL NOTES

1. THIS DRAWING DOCUMENT EXISTING FIELD CONDITIONS BASED

ON ORIGINAL DRAWINGS AND LIMITED FIELD OBSERVATIONS.

FIELD VERIFY EQUIPMENT LOCATIONS AND ARRANGEMENT

PRIOR TO CONSTRUCTION.

2. REFERENCE M000 FOR ABBREVIATION AND SYMBOL

INFORMATION.

3. REFERENCE M600 FOR FURTHER DEMOLITION AND RENOVATION

SCOPE INFORMATION.

4. MISCELLANEOUS PIPING TO BE SUPPORTED DURING

CONSTRUCTION.

5. ONE STEAM LINE SHALL REMAIN ACTIVE DURING INSULATION

ABATEMENT, DEMOLITION, AND RENOVATION PHASE ACTIVITIES.

6. WITHIN 5' 0" OF NEW WORK, CONTRACTOR SHALL MAINTAIN

AMBIENT TEMPERATURE AND HUMIDITY CONDITIONS BELOW

DEW POINT ON CHILLED WATER PIPING PRIOR TO INSTALLING

NEW CHILLED WATER PIPING INSULATION.

SHEET KEYED NOTES#

1. PROVIDE NEW INSULATION FOR 10 INCH AND 12 INCH EXISTING STEAM

LINES.

2. REPLACE EXISTING EXPANSION JOINT WITH NEW SLIP TYPE

EXPANSION JOINT ON 10 INCH HIGH PRESSURE STEAM PIPING.

3. PROVIDE NEW MECHANICAL PIPE SUPPORT FOR EXISTING STEAM

PIPING AT STRUCTURAL SUPPORT RACK . ATTACH TO NEW

STRUCTURAL MEMBER.

4. PROVIDE NEW MECHANICAL ADJUSTABLE PIPE SLIDING GUIDE FOR

EXISTING STEAM PIPING AS SPECIFIED AND ATTACH TO NEW

STRUCTURAL MEMBER.

5. PROVIDE NEW MECHANICAL PIPE SUPPORTS FOR ALL EXISTING

DOMESTIC COLD WATER AND CHILLED WATER PIPING. ATTACH TO NEW

STRUCTURAL MEMBER.

6. PROVIDE NEW MECHANICAL ADJUSTABLE PIPE SLIDING GUIDE FOR

EXISTING CONDENSATE RETURN PIPING AS SPECIFIED AND ATTACH TO

NEW STRUCTURAL MEMBER.

7. PROVIDE NEW MECHANICAL PIPE ANCHOR FOR EXISTING 8 INCH

CONDENSATE RETURN PIPING (QTY. 2) AND 10 INCH STEAM PIPING AS

SPECIFIED AND ATTACH TO NEW STRUCTURAL MEMBER.

8. PROVIDE NEW MECHANICAL PIPE ANCHOR FOR EXISTING 12 INCH

STEAM LINE AS SPECIFIED AND ATTACH TO NEW STRUCTURAL MEMBER.

9. PROVIDE NEW MECHANICAL PIPE SUPPORT FOR EXISTING

CONDENSATE RETURN AT STRUCTURAL SUPPORT RACK . ATTACH TO

NEW STRUCTURAL MEMBER.

10. PROVIDE NEW INSULATION FOR 4 INCH EXISTING CONDENSATE

RETURN LINE. EXTENT OF RENOVATION TO BE BETWEEN ELBOWS.

11. PROVIDE NEW INSULATION FOR 8 INCH CONDENSATE RETURN LINES

(QTY.2).

12. PROVIDE NEW INSULATION FOR CHILLED WATER LINE.

13. NEW INSULATION SHALL NOT EXCEED SPECIFIED POINT FOR

ASSOCIATED SYSTEM FOR EXTENT OF RENOVATION.

VHASHRMoralJ Text Box

THE AREA SHOWN ABOVE SHALL BE ABATED FIRST.

VHASHRMoralJ Typewritten Text R

VHASHRMoralJ Text Box

*REVISED 07-20-21

Sheets
M000 - MECHANICAL SYMBOLS & ABBREVIATIONS
M101 - MECHANICAL DEMOLITION PLAN
M102 - MECHANICAL DEMOLITION PLAN
M103 - MECHANICAL SUB-BASEMENT DEMOLITION PLAN
M201 - MECHANICAL RENOVATION PLAN
M202 - MECHANICAL RENOVATION PLAN
M203 - MECHANICAL SUB-BASEMENT RENOVATION PLAN
M600 - MECHANICAL SECTIONS
M601 - MECHANICAL SECTIONS
M602 - MECHANICAL SECTIONS
M603 - MECHANICAL SECTIONS
M604 - MECHANICAL SECTIONS
M605 - MECHANICAL SECTIONS
M606 - MECHANICAL SECTIONS
M607 - MECHANICAL SCHEMATICS
M800 - MECHANICAL DETAILS
M801 - MECHANICAL DETAILS

File details come from the government source that posted it. Updated .